1.01 Data Sheet :
1
Design of Box culvert ( 1 x 6 x 2.5) Component
Unit Description : 2.0 Sketches
for DCH 234+730 Description :
2.01 Sketch:
Top Slab
RTL RTL
m
0.50
0.40 m
6.00 m
0.55 m
2
2.02 Values of Modulus of Subgrade Reaction (Granular Soils / Dry or Moist Sand) :
(Loose - A/1)
12750
for Node outter Ks1 = x 0.200 x 12.00
0.30 x 0.30
12750
for Node inner Ks2 = x 0.4 x 12.00
0.30 x 0.30
3
Design of Box culvert ( 1 x 6 x 2.5) for DCH Calculation of Active Earth
Unit Description : Component Description : 3.0
234+730 Pressure Coefficient (Ka)
Normal Condition
α = 90.00 Degree
β = 0.00 Degree
Φ = 30.00 Degree
δ = 20.00 Degree
Ka = 1 - SIN(Φ)
Ka = 0.500
4
Design of Box culvert ( 1 x 6 x 2.5) for
Unit Description : Component Description : 4.0 Detailed Load Calculation
DCH 234+730
For a design of SC
Unit Width of SC = 12.00 m
a) Self Weight of SC
= 1.645 T/m
= 0.000 T/m
+ 0.100 x 2.00
= 2.163 T/m
= 0.000 T/m
= 0.000 T/m
= 0.000 T/m
5
v) Loads of Wall & Earth fill :-
= 2.000 x 0.50 x 0.00 x 2.50
= 0.000 T/m
+ 0.000 x 0.00
= 0.000 T/m
c) Earth Pressure :
Structures designed to retain earth fill shall be proportioned to withstand pressure calculated in accordance with any rational
theory.
i) Dry Conditions :
RTL
Diagram due to
Active Earth
Pressure
Ep
Base Pressure due to Active Earth upto Raft / Bottom Slab (Founding Level) :
= 36.300 T/m
6
d) Live Load Surcharge :
For designed of Box-Type Nalla, a live load surcharge consider equivalent to 1.20m earthfill
RTL
Base Pressure due to Live Load Surcharge upto Raft / Bottom Slab (Founding Level) :
= 14.400 T/m
e) Water Pressure :
i) Water pressure on wall
Box-Type Nalla are designed to withstand the Water Pressure during flooded condition of Nalla.
RTL
Diagram due to
Flooded Water
Pressure
Base Pressure due to Water Force upto Nalla Bed (Bed Protection) :
= 36.300 T/m
= 32.700 T/m
7
f) Flood Conditions :
Water Level, When Flood occur
Ep1 0.00 m below RTL
Ep2
Ep3 Ep4
Where,
Ep1 = Lateral Pressure Intensity due to Dry Soil.
Ep2 = Lateral Pressure Intensity due to Dry Soil.
Ep3 = Lateral Pressure Intensity due to Submerged Soil.
Ep4 = Lateral Pressure Intensity due to Water.
γd = 2.00 T/m3
γw = 1.00 T/m3
γ' = γd - (1-n) x γw
= 1.40 T/m3
= 0.000 T/m
= 25.410 T/m
8
Ep4 = Ka x γw x H2 x cos Ѳ x Total width
= 18.150 T/m
= 0.000 T/m
Box-Type Nalla are designed to withstand the Vehicular Live Loads for Maximum Hogging & Sagging Bending Moments
i) Breaking Force :
LONGI FORCE LONGI MOMENT
9
Unit Design of Box culvert ( 1 x 6 x Component
Temperature Stresses
Description : 2.5) for DCH 234+730 Description :
Temparature Stresses:-
= (Average(47.5,2.5))+10
Effective bridge temperature will be
OR
critical of two
= (Average(47.5,2.5))-10
= 35.0 OR 15.0
10
Unit Design of Box culvert ( 1 x 6 x Component
Check for Base Pressure
Description : 2.5) for DCH 234+730 Description :
2
Area of raft = 1 x 6.4 = 6.4 m
Base Pressure = P
A
= 47.7
6.4
11
Component
Unit Description : Design of Box culvert ( 1 x 6 x 2.5) for DCH 234+730 5.0 Summary of Bending Moments & Forces
Description :
Loads Combination: 12.00
LOAD COMBINATION / M
COMBI
LOAD Sr. Top Slab Raft / Bottom Slab Vertical Walls (End Wall)
No Load Cases Bending Shear Bending Shear Bending Shear
. T/F B/F Force B/F T/F Force O/F I/F Force
1 DL+SIDL+EP-D 4.02 -7.10 6.95 -5.01 4.41 9.58 5.01 0.00 4.90
LOAD 8 LOADTYPE None TITLE TEMP -VE
2 DL+SIDL+EP-D+LLS(OS) 5.46 -6.87 7.33 -7.51 4.94 9.67 7.51 0.00 8.23
3 DL+SIDL+EP-D+LLS(BS) 4.48 -6.64 6.95 -5.86 4.22 9.70 5.86 0.00 7.21
4 DL+SIDL+EP-D+VLL-TS 10.49 -17.14 18.24 -9.16 14.96 18.56 9.62 2.20 6.57
5 DL+SIDL+EP-D+VLL-TS+LLS(OS) 11.93 -16.91 18.62 -11.66 15.49 18.64 12.12 2.20 9.91
6 DL+SIDL+EP-D+VLL-TS+LLS(BS) 10.95 -16.68 18.24 -10.00 14.77 18.68 10.47 2.20 8.88
7 DL+SIDL+EP-F+WP 3.72 -7.39 6.95 -4.31 4.59 10.04 4.31 0.00 2.64
8 DL+SIDL+EP-F+WP+LLS(OS) 5.17 -7.16 7.33 -6.82 5.24 10.12 6.82 0.00 5.97
9 DL+SIDL+EP-F+WP+LLS(BS) 4.18 -6.93 6.95 -5.16 4.41 10.16 5.16 0.00 4.94
10 DL+SIDL+EP-F+WP+VLL-TS 10.19 -17.44 18.24 -8.46 15.14 19.01 8.92 2.20 4.31
11 DL+SIDL+EP-F+WP+LLS(OS)+VLL-TS 11.64 -17.21 18.62 -10.97 15.79 19.10 11.43 2.20 7.64
12 DL+SIDL+EP-F+WP+LLS(BS)+VLL-TS 10.65 -16.98 18.24 -9.31 14.95 19.13 9.77 2.20 6.61
1 DL+SIDL+EP-D 5.45 -5.67 6.95 -2.97 4.94 9.30 5.45 0.00 3.76
ULS
2 DL+SIDL+EP-D+LLS(OS) 6.89 -5.44 7.33 -5.48 5.84 9.39 6.89 0.00 7.09
3 DL+SIDL+EP-D+LLS(BS) 5.91 -5.21 6.95 -3.82 4.69 9.42 5.91 0.00 6.06
4 DL+SIDL+EP-D+VLL-TS 11.92 -15.71 18.24 -7.12 15.49 18.28 10.06 2.20 5.43
5 DL+SIDL+EP-D+VLL-TS+LLS(OS) 13.36 -15.48 18.62 -9.63 16.39 18.36 11.50 2.20 8.76
6 DL+SIDL+EP-D+VLL-TS+LLS(BS) 12.38 -15.25 18.24 -7.97 15.23 18.39 10.52 2.20 7.73
7 DL+SIDL+EP-F+WP 5.15 -5.96 6.95 -2.28 5.24 9.76 5.15 0.00 2.17
8 DL+SIDL+EP-F+WP+LLS(OS) 6.59 -5.73 7.33 -4.78 6.23 9.84 6.59 0.00 4.82
9 DL+SIDL+EP-F+WP+LLS(BS) 5.61 -5.50 6.95 -3.12 4.92 9.87 5.61 0.00 4.22
10 DL+SIDL+EP-F+WP+VLL-TS 11.62 -16.01 18.24 -6.42 15.79 18.73 9.76 2.20 3.84
11 DL+SIDL+EP-F+WP+LLS(OS)+VLL-TS 13.06 -15.78 18.62 -8.93 16.78 18.82 11.20 2.20 6.49
12 DL+SIDL+EP-F+WP+LLS(BS)+VLL-TS 12.08 -15.55 18.24 -7.27 15.47 18.85 10.22 2.20 5.89
Summary /M 13.36 -17.44 18.62 -11.66 16.78 19.13 12.12 2.20 9.91
13.36 17.44 18.62 11.66 16.78 19.13 12.12 2.20 9.91
12
1 DL+SIDL+EP-D 2.96 -5.21 5.10 -3.52 3.29 7.04 3.52 0.00 3.24
12 DL+SIDL+EP-F+WP+LLS(BS)+VLL-TS 7.24 -11.94 12.63 -6.06 10.40 13.54 6.36 1.47 3.30
1 DL+SIDL+EP-D 3.91 -4.26 5.10 -2.16 3.65 6.85 3.91 0.00 2.47
LOAD 9 LOADTYPE None TITLE TEMP +VE
2 DL+SIDL+EP-D+LLS(OS) 4.87 -4.10 5.36 -3.83 4.24 6.91 4.87 0.00 4.69
3 DL+SIDL+EP-D+LLS(BS) 4.21 -3.95 5.10 -2.73 3.48 6.93 4.21 0.00 4.01
4 DL+SIDL+EP-D+VLL-TS 8.22 -10.95 12.63 -4.93 10.69 12.83 6.98 1.47 3.59
5 DL+SIDL+EP-D+VLL-TS+LLS(OS) 9.18 -10.80 12.89 -6.60 11.27 12.89 7.94 1.47 5.81
6 DL+SIDL+EP-D+VLL-TS+LLS(BS) 8.53 -10.65 12.63 -5.49 10.51 12.91 7.29 1.47 5.13
7 DL+SIDL+EP-F+WP 3.57 -4.59 5.10 -1.37 4.00 7.29 3.57 0.00 1.03
8 DL+SIDL+EP-F+WP+LLS(OS) 4.53 -4.44 5.36 -3.04 4.68 7.35 4.53 0.00 2.10
9 DL+SIDL+EP-F+WP+LLS(BS) 3.88 -4.29 5.10 -1.93 3.77 7.37 3.88 0.00 2.40
10 DL+SIDL+EP-F+WP+VLL-TS 7.88 -11.29 12.63 -4.13 11.03 13.27 6.64 1.47 2.15
11 DL+SIDL+EP-F+WP+LLS(OS)+VLL-TS 8.85 -11.14 12.89 -5.80 11.71 13.33 7.61 1.47 3.22
12 DL+SIDL+EP-F+WP+LLS(BS)+VLL-TS 8.19 -10.98 12.63 -4.70 10.80 13.35 6.95 1.47 3.51
Summary :RARE (Dead Load) 4.87 -5.55 5.36 -5.19 4.68 7.56 5.19 0.00 5.46
RARE
Summary :RARE (Dead Load) 4.87 5.55 5.36 5.19 4.68 7.56 5.19 0.00 5.46
Summary :RARE (Live Load) 4.31 6.70 7.53 2.77 7.03 5.98 3.07 1.47 1.11
13
Temp. Temp.
1 DL+SIDL+EP-D 3.03 -5.13 5.10 -3.41 3.31 7.02 3.41 0.00 3.17
Fall
2 DL+SIDL+EP-D+LLS(OS) 3.12 -5.05 5.10 -3.60 3.27 7.05 3.60 0.00 3.82
QUASI
1 DL+SIDL+EP-D 3.83 -4.34 5.10 -2.28 3.62 6.87 3.83 0.00 2.54
Rise
2 DL+SIDL+EP-D+LLS(OS) 3.91 -4.25 5.10 -2.47 3.56 6.89 3.91 0.00 3.18
Summary /M 3.91 -5.13 5.10 -3.60 3.62 7.05 3.91 0.00 3.82
3.91 5.13 5.10 3.60 3.62 7.05 3.91 0.00 3.82
14
K = Mu/bd2Fck 0.0344 0.0297 0.0459
Min. distribution Ast Required = 20%*Ast 143.67 187.53 118.83 170.95 181.20 74.85
8 8 8 8 8 8
200 200 200 200 200 200
Ast provided (As) 251.33 251.33 251.33 251.33 251.33 251.33
safe safe safe safe safe safe
Check OK OK OK
15
Sr max=(3.4 c+0.425 k1 k2 φ) /peff 372.92 575.85 575.85
x = dc
-AsEs+((AsEs)2+2bAsEsEcmd)1/2 89.715 71.231 57.932
bEcm
125 187.5 187.5
16
I =bx3/3m +As(h-x)2 253595656.6 171722384.2 76943854.63
c σp 0 0 0
Remark STEEL NOT REQD STEEL NOT REQD STEEL NOT REQD
17
5.04 Stress check
18
5.05 Stress check for creep effect
Stress check for creep effect for short term
x = dc
95.107 77.089 54.879
-AsEs+((AsEs)2+2bAsEsEcmd)1/2
19
x = dc
169.589 141.066 101.437
-AsEs+((AsEs)2+2bAsEsEcmd)1/2
m=αe = Es/Ec,eff 25.975 25.816 26.328
20
Calculation of Beff for 70R train Diagram Beff
1.70
0.43
Actual Beff
1) Case = IF Beff /2 has to be less than 1.93/2 than
= Calculated Beff ( For Single axle ) IF Beff cal < ( Beff cal /2 + 4.49),than
else
2) Case = IF Beff cal < ( Beff cal /2 + 4.490 ),than
Calculated Beff/2 +4.49 1.7 + 2.79 = 4.49
else
3) Case = IFCalculated Beff > 12.00 than
= 12.00
2.3
RAILING = 0 1.8
FOOTHPATH = 0
ACB = 0.5
EDGE DISTANCE = 0.15
0.65
0.25
Actual Beff
1) Case = IF Beff /2 has to be less than 1.8/2 than
= Calculated Beff ( For Single axle )
else
2) Case = IF Beff cal < ( Beff cal /2 + 2.950 ),than
Calculated Beff/2 +2.95 0.65 + 2.3 = 2.95
else
3) Case = IFCalculated Beff > 12.00 than
= 12.00
21
Calculation of Beff for class A-2L train
0.65
0.25
Actual Beff
1) Case = IF Beff /2 has to be less than 1.8/2 than
= Calculated Beff ( For Single axle )
else
2) Case = IF Beff cal < ( Beff cal /2 + 6.450 ),than
Calculated Beff/2 +6.45 0.65 + 0.25 + 1.8 = 6.45
else 1.7 + 1.8 + 0.25
3) Case = IFCalculated Beff > 12.00 than
= 12.00
1.7 1.7
0.65
0.25
Actual Beff
1) Case = IF Beff /2 has to be less than 1.8/2 than
= Calculated Beff ( For Single axle )
else
2) Case = IF Beff cal < ( Beff cal /2 + 9.950 ),than = 9.95
Calculated Beff/2 +9.95
else
3) Case = IFCalculated Beff > 12.00 than
= 12.00
22
Calculation of Beff for 70R-1L+class A 1L (Case A)
7.5
0.50
0.43 0.25
7.25
0.50
70R Class A
0.43 0.25
23
Actual Beff for CL A -1L
1) Case = IF Beff /2 has to be less than 1.8/2 then
= Calculated Beff ( For Single axle )
else
2) Case = IF Beff cal < ( Beff cal /2 + 2.9)),then
2.9 + Calculated Beff/2 (0.25+1.8+0.25+0.6)
else = 2.90
3) Case = IF Calculated Beff > 14 then
= 12.000
24
Calculation of Beff for class A 1L+ 70R-1L (Case B)
3.75 7.25
0.50
CL - A CL - 70R
0.25 0.43
25
Diagram Beff
Calculation of effective width :
beff = α x a ( 1 - a / lo ) + b1
a = Dist of c.g of concentrated load from nearer support in the direction of span.
26
α = 5.02
lo = 6.40 m impact factor = 1.362903 For Class A
b1 = 0.63 m
beff = α x a (1 - a / lo ) + b 1
TOTAL WID= 12.00 m
CLASS A-1L
IMPACT
TOTAL
B.M (mton- ACTUAL
WITH
LOAD B.M. metre) a bEffec bEFFEC B.M per metre
2.7 0.000 0.00 -1.40 -7.935 -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
2.7 0.000 0.00 -0.30 -0.947 -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
11.4 5.350 2.68 2.90 8.591 7.246 ( 2.0 X 2.675) / 7.246 = 0.7 T-M
11.4 5.490 2.75 2.30 8.027 6.963 ( 2.0 X 2.745) / 6.963 = 0.8 T-M
T/F
6.8
= 1.53 T-M
= 2.08 T-M
0.000 0.00 -2.00 -12.548 -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
6.8 0.000 0.00 -5.00 -44.079 -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
6.8 0.000 0.00 -8.00 -89.730 -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
TOP SLAB
6.8 0.000 0.00 -11.00 -149.499 -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
2.7 0.000 0.00 -1.10 -5.841 -5.841 ( 1.0 X 0.000) -/ 5.841 = 0.0 T-M
2.7 -0.090 -0.05 0.00 0.630 0.630 ( 1.0 X -0.045) / 0.630 - = 0.1 T-M
11.4 -12.690 -6.35 3.20 8.662 7.281 ( 2.0 X -6.345) / 7.281 - = 1.7 T-M
11.4 -6.680 -3.34 2.00 7.533 6.716 ( 2.0 X -3.340) / 6.716 - = 1.0 T-M
B/F
- = 2.81 T-M
- = 3.83 T-M
6.8 0.000 0.00 -2.30 -15.065 -15.065 ( 1.0 X 0.000) -/ 15.065 = 0.0 T-M
6.8 0.000 0.00 -5.30 -48.009 -48.009 ( 1.0 X 0.000) -/ 48.009 = 0.0 T-M
6.8 0.000 0.00 -8.30 -95.072 -95.072 ( 1.0 X 0.000) -/ 95.072 = 0.0 T-M
6.8 0.000 0.00 -11.30 -156.253 -156.253 ( 1.0 X 0.000) -/ 156.253 = 0.0 T-M
2.7 0.000 0.00 -1.40 -7.935 -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
2.7 0.000 0.00 -0.30 -0.947 -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
11.4 -5.350 -2.68 2.90 8.591 7.246 ( 2.0 X -2.675) / 7.246 - = 0.7 T-M
O/F-S
11.4 -5.490 -2.75 2.30 8.027 6.963 ( 2.0 X -2.745) / 6.963 - = 0.8 T-M
- = 1.53 T-M
- = 2.08 T-M
6.8 0.000 0.00 -2.00 -12.548 -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
BENDING MOMENT
6.8 0.000 0.00 -5.00 -44.079 -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
6.8 0.000 0.00 -8.00 -89.730 -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
WALL
6.8 0.000 0.00 -11.00 -149.499 -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
2.7 0.000 0.00 -18.80 -370.976 -370.976 ( 1.0 X 0.000) -/ 370.976 = 0.0 T-M
2.7 0.000 0.00 -17.70 -333.961 -333.961 ( 1.0 X 0.000) -/ 333.961 = 0.0 T-M
11.4 0.000 0.00 -14.50 -237.075 -237.075 ( 1.0 X 0.000) -/ 237.075 = 0.0 T-M
I/F-S
11.4 0.000 0.00 -13.30 -204.884 -204.884 ( 1.0 X 0.000) -/ 204.884 = 0.0 T-M
= 0.32 T-M
= 0.43 T-M
6.8 0.000 0.00 -9.00 -108.084 -108.084 ( 1.0 X 0.000) -/ 108.084 = 0.0 T-M
6.8 0.000 0.00 -6.00 -57.728 -57.728 ( 1.0 X 0.000) -/ 57.728 = 0.0 T-M
6.8 0.000 0.00 -3.00 -21.489 -21.489 ( 1.0 X 0.000) -/ 21.489 = 0.0 T-M
6.8 0.400 0.20 0.00 0.630 0.630 ( 1.0 X 0.200) / 0.630 = 0.3 T-M
2.7 0.000 0.00 -4.30 -35.459 -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
2.7 0.000 0.00 -3.20 -23.466 -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
11.4 -2.310 -1.16 0.00 0.630 0.630 ( 1.0 X -1.155) / 0.630 - = 1.8 T-M
11.4 -1.670 -0.84 1.20 5.525 5.712 ( 2.0 X -0.835) / 5.712 - = 0.3 T-M
B/F
- = 2.19 T-M
- = 2.98 T-M
6.8 -0.330 -0.17 0.90 4.513 5.206 ( 2.0 X -0.165) / 5.206 - = 0.1 T-M
6.8 0.000 0.00 -2.10 -13.371 -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
6.8 0.000 0.00 -5.10 -45.374 -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
RAFT
6.8 0.000 0.00 -8.10 -91.495 -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
2.7 0.000 0.00 -4.30 -35.459 -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
2.7 0.000 0.00 -3.20 -23.466 -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
11.4 4.560 2.28 0.00 0.630 0.630 ( 1.0 X 2.280) / 0.630 = 3.6 T-M
11.4 4.010 2.01 1.20 5.525 5.712 ( 2.0 X 2.005) / 5.712 = 0.7 T-M
T/F
= 4.46 T-M
= 6.08 T-M
6.8 0.730 0.37 0.90 4.513 5.206 ( 2.0 X 0.365) / 5.206 = 0.1 T-M
6.8 0.000 0.00 -2.10 -13.371 -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
6.8 0.000 0.00 -5.10 -45.374 -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
6.8 0.000 0.00 -8.10 -91.495 -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
27
For Class A
IMPACT
IMPACT
TOTAL
TOTAL
ACTUAL ACTUAL
WITH
WITH
bEFFEC B.M per metre bEFFEC B.M per metre
-7.935 ( 1.0 X 0.000) -/ 7.935 = 0.00 T-M -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
-0.947 ( 1.0 X 0.000) -/ 0.947 = 0.00 T-M -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
10.746 ( 2.0 X 2.675) / 10.746 = 1.00 T-M 12.000 ( 2.0 X 2.675) / 12.000 = 1.3 T-M
10.463 ( 2.0 X 2.745) / 10.463 = 1.05 T-M 12.000 ( 2.0 X 2.745) / 12.000 = 1.4 T-M
= 2.05 T-M
= 2.79 T-M
= 2.71 T-M
= 3.69 T-M
-12.548 ( 1.0 X 0.000) -/ 12.548 = 0.00 T-M -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
-44.079 ( 1.0 X 0.000) -/ 44.079 = 0.00 T-M -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
-89.730 ( 1.0 X 0.000) -/ 89.730 = 0.00 T-M -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
-149.499 ( 1.0 X 0.000) -/ 149.499 = 0.00 T-M -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
-5.841 ( 1.0 X 0.000) -/ 5.841 = 0.00 T-M -5.841 ( 1.0 X 0.000) -/ 5.841 = 0.0 T-M
0.630 ( 1.0 X -0.045) / 0.630 - = 0.07 T-M 0.630 ( 1.0 X -0.045) / 0.630 - = 0.1 T-M
10.781 ( 2.0 X -6.345) / 10.781 - = 2.35 T-M 12.000 ( 2.0 X -6.345) / 12.000 - = 3.2 T-M
10.216 ( 2.0 X -3.340) / 10.216 - = 1.31 T-M 12.000 ( 2.0 X -3.340) / 12.000 - = 1.7 T-M
- = 3.73 T-M
- = 5.09 T-M
- = 4.91 T-M
- = 6.70 T-M
-15.065 ( 1.0 X 0.000) -/ 15.065 = 0.00 T-M -15.065 ( 1.0 X 0.000) -/ 15.065 = 0.0 T-M
-48.009 ( 1.0 X 0.000) -/ 48.009 = 0.00 T-M -48.009 ( 1.0 X 0.000) -/ 48.009 = 0.0 T-M
-95.072 ( 1.0 X 0.000) -/ 95.072 = 0.00 T-M -95.072 ( 1.0 X 0.000) -/ 95.072 = 0.0 T-M
-156.253 ( 1.0 X 0.000) -/ 156.253 = 0.00 T-M -156.253 ( 1.0 X 0.000) -/ 156.253 = 0.0 T-M
-7.935 ( 1.0 X 0.000) -/ 7.935 = 0.00 T-M -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
-0.947 ( 1.0 X 0.000) -/ 0.947 = 0.00 T-M -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
10.746 ( 2.0 X -2.675) / 10.746 - = 1.00 T-M 12.000 ( 2.0 X -2.675) / 12.000 - = 1.3 T-M
10.463 ( 2.0 X -2.745) / 10.463 - = 1.05 T-M 12.000 ( 2.0 X -2.745) / 12.000 - = 1.4 T-M
- = 2.05 T-M
- = 2.79 T-M
- = 2.71 T-M
- = 3.69 T-M
-12.548 ( 1.0 X 0.000) -/ 12.548 = 0.00 T-M -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
-44.079 ( 1.0 X 0.000) -/ 44.079 = 0.00 T-M -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
-89.730 ( 1.0 X 0.000) -/ 89.730 = 0.00 T-M -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
-149.499 ( 1.0 X 0.000) -/ 149.499 = 0.00 T-M -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
-370.976 ( 1.0 X 0.000) -/ 370.976 = 0.00 T-M -370.976 ( 1.0 X 0.000) -/ 370.976 = 0.0 T-M
-333.961 ( 1.0 X 0.000) -/ 333.961 = 0.00 T-M -333.961 ( 1.0 X 0.000) -/ 333.961 = 0.0 T-M
-237.075 ( 1.0 X 0.000) -/ 237.075 = 0.00 T-M -237.075 ( 1.0 X 0.000) -/ 237.075 = 0.0 T-M
-204.884 ( 1.0 X 0.000) -/ 204.884 = 0.00 T-M -204.884 ( 1.0 X 0.000) -/ 204.884 = 0.0 T-M
= 0.32 T-M
= 0.43 T-M
= 0.32 T-M
= 0.43 T-M
-108.084 ( 1.0 X 0.000) -/ 108.084 = 0.00 T-M -108.084 ( 1.0 X 0.000) -/ 108.084 = 0.0 T-M
-57.728 ( 1.0 X 0.000) -/ 57.728 = 0.00 T-M -57.728 ( 1.0 X 0.000) -/ 57.728 = 0.0 T-M
-21.489 ( 1.0 X 0.000) -/ 21.489 = 0.00 T-M -21.489 ( 1.0 X 0.000) -/ 21.489 = 0.0 T-M
0.630 ( 1.0 X 0.200) / 0.630 = 0.32 T-M 0.630 ( 1.0 X 0.200) / 0.630 = 0.3 T-M
-35.459 ( 1.0 X 0.000) -/ 35.459 = 0.00 T-M -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
-23.466 ( 1.0 X 0.000) -/ 23.466 = 0.00 T-M -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
0.630 ( 1.0 X -1.155) / 0.630 - = 1.83 T-M 0.630 ( 1.0 X -1.155) / 0.630 - = 1.8 T-M
9.212 ( 2.0 X -0.835) / 9.212 - = 0.36 T-M 12.000 ( 2.0 X -0.835) / 12.000 - = 0.4 T-M
- = 2.27 T-M
- = 3.10 T-M
- = 2.33 T-M
- = 3.18 T-M
8.706 ( 2.0 X -0.165) / 8.706 - = 0.08 T-M 12.000 ( 2.0 X -0.165) / 12.000 - = 0.1 T-M
-13.371 ( 1.0 X 0.000) -/ 13.371 = 0.00 T-M -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
-45.374 ( 1.0 X 0.000) -/ 45.374 = 0.00 T-M -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
-91.495 ( 1.0 X 0.000) -/ 91.495 = 0.00 T-M -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
-35.459 ( 1.0 X 0.000) -/ 35.459 = 0.00 T-M -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
-23.466 ( 1.0 X 0.000) -/ 23.466 = 0.00 T-M -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
0.630 ( 1.0 X 2.280) / 0.630 = 3.62 T-M 0.630 ( 1.0 X 2.280) / 0.630 = 3.6 T-M
9.212 ( 2.0 X 2.005) / 9.212 = 0.87 T-M 12.000 ( 2.0 X 2.005) / 12.000 = 1.0 T-M
= 4.66 T-M
= 6.35 T-M
= 4.80 T-M
8.706 ( 2.0 X 0.365) / 8.706 = 0.17 T-M 12.000 ( 2.0 X 0.365) / 12.000 = 0.2 T-M = 6.55 T-M
-13.371 ( 1.0 X 0.000) -/ 13.371 = 0.00 T-M -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
-45.374 ( 1.0 X 0.000) -/ 45.374 = 0.00 T-M -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
-91.495 ( 1.0 X 0.000) -/ 91.495 = 0.00 T-M -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
28
α = 5.02 For Class 70 R
lo = 6.40 m impact factor = 1.362903 TOP SALB
b1 = 0.99 m BOTTOM SLAB
beff = α x a (1 - a / lo ) + b1 WALL
TOTAL WID= 12.00 m
70R - 1L
IMPACT
TOTAL
B.M (mton- ACTUAL
WITH
LOAD B.M. metre) a bEffec bEFFEC B.M per metre
8 0.000 0.000 -4.100 -32.777 -32.777 ( 1.0 X 0.000) -/ 32.777 = 0.0 T-M
12 0.000 0.000 -0.140 0.272 0.272 ( 1.0 X 0.000) / 0.272 = 0.0 T-M
12 3.130 1.565 1.380 6.424 7.702 ( 2.0 X 1.565) / 7.702 = 0.4 T-M
T/F
17
= 2.21 T-M
= 3.01 T-M
8.420 4.210 2.890 8.947 8.963 ( 2.0 X 4.210) / 8.963 = 0.9 T-M
17 6.800 3.400 1.520 6.808 7.894 ( 2.0 X 3.400) / 7.894 = 0.9 T-M
17 0.000 0.000 -1.530 -8.527 -8.527 ( 1.0 X 0.000) -/ 8.527 = 0.0 T-M
TOP SLAB
17 0.000 0.000 -2.900 -20.165 -20.165 ( 1.0 X 0.000) -/ 20.165 = 0.0 T-M
8 0.000 0.000 -4.400 -36.284 -36.284 ( 1.0 X 0.000) -/ 36.284 = 0.0 T-M
12 0.000 0.000 -0.440 -1.371 -1.371 ( 1.0 X 0.000) -/ 1.371 = 0.0 T-M
12 -3.370 -1.685 1.080 5.497 7.238 ( 2.0 X -1.685) / 7.238 - = 0.5 T-M
B/F
- = 3.63 T-M
- = 4.95 T-M
17 -18.840 -9.420 3.190 9.022 9.001 ( 2.0 X -9.420) / 9.001 - = 2.1 T-M
17 -8.840 -4.420 1.820 7.528 8.254 ( 2.0 X -4.420) / 8.254 - = 1.1 T-M
17 0.000 0.000 -1.230 -6.371 -6.371 ( 1.0 X 0.000) -/ 6.371 = 0.0 T-M
17 0.000 0.000 -2.600 -17.364 -17.364 ( 1.0 X 0.000) -/ 17.364 = 0.0 T-M
8 0.000 0.000 -4.100 -32.777 -32.777 ( 1.0 X 0.000) -/ 32.777 = 0.0 T-M
12 0.000 0.000 -0.140 0.272 0.272 ( 1.0 X 0.000) / 0.272 = 0.0 T-M
12 -3.130 -1.565 1.380 6.424 7.702 ( 2.0 X -1.565) / 7.702 - = 0.4 T-M
O/F-S
- = 2.21 T-M
- = 3.01 T-M
17 -8.420 -4.210 2.890 8.947 8.963 ( 2.0 X -4.210) / 8.963 - = 0.9 T-M
17 -6.800 -3.400 1.520 6.808 7.894 ( 2.0 X -3.400) / 7.894 - = 0.9 T-M
BENDING MOMENT
17 0.000 0.000 -1.530 -8.527 -8.527 ( 1.0 X 0.000) -/ 8.527 = 0.0 T-M
17 0.000 0.000 -2.900 -20.165 -20.165 ( 1.0 X 0.000) -/ 20.165 = 0.0 T-M
WALL
8 0.000 0.000 -13.400 -207.120 -207.120 ( 1.0 X 0.000) -/ 207.120 = 0.0 T-M
12 0.000 0.000 -9.440 -116.297 -116.297 ( 1.0 X 0.000) -/ 116.297 = 0.0 T-M
12 0.000 0.000 -7.920 -87.969 -87.969 ( 1.0 X 0.000) -/ 87.969 = 0.0 T-M
I/F-S
= 0.50 T-M
= 0.68 T-M
17 0.000 0.000 -5.790 -54.371 -54.371 ( 1.0 X 0.000) -/ 54.371 = 0.0 T-M
17 0.000 0.000 -4.420 -36.522 -36.522 ( 1.0 X 0.000) -/ 36.522 = 0.0 T-M
17 0.000 0.000 -1.370 -7.360 -7.360 ( 1.0 X 0.000) -/ 7.360 = 0.0 T-M
17 0.990 0.495 0.000 0.990 0.990 ( 1.0 X 0.495) / 0.990 = 0.5 T-M
8 0.000 0.000 -7.000 -72.584 -72.584 ( 1.0 X 0.000) -/ 72.584 = 0.0 T-M
12 0.000 0.000 -3.040 -21.520 -21.520 ( 1.0 X 0.000) -/ 21.520 = 0.0 T-M
12 0.000 0.000 -1.520 -8.453 -8.453 ( 1.0 X 0.000) -/ 8.453 = 0.0 T-M
B/F
- = 2.02 T-M
- = 2.75 T-M
17 -3.030 -1.515 0.610 3.760 6.370 ( 2.0 X -1.515) / 6.370 - = 0.5 T-M
17 -1.660 -0.830 1.980 7.855 8.417 ( 2.0 X -0.830) / 8.417 - = 0.2 T-M
17 -0.340 -0.170 1.370 6.395 7.688 ( 2.0 X -0.170) / 7.688 = 0.0 T-M
17 -2.570 -1.285 0.000 0.990 0.990 ( 1.0 X -1.285) / 0.990 - = 1.3 T-M
RAFT
8 0.000 0.000 -7.600 -82.468 -82.468 ( 1.0 X 0.000) -/ 82.468 = 0.0 T-M
12 0.000 0.000 -3.640 -27.675 -27.675 ( 1.0 X 0.000) -/ 27.675 = 0.0 T-M
12 0.000 0.000 -2.120 -13.178 -13.178 ( 1.0 X 0.000) -/ 13.178 = 0.0 T-M
T/F
= 4.62 T-M
= 6.30 T-M
17 6.790 3.395 0.010 1.040 1.040 ( 1.0 X 3.395) / 1.040 = 3.3 T-M
17 5.860 2.930 1.380 6.424 7.702 ( 2.0 X 2.930) / 7.702 = 0.8 T-M
17 3.280 1.640 1.970 7.835 8.408 ( 2.0 X 1.640) / 8.408 = 0.4 T-M
17 1.330 0.665 0.600 3.720 6.350 ( 2.0 X 0.665) / 6.350 = 0.2 T-M
29
α = 5.02
lo = 6.40 m Impact factor(Class A) = 1.362903 For Class 70 R + A
b1 = 0.63 m
beff = α x a (1 - a / lo ) + b1
TOTAL WID= 12.00 m
CLASS A-1L
IMPACT
TOTAL
WITH
B.M (mton- ACTUAL
LOAD B.M. a bEffec B.M per metre
metre) bEFFEC
2.7 0.000 0.000 -1.400 -7.935 -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
2.7 0.000 0.000 -0.300 -0.947 -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
11.4 5.350 2.675 2.900 8.591 7.196 ( 2.0 X 2.675) / 7.196 = 0.7 T-M
11.4 5.490 2.745 2.300 8.027 6.913 ( 2.0 X 2.745) / 6.913 = 0.8 T-M
T/F
= 1.54 T-M
= 2.10 T-M
6.8 0.000 0.000 -2.000 -12.548 -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
6.8 0.000 0.000 -5.000 -44.079 -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
6.8 0.000 0.000 -8.000 -89.730 -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
TOP SLAB
6.8 0.000 0.000 -11.000 -149.499 -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
2.7 0.000 0.000 -1.100 -5.841 -5.841 ( 1.0 X 0.000) -/ 5.841 = 0.0 T-M
2.7 -0.090 -0.045 0.000 0.630 0.630 ( 1.0 X -0.045) / 0.630 - = 0.1 T-M
11.4 -12.690 -6.345 3.200 8.662 7.231 ( 2.0 X -6.345) / 7.231 - = 1.8 T-M
11.4 -6.680 -3.340 2.000 7.533 6.666 ( 2.0 X -3.340) / 6.666 - = 1.0 T-M
B/F
- = 2.83 T-M
- = 3.85 T-M
6.8 0.000 0.000 -2.300 -15.065 -15.065 ( 1.0 X 0.000) -/ 15.065 = 0.0 T-M
6.8 0.000 0.000 -5.300 -48.009 -48.009 ( 1.0 X 0.000) -/ 48.009 = 0.0 T-M
6.8 0.000 0.000 -8.300 -95.072 -95.072 ( 1.0 X 0.000) -/ 95.072 = 0.0 T-M
6.8 0.000 0.000 -11.300 -156.253 -156.253 ( 1.0 X 0.000) -/ 156.253 = 0.0 T-M
2.7 0.000 0.000 -1.400 -7.935 -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
2.7 0.000 0.000 -0.300 -0.947 -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
11.4 -5.350 -2.675 2.900 8.591 7.196 ( 2.0 X -2.675) / 7.196 - = 0.7 T-M
O/F-S
11.4 -5.490 -2.745 2.300 8.027 6.913 ( 2.0 X -2.745) / 6.913 - = 0.8 T-M
- = 1.54 T-M
- = 2.10 T-M
6.8 0.000 0.000 -2.000 -12.548 -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
BENDING MOMENT
6.8 0.000 0.000 -5.000 -44.079 -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
6.8 0.000 0.000 -8.000 -89.730 -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
WALL
6.8 0.000 0.000 -11.000 -149.499 -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
2.7 0.000 0.000 -18.800 -370.976 -370.976 ( 1.0 X 0.000) -/ 370.976 = 0.0 T-M
2.7 0.000 0.000 -17.700 -333.961 -333.961 ( 1.0 X 0.000) -/ 333.961 = 0.0 T-M
11.4 0.000 0.000 -14.500 -237.075 -237.075 ( 1.0 X 0.000) -/ 237.075 = 0.0 T-M
11.4 0.000 0.000 -13.300 -204.884 -204.884 ( 1.0 X 0.000) -/ 204.884 = 0.0 T-M
I/F-S
= 0.32 T-M
= 0.43 T-M
6.8 0.000 0.000 -9.000 -108.084 -108.084 ( 1.0 X 0.000) -/ 108.084 = 0.0 T-M
6.8 0.000 0.000 -6.000 -57.728 -57.728 ( 1.0 X 0.000) -/ 57.728 = 0.0 T-M
6.8 0.000 0.000 -3.000 -21.489 -21.489 ( 1.0 X 0.000) -/ 21.489 = 0.0 T-M
6.8 0.400 0.200 0.000 0.630 0.630 ( 1.0 X 0.200) / 0.630 = 0.3 T-M
2.7 0.000 0.000 -4.300 -35.459 -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
2.7 0.000 0.000 -3.200 -23.466 -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
11.4 -2.310 -1.155 0.000 0.630 0.630 ( 1.0 X -1.155) / 0.630 - = 1.8 T-M
11.4 -1.670 -0.835 1.200 5.525 5.662 ( 2.0 X -0.835) / 5.662 - = 0.3 T-M
B/F
- = 2.19 T-M
- = 2.99 T-M
6.8 -0.330 -0.165 0.900 4.513 5.156 ( 2.0 X -0.165) / 5.156 - = 0.1 T-M
6.8 0.000 0.000 -2.100 -13.371 -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
RAFT SLAB
6.8 0.000 0.000 -5.100 -45.374 -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
6.8 0.000 0.000 -8.100 -91.495 -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
2.7 0.000 0.000 -4.300 -35.459 -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
2.7 0.000 0.000 -3.200 -23.466 -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
11.4 4.560 2.280 0.000 0.630 0.630 ( 1.0 X 2.280) / 0.630 = 3.6 T-M
11.4 4.010 2.005 1.200 5.525 5.662 ( 2.0 X 2.005) / 5.662 = 0.7 T-M
T/F
= 4.47 T-M
= 6.09 T-M
6.8 0.730 0.365 0.900 4.513 5.156 ( 2.0 X 0.365) / 5.156 = 0.1 T-M
6.8 0.000 0.000 -2.100 -13.371 -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
6.8 0.000 0.000 -5.100 -45.374 -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
6.8 0.000 0.000 -8.100 -91.495 -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
30
Impact factor (70R) = 1.25 For Class 70 R + A
70R
IMPACT
TOTAL
B.M (mton-
WITH
ACTUAL
LOAD B.M. a bEffec
TOTAL
B.M per metre
metre) bEFFEC
8 0.00 0.00 -4.10 -32.78 -32.777 ( 1.0 X 0.000) -/ 32.777 = 0.00 T-M
12 0.00 0.00 -0.14 0.27 0.272 ( 1.0 X 0.000) / 0.272 = 0.00 T-M
12 3.13 1.57 1.38 6.42 6.602 ( 2.0 X 1.565) / 6.602 = 0.47 T-M
17 8.42 4.21 2.89 8.95 7.863 ( 2.0 X 4.210) / 7.863 = 1.07 T-M
17 6.80 3.40 1.52 6.81
= 2.55 T-M
= 3.18 T-M
= 3.18 T-M
6.794 ( 2.0 X 3.400) / 6.794 = 1.00 T-M
17 0.00 0.00 -1.53 -8.53 -8.527 ( 1.0 X 0.000) -/ 8.527 = 0.00 T-M
17 0.00 0.00 -2.90 -20.16 -20.165 ( 1.0 X 0.000) -/ 20.165 = 0.00 T-M
8 0.00 0.00 -4.40 -36.28 -36.284 ( 1.0 X 0.000) -/ 36.284 = 0.00 T-M
12 0.00 0.00 -0.44 -1.37 -1.371 ( 1.0 X 0.000) -/ 1.371 = 0.00 T-M
12 -3.37 -1.69 1.08 5.50 6.138 ( 2.0 X -1.685) / 6.138 - = 0.55 T-M
17 -18.84 -9.42 3.19 9.02 7.901 ( 2.0 X -9.420) / 7.901 - = 2.38 T-M
- = 4.17 T-M
- = 5.21 T-M
- = 5.21 T-M
17 -8.84 -4.42 1.82 7.53 7.154 ( 2.0 X -4.420) / 7.154 - = 1.24 T-M
17 0.00 0.00 -1.23 -6.37 -6.371 ( 1.0 X 0.000) -/ 6.371 = 0.00 T-M
17 0.00 0.00 -2.60 -17.36 -17.364 ( 1.0 X 0.000) -/ 17.364 = 0.00 T-M
8 0.00 0.00 -4.10 -32.78 -32.777 ( 1.0 X 0.000) -/ 32.777 = 0.00 T-M
12 0.00 0.00 -0.14 0.27 0.272 ( 1.0 X 0.000) / 0.272 = 0.00 T-M
12 -3.13 -1.57 1.38 6.42 6.602 ( 2.0 X -1.565) / 6.602 - = 0.47 T-M
17 -8.42 -4.21 2.89 8.95 7.863 ( 2.0 X -4.210) / 7.863 - = 1.07 T-M
- = 2.55 T-M
- = 3.18 T-M
- = 3.18 T-M
17 -6.80 -3.40 1.52 6.81 6.794 ( 2.0 X -3.400) / 6.794 - = 1.00 T-M
17 0.00 0.00 -1.53 -8.53 -8.527 ( 1.0 X 0.000) -/ 8.527 = 0.00 T-M
17 0.00 0.00 -2.90 -20.16 -20.165 ( 1.0 X 0.000) -/ 20.165 = 0.00 T-M
8 0.00 0.00 -13.40 -207.12 -207.120 ( 1.0 X 0.000) -/ 207.120 = 0.00 T-M
12 0.00 0.00 -9.44 -116.30 -116.297 ( 1.0 X 0.000) -/ 116.297 = 0.00 T-M
12 0.00 0.00 -7.92 -87.97 -87.969 ( 1.0 X 0.000) -/ 87.969 = 0.00 T-M
17 0.00 0.00 -5.79 -54.37 -54.371 ( 1.0 X 0.000) -/ 54.371 = 0.00 T-M
17 0.00 0.00 -4.42 -36.52
= 0.50 T-M
= 0.63 T-M
= 0.63 T-M
-36.522 ( 1.0 X 0.000) -/ 36.522 = 0.00 T-M
17 0.00 0.00 -1.37 -7.36 -7.360 ( 1.0 X 0.000) -/ 7.360 = 0.00 T-M
17 0.99 0.50 0.00 0.99 0.990 ( 1.0 X 0.495) / 0.990 = 0.50 T-M
8 0.00 0.00 -7.00 -72.58 -72.584 ( 1.0 X 0.000) -/ 72.584 = 0.00 T-M
12 0.00 0.00 -3.04 -21.52 -21.520 ( 1.0 X 0.000) -/ 21.520 = 0.00 T-M
12 0.00 0.00 -1.52 -8.45 -8.453 ( 1.0 X 0.000) -/ 8.453 = 0.00 T-M
17 -3.03 -1.52 0.61 3.76 5.270 ( 2.0 X -1.515) / 5.270 - = 0.57 T-M
- = 2.15 T-M
- = 2.69 T-M
- = 2.99 T-M
17 -1.66 -0.83 1.98 7.85 7.317 ( 2.0 X -0.830) / 7.317 - = 0.23 T-M
17 -0.34 -0.17 1.37 6.40 6.588 ( 2.0 X -0.170) / 6.588 - = 0.05 T-M
17 -2.57 -1.29 0.00 0.99 0.990 ( 1.0 X -1.285) / 0.990 - = 1.30 T-M
8 0.00 0.00 -7.60 -82.47 -82.468 ( 1.0 X 0.000) -/ 82.468 = 0.00 T-M
12 0.00 0.00 -3.64 -27.68 -27.675 ( 1.0 X 0.000) -/ 27.675 = 0.00 T-M
12 0.00 0.00 -2.12 -13.18 -13.178 ( 1.0 X 0.000) -/ 13.178 = 0.00 T-M
17 6.79 3.40 0.01 1.04 1.040 ( 1.0 X 3.395) / 1.040 = 3.26 T-M
17 5.86 2.93 1.38 6.42
= 4.85 T-M
= 6.07 T-M
= 6.09 T-M
31
α = 5.02
lo = 6.40 m Impact factor(ClassA) = 1.362903 For Class A + 70 R
b1 = 0.63 m
beff = α x a (1 - a / lo ) + b1
TOTAL WID= 12.00 m
CLASS A-1L
IMPACT
TOTAL
WITH
B.M (mton- ACTUAL
LOAD B.M. a bEffec B.M per metre
metre) bEFFEC
2.7 0.000 0.000 -1.400 -7.935 -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
2.7 0.000 0.000 -0.300 -0.947 -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
11.4 5.350 2.675 2.900 8.591 7.196 ( 2.0 X 2.675) / 7.196 = 0.7 T-M
11.4 5.490 2.745 2.300 8.027 6.913 ( 2.0 X 2.745) / 6.913 = 0.8 T-M
T/F
= 1.54 T-M
= 2.10 T-M
6.8 0.000 0.000 -2.000 -12.548 -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
6.8 0.000 0.000 -5.000 -44.079 -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
6.8 0.000 0.000 -8.000 -89.730 -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
TOP SLAB
6.8 0.000 0.000 -11.000 -149.499 -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
2.7 0.000 0.000 -1.100 -5.841 -5.841 ( 1.0 X 0.000) -/ 5.841 = 0.0 T-M
2.7 -0.090 -0.045 0.000 0.630 0.630 ( 1.0 X -0.045) / 0.630 - = 0.1 T-M
11.4 -12.690 -6.345 3.200 8.662 7.231 ( 2.0 X -6.345) / 7.231 - = 1.8 T-M
11.4 -6.680 -3.340 2.000 7.533 6.666 ( 2.0 X -3.340) / 6.666 - = 1.0 T-M
B/F
- = 2.83 T-M
- = 3.85 T-M
6.8 0.000 0.000 -2.300 -15.065 -15.065 ( 1.0 X 0.000) -/ 15.065 = 0.0 T-M
6.8 0.000 0.000 -5.300 -48.009 -48.009 ( 1.0 X 0.000) -/ 48.009 = 0.0 T-M
6.8 0.000 0.000 -8.300 -95.072 -95.072 ( 1.0 X 0.000) -/ 95.072 = 0.0 T-M
6.8 0.000 0.000 -11.300 -156.253 -156.253 ( 1.0 X 0.000) -/ 156.253 = 0.0 T-M
2.7 0.000 0.000 -1.400 -7.935 -7.935 ( 1.0 X 0.000) -/ 7.935 = 0.0 T-M
2.7 0.000 0.000 -0.300 -0.947 -0.947 ( 1.0 X 0.000) -/ 0.947 = 0.0 T-M
11.4 -5.350 -2.675 2.900 8.591 7.196 ( 2.0 X -2.675) / 7.196 - = 0.7 T-M
O/F-S
11.4 -5.490 -2.745 2.300 8.027 6.913 ( 2.0 X -2.745) / 6.913 - = 0.8 T-M
- = 1.54 T-M
- = 2.10 T-M
6.8 0.000 0.000 -2.000 -12.548 -12.548 ( 1.0 X 0.000) -/ 12.548 = 0.0 T-M
BENDING MOMENT
6.8 0.000 0.000 -5.000 -44.079 -44.079 ( 1.0 X 0.000) -/ 44.079 = 0.0 T-M
6.8 0.000 0.000 -8.000 -89.730 -89.730 ( 1.0 X 0.000) -/ 89.730 = 0.0 T-M
WALL
6.8 0.000 0.000 -11.000 -149.499 -149.499 ( 1.0 X 0.000) -/ 149.499 = 0.0 T-M
2.7 0.000 0.000 -18.800 -370.976 -370.976 ( 1.0 X 0.000) -/ 370.976 = 0.0 T-M
2.7 0.000 0.000 -17.700 -333.961 -333.961 ( 1.0 X 0.000) -/ 333.961 = 0.0 T-M
11.4 0.000 0.000 -14.500 -237.075 -237.075 ( 1.0 X 0.000) -/ 237.075 = 0.0 T-M
I/F-S
11.4 0.000 0.000 -13.300 -204.884 -204.884 ( 1.0 X 0.000) -/ 204.884 = 0.0 T-M
= 0.32 T-M
= 0.43 T-M
6.8 0.000 0.000 -9.000 -108.084 -108.084 ( 1.0 X 0.000) -/ 108.084 = 0.0 T-M
6.8 0.000 0.000 -6.000 -57.728 -57.728 ( 1.0 X 0.000) -/ 57.728 = 0.0 T-M
6.8 0.000 0.000 -3.000 -21.489 -21.489 ( 1.0 X 0.000) -/ 21.489 = 0.0 T-M
6.8 0.400 0.200 0.000 0.630 0.630 ( 1.0 X 0.200) / 0.630 = 0.3 T-M
2.7 0.000 0.000 -4.300 -35.459 -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
2.7 0.000 0.000 -3.200 -23.466 -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
11.4 -2.310 -1.155 0.000 0.630 0.630 ( 1.0 X -1.155) / 0.630 - = 1.8 T-M
11.4 -1.670 -0.835 1.200 5.525 5.662 ( 2.0 X -0.835) / 5.662 - = 0.3 T-M
B/F
- = 2.19 T-M
- = 2.99 T-M
6.8 -0.330 -0.165 0.900 4.513 5.156 ( 2.0 X -0.165) / 5.156 - = 0.1 T-M
6.8 0.000 0.000 -2.100 -13.371 -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
6.8 0.000 0.000 -5.100 -45.374 -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
RAFT SLAB
6.8 0.000 0.000 -8.100 -91.495 -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
2.7 0.000 0.000 -4.300 -35.459 -35.459 ( 1.0 X 0.000) -/ 35.459 = 0.0 T-M
2.7 0.000 0.000 -3.200 -23.466 -23.466 ( 1.0 X 0.000) -/ 23.466 = 0.0 T-M
11.4 4.560 2.280 0.000 0.630 0.630 ( 1.0 X 2.280) / 0.630 = 3.6 T-M
11.4 4.010 2.005 1.200 5.525 5.662 ( 2.0 X 2.005) / 5.662 = 0.7 T-M
T/F
= 4.47 T-M
= 6.09 T-M
6.8 0.730 0.365 0.900 4.513 5.156 ( 2.0 X 0.365) / 5.156 = 0.1 T-M
6.8 0.000 0.000 -2.100 -13.371 -13.371 ( 1.0 X 0.000) -/ 13.371 = 0.0 T-M
6.8 0.000 0.000 -5.100 -45.374 -45.374 ( 1.0 X 0.000) -/ 45.374 = 0.0 T-M
6.8 0.000 0.000 -8.100 -91.495 -91.495 ( 1.0 X 0.000) -/ 91.495 = 0.0 T-M
32
Impact factor (70R) = 1.25 For Class A + 70 R
70R
IMPACT
TOTAL
B.M (mton-
WITH
ACTUAL
LOAD B.M. a bEffec B.M per metre
metre) bEFFEC
8 0.00 0.00 -4.10 -32.78 -32.777 ( 1.0 X 0.000) -/ 32.777 = 0.00 T-M
12 0.00 0.00 -0.14 0.27 0.272 ( 1.0 X 0.000) / 0.272 = 0.00 T-M
12 3.13 1.57 1.38 6.42 6.602 ( 2.0 X 1.565) / 6.602 = 0.47 T-M
17 8.42 4.21 2.89 8.95 7.863 ( 2.0 X 4.210) / 7.863 = 1.07 T-M
17 6.80 3.40 1.52 6.81
= 2.55 T-M
= 3.18 T-M
6.794 ( 2.0 X 3.400) / 6.794 = 1.00 T-M
17 0.00 0.00 -1.53 -8.53 -8.527 ( 1.0 X 0.000) -/ 8.527 = 0.00 T-M
17 0.00 0.00 -2.90 -20.16 -20.165 ( 1.0 X 0.000) -/ 20.165 = 0.00 T-M
8 0.00 0.00 -4.40 -36.28 -36.284 ( 1.0 X 0.000) -/ 36.284 = 0.00 T-M
12 0.00 0.00 -0.44 -1.37 -1.371 ( 1.0 X 0.000) -/ 1.371 = 0.00 T-M
12 -3.37 -1.69 1.08 5.50 6.138 ( 2.0 X -1.685) / 6.138 - = 0.55 T-M
17 -18.84 -9.42 3.19 9.02 7.901 ( 2.0 X -9.420) / 7.901 - = 2.38 T-M
- = 4.17 T-M
- = 5.21 T-M
17 -8.84 -4.42 1.82 7.53 7.154 ( 2.0 X -4.420) / 7.154 - = 1.24 T-M
17 0.00 0.00 -1.23 -6.37 -6.371 ( 1.0 X 0.000) -/ 6.371 = 0.00 T-M
17 0.00 0.00 -2.60 -17.36 -17.364 ( 1.0 X 0.000) -/ 17.364 = 0.00 T-M
8 0.00 0.00 -4.10 -32.78 -32.777 ( 1.0 X 0.000) -/ 32.777 = 0.00 T-M
12 0.00 0.00 -0.14 0.27 0.272 ( 1.0 X 0.000) / 0.272 = 0.00 T-M
12 -3.13 -1.57 1.38 6.42 6.602 ( 2.0 X -1.565) / 6.602 - = 0.47 T-M
17 -8.42 -4.21 2.89 8.95 7.863 ( 2.0 X -4.210) / 7.863 - = 1.07 T-M
- = 2.55 T-M
- = 3.18 T-M
17 -6.80 -3.40 1.52 6.81 6.794 ( 2.0 X -3.400) / 6.794 - = 1.00 T-M
17 0.00 0.00 -1.53 -8.53 -8.527 ( 1.0 X 0.000) -/ 8.527 = 0.00 T-M
17 0.00 0.00 -2.90 -20.16 -20.165 ( 1.0 X 0.000) -/ 20.165 = 0.00 T-M
8 0.00 0.00 -13.40 -207.12 -207.120 ( 1.0 X 0.000) -/ 207.120 = 0.00 T-M
12 0.00 0.00 -9.44 -116.30 -116.297 ( 1.0 X 0.000) -/ 116.297 = 0.00 T-M
12 0.00 0.00 -7.92 -87.97 -87.969 ( 1.0 X 0.000) -/ 87.969 = 0.00 T-M
17 0.00 0.00 -5.79 -54.37 -54.371 ( 1.0 X 0.000) -/ 54.371 = 0.00 T-M
17 0.00 0.00 -4.42 -36.52
= 0.50 T-M
= 0.63 T-M
-36.522 ( 1.0 X 0.000) -/ 36.522 = 0.00 T-M
17 0.00 0.00 -1.37 -7.36 -7.360 ( 1.0 X 0.000) -/ 7.360 = 0.00 T-M
17 0.99 0.50 0.00 0.99 0.990 ( 1.0 X 0.495) / 0.990 = 0.50 T-M
0.000
8 0.00 0.00 -7.00 -72.58 -72.584 ( 1.0 X 0.000) -/ 72.584 = 0.00 T-M
12 0.00 0.00 -3.04 -21.52 -21.520 ( 1.0 X 0.000) -/ 21.520 = 0.00 T-M
12 0.00 0.00 -1.52 -8.45 -8.453 ( 1.0 X 0.000) -/ 8.453 = 0.00 T-M
17 -3.03 -1.52 0.61 3.76 5.270 ( 2.0 X -1.515) / 5.270 - = 0.57 T-M
- = 2.15 T-M
- = 2.69 T-M
17 -1.66 -0.83 1.98 7.85 7.317 ( 2.0 X -0.830) / 7.317 - = 0.23 T-M
17 -0.34 -0.17 1.37 6.40 6.588 ( 2.0 X -0.170) / 6.588 - = 0.05 T-M
17 -2.57 -1.29 0.00 0.99 0.990 ( 1.0 X -1.285) / 0.990 - = 1.30 T-M
0.000
8 0.00 0.00 -7.60 -82.47 -82.468 ( 1.0 X 0.000) -/ 82.468 = 0.00 T-M
12 0.00 0.00 -3.64 -27.68 -27.675 ( 1.0 X 0.000) -/ 27.675 = 0.00 T-M
12 0.00 0.00 -2.12 -13.18 -13.178 ( 1.0 X 0.000) -/ 13.178 = 0.00 T-M
17 6.79 3.40 0.01 1.04 1.040 ( 1.0 X 3.395) / 1.040 = 3.26 T-M
17 5.86 2.93 1.38 6.42
= 4.85 T-M
= 6.07 T-M
33