PT.

PLN (PERSERO)
CENTER OF TECHNOLOGY
UNIT INDUK PEMBANGUNAN UNIVERSITAS HASANUDDIN
SULAWESI BAGIAN UTARA Jln. Poros Malino, Km. 6, Gowa
Jln.

PEKERJAAN : SOIL INVESTIGATION T/L 150 kV OTAM-MOBILAGU


LOKASI : OTAM-MALIBAGU
FOUNDATION SHCEDULE (BERDASARKAN TIPE TOWER)
KOORDINAT NILAI qc>200 kg/cm² KEDALAMAN INTERVAL
TIPE KELAS
NO. TITIK TOWER KEDALAMAN qc M.A.T qc rata-rata q all TIPE PONDASI
TOWER X Y PONDASI
m (kg/cm²) m (kg/cm²) (kg/cm²)
A Dd 9.40 215 37.00 1.23
1 TIP 094 637527.08098 58135.58956 3 Concrete Pad & Chimney
B Dd 10.80 200 34.75 1.16
A Bb 1.80 200 200.00 6.67
2 TIP 095 637740.35659 58008.15645 1 Concrete Pad & Chimney
B Bb 3.80 200 77.27 2.58
A Dd 7.00 200 42.10 1.40
3 TIP 102 638315.08356 56215.40269 2 Concrete Pad & Chimney
B Dd 7.40 250 36.00 1.20
A Dd 6.20 200 29.25 0.98
4 TIP 126 639540.39086 49175.63496 3 Concrete Pad & Chimney
B Dd 7.20 210 28.25 0.94
A Dd
5 TIP 132 639899.97846 47389.15558 TEST PIT 4A Concrete Pad & Chimney
B Dd

FOUNDATION SHCEDULE (BERDASARKAN KEDALAMAN 2 - 4 m)


KOORDINAT NILAI qc>200 kg/cm² KEDALAMAN INTERVAL 2 - 4 m
TIPE KELAS
NO. TITIK TOWER KEDALAMAN qc M.A.T qc rata-rata q all TIPE PONDASI
TOWER X Y PONDASI
m (kg/cm²) m (kg/cm²) (kg/cm²)
A Dd 9.40 215 31.82 1.06
1 TIP 094 637527.08098 58135.58956 3 Concrete Pad & Chimney
B Dd 10.80 200 36.36 1.21
A Bb 1.80 200 250.00 8.33
2 TIP 095 637740.35659 58008.15645 1 Concrete Pad & Chimney
B Bb 3.80 200 83.50 2.78
A Dd 7.00 200 29.73 0.99
3 TIP 102 638315.08356 56215.40269 3 Concrete Pad & Chimney
B Dd 7.40 250 30.91 1.03
A Dd 6.20 200 23.18 0.77
4 TIP 126 639540.39086 49175.63496 3 Concrete Pad & Chimney
B Dd 7.20 210 25.91 0.86
A Dd
5 TIP 132 639899.97846 47389.15558 TEST PIT 4A Concrete Pad & Chimney
B Dd