ADHI - CNTIC - LAPI JO

DOCUMENT NO : DATE
INSPECTION FOR
VISUAL WELDING PENETRANT TEST

Owner : PT. PLN (Persero)


Location : __________________ Erection By : __________________
Reference Drawing : __________________ Weather : __________________
Temperature : __________________

COOLING WATER SISTEM

RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NO DATE SIGN

Notes :

Subject : Liquid Penetrant examination report

Client : PT. PLN (Persero)


PT. ADHIKARYA PT.PLN (Persero)
Print Name
Signature

Date
ADHI - CNTIC - LAPI JO

DOCUMENT NO : DATE
INSPECTION FOR
VISUAL WELDING PENETRANT TEST

Project title : Lobong Mini Hydro Power Plan (2x800kW)


Name of equipment
and identification no. : __________________________

Cable code Stage of examined

Material As welded After Hydro Test


After P.W.H.T Others
Surface preparation Grinding Machine Others
Type Color contrast Fluorescent
Penetrant Application Brushing Spraying
Temperature Ambiant Penetrant Time Minutes
Water washable penetrants Dry Developer
Removal Post emulsifying penetrants Developing
Solven-removable penetrants Wet Developer
Location examined

Satisfactory Attachment report


Management
Unsatisfactory

PT. ADHIKARYA PT.PLN (Persero)


Print Name
Signature

Date