Professional Documents
Culture Documents
TH TH TH ST ND RD TH: Tower B Unit Status - Power Master
TH TH TH ST ND RD TH: Tower B Unit Status - Power Master
UNIT. NO
LEVEL
1 2 3 4 5 6 7 8 9 10
th
8 FLOOR
9th FLOOR
10th FLOOR 9-Aug
14TH FLOOR
th
30 FLOOR
31st FLOOR 20-Aug
nd
32 FLOOR 20-Aug
33rd FLOOR
34th FLOOR
35th FLOOR
36th FLOOR 20-Aug
th
37 FLOOR 13-Aug 20-Aug
th
38 FLOOR
39th FLOOR
40th FLOOR 13-Aug
41st FLOOR
42nd FLOOR 20-Aug
rd
43 FLOOR
HANDOVERED
(HO DATE) SOLD UNITS - Not Final Coated
(F. COAT DATE) TIMBER FLOOR FINAL COATED ( DATE)