Input Data: Project: Building: Client: Floor: Contractor: Axes: Engineer: Submersible Pump No.
Input Data: Project: Building: Client: Floor: Contractor: Axes: Engineer: Submersible Pump No.
Project: Building:
Client: Floor:
Contractor: Axes:
Engineer: Submersible Pump No.:
Input Data
Height Between The Top of The
Minimum Time Height Between The Minimum Height of Water
Submersible Pump Slab & The Bottom of Lowest Sump Pit Sump Pit
Between Two Bottom of Lowest Drainage Required to Submerge The
Discharge Drainage Pipe Drained to The Length Width
Successive Starts Pipe & The switch on Level Pump Discharge Pipe
Sump Pit
Output Data
Minimum Storage Volume
Storage Height
for The Sump Pit
1.3m
10.35 m3 1.73 m Lowest drainage Pipe Bottom Level
Results 1m
4.13m
Switch On Level
Sump Pit Height
(The Height Between The Top of The Slab & 1.73m
The Concrete Level of The Pit)
Switch Off Level
4.13 m
0.1m
3m X 2m
8/22/2019 Page 1 of 1