DSC Workflows
Supplemental Cultural
Resource Studies
1.0 Predesign Based on the Design Development Documents, recommendations from the Design Stage Value Analysis and
NPS review comments, prepare the following:
2.0 Schematic Design
CONSTRUCTION Templates:
Template: Submittal List and Review Estimate (See 3rd tab (lower section of form) for template instructions.)
Samples: 4th & 5th tabs of Submittal List and Review Estimate Template
Prepare the Closeout and O&M requirements as identified in individual construction specification sections.
Sample: 2nd tab of Closeout and Operation & Maintenance (O&M) Requirements Template
www.nps.gov/dscw/dbbcondocs.htm 1/3
3/31/13 4.0 Construction Documents (DBB) - DSC Workflows
Working collaboratively within the integrated design team complete the Construction Documents portion of
the NPS Project Sustainability Checklist.
Templates:
Upate and finalize the Design Stage Value Analysis (DSVA) Report documenting all CD Phase value analysis
activities.
Template: VA Report
Prepare the Class A Construction Cost Estimate based on the completed 100% Draft Construction
Documents using the Class A Construction Cost Estimate Template and Instructions. Confirm that project
cost is within available funds.
Template:
Identify and format final supplemental design reports to be included in the Construction Specifications.
Construction Drawings
Division 1 through 49 Construction Specifications
Final Product File
Statement of Structural Tests and Special Inspections
Profit Calculator
Contract Price Schedule
Submittal List
Closeout and Operation & Maintenance (O&M) Requirements
Constructability Checklist
NPS Project Sustainability Checklist
Design Stage Value Analysis Report
Class A Construction Cost Estimate
Design Calculations
Resolve all review comments and incorporate resolutions into the documents listed in Paragraph
4.9.1.
www.nps.gov/dscw/dbbcondocs.htm 2/3
3/31/13 4.0 Construction Documents (DBB) - DSC Workflows
Submit the 100% Complete Construction Documents and written responses to review comments,
utilizing the NPS review form, within 30 calendar days of receipt of comments for final approval.
Upon final approval of documents submitted in Paragraph 4.9.2, submit the following documents
for construction contracting and NPS archiving:
Update Class A Construction Cost Estimate, as directed, when the elapsed time between submission of Final
Construction Documents and initiation of Construction Contract Procurement exceeds six months.