Professional Documents
Culture Documents
RI/QG/INC/INS/544: Request For Inspection
RI/QG/INC/INS/544: Request For Inspection
Note: RFI shall be submitted to RG at least 24 hrs prior to actual inspection date and time.
Sign:
INSPECTION RESULTS
Legends for Inspection result:
QA/QC/RFI-001
INECO INECO
Q
CONSTRUCTION QCI
Sign:
QA/QC/RFI-001
FOLDING, PAINTING , INSULATION AND REFRACTORY
LONG TERM CALL-OFF CONTRACT
RACT NO: CT/RG18/G120A/15
S: Surveillance WO No.:
R: Review
QATAR GAS W
27/03/2019
11168932(FM-STAT)
08:00AM
27/03/2019
11184999(TD-INTEG)
08:10AM
27/03/2019
11170101(TD-INTEG)
08:20AM
27/03/2019
11170100(TD-INTEG)
08:30AM
27/03/2019
11184897(TD-INTEG)
08:40AM
UANCE / RECEIPT
INECO QCI QATAR GAS
NIRAJ LAMA
Q.C.INSPECTOR
26/3/2019
CTION RESULTS
s for Inspection result:
R: Rejected
Inspection Results
QA/QC/RFI-001
QATAR GAS QCI
QA/QC/RFI-001
FIELD MAINTENANACE SCAFFOLDING, PAINTING , INSULATION AND REFRA
SERVICES LONG TERM CALL-OFF CONTRACT
CONTRACT NO: CT/RG18/G120A/15
INECO would like to have QC presence for inspection according to the following schedule:
9,10
Note: RFI shall be submitted to RG at least 24 hrs prior to actual inspection date and time.
Sign:
INSPECTION RESULTS
Legends for Inspection result:
QA/QC/RFI-001
INECO INECO
Q
CONSTRUCTION QCI
Sign:
QA/QC/RFI-001
FOLDING, PAINTING , INSULATION AND REFRACTORY
LONG TERM CALL-OFF CONTRACT
RACT NO: CT/RG18/G120A/15
S: Surveillance WO No.:
R: Review
QATAR GAS W
29/01/2019
11118542/ 3124962(CO)
08:00AM
29/01/2019
11118542/ 3124962(CO)
08:10AM
UANCE / RECEIPT
INECO QCI QATAR GAS
NIRAJ LAMA
Q.C.INSPECTOR
1/28/2019
CTION RESULTS
s for Inspection result:
R: Rejected
Inspection Results
QA/QC/RFI-001
QATAR GAS QCI
QA/QC/RFI-001