Professional Documents
Culture Documents
Akbi Bab 7 (Metode)
Akbi Bab 7 (Metode)
J1 J2 P1
Biaya lngsng Dept IDR 10,000,000.00 IDR 20,000,000.00 IDR 40,000,000.00
Alokasi J1:
Proporsi -100% 40%
Alokasi IDR 10,000,000 IDR 4,000,000
Alokasi J2:
Proporsi -100% 0.3333333333
Alokasi IDR 20,000,000 IDR 6,666,667
BOP setelah alokasi 0 IDR - IDR 50,666,667
60%
IDR 6,000,000
0.6666666667
IDR 13,333,333
IDR 79,333,333
Departemen Produksi
P2
IDR 60,000,000.00
40%
IDR 8,000,000
IDR 68,000,000.00
60%
IDR 10,800,000
IDR 78,800,000