PWD Schedule 9th Corri

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
_— 9th Corrigenda & Addenda to PWD (WB), SOR: 2015 16 Volume HI: Road & Bridge Works 9th. ADDENDA & CORRIGENDA ‘TO THE PWD (WB), SCHEDULE OF RATES- 2015-16 Volume III: Road & Bridge Works Dates th Februat CORRIGENDA OF SCHEDULE OF RATES - 2015-16 2017. 1, Following Corrections are to be made to the TABLE NO. I_ ISSUE RATE & BASIC RATES OF CEMENT & STEEL MATERIALS (Page 215 of SOR 2015-16): ee ingle of Tobe readas Page | Item. Tssue Ratu ( Rs) ‘Basi¢ Price (Rs) Issue Rate (Rs) Basic Price (Rs) No. | SI Description of item Unit | supp nyCeprment | (Suess Conaven | (Suptedovtajas er (Gps Carano) No. ‘Sout | Nonh | South | Neth | South Ne Sean] Noth fet | femal | songs | Gens | conga | cma | souu | pega ‘Steel materials Table | Md steal ods T| 3680000 | s8600.00 | 3250000 | s400000 | 49900.00 | s1500.00 | aest0.00 | asso0.00 ‘No. | (SAIL/ TATA /RINL) 44 | (Fe250, Conforms tS: 432) 25 ifr sil ods /HYSD bars] - THT bas tm | (SAIL TATA RINL) ur | 5690000 | s860000 | 2800.00 | s4000.00 | 49900.00 | 5150000 | 42310.00 | 4sso0.00 No.2 | (Fe415 sFe 500 Fe 5000, canfors to IS: 1785) _ Tam] Stel materals Page? | Now | fi soo ods 2a) | (ther than SAIL/TATAIRINL) | MT | 3590000 | 5700.00 | 3187100 | 3207000 | 44300.00 | 4590000 | ssenn.n | anz00.00 or |New | (he 280, Contos toiS 432 tem | iforstel rods /HYSD bas me | No. | THT bas Corr | 20a) | (Omertnan sasrarasrnLy | 1 | 3590000 | srsooo0 | 3157100 | 22070.00 | 44300.00 | 4590000 | sez00.00 | 40700.00 New | (Fes Fe S00 Fe 8000, conforms IS: 786, 2. Following Corrections are to be made to the TABLE NO. |-2 EX-OUTLET PRICES OF BITUMEN (Page 216 of ‘SOR 2015-16): Page s No. theasipliertosa Unit In place of To be read as | No. | Item Rates at outlets (Rs) | Rates at outlets (Rs) i 2 - 3 a 5 6 216 | TABLE | EX-OUTLET PRICES OF BITUMEN : AtHaldia | AtDhulagarh | AtHaldia | AtDhulagarh I non NH-6) n(on NH6)_| 1 Bitumen (Bulk) -VG-10 (80/100) 27087.00 ~ _| 2658.00 a __2.__| Bitumen (Packed) :VG-10 (80/100) 31292.00 3336200 | 3.__| Bitumen (Bulk) :VG-30 (60/70) 28048.00_| 30619.00 * 4, _| Bitumen (Packed) :VG-30 (60/70) MT | 3295300 34344.00 5, | Bitumen (Bulk) :VG-40 (30/40) MT | p8ana.o | 30980,00 cd 6. | Bitumen (Packed) :VG-40 (30/40) MT a o = a 7. __| Penetration gr. Bitumen 10/20 (Packed): | MT as 4100.00 ~ 8 Bituminous Emulsion (Bulk) MS Type | MT | 24035.00 ™~ 25946,00 ce 8. | Bituminous Emutsion (Pecked) MS Type | MT ~ az646.00 | | 34gdo.00 10. | CRMB~- 55 (Bulk) MT | 30763. “ 3503.00 te 11, | CRMB- 55 (Packed) MT | 36146.00 a 36146.00 12. | CRMB-60 (Bulk) MT | 32860.00 “ 32850.00 7 13. | CRMB — 60 (Packed) ur 36566.00 7 36566.00 “ + Corrigenda & Addenda to PWD (WB), SOR: 2015-16 Volume III: Road & Bridge Works 3. Following Corrections are to be made to the Rates OF SOR 2015-16: In Place of To be read as, Pi ‘Ail districts of W.B. & All districts of W.B. & | irc a) he 18. Darjeeling Plain of Siiguri | Daxieeing Hil Area | Darjgeling Plain of Siiguri | Darjeeling Hil Area . ‘Sub-Division Rate (Rs) ‘Sub-Division | Rate (Rs) | Rate (Rs) Rote (Ro) 8.1000 2865.00 3081.00 2893.00 3109.00 ee 8.10(i) 1707 0 1849000 1722.00 1863.00 8.104) 455.00 482.00 468,00 498.00 aia | 1069.00 1118.00 4316.00 4364.00 Fa 817 673.00 |___ 748.00 754,00 2600 | 268 82 1148.00, ~_137900 1158.00 1390.00 HE 74.08 155.00 1937.00, 1865.00 1965.00 312 16.19 168.00 178.00 178.00 [188.00 L { spot! Bree nae, ¢ 2 (TAPASH KR. DEY) Y) (DEBASHIS ROY) (SRIKUMAR BHATTACHARYA) Superintending Engineer Superintending Engineer __Superintending Engineer Engineer in-Chief Bridge Planning Circle Survey&Oesign Circle Planning & Monitoring Circle Public Works Department Member ofthe Combined Member ofthe Combined Member Convener of the Chairman of the Combined ‘Schedule Commitee PW Dte.& Schedule Commitee PW Dte. & Combined Schedule Commitee ScheduleCommittee PW te. & PW PW (Roads) De. PW (Roads) Die. PW Die. & PW (Roads) Dt. ‘(Roacs) Dt.

You might also like