OPERATOR TRAINING SIMULATOR PERFORMANCE PRO

CANDIDATE NAME ALI YAR DESIGNATION JUNIOR OFFICER

DEPARTMENT NAPHTHA BLOCK UNIT 309

EVALUATOR'S NAME MUHAMMAD HAMMAD LAKHANI PASSING CRITERIA 60%

PERFORMACE

EVALUATION TOTAL MARKS MARKS OBTAINED PERCENTAGE

NORMAL SITUATION

START-UP 100 80 80%

SHUT-DOWN 100 70 70%

EMERGENCY SITUATION

Temperature Excursion 50 30 60%

Power Failure 50 40 80%

Steam Failure 50 40 80%

Feed Loss 50 50 100%

Makeup Gas Loss 50 35 70%

Instruement Air Failure 50 30 60%

Rise In Hydrogen Pressure 50 40 80%

CO / CO2 Rise In
50 45 90%
Makeup Gas

Feed Pump Failure 50 30 60%

Compressor Failure 50 30 60%

OVERALL 700 520 74%

REMARKS

Although Mr. Ali Yar have passed the test, still a performance test is required to judge his confidendence.
RFORMANCE PROFILE

JUNIOR OFFICER

309

60%

RESULT

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS
OPERATOR TRAINING SIMULATOR PERFORMANCE PRO

CANDIDATE NAME FAHAD-UR-REHMAN DESIGNATION JUNIOR OFFICER

DEPARTMENT NAPHTHA BLOCK UNIT 309

EVALUATOR'S NAME MUHAMMAD HAMMAD LAKHANI PASSING CRITERIA 60%

PERFORMACE

EVALUATION TOTAL MARKS MARKS OBTAINED PERCENTAGE

NORMAL SITUATION

START-UP 100 85 85%

SHUT-DOWN 100 75 75%

EMERGENCY SITUATION

Temperature Excursion 50 30 60%

Power Failure 50 40 80%

Steam Failure 50 45 90%

Feed Loss 50 50 100%

Makeup Gas Loss 50 40 80%

Instruement Air Failure 50 35 70%

Rise In Hydrogen Pressure 50 40 80%

CO / CO2 Rise In
50 45 90%
Makeup Gas

Feed Pump Failure 50 35 70%

Compressor Failure 50 40 80%

OVERALL 700 560 80%

REMARKS

Although Mr. Fahad-ur-Rehman have passed the test, still a performance test is required to judge his confidendence.
RFORMANCE PROFILE

JUNIOR OFFICER

309

60%

RESULT

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

PASS

e.
OPERATOR TRAINING SIMULATOR PERFORMANCE PRO

CANDIDATE NAME UMAIS DESIGNATION ENGINEER

DEPARTMENT NAPHTHA BLOCK UNIT 308

EVALUATOR'S NAME MUHAMMAD HAMMAD LAKHANI PASSING CRITERIA 60%

PERFORMACE

EVALUATION TOTAL MARKS MARKS OBTAINED PERCENTAGE

NORMAL SITUATION

START-UP 100 90 90%

SHUT-DOWN 100 80 80%

EMERGENCY SITUATION

Temperature Excursion 50 -- --

Power Failure 50 40 80%

Steam Failure 50 45 90%

Feed Loss 50 50 100%

Makeup Gas Loss 50 45 90%

Instruement Air Failure 50 35 70%

Rise In Hydrogen Pressure 50 -- --

CO / CO2 Rise In
50 -- --
Makeup Gas

Feed Pump Failure 50 45 90%

Compressor Failure 50 40 80%

OVERALL 550 470 85%

REMARKS
RFORMANCE PROFILE

ENGINEER

308

60%

RESULT

PASS

PASS

--

PASS

PASS

PASS

PASS

PASS

--

--

PASS

PASS

PASS
OPERATOR TRAINING SIMULATOR PERFORMANCE PRO

CANDIDATE NAME UMAIS DESIGNATION ENGINEER

DEPARTMENT NAPHTHA BLOCK UNIT 308

EVALUATOR'S NAME MUHAMMAD HAMMAD LAKHANI PASSING CRITERIA 60%

PERFORMACE

EVALUATION TOTAL MARKS MARKS OBTAINED PERCENTAGE

NORMAL SITUATION

START-UP 100 80 80%

SHUT-DOWN 100 75 75%

EMERGENCY SITUATION

Temperature Excursion 50 -- --

Power Failure 50 35 70%

Steam Failure 50 45 90%

Feed Loss 50 50 100%

Makeup Gas Loss 50 45 90%

Instruement Air Failure 50 30 60%

Rise In Hydrogen Pressure 50 -- --

CO / CO2 Rise In
50 -- --
Makeup Gas

Feed Pump Failure 50 40 80%

Compressor Failure 50 35 70%

OVERALL 550 435 79%

REMARKS
RFORMANCE PROFILE

ENGINEER

308

60%

RESULT

PASS

PASS

--

PASS

PASS

PASS

PASS

PASS

--

--

PASS

PASS

PASS
OPERATOR TRAINING SIMULATOR PERFORMANCE PROFILE

CANDIDATE'S NAME Sharjeel Zaheer NRL NO. 11695

DESIGNATION SHIFT ENGINEER DEPARTMENT SULFUR BLOCK

INSTRUCTOR'S NAME MUHAMMAD FARHAN NRL NO. 11606

UNIT SRU-312 PASSING CRITERIA 80%

PERFORMACE

EVALUATION DATE DURATION (HOURS) TOTAL MARKS MARKS OBTAINED PERCENTAGE RESULT

NORMAL SITUATION

Startup 22-11-2018, 23-11-2 24 100 82 82% PASS

Shutdown 28-11-2018 8 100 85 85% PASS

EMERGENCY SITUATION

312-P01A/B Failure 29-11-2018 1 50 40 80% PASS

Power Failure 29-11-2018 1 50 45 90% PASS

Fuel Gas failure 30-11-2018 2 50 45 90% PASS

Hydrogen Failure 30-11-2018 1 50 45 90% PASS

Compressor Switchover 1/12/2018 1 50 40 80% PASS

- - -- -- --

- - -- -- --

- - -- -- --

- - -- -- --

- - -- -- --

- - -- -- --

OVERALL 37 450 382 85% PASS

Mention the date for retest, if marks obtained in any evaluation is less than 80%.