The document lists materials required for a construction site, including:
1) A 2.5 ton winch machine for erecting a ladder, tower crane pulley, and curved hoist beam.
2) Two steel wire ropes of 16mm diameter and 700m length and one of 16mm diameter and 600m length for ladder, earthing strip, and pulley removal.
3) Various wire rope clamps, shackles, pulleys, polypropylene rope, and a drilling machine for construction tasks.
The document lists materials required for a construction site, including:
1) A 2.5 ton winch machine for erecting a ladder, tower crane pulley, and curved hoist beam.
2) Two steel wire ropes of 16mm diameter and 700m length and one of 16mm diameter and 600m length for ladder, earthing strip, and pulley removal.
3) Various wire rope clamps, shackles, pulleys, polypropylene rope, and a drilling machine for construction tasks.
The document lists materials required for a construction site, including:
1) A 2.5 ton winch machine for erecting a ladder, tower crane pulley, and curved hoist beam.
2) Two steel wire ropes of 16mm diameter and 700m length and one of 16mm diameter and 600m length for ladder, earthing strip, and pulley removal.
3) Various wire rope clamps, shackles, pulleys, polypropylene rope, and a drilling machine for construction tasks.
Automation and Robotisation in Welding and Allied Processes: Proceedings of the International Conference Held at Strasbourg, France, 2-3 September 1985, under the Auspices of the International Institute of Welding