T208 - Springleaf Station B1L01, B1L02, B1L03, B2L01 & B2L02 Lift Glass Enclosure Drawing List
T208 - Springleaf Station B1L01, B1L02, B1L03, B2L01 & B2L02 Lift Glass Enclosure Drawing List
L E I G H TO
TO N
N
A
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
A A limited to works designed by A/E (C2103).
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
A A works designed by A/E (C2103).
SHOP DRAWING REVIEW
A This shop drawing review shall not relieve the Contractor of his responsibility in
Date Received : the preparation of the shop drawings based on A/E (C2103) design drawings.
................................................
Date Returned :
................................................
A A DAR Ref.
................................................
Reviewed by :£ TYL £ DPA
L E I G H TO
TO N
N
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
SERVICE
SHAFT 2
SERVICE
SHAFT 2
Reviewed by :£ TYL £ DPA
A
ENTRANCE A2 LEVEL ENTRANCE A2 LEVEL
A ................................................
Date:
(Signature and Name)
A
TOP OF BOX LEVEL TOP OF BOX LEVEL
A
CONCOURSE LEVEL CONCOURSE LEVEL
LE I G H TO
TO N
N
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
TOP OF ROOF limited to works designed by A/E (C2103).
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
BEAM SOFFIT
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
Date:
................................................
A (Signature and Name)
ENTRANCE A2 LEVEL
for and DP ARCHITECTS Pte. Ltd.
GROUND LEVEL
CEILING HEIGHT
A
CONCOURSE LEVEL
L E I G H TO
TO N
N
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
A limited to works designed by A/E (C2103).
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
A
Date:
................................................
(Signature and Name)
A
A
A
A A A A
A
A
L E I G H TO
TO N
N
TOP OF ROOF
This shop drawing review is for the verification that details shown conform
TOP OF ROOF to the contract requirements, specifications and design drawings and it is
A limited to works designed by A/E (C2103).
BEAM SOFFIT BEAM SOFFIT This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
A
GRD. LVL
A
TOP OF BOX LEVEL TOP OF BOX LEVEL
A
CEILING HEIGHT CEILING HEIGHT
A A A
L E I G H TO
TO N
N
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
CEILING HEIGHT
CONCOURSE LEVEL
L E I G H TO
TO N
N
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
limited to works designed by A/E (C2103).
A A
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
1 1 1
W/T208/SPL/LFT/0019
W/T208/SPL/LFT/0019 W/T208/SPL/LFT/0019
Reviewed by :£ TYL £ DPA
................................................ Date:
(Signature and Name)
C.C C.C C.C
for and DP ARCHITECTS Pte. Ltd.
P P P
14 C.3
14 C.3 3 2
W/T208/SPL/LFT/0019
3 2 W/T208/SPL/LFT/0019
W/T208/SPL/LFT/0019 W/T208/SPL/LFT/0019
1 1
W/T208/SPL/LFT/0019 W/T208/SPL/LFT/0019
C.C C.C
P P
L E I G H TO
TO N
N
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
limited to works designed by A/E (C2103).
CEILING HEIGHT CEILING HEIGHT CEILING HEIGHT
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
A This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
................................................ Date:
(Signature and Name)
ENTRANCE - C LEVEL ENTRANCE - C LEVEL ENTRANCE - C LEVEL
for and DP ARCHITECTS Pte. Ltd.
L E I G H TO
TO N
N
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
limited to works designed by A/E (C2103).
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
2 2 This shop drawing review shall not relieve the Contractor of his responsibility in
W/T208/SPL/LFT/0021 W/T208/SPL/LFT/0021 the preparation of the shop drawings based on A/E (C2103) design drawings.
1 1
W/T208/SPL/LFT/0022 W/T208/SPL/LFT/0022
Reviewed by :£ TYL £ DPA
E E ................................................ Date:
(Signature and Name)
1
W/T208/SPL/LFT/0021
10
10
3 3
W/T208/SPL/LFT/0021
W/T208/SPL/LFT/0021
A A A
2
W/T208/SPL/LFT/0021 1
W/T208/SPL/LFT/0022 2 1
W/T208/SPL/LFT/0021 W/T208/SPL/LFT/0022
E E
2 2
1 W/T208/SPL/LFT/0012 1
W/T208/SPL/LFT/0022 W/T208/SPL/LFT/0021
W/T208/SPL/LFT/0021
L E I G H TO
TO N
N
AMXON
SINGAPORE CONSTRUCTORS
738957 PTE LTD
BLK. 205 WOODLANDS AVE. 9
#05-53 WOODLANDS SPECTRUM 2
AMXON
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
................................................ Date:
CEILING HEIGHT CEILING HEIGHT (Signature and Name)
CEILING HEIGHT
for and DP ARCHITECTS Pte. Ltd.
1 LIFT B2L01 & LIFT B2L02 2 LIFT B2L01 3 LIFT B2L01 & LIFT B2L02
W/T208/SPL/LFT/0020ELEVATION SCALE 1:50 W/T208/SPL/LFT/0020 ELEVATION SCALE 1:50 W/T208/SPL/LFT/0020 ELEVATION SCALE 1:50
L E I G H TO
TO N
N
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
limited to works designed by A/E (C2103).
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
CEILING HEIGHT CEILING HEIGHT works designed by A/E (C2103).
This shop drawing review shall not relieve the Contractor of his responsibility in
CEILING HEIGHT the preparation of the shop drawings based on A/E (C2103) design drawings.
................................................ Date:
(Signature and Name)
1 LIFT B2L01 & LIFT B2L02 2 LIFT B2L01 & LIFT B2L02
W/T208/SPL/LFT/0020 SECTION SCALE 1:50 W/T208/SPL/LFT/0020 SECTION SCALE 1:50
L E I G H TO
TO N
N
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
A A
A
Reviewed by :£ TYL £ DPA
................................................ Date:
(Signature and Name)
A
A
A
A
A
A A
A
A
L E I G H TO
TO N
N
This shop drawing review is for the verification that details shown conform
to the contract requirements, specifications and design drawings and it is
limited to works designed by A/E (C2103).
This shop drawing review excludes the bar bending schedule, survey setting
out information, material take-off, and all other items not relevant to the
works designed by A/E (C2103).
A
This shop drawing review shall not relieve the Contractor of his responsibility in
the preparation of the shop drawings based on A/E (C2103) design drawings.
A
A
A
A
A
CONCOURSE LEVEL
A A
L E I G H TO
TO N
N