Requirements of Fixed Assets with Justification for semester beginning July, 2019 Annexure - 2

Page 1 of 29

Lab Equipment / Computer System & Software / Furniture / Others

f Institution:- GCET Gr Noida Reference No. :


Department : Electrical Engineering Date : 25/07/2019

Whether
Qty. Unit Price** Value Required by Replacement/
S. No. Item Name Item Specifications* Required Rs. Required for Justification for Purchase
C =AXB Date Additional/
A B
First Time

Electrical Machine Lab

To perform Hopkinson’s test and determine complete experiment 1 conducting 22.07.19 not available in laboratory and req
1 55000/- 55000 First Time
losses and efficiency of DC machine. kit experiment for conducting experiment

To obtain 3-phase to 2-phase conversion by complete experiment 1 conducting 22.07.19 not available in laboratory and req
2 36500/- 36500 First Time
Scott connection. kit experiment for conducting experiment

To obtain speed control of DC separately complete experiment 1 conducting 22.07.19 not available in laboratory and req
3 48800/- 48800 First Time
excited motor using Ward-Leonard. kit experiment for conducting experiment

To determine speed-torque characteristics of


three phase slip ring induction motor and complete experiment 1 conducting 22.07.19 not available in laboratory and req
4 60500/- 60500 First Time
study the effect of including resistance or kit experiment for conducting experiment
capacitance in the rotor circuit.

To determine Xd and Xq of a three phase complete experiment 1 conducting 22.07.19 not available in laboratory and req
5 salient pole synchronous machine using the 62500/- 62500 First Time
slip test and to draw. kit experiment for conducting experiment

conducting 22.07.19 not available in laboratory and req


6 Rheostat 450 ohm/5Amp 450 ohm/5Amp 4 800/- 3200 First Time
experiment for conducting experiment

conducting 22.07.19 not available in laboratory and req


7 Rheostat 1500ohm/3Amp 1500 ohm/3Amp 4 1050/- 4200 First Time
experiment for conducting experiment

conducting 22.07.19 not available in laboratory and req


8 Techometer contact type contact type 1 3000/- 3000 First Time
experiment for conducting experiment

conducting 22.07.19 not available in laboratory and req


9 Techometer Noncontact type non contact type 1 3300/- 3000 First Time
experiment for conducting experiment
conducting 22.07.19 not available in laboratory
Annexureand
- 2req
10 AC Amperemeter 0-10Amp Portable 0-10Amp 4 2250/- 9000 First Time
experiment for conducting experiment
Page 2 of 29
conducting 22.07.19 not available in laboratory and req
11 AC Voltmeter 0-300V (AE) 0-300V 4 2250/- 9000 First Time
experiment for conducting experiment

conducting 22.07.19 not available in laboratory and req


12 3 Point Starter 220V 1 3750/- 3750 First Time
experiment for conducting experiment

conducting 22.07.19 not available in laboratory and req


13 Main Switch -2 pole single Throw 220V 2 300/- 600 First Time
experiment for conducting experiment

Experimental Setup kit-To study and calibrate complete experiment conducting 22.07.19 not available in laboratory and req
14 Temperature using resistance temperature 1 5800/- 5800 First Time
deductor(RTD) kit experiment for conducting experiment

To Study Synchrotransmitter and Receiver kit complete experiment 1 conducting 22.07.19 not available in laboratory and req
15 9500/- 9500 First Time
by V/s kit experiment for conducting experiment

16 Insulation Pad 3x4 ft 6 600/sqr mtr 2500 Experiment 22 July,19 First time Student safety

17 Foundation of three phase IM 1 Experiment 22 July,19 First time Equipment safety

18 Resistance lamp load 1KW variable 2 350/- 700 Experiment 22 July,19 First time For experiment

19 Inductive load bank 1 KW variabe 2 2000/- 4000 Experiment 22 July,19 First time For experiment

20 Capacitive load bank 500 W variable 1 2000 2000 Experiment 22 July,19 First time For experiment

Range extendible till 6


21 Multimeter 500 3000 Experiment 22 July,19 Additional For experiment
Milliampere

Electrical Design &


Fabrication Lab

22 ROLLER TINNING MACHINE RTM 10 1 No 34000/- 34,000.00 Lab Experime Even Sem First Time Required for conducting experime

23 WINDING MACHINE for Transformer Manual 2 Nos. 24000/- 48,000.00 Lab Experime Even Sem First Time Required for conducting experime

24 WINDING MACHINE Counter 2 750/- 1500.00 Conducting e Even Sem First Time Required for conducting experime
25 Counter GEAR 10 30/- 300.00 Conducting e Even Sem First Time Annexure
Required for conducting -2
experime
Page 3 of 29

26 Winding Machine Warcle Black (Rubber) 10 30/- 300.00 Conducting e Even Sem First Time Required for conducting experime

27 PCB DRILLING MACHINE ( PROTODRILL - 3000 ) 2 Nos. 18000/- 36000.00 Lab Experime Even Sem First Time Required for conducting experime

28 PCB SHEARING MACHINE Slash - 300 1 No 20000/- 20000.00 Lab Experime Even Sem First Time Required for conducting experime

29 PHOTO RESIST DIP COATING MACHINE 10 x 12 1 No 23000/- 23000.00 Lab Experime Even Sem First Time Required for conducting experime

30 PROTO-CONTACT - PCB Artwork Film maker 1 No 18200/- 18200.00 Lab Experime Even Sem First Time Required for conducting experime

31 PROTOCURE - 2 / PCB Curing machine Oven 1 No 18000/- 18,000.00 Lab Experime Even Sem First Time Required for conducting experime

32 PROTO-ETCH ETCHING MACHINE 1 No 23750/- 23,750.00 Lab Experime Even Sem First Time Required for conducting experime

33 PROTO - DYE/DEVELOPER 2 in 1 Unit 1 No 22000/- 22,000.00 Lab Experime Even Sem First Time Required for conducting experime

34 DOUBLE SIDED U.V.EXPOSURE UNIT PROTO-UV 1 No 35000/- 35,000.00 Lab Experime Even Sem First Time Required for conducting experime

PROJECT LAB

35 Aurdino Kit 3 6500 19500 Lab 7/25/2019 New For experiment/project

36 GSM Module 3 1150 3450 Lab 7/25/2019 New For experiment/project

37 WIFI Module 3 1540 4620 Lab 7/25/2019 New For experiment/project

38 Stepper Motor 3 1650 4950 Lab 7/25/2019 New For experiment/project

39 LCD Display 3 200 600 Lab 7/25/2019 New For experiment/project


40 Geared Motor 3 750 2250 Lab 7/25/2019 New Annexure - 2
For experiment/project
Page 4 of 29

41 Servo Motor 3 890 2670 Lab 7/25/2019 New For experiment/project

42 Webcam 2 1100 2200 Lab 7/25/2019 New For experiment/project/webminar

43 Speaker 2 2000 4000 Lab 7/25/2019 New For experiment/project/webminar

44 Projector Pointer 2 180 360 Lab 7/25/2019 New For experiment/project/webminar

45 Wireless Coller Microphone Receiver 2 3600 7200 Lab 7/25/2019 New For experiment/project/webminar

46 Function Generator 2 7350 14700 Lab 7/25/2019 New For experiment/project

47 Oscilloscope/CRO 2 18600 37200 Lab 7/25/2019 New For experiment/project

48 DSO 1 21500 21500 Lab 7/25/2019 Additional For experiment

49 Power Supply 2 5500 11000 Lab 7/25/2019 New For experiment

50 Multimeter Scientific 5 2450 12250 Lab 7/25/2019 Additional For experiment as per AKTU syllab

51 Extension Board Anchor 5 Socket 5 Switch 20 190 3800 Lab 7/25/2019 New For experiment

52 Wire Cutter 5 50 250 Lab 7/25/2019 New For experiment

i5 Processor, 8 GB
53 Computer System with MatLab 110 Lab 7/25/2019 New For experiment
RAM, 500 GB HDD

54 PIEZOELECTRIC Material 0.7v 5 300 1500 Lab 7/25/2019 New For experiment

55 Printer Canon pixma G2000 1 8500/- 8500 project 21.7.19 first time For experiment
56 MATLAB 9.5 (Latest Version) 3user project 21.7.19 first time For experiment Annexure - 2
Page 5 of 29

57 PSPICE Software,MultiSim Software latest version lab experimeneven semest First Time As per Syllabus

For Student Presntation and PPT b


58 Projector Standard 1 25000/- 25000 For Installatio22.07.19 First Time lectures

POWER ELECTRONICS LAB

Triggering of (i) IGBT (ii) MOSFET (iii)


59 1 10000 10000 Lab 7/25/2019 New For experiment as per AKTU syllab
Power Transistor

60 R, RC & UJT trigger circuit for SCR. 1 15600 15600 Lab 7/25/2019 New For experiment as per AKTU syllab

Single Phase Fully Controlled Bridge


61 1 16700 16700 Lab 7/25/2019 New For experiment as per AKTU syllab
Rectifiers with DC Motor Load.
Three-Phase Fully Controlled Bridge
62 Rectifier with Resistive and Inductive 1 23400 23400 Lab 7/25/2019 New For experiment as per AKTU syllab
Loads
Single-Phase AC Voltage Regulator with
63 1 23400 23400 Lab 7/25/2019 New For experiment as per AKTU syllab
Resistive and Inductive Loads

Four Quadrant Operation of Chopper


64 1 25400 25400 Lab 7/25/2019 New For experiment as per AKTU syllab
Circuit

To study impedance, MHO, Reactance


65 1 98000 98000 Lab 7/25/2019 New For experiment as per AKTU syllab
type distance relays

Power System

To study impedance, MHO, Reactance For experiment as per new AK


66 1 20000 20000 Lab 7/25/2019 New
type distance relays syllabus

67 Multimeter Scientific 1500 3000 Lab 7/25/2019 New


2 For experiment

68 Extension Board 5 Pin, 5 Socket 4 800 3200 Lab 7/25/2019 New


For experiment

Basic Electrical Engineering


69 Insulation Pad 3x4 ft 6 600/sqr mtr Experiment 22 July,19 First time Annexure
Student safety - 2
Page 6 of 29

70 Foundation of three phase IM 1 2000 2000 Experiment 22 July,19 First time Equipment safety

71 Resistance lamp load 1KW variable 2 350 700 Experiment 22 July,19 First time For experiment

72 Inductive load bank 1 KW variabe 2 2000 4000 Experiment 22 July,19 First time For experiment

73 Capacitive load bank 500 W variable 1 2000 2000 Experiment 22 July,19 First time For experiment

74 Multimeter Range extendible till Milliampere 6 500 3000 Experiment 22 July,19 Additional For experiment

Measurement of power and power factor


in a single phase ac series inductive circuit
75 Kit 1 15000 15000 Experiment 22 July,19 First time For experiment
and study improvement of power factor
using capacitor

76 fluorescent lamp (tube light) Set Complete 1 350 350 Experiment 22 July,19 First time For experiment

Determination of parameters of ac single


77 Kit 1 2000 2000 Experiment 22 July,19 First time For experiment
phase series RLC circuit

To observe the B-H loop of a


78 Kit 1 9000 9000 Experiment 22 July,19 First time For experiment
ferromagnetic material in CRO.
Determination of efficiency of a dc shunt
79 motor by load test Kit 1 8000 8000 Experiment 22 July,19 First time For experiment

Demonstration of cut-out sections of


machines: dc machine, three phase
80 induction machine, singlephase induction Cut-Section 1 Set Each 8000 24000 Experiment 22 July,19 First time For experiment
machine and synchronous machine.

81 DC shunt motor 1500 rpm, 3 HP 1 8000 8000 Experiment 22 July,19 First time For experiment

Total 1110850

fore start of the semester. In case it is delayed please give reasons:


Approved by Head of
HOD Institution/Director
Signature Annexure - 2
Page 7 of 29
Name Dr. MD DANISH EQUBAL

Date 25-Jul-19

Notes:
ed and mention unit price for the selected quote.
ease provide details of items being replaced separately.
Justification for semester beginning July, 2019 Annexure - 2
Page 8 of 29

System & Software / Furniture / Others

Justification for Purchase

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment
not available in laboratory and required Annexure - 2
for conducting experiment Page 9 of 29
not available in laboratory and required
for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

not available in laboratory and required


for conducting experiment

Student safety

Equipment safety

For experiment

For experiment

For experiment

For experiment

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment


Required for conducting experiment Annexure - 2
Page 10 of 29

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment

Required for conducting experiment

For experiment/project

For experiment/project

For experiment/project

For experiment/project

For experiment/project
For experiment/project Annexure - 2
Page 11 of 29

For experiment/project

For experiment/project/webminar

For experiment/project/webminar

For experiment/project/webminar

For experiment/project/webminar

For experiment/project

For experiment/project

For experiment

For experiment

For experiment as per AKTU syllabus

For experiment

For experiment

For experiment

For experiment

For experiment
For experiment Annexure - 2
Page 12 of 29

For Student Presntation and PPT based


lectures

For experiment as per AKTU syllabus

For experiment as per AKTU syllabus

For experiment as per AKTU syllabus

For experiment as per AKTU syllabus

For experiment as per AKTU syllabus

For experiment as per AKTU syllabus

For experiment as per AKTU syllabus

For experiment as per new AKTU


syllabus

For experiment

For experiment
Student safety Annexure - 2
Page 13 of 29

Equipment safety

For experiment

For experiment

For experiment

For experiment

For experiment

For experiment

For experiment

For experiment

For experiment

For experiment

For experiment
Annexure - 2
Page 14 of 29

Detail of Items being Replaced


Name of Institution:- GCET Gr. Noida Date : 03.07.19
Department : Electrical Engg.

Sl. No. Whether in


Ref. of Item Name Item Specifications * Item Code Location Code working Remarks
Reqmnt. condition
Sheet Yes/ No

N.A.

Notes:
Date:

Signature & Name of HOD

April 26, 2013


Annexure - 2
Page 15 of 29
Requirement of Consumables for Lab/ Workshop for Semester July, 2019
Name of Institution: GCET Gr.Noida `
Electrical
Department : Engineering
Lab : Electrical Machines
Expected Approx. Unit Approx. Value
Qty. On hand Net Qty. to be Price Required by Name, Contact # & Ad
Sl. No. Item Description & Specifications semester
Purchased Unit of Measure (Rs.)
A Consumptn C=B-A Rs./ Unit E = C X D Date Use ';' Separator for each
B D
Electrical Machine Lab
1 Battery 9V NIL 12 12 Piece 20/- 240 22.07.19
2 Pencil Cell 1.5V NIL 50 50 Piece 8/- 400 22.07.19
3 DPST switch 16A NIL 2 2 Piece 300/- 600 22.07.19
4 Carbon Brush NIL 10 10 Piece 10/- 100 22.07.19
400/- per
5 Soldering Wire 100gm 500 500 Gram 200 22.07.19
half kg
50/- per
6 Soldering Paste 100gm 50gm 1 1 Box 50 22.07.19
Box
7 Three PinTop 6Amp NIL 10 10 Piece 25/- 250 22.07.19
8 Banana Pin 8mm 10 150 140 Piece 8/- 1120 22.07.19
9 Insulation Tape NIL 5 5 Piece 10/- 50 22.07.19
700/- per
10 PVC Wire 1.5mm 5m 2 2 Roll 1400 22.07.19
roll
11 Digital Voltmeter 4x4 NIL 10 10 Piece 1500/- 15000 22.07.19
12 Digital Ammeter NIL 10 10 Piece 1600/- 16000 22.07.19
13 Chart single phase induction NIL 1 1 Piece 250/- 250 22.07.19
motor
14 Chart three phase induction NIL 1 1 Piece 250/- 250 22.07.19
motor
15 Chart Single Phase Transformer NIL 1 1 Piece 250/- 250 22.07.19

April 26, 2013


Annexure - 2
Page 16 of 29
16 Chart DC Motor Cut Model NIL 1 1 Piece 250/- 250 22.07.19
17 Chart Synchronous Motor NIL 1 1 Piece 250/- 250 22.07.19
18 Chart Three Phase Alternator NIL 1 1 Piece 250/- 250 22.07.19
19 Chart DC Shunt Generator NIL 1 1 Piece 250/- 250 22.07.19

20 Chart DC Compound Generator NIL 1 1 Piece 250/- 250 22.07.19

21 Chart Three point Starter NIL 1 1 Piece 250/- 250 22.07.19


22 Chart Four Point Starter NIL 1 1 Piece 250/- 250 22.07.19
Electrical Design & Fabrication
Lab

23 Bobbin 23x6 50 100 50 4 Packet 475/- 1,900.00 Even Sem crescent agencies

24 Copper Wire 26 SWG 3 KG 5KG 1KG 1 Kg 1250/- 1,250.00 Even Sem crescent agencies
25 Copper Wire 40 SWG 1 kg 3kg 1 kg 1 kg 1450/- 1,450.00 Even Sem crescent agencies
26 Red Wire 2 Roll 3 Roll 1 Roll 1 Roll 180/- 180 Even Sem crescent agencies
27 Black Wire 2 Roll 3 Roll 1 Roll 1 Roll 180/- 180 Even Sem crescent agencies
28 Solder Flux 2 Box 4 Box 2 Box 2 Box 60/- 120 Even Sem crescent agencies

29 Lith Film 250mmx 300mm 10 No 20 No 10 No 10 No 280/- 2,800.00 Even Sem crescent agencies
(10"x12")
30 Lith Film Developer A&B 2L 5L 3L 1 Packet 520/- 520 Even Sem crescent agencies
31 Lith Film Fixer NIL 1 Bottle 1 Bottle 1 Bottle 420/- 420 Even Sem crescent agencies
32 Liquid Photoresist 0.5 L 2L 1.5 L 2L 2850/- 5,700.00 Even Sem crescent agencies
33 Photoresist Thinner 1L 2L 1L 1L 680/- 680 Even Sem crescent agencies
34 Photoresist Developer 1L 4L 3L 3L 480/- 1,440.00 Even Sem crescent agencies

April 26, 2013


Annexure - 2
Page 17 of 29
35 Photoresist Dye 1L 3L 2L 2L 680/- 13,600.00 Even Sem crescent agencies
36 Etching Crystals 2 KG 6 KG 4 KG 4 KG 250/- 1,000.00 Even Sem crescent agencies

April 26, 2013


Trinity
Annexure - 2
Microsy
stems 18 of 29
Page
Basic Electrical Engineering Pvt. Ltd;
Fani B
37 Battery 0 20 20 6Volt 20/- 400 22 July,19 dwivedi;
Master Radio; Ab
Ajay
38 Pencil Battery 0 15 15 9 Volt 90/- 1350 22 July,19 Kumar
Silicon Electronics
Trinity
39 Fuse with cap 5 50 45 20/- 900 22 July,19 Microsy
stems
40 Connecting wire with connector 10 70 60 2mm 90/- 5400 22 July,19 Master Radio; Ab
Pvt.
Ltd;ST.
41 Connecting wire with connector 10 70 60 4mm 90/- 5400 22 July,19 Trinity
EnterpriMicrosyste
ses;
42 Resistance 8 1 packet 100Ω 35/- 35 22 July,19 Master
ChoudhRadio; Ab
ary
43 Resistance 8 1 packet 1000Ω 35/- 35 22 July,19 Trinity Microsyste
Electrica
l
44 Resistance 8 1 packet 500Ω 35/- 35 22 July,19 Master Radio; Ab
45 Breadboard 5 10 5 80/- 400 22 July,19 Master Radio; Ab
46 Resistance 8 1 packet 500Ω 35/- 35 22 July,19 Master Radio; Ab
47 Breadboard 5 10 5 80/- 400 22 July,19 Master Radio; Ab
Power System
48 Soldering Wire NIL 500gm 500gm 800/- per kg 400.00 Even Sem
49 Wire Cutter NIL 1 1 Medium 100/- 100.00 Even Sem
50 Soldering Iron 0 0 3 100W 300/- 900 Even Sem
51 Banana Clip 0 40 40 Piece 5 200 22 July,19
52 U Clip 0 40 40 Piece 5 200 22 July,19
53 Brush 0 2, 2 Inch 2, 2 Inch Piece 150 300 22 July,19
54 Chicken Mat 0 5, 3*4 foot 5, 3*4 foot Piece 380 1900 22 July,19
55 CRO Probes 0 6 6 Piece 350 2100 22 July,19

April 26, 2013


Annexure - 2
Page 19 of 29
Electrical Workshop
56 Bulb 6 0 0 100W 15/- 90 Even Sem
57 Wires (Red, Yellow) 2 0 2 (1.5 mm Copper wire) 1200/- 2400 Even Sem
58 Brush 4 (4 inch) 50/- 100 Even Sem
59 Wire (Green) 1 (0.75 mm Copper wire) 900/- 900 Even Sem
60 Flexible Pipe 1kg 90 Meter 200/- 200 Even Sem
61 MCB 3Ph 4 4 (16A) 700/- 2800 Even Sem
62 MCB 1 PH 3 3 (6A ) 200/- 600 Even Sem
63 Bulb(100 Watt each) NIL 15 15 100 W 15/- 225.00 Even Sem

64 Wire (Red, Yellow, Blue and half Packet1 Packet Each1 Packet Each 1.5 mm 2165/- 9,000.00 Even Sem
Black) (1.5 mm Copper wire)
65 Cleaner NIL 1L 1L 150/- 150 Even Sem
66 Brush (3cm) NIL 4 4 3 cm 30/- 120.00 Even Sem
67 Power Switch NIL 8 8 16 A 90/- 720.00 Even Sem
68 DPI box NIL 10 10 3x4 Size 120/- 1,200.00 Even Sem
69 Three pin socket NIL 10 10 5A 50/- 500.00 Even Sem

70 Wire (Red, Yellow, Blue and NIL 1 Packet Each1 Packet Each 1.5 mm 2165/- 9,000.00 Even Sem
Black) (2.5 mm Copper wire)

71 Wire (Green) (0.75 mm Copper NIL 1 Packet 1 Packet 0.5 mm 900/- 900 Even Sem
wire)
72 Conduit pipe NIL 8 8 20 mm 40/- 320.00 Even Sem
73 Flexible pipe NIL 1kg 1kg 20 mm 200/- 200 Even Sem
74 Clip for conduit pipe NIL 1 Packet 1 Packet Banana Clip 150/- 150 Even Sem

April 26, 2013


Annexure - 2
Page 20 of 29
75 16 Batten Holder NIL 20 20 Backlite Switch 15/- 300.00 Even Sem
76 Socket 6 A NIL 10 10 6 Ampere 60/- 600.00 Even Sem
77 Socket 16A NIL 10 10 16 Ampere 200/- 2,000.00 Even Sem
Resistor , Capacitor of different
78 ratings Kits NIL One kit Each One kit Each different ratings 320/- 960.00 Even Sem

79 Isolator 40 A NIL 1 1 40 Ampere 350/- 350 Even Sem


80 MCB, 6A NIL 1 1 6 Ampere 300/- 300 Even Sem

Total 133225

Name Prepared by Faculty In-charge HOD Approved by Head of Institution/D

Prof. Surbhi Singh(Basic Electrical Engg.


Signature Lab)
Porf. Surendra K Pal (Electrical Workshop
Signature Lab)
Signature Prof. Ankit Thakur (Electric Drive Lab)

Prof. Sudhanshu Mittal (Electrical Design


Signature and Fabrication Lab)

Prof. Amit Kumar Sharma (Electrical


Signature Machines Lab)

Signature Prof. Dinesh Prasad (Networks Lab) Dr. MD DANISH EQUBAL

Signature Dr. Pinki Yadav (Project Lab)

Signature

Date 03.07.19

April 26, 2013


Annexure - 2
Page 21 of 29
es for Lab/ Workshop for Semester July, 2019
Reference No. :

Date : 25.07.19

Name, Contact # & Address of Vendors


Use ';' Separator for each vendor

April 26, 2013


Annexure - 2
Page 22 of 29

crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi

crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi


crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi

crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi

crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi


crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi

April 26, 2013


Annexure - 2
Page 23 of 29
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi
crescent agencies pvt.ltd.9-N, Munshilal Building Connaught Circus New Delhi

April 26, 2013


Annexure - 2
Page 24 of 29

Master Radio; Abhimanyu Arora;Trinity Microsystems Pvt. Ltd.


Silicon Electronics Pvt. Ltd;Ajay Kumar;Trinity Microsystems Pvt. Ltd

Master Radio; Abhimanyu Arora;Trinity Microsystems Pvt. Ltd.


Trinity Microsystems Pvt. Ltd;ST. Enterprises; Choudhary Electrical
Master Radio; Abhimanyu Arora;Trinity Microsystems Pvt. Ltd.
Trinity Microsystems Pvt. Ltd; Fani B dwivedi; Ajay Kumar
Master Radio; Abhimanyu Arora;Trinity Microsystems Pvt. Ltd.
Master Radio; Abhimanyu Arora;Trinity Microsystems Pvt. Ltd.
Master Radio; Abhimanyu Arora;Trinity Microsystems Pvt. Ltd.
Master Radio; Abhimanyu Arora;Trinity Microsystems Pvt. Ltd.

April 26, 2013


Annexure - 2
Page 25 of 29

April 26, 2013


Annexure - 2
Page 26 of 29

Approved by Head of Institution/Director

April 26, 2013


Requirements of Fixed Assets with Justification for semester beginning July, 2019 Annexure - 2
Page 27 of 29
Lab Equipment / Computer System & Software / Furniture / Others

Name of Institution:- GCET Gr Noida Reference No. :


Department : Electrical Engineering Date : 22/07/2019
Whether
Qty. Unit Required Replacement
Item Require Price** Value Required
S. No. Item Name by / Justification for Purchase
Specifications* d Rs. C=AXB for Date Additional/
A B First Time

Basic Electrical Engineering

1 Plastic Chair 2 400/- 800 Seating 22 July,19 Additional Faculty seating arrangement

2 Revoloving chair with arm 2 2000/- 4000 Seating 22 July,19 First time Faculty seating arrangement

PROJECT LAB

3 Students Tables (4'x6') 3 2000/- 6000 for Students 21.7.19 first time For experiment

4 Almirah (Big size) 1 8000/- 8000 project 21.7.19 first time For experiment

5 Almirah (Small size) 1 4000/- 4000 project 21.7.19 first time For experiment

60000 conducting not available in laboratory and


6 Table 4x6 10 6000/- experiment 22.07.19 First Time required for conducting experiment

conducting not available in laboratory and


7 Wooden Stool 2.5 Feet 60 400/- 24000 experiment 22.07.19 First Time required for conducting experiment

25000 conducting 22.07.19 not available in laboratory and


8 Faculty Table 2.5 x 3 Feet 5 5000 First Time
experiment required for conducting experiment
24000 conducting not available in laboratory and - 2
Annexure
9 Faculty Chair Standard 3000 experiment 22.07.19
8 First Time required for conducting Page
experiment
28 of 29

conducting 22.07.19 not available in laboratory and


10 Lab Technician Table Chair set Standard 5 1500 7500 First Time
experiment required for conducting experiment

16000 conducting 22.07.19 not available in laboratory and


11 Lab Layout design Wooden Work Standard 4 4000 First Time
experiment required for conducting experiment

12 Power System

3 Tonne , 2 AC 14
13 AC project 21.7.19 first time For experiment
per Lab

Total 179300

This requirement must be sent 2 months before start of the semester. In case it is delayed please give reasons:

Lab Incharge: Prof. Surbhi Singh Approved by Head of


HOD
Porf. Surendra K Pal Institution/Director
Prof. Ankit Thakur
Prof. Sudhanshu Mittal Signature
Prof. Amit Kumar Sharma
Prof. Dinesh Prasad
Dr. Pinki Yadav
Name MD DANISH EQUBAL

Date 22-Jul-19

Notes:
** Attach quotations collected and mention unit price for the selected quote. Annexure - 2
Page 29 of 29

In case of replacement purchase, please provide details of items being replaced separately.