Public Bidding Sample
Public Bidding Sample
Public Bidding Sample
(5) Name/Location of Projects (7) Source of Fund (8) Issued Obligation (9) Funding
Authority Warrant
II. CARPENTRY WORKS (AREA = 549.60 sq.m) 13.19% Lot 1.00 340,800.00 340,800.00
APPROVED :
Prepared by:
( 1.00 LOT )
A. DIRECT COST
EQUIPMENT COST
B. INDIRECT COST
3. Value Added Tax, VAT (OCM + Contractor's Profit + Direct Cost) 5.00% 1,839,247.50 91,962.38
Prepared by:
EQUIPMENT
3. LABOR NO. OF DAYS UNIT RATE AMOUNT
1 1 - Foreman 10.00 Days 700.00 /day 7,000.00
2 3 - Skilled Laborer 10.00 Days 500.00 /day 15,000.00
3 6 - Common Laborer 10.00 Days 400.00 /day 24,000.00
3. Value Added Tax, VAT (OCM + Contractor's Profit + Direct Cost) 5.00% 426,000.00 21,300.00
Prepared by:
III. REMOVAL AND REPLACEMENT OF ALUMINIZED CEILING AT PASSENGER TERMINAL BUILDING (AREA = 400 sq.m)
( 1.00 LOT )
A. DIRECT COST
B. INDIRECT COST
3. Value Added Tax, VAT (OCM + Contractor's Profit + Direct Cost) 5.00% 151,250.00 7,562.50
Prepared by:
JENNIE M. BANUAG JR
Planning and Programming
Republic of the Philippines
AGENCY : CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
NAME OF PROJECT : REHABILITATION OF PASSENGER TERMINAL BUILDING
LOCATION : Laguindingan Airport
BILL OF QUANTITY/DETAILED ESTIMATE
( 1.00 LOT )
A. DIRECT COST
Note:
1. Site inpection should be required by the bidder to
determine the operation and effeciency of the electronic
equipment
2. Wires and other operational accessories should be
included in the scope of work
EQUIPMENT COST
LABOR COST
B. INDIRECT COST
3. Value Added Tax, VAT (OCM + Contractor's Profit + Direct Cost) 5.00% 812,500.00 40,625.00