Download as pdf
Download as pdf
You are on page 1of 6
“EE Ref: AEB/1078/YL/B.1.9/0311/2019 19 August 2019 HILL INTERNATIONAL P.O. Box 21835, Doha, Qatar “Tol 4435 8381 Fax: 4435 8384 Attention ‘Ne. Patrice Daens, Project Director Project 1078 QINC TOWER - ABRAJ AL TAHWILIVA, WEST BAY, DOHA Subject : CLIENT APPROVED CHA ER STRU PROVAL Further to your letter ref POAOI112-AAT-HIL-AEB-0193-19 dated 18/0819, please find attached soft copy of the drawings to be issued to the Contractor further to coordinate ‘with the Post Tension Designer: 1. Opening in the Mezzanine Foor Slab and Panoramic Lift Area Sib Closure. 2. Opening in corewall at Podium Roof level lift opening. drawing attached for {implementation “The above is for your information and necessary action. Best Regards, Yas THY Sr. Project Manager Cee. Sa al QC Project Octr Fa 437978 I tion, GT Bt Fa 12 0 eee { eaw (se10) REINFORCEMENT DETALS eu onl RO Ce © © © O80 & International Ret POAOTH12-AAT-HIL-AES.O183-18 se August 2010 ‘Arab Engineering Buren (AEB) Ploveox 1148 Bona, Qatar el ra 4406 see tn 2M YassorFaway Eat -Sonir Project Manager PROJECT; ABRAJ AL TAHWILIVA suevect changes an ral Approvals Dear. ay, iteration config te folowing changes agred with the EmeloyedEngteer snd previously Beco wih AES nest se Pararme Ufs (C18 L17) ce earl fom GF sab and above. Opeiogn GF sb shal be (Sooo. Canned bas between coun st Mazzanib veto be sag Saha res bea 2 Basemert shu ite (L188 L1) wilhave oth oe openings tera Coward oe et GF eve 4 Opering ia Mezzanine sab t Hoel Tower for sat as per AEB drawing pase to REDCO 25 ‘sience copy on 1 fugit 2018 Slama to heck preter bes cata ral. Ne AE ‘Selves requests may be ol cect wh ucurel seed (=) 4 Opening in cre wat Padum Roo oe om Hotel pasenge its tthe Ofc Tower ie (hott (Sr ats ove and at sit sve ha Reta ent ie ae Rone and REDOO Sovaed Tuy ‘FrAagut 25 hate tt oven eile bow te ype Poa Roo sl ve. We ee also config om our maetng on Saray 11 August 2019 wih REDCC, AEB and Salama Engneeon tet neresting be ‘saneson’ nah of te core fm 5 syst 10 sty is snepele fnep on candon AEBalama resaes ‘an undetahing ese for REDCO snd har Sr Party (FD Eat ake respon fr any lronce ess ‘ato discussed at the sbove mesg he posse change te Pm fade tan lls des. fom REDCO snd Stara coe at # here ean fzcae hosing thes wilbesocrmodato nthe Fos [Snsonng desu Ping po ecauons fr tetas Be cored wah postsnconing ans ‘Anecaeary Engheor nercon wil be sue cover te above tems, This for our neaton ac necessary ton, nae 0 i pec Glee Sent ‘Sad Agu 0239 T5680 te Met Waleed Gara Hose Araby e ‘Baen Paice Sub ajo Ysa Either Doss Arado Geog Bot, Rahaman aihandn Kateri ose Aa, Hossa, Masa, anal Eres Rand ra Abs Si sabject FE AAT CLENT APPROVED CHANGES AND OTHER STRUCTURAL APPROVALS ‘Thanks for th confmations state in your blow Ee. Kay arange with cent oa the relevant sin oder ‘ofermae the changes ine with coal conor ond meanwhile wl enous to proce ate. ——— Sheds eae ianianeen Soe ceca |W entedessinana com eLAraby - Dane Fr: Soi Rann ‘sett enjoin Dos ee J ey aldo; Seog okt fomnntentere. oni sq Raymond See cue APPROVED am ontenng the folowing changes zed with the Employer nd penis cused wth REDO: "Panoramic te 36 & 17] ar cancabd from Gs and stove. Opening G9 lb oe, Conecting trom between cl at exarne vel ta be stg, Seas t ve bee, 2 Shut is (18 89} wi have both oor pens tothe er (nord core) aL GEL 5. Opening in ezranine so at etl Tower or stata per AB drawing pated to REDCD 408 copy O8 1 ‘Aas 209 Slama ocho permeter beam ect wal (Conse ature sure aque, ne maybe Stet deck ith structural ee 6)) 4 Openingin cor wal at Pau st val om Hotel asargr tte Os Tower ie hot ay hi level nd ab above te ta cht its Kane nd REDCD coined Turn Aust 209 that te overran alle blow the typi Posum Ro ss ee, ‘The above lb cone by iar sonra posibe ser Es amas cotning rom our martin oy wt RECO, AEB an Saas Energi increasing the ta aloe” bit ofthe core rom sores to 10 story acapaem pcp on cndton A/S recs reins ‘eter fom REDCD anther Pay FO Cont oak repos fran tne sue. ‘so cused today was th ose change tothe Fou fae tan al gs devin 8th RECO aa San ‘ree that if thre an ean sang sw be accormodated the pottensonng ign Fig pot locations forthe fade to be coordina with PT anchors -Act/Satr wl eete the el design prota, Sop drawings fo Area A rebase today oF dreads [ARTIC Projet ‘he Comete oe ‘MUL TERNATIONAL Nattrce@hiil eo Hill International

You might also like