Test Case Name: MRP Run Step # Step Description T-Code
Test Case Name: MRP Run Step # Step Description T-Code
Test Case Name: MRP Run Step # Step Description T-Code
10 MRP run
Navigate Request for MD02
MRP execution
Logistics --> Production
- Process --> MRP -->
Planning --> MD02 -
Multilevel Single-Item
Planning
Enter the MRP parameters MD50
as mentioned in input data
and press enter twice to
execute MRP. The warning
message to check the
parameters can be ignored.
20 MRP evaluation
Stock Requirement List: MD4C
Navigation
Logistics --> Production -
Process --> MRP
-->Evaluation --> MD05 -
Stock/Requirements List
Press Execute
Input Data
Press
Expected Results Pass/ Pass/
Fail Fail
Cycle 1 Cycle 2
Describe the verification steps Document actual Whether Whether
results, document the step the step
#'s, report that was passed passed
executed, etc. or failed or failed