The document outlines audit requirements for three customer groups - A, B, and C - based on their certification status and past audit performance.
Customer Group A must have onsite readiness reviews, with a minimum of 0.5 audit days, as well as full stage 2 audits according to the IAF table. Customer Group B requires onsite readiness reviews and stage 2 audits covering 90-100% of the IAF table. Customer Group C can have an offsite document review for readiness and stage 2 audits covering 80-90% of the IAF table.
Original Description:
Anexo 1, tabla 1 Guía de tiempo de auditoría para auditorías de transición
Original Title
Anexo 1, tabla 1 Guía de tiempo de auditoría para auditorías de transición
The document outlines audit requirements for three customer groups - A, B, and C - based on their certification status and past audit performance.
Customer Group A must have onsite readiness reviews, with a minimum of 0.5 audit days, as well as full stage 2 audits according to the IAF table. Customer Group B requires onsite readiness reviews and stage 2 audits covering 90-100% of the IAF table. Customer Group C can have an offsite document review for readiness and stage 2 audits covering 80-90% of the IAF table.
The document outlines audit requirements for three customer groups - A, B, and C - based on their certification status and past audit performance.
Customer Group A must have onsite readiness reviews, with a minimum of 0.5 audit days, as well as full stage 2 audits according to the IAF table. Customer Group B requires onsite readiness reviews and stage 2 audits covering 90-100% of the IAF table. Customer Group C can have an offsite document review for readiness and stage 2 audits covering 80-90% of the IAF table.
Annex 1, table 1 Customer Group A Customer Group B Customer
Audit time Certified, compliant Certified, mature and Group C
and mostly effective fully effective system Certified, guidance for system mature and transition sustainable audits system (effective process management, consideration of interested parties) Certified for less than 3 Certified for more years or an average of 3 or than 3 years Certified for more non conformities per and an average of less more than 3 audit during the last than 3 non conformities per audit during years plus certification cycle. the last certification cycle. evidence for effective process approach and consideration of interested parties. Stage 1: Required; Required; Required; Readiness review - onsite - - onsite -* Offsite The readiness review may Minimum 0,5 audit Minimum 0,5 audit (document be substituted by a “Gap”- audit or “diagnostic” against days; days; review) is FDIS with a positive result acceptable and conducted less than 6 months before stage 2 (system audit). Audit time for readiness review is in addition to stage 2 (system audit). Stage 2: ≥ 100 % of IAF table 90 to 100% of IAF table 80 to 90% of Transfer-/Re- for recertification audit for recertification audits IAF table for certification audit recertification audits