SNBP Energ SNBP ENERGIZATION (Backfeed Power) SCHEDULE - Sir Neil 2
SNBP Energ SNBP ENERGIZATION (Backfeed Power) SCHEDULE - Sir Neil 2
SNBP Energ SNBP ENERGIZATION (Backfeed Power) SCHEDULE - Sir Neil 2
SNBP ENERGIZATION
ENERG (Backfeed Power) SCHEDULE - Sir Neil 2 185 02-May-18 A 06-Aug-19
ARCHITECTURAL WORKS
ARCHITECTUR 23 14-Jun-19 11-Jul-19
SNBP-EC-A-100 Architectural Finishes (Masonry Walls, Plaster, Ceiling, & Painting - Electrical Room only (priority) 23 14-Jun-19 11-Jul-19
ELECTRICAL WORKS
W (for Backfeed Power) 67 18-May-19 06-Aug-19
SNBP-EC-E-400 Testing of Protection, Telecom / SCADA & DC Panels 12 18-May-19 31-May-19
SNBP-EC-E-100 Install Cable Trays beneath the E&C Building 7 14-Jun-19 22-Jun-19
SNBP-EC-E-200 Pull Cables inside the E&C Building 14 22-Jun-19 09-Jul-19
SNBP-EC-E-300 Install Protection, Telecom / SCADA, & DC Panels 3 11-Jul-19 15-Jul-19
SNBP-EC-E-510 Test Cable, & terminate 7 15-Jul-19 23-Jul-19
SNBP-EC-E-500 Testing of Substation CT & Metering, VT, DS & PCB, & Transformer Annunciator simulation of faults 12 23-Jul-19 06-Aug-19
ENERGIZATION (BACKFEED POWER) 3 18-May-19 21-May-19
SNBP-E-100 Communication test to NGCP prior to Energization - Evaluation Request Form (ERF) 3 18-May-19 21-May-19
PROJECT: SOUTH NEGROS
SNBP Detailed Energization 25MW BIOMASS-FIRED POWER PLANT
Schedule
19 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 39
A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A
Target to Energize,
Architectural Finishes (Masonry Walls, Plaster, Ceiling, & Painting - Electrical Room only (priority)