JOB NO. DOCUMENT NO.

REV.1
E14005 CB3-EC-50-CA-007-A4

DATE 24 June 2015 Page 1 OF 36

Calculation Sheet for Densito Meter Shelter Structure &


Foundation

JASA KONSULTANSI FEED PIPANISASI CB-III (EX. CB-I)


(LOMANIS - TASIKMALAYA)

DIREKTORAT PEMASARAN & NIAGA


PT. PERTAMINA (PERSERO)
2015

1 24 June 2015 ISSUED FOR BID JUN ARF DK

0 18 May 2015 ISSUED FOR APPROVAL JUN ARF DK

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED CLIENT


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

REVISION HISTORICAL SHEET

Rev. Date Description

0 18 May 2015 ISSUED FOR APPROVAL


1 24 June 2015 ISSUED FOR BID

DOC. NO. CB3-EC-50-CA-007-A4 Page 2 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 3 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

TABLE OF CONTENTS

Page
1.0 GENERAL ……………………………………………………… 4
1.1 Introduction …………………………………………….. 4
1.2 Codes, Standards, and References …………………………………………….. 4
1.3 Quality of Material …………………………………………….. 4
1.4 Unit Weight of Material …………………………………………….. 4
1.5 Unit Measurement …………………………………………….. 5
1.6 Computer Software …………………………………………….. 5
1.7 Conclusion …………………………………………….. 5
2.0 MODEL DESIGN ……………………………………………………… 6
3.0 LOADING DESIGN ……………………………………………………… 8
3.1 Dead Load …………………………………………….. 8
3.2 Live Load …………………………………………….. 8
3.3 Wind Load …………………………………………….. 10
3.4 Earthquake Load …………………………………………….. 13
3.5 Load Combination …………………………………………….. 16
4.0 PURLIN DESIGN ……………………………………………………… 19
5.0 STEEL DESIGN ……………………………………………………… 23
5.1 Stress Check …………………………………………….. 23
5.2 Deflection Check …………………………………………….. 23
6.0 FOUNDATION DESIGN ……………………………………………………… 25
6.1 Reaction For Footplat Foundation …………………………………………….. 25
6.2 Footplat Analysis …………………………………………….. 26
6.3 Pedestal …………………………………………….. 36

ATTACHMENT
Soil Report
Staad input

DOC. NO.CB3-EC-50-CA-007-A4 Page 3 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO.CB3-EC-50-CA-007-A4 Page 4 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

1.0 GENERAL
1.1 Introduction
This document present Calculation Sheet Densito Meter Shelter Structure and Foundation
for Pipanisasi CB-III Tasikmalaya-West Java.

1.2 Codes, Standards, and References


a CB3-EC-50-SP-001-A4 Civil and Structure General Specification
b CB3-EC-50-SP-004-A4 Concrete Work Specification
c CB3-EC-50-SP-005-A4 Foundation Specification
d ACI 318 & ACI 318R Building Code Requirements for Structural Concrete
and Commentary
e Uniform Building Code, Vol.2 Structural Engineering Design Provision
f ANSI/ASCE 7 - 05
Minimum Design Load for Building and Other Structure

g Bowles, J. E., Foundation Analysis and Design: 4th edition, McGraw-


Hill,Inc.
h SNI-03-1726-2012 Tata Cara Perencanaan Ketahanan Gempa Untuk
Struktur Bangunan Gedung dan Non Gedung
i Laporan Soil Investigasi dan Soil Resistivity CY-III (Lomanis - Rewulu), CB-I (Lomanis -
Tasikmalaya) dan Padalarang - Sukabumi

j Peraturan Pembebanan Indonesia untuk Gedung -1983

1.3 Quality of Material


a. Concrete
Concrete Structure fc' = 22.8 Mpa = 275 kg/cm2
Leveling Concrete fc' = 11.56 Mpa = 140 kg/cm2
b. Reiforcing bar ASTM A615
Deformed Bars fy = 400 Mpa = 4000 kg/cm2
Plain Bars fy = 240 Mpa = 2400 kg/cm2

1.4 Unit Weight of Material


Reinforced Concrete gConcrete = 23.54 kN/m3 = 2.400 t/m3
Lean Concrete gLean = 22.54 kN/m3 = 2.298 t/m3
Steel gSteel = 77 kN/m3 = 7.852 t/m3
Soil gSoil = 16.5 kN/m3 = 1.683 t/m3
Sand Gravel gGravel = 17.7 kN/m3 = 1.805 t/m3
Water gWater = 10 kN/m3 = 1.020 t/m3
DOC. NO. CB3-EC-50-CA-007-A4 Page 4 of 36 Rev.1
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

1.5 Unit Measurement


Unit measurement is Metric System

1.6 Computer Software


For calculate this document use Staad.Pro 2007 and Microsoft Excel

1.7 Conclusion

No Description Size (mm) Main Bars Stirrups Remarks


1 Pedestal 300 x 225 6-D13 Ø10-150

Footing Foundation
No Description Size (mm) Main Bars (x) Main Bars (y) Remarks

D13-200 (Top D13-200 (Top


F1 Footing 700x700x250 Depth = 0,700 m
& Bott.) & Bott.)

Steel Structure
Member Type Shape Ratio Result
Rafter CNP-150x75x6.5 0.248 OK
Column CNP-150x75x6.5 0.75 OK
Beam CNP-150x75x6.5 0.184 OK
Overstek CNP-150x75x6.5 0.0199 OK

Lip Channel C-
Purlin 125x50x20x3,2 @
1200

DOC. NO. CB3-EC-50-CA-007-A4 Page 5 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 6 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

2.0 MODEL DESIGN

Column Plan

DOC. NO.CB3-EC-50-CA-007-A4 Page 6 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Rafter & Beam Plan

Pedestal Plan

DOC. NO.CB3-EC-50-CA-007-A4 Page 7 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO.CB3-EC-50-CA-007-A4 Page 8 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

3.0 LOADING DESIGN


3.1 Dead Load
All selfweight of structural Concrete shall be calculated with STAAD. Pro 2007
a. Roof
Colorbond Roof Weight = 15 kg/m2
Additional Load (10 %) = 1.5 kg/m2
Purlin = 6.13 kg/m
b. Ground Floor
Concrete Slab ( 150 mm ) = 360 kg/m2

3.2 Live Load


a. Uniform Live Load = (40 - 0.8 a) = 20 kg/m2
Concentrated Live Load, PL = 100 kg
b. Uniform Live Load (Pump Load) = 500 kg/m2

DOC. NO. CB3-EC-50-CA-007-A4 Page 8 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 9 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 10 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

3.3 Wind Load


Wind Load based on ASCE-7-05
Building Category = III

Importance Factor, I I = 1.15

Basic wind speed V = 36.114 mps


Exposure Category = B
Gust effect factor G = 0.85
Length of Building B = 3 m
Width of Building L = 2.75 m

DOC. NO. CB3-EC-50-CA-007-A4 Page 10 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Height of Building h = 3.2 m

Velocity pressure Exposure Coefficients Kzt = 1


Velocity pressure
qz = 0,613 Kz Kzt V2 I

Height of Kz Exposure
qz (kg/m2 )
Building (m) C
3.2 0.7 65.61

Wind Load X- Direction

B 3.0 = 1.09
L 2.8
All Value
Cp 0.8 for windward Wall
Cp -0.5 for Leeward Wall

Design Wind Pressure


P = qz . G. Cp
Design Wind pressure Windward Wall
Height above Distributed to Distributed to
Cp G P (kg/m2)
level (m) Inner member Edge Member
3.2 0.8 0.85 44.612 0.000 66.917

Design Wind pressure Leeward Wall


Height above Distributed to Distributed to
Cp G P (kg/m2)
level (m) Inner member Edge Member
3.2 -0.5 0.85 -27.882 0.000 -41.823

DOC. NO. CB3-EC-50-CA-007-A4 Page 11 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Wind Load Z Direction


L= 3 = 0.92
B 3.0
All Value
Cp 0.8 for windward Wall Cp -1.2 for Windward Monoslope Roof
Cp -0.5 for Leeward Wall Cp 0.3 for Leeward Monoslope Roof

Design Wind pressure Windward Wall


Height above Distributed to Distributed to
Cp G P (kg/m2)
level (m) Inner member Edge Member
3.2 0.8 0.85 44.612 0.000 61.341

Design Wind pressure Leeward Wall


Height above Distributed to Distributed to
Cp G P (kg/m2)
level (m) Inner member Edge Member
3.2 -0.5 0.85 -27.882 0.000 -38.338

Design Wind pressure Windward Roof


Height above Distributed to Distributed to
Cp G P (kg/m2)
level (m) Inner member Edge Member
3.2 -1.2 0.85 -66.917 0.000 -92.011

Design Wind pressure Leeward Roof


Height above Distributed to Distributed to
Cp G P (kg/m2)
level (m) Inner member Edge Member
3.2 0.3 0.85 16.729 0.000 23.003

DOC. NO. CB3-EC-50-CA-007-A4 Page 12 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 13 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

3.4 Earthquake Load


Earthquake load based on SNI 03-1726-2012, with design pararameter such as:
Project Location = Tasikmalaya, West Java
Risk Category = IV
Important Factor = 1.5
Ct = 0.0724
Height of Building = 3.1
Soil Type = SD
Coeffitien for Modification Response = 8
Design Seismic Base Share
V = Cs. Wt
SDs = 0.73
SD1 = 0.42
Fundamental period from building
Ta = Ct hnx
Ta = 0.20
T = Ta × Cu ≤ Tc
T = 0.28
Design Seismic Base Share Coefficient (Cs)
SDs
Cs =
R
I
= 0.137
Maximum Seismic Base Shear Coefficient
SD1
Csmax =
R
T
I
= 0.282
Minimum Seismic Base Shear Coefficient

Csmin1 = 0,044 × SDs × I ≥ 0.01

= 0.048312 ≥ 0.01
Csmin2 = 0.01
Cs = 0.137
V = Cs. Wt
= 27.345

DOC. NO. CB3-EC-50-CA-007-A4 Page 13 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Selfweight (10 Total Dead


Length Width Dead Load Live Load Weight for seismic
No % From Dead Load
(m) (m) (kg/m2) (kg/m2) (DL + 0.30 LL) (kg)
Load) (kg/m2) (kg/m2)

1 3.00 2.75 16.5 1.65 18.15 20 199.2375

Height Elevasi Weight Wx H x Fi


Wx Hx
(m) (m) (kg) ∑ Wx Hx (kg)
3.1 3.1 199.2375 617.63625 1.00 27.35
∑= 199.2375 617.63625

Roof Floor (4 joint column to beam)


Fix = 6.836 kg
Fiz = 6.836 kg
Soil Type BH-08
Kedalaman Tebal
No Lapis NSPT Ñ Ñ = 30/∑Ñ
(m) (m)
0 0 12 2 2 0.000
1 1 13 4 2 0.154
2 2 10 6 2 0.200 34.481

DOC. NO. CB3-EC-50-CA-007-A4 Page 14 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya) 34.481
3 3 15 8 2 0.133
4 4 40 10 2 0.050

5 5 32 12 2 0.063
6 6 37 14 2 0.054
7 7 41 16 2 0.049
8 8 47 18 2 0.043
9 9 45 20 2 0.044
10 10 44 22 2 0.045
11 11 57 24 2 0.035

0.870

DOC. NO. CB3-EC-50-CA-007-A4 Page 15 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 16 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

3.5 Load Combination


The following is loading combination which will be generated in STAAD.Pro analysis
program :
Factored Load Combination
Erection Condition
Load Comb. 1001 1.40 D
Load Comb. 1002 0.90 D + 1.00 W (x+)
Load Comb. 1003 0.90 D + 1.00 W (x-)
Load Comb. 1004 0.90 D + 1.00 W (z+)
Load Comb. 1005 0.90 D + 1.00 W (z-)
Load Comb. 1006 0.90 D + 0.30 Eqx + 1.00 Eqz
Load Comb. 1007 0.90 D + 0.30 Eqx - 1.00 Eqz
Load Comb. 1008 0.90 D - 0.30 Eqx + 1.00 Eqz
Load Comb. 1009 0.90 D - 0.30 Eqx - 1.00 Eqz
Load Comb. 1010 0.90 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 1011 0.90 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 1012 0.90 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 1013 0.90 D - 1.00 Eqx - 0.30 Eqz
Operating Condition
Load Comb. 1014 1.20 D + 1.60 L
Load Comb. 1015 1.20 D + 1.60 L + 0.50 W (x+)
Load Comb. 1016 1.20 D + 1.60 L + 0.50 W (x-)
Load Comb. 1017 1.20 D + 1.60 L + 0.50 W (z+)
Load Comb. 1018 1.20 D + 1.60 L + 0.50 W (z-)
Load Comb. 1019 1.20 D + 1.00 L + 0.30 Eqx + 1.00 Eqz
Load Comb. 1020 1.20 D + 1.00 L + 0.30 Eqx - 1.00 Eqz
Load Comb. 1021 1.20 D + 1.00 L - 0.30 Eqx + 1.00 Eqz
Load Comb. 1022 1.20 D + 1.00 L - 0.30 Eqx - 1.00 Eqz
Load Comb. 1023 1.20 D + 1.00 L + 1.00 Eqx + 0.30 Eqz
Load Comb. 1024 1.20 D + 1.00 L + 1.00 Eqx - 0.30 Eqz
Load Comb. 1025 1.20 D + 1.00 L - 1.00 Eqx + 0.30 Eqz
Load Comb. 1026 1.20 D + 1.00 L - 1.00 Eqx - 0.30 Eqz
Test Condition
Load Comb. 1027 1.20 D + 1.00 L + 1.00 W (x+)
Load Comb. 1028 1.20 D + 1.00 L + 1.00 W (x-)
Load Comb. 1029 1.20 D + 1.00 L + 1.00 W (z+)
Load Comb. 1030 1.20 D + 1.00 L + 1.00 W (z-)

DOC. NO. CB3-EC-50-CA-207-A4 Page 16 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Maintenance Condition
Load Comb. 1031 1.40 D
Load Comb. 1032 0.90 D + 1.00 W (x+)
Load Comb. 1033 0.90 D + 1.00 W (x-)
Load Comb. 1034 0.90 D + 1.00 W (z+)
Load Comb. 1035 0.90 D + 1.00 W (z-)
Load Comb. 1036 0.90 D + 0.30 Eqx + 1.00 Eqz
Load Comb. 1037 0.90 D + 0.30 Eqx - 1.00 Eqz
Load Comb. 1038 0.90 D - 0.30 Eqx + 1.00 Eqz
Load Comb. 1039 0.90 D - 0.30 Eqx - 1.00 Eqz
Load Comb. 1040 0.90 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 1041 0.90 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 1042 0.90 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 1043 0.90 D - 1.00 Eqx - 0.30 Eqz

Unfactored Load Combination


Erection Condition
Load Comb. 2001 1.00 D
Load Comb. 2002 1.00 D + 1.0 W (x+)
Load Comb. 2003 1.00 D + 1.0 W (x-)
Load Comb. 2004 1.00 D + 1.0 W (z+)
Load Comb. 2005 1.00 D + 1.0 W (z-)
Load Comb. 2006 1.00 D + 0.3 Eqx + 1.0 Eqz
Load Comb. 2007 1.00 D + 0.3 Eqx - 1.0 Eqz
Load Comb. 2008 1.00 D - 0.3 Eqx + 1.0 Eqz
Load Comb. 2009 1.00 D - 0.3 Eqx - 1.0 Eqz
Load Comb. 2010 1.00 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 2011 1.00 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 2012 1.00 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 2013 1.00 D - 1.00 Eqx - 0.30 Eqz
Operating Condition
Load Comb. 2014 1.00 D + 1.00 L
Load Comb. 2015 1.00 D + 1.00 L + 1.0 W (x+)
Load Comb. 2016 1.00 D + 1.00 L + 1.0 W (x-)
Load Comb. 2017 1.00 D + 1.00 L + 1.0 W (z+)

DOC. NO. CB3-EC-50-CA-207-A4 Page 17 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Load Comb. 2018 1.00 D + 1.00 L + 1.0 W (z-)


Load Comb. 2019 1.00 D + 1.00 L + 0.3 Eqx + 1.0 Eqz
Load Comb. 2020 1.00 D + 1.00 L + 0.3 Eqx - 1.0 Eqz

Load Comb. 2021 1.00 D + 1.00 L - 0.3 Eqx + 1.0 Eqz


Load Comb. 2022 1.00 D + 1.00 L - 0.3 Eqx - 1.0 Eqz
Load Comb. 2023 1.00 D + 1.00 L + 1.00 Eqx + 0.30 Eqz
Load Comb. 2024 1.00 D + 1.00 L + 1.00 Eqx - 0.30 Eqz
Load Comb. 2025 1.00 D + 1.00 L - 1.00 Eqx + 0.30 Eqz
Load Comb. 2026 1.00 D + 1.00 L - 1.00 Eqx - 0.30 Eqz
Test Condition
Load Comb. 2027 1.00 D + 0.50 L
Load Comb. 2028 1.00 D + 0.50 L + 0.25 W (x+)
Load Comb. 2029 1.00 D + 0.50 L + 0.25 W (x-)
Load Comb. 2030 1.00 D + 0.50 L + 0.25 W (z+)
Load Comb. 2031 1.00 D + 0.50 L + 0.25 W (z-)
Maintenance Condition
Load Comb. 2032 1.00 D
Load Comb. 2033 1.00 D + 1.0 W (x+)
Load Comb. 2034 1.00 D + 1.0 W (x-)
Load Comb. 2035 1.00 D + 1.0 W (z+)
Load Comb. 2036 1.00 D + 1.0 W (z-)
Load Comb. 2037 1.00 D + 0.3 Eqx + 1.0 Eqz
Load Comb. 2038 1.00 D + 0.3 Eqx - 1.0 Eqz
Load Comb. 2039 1.00 D - 0.3 Eqx + 1.0 Eqz
Load Comb. 2040 1.00 D - 0.3 Eqx - 1.0 Eqz
Load Comb. 2041 1.00 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 2042 1.00 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 2043 1.00 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 2044 1.00 D - 1.00 Eqx - 0.30 Eqz

Where:
D : Dead Load
L : Live Load
W : Wind Load
E : Earthquake Load

DOC. NO. CB3-EC-50-CA-207-A4 Page 18 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-207-A4 Page 19 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

4.0 PURLIN DESIGN


Load pattern taken from the building regulations for the Imposition of Indonesia 1987
a). Dead Load
Roof
- Colorbond Roof Weight = 15 kg/m2
- Self weight = Adjusting Planning
- Additional Load = 10 % from (self weight plus roof weight)
b). Live Load
- Uniform Live Load :
a = 3 0
q = (40 - 0.8 a) = 38 kg/m2 > 20 kg/m2
Used q = = 20 kg/m2
- Concentrated Live Load
P = 100 kg
c). Data Roof
Type = Zincalume Colorbond
Weight = 15 kg/m2
Spacing of Purlin = 120 cm
Spacing of Frame = 275 cm
Roof Slope Angle = 0.0524 rad = 30

Planning profile lip channel for gording with size:


C 125 x 50 x 20 x 3.2
Material Properties : Zx = 29 cm3
A= 7.81 cm2 Zy = 8 cm3
W= 6.13 kg/m fu = 3700 kg/cm2 = 370 Mpa
Ix = 181 cm4 fy = 2400 kg/cm2 = 240 Mpa
Iy = 27 cm 4
E= 210000 Mpa

DOC. NO. CB3-EC-50-CA-007-A4 Page 19 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Design Load
a). Dead Load
Selfweight (Purlin) = 6.13 kg/m
Roof Weight = 18 kg/m +
Total Weight = 24.13 kg/m
Additional Weight 10 % = 2.413 kg/m
qD = 26.543 kg/m
b). Live Load
Uniform Live Load = (40 - 0.8 a) = = 20 kg/m2
qL = gording horizontal distance x q = -23.76 kg/m
Concentrated Live Load, PL = 100 kg
c). Wind Load
Wind Windward Pressure = 13.614 kg/m2
Wind Windward Pressure = 16.336 kg/m
Wind Leeward Pressure = 8.5085 kg/m2
Wind Leeward Pressure = 10.21 kg/m
Dead Load + Live Load > Wind Windward Pressure :
26.543 + -23.76 kg/m > 16.336 kg/m
Wind Load Presneed calculated ==> qw = 10.21 kg/m
Calculation of load moment due to the x-axis and y-axis
Dead Load
MXD = 1/8 (qD x cosa) L2 = 0.125 x 26.543 x 0.999 x 7.562 = 25.057 kg.m
MYD = 1/8(qDxsina) x L/2 2
= 0.125 x 26.543 x 0.052 x 1.890 = 1.3132 kg.m
Uniform Live Load
MXLD = 1/8 (qL x cosa) L2 = 0.125 x -23.76 x 0.999 x 7.5625 = -22.43 kg.m
MYL = 1/8(qLxsina) x L/2 2
= 0.125 x -23.76 x 0.052 x 1.890 = -1.175 kg.m
Concentrated Live Load
MXL = 1/4 (qL x cosa) L = 0.25 x 100 x 0.999 x 2.75 = 68.656 kg.m
MYL = 1/4(qL x sina)(L/3) = 0.25 x 100 x 0.052 x 0.81 = 1.1994 kg.m
Uniform Wind Load
MXW = 1/8 x qw x L = 0.125 x 10.21 x 2.75 = 3.5098 kg.m
Moment Resistance ( Mu = 1.2 MD + 1.6 ML + 0.8 MW )
Mu (Uniform Dead Load, Live Load and Wind Load)
X axis Y axis
MD = 25.057 kg.m MD = 1.3132 kg.m

DOC. NO. CB3-EC-50-CA-007-A4 Page 20 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)
ML = -22.43 kg.m ML = -1.175 kg.m
Mw = 3.5098 kg.m

MUX = -3.011 kg.m


MUY = -0.305 kg.m
Mu (Uniform Dead Load, Wind Load and Concentrated Live Load)
X axis Y axis
MD = 25.057 kg.m MD = 1.3132 kg.m
ML = 68.656 kg.m ML = 1.1994 kg.m
Mw = 3.5098 kg.m
MUX = 142.73 kg.m
MUY = 3.4948 kg.m
Equation Iteration
Mux Muy
+ ≤ 1
fb . Mnx fb . Mny
Assume a compact section
Mnx = Zx x fy = 6960000 Nmm
Mny = Zy x fy = 1920000 Nmm
Uniform Dead Load, Wind Load and Live Load
-30112.2 -3049.6
+ ≤ 1
6264000 1728000
-0.005 + -0.002 ≤ 1
-0.007 ≤ 1
Uniform Dead Load, Wind Load, and Concentrated Live Load
1427255.1 34948.1
+ ≤ 1
6264000 1728000
0.228 + 0.020 ≤ 1
0.248 ≤ 1
Check Displacement
Limit Displacement δ = L = 1.1458 cm
240
Displacement due to Uniform Load (1)
5 (qD + L) cos a L4 5 0.0028 x 0.9986 x 57.191
δx = x = x
384 E Ix 384 2100 x 181
= 0.005 cm
5 (qD + L) sin a (L/3)4 5 0.0028 x 0.0523 x 0.7061
δy = x = x
DOC. NO. CB3-EC-50-CA-007-A4 Page 21 of 36 Rev.1
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)
δy = x = x
384 E Iy 384 2100 x 181
= 0.000 cm

Displacement due to Concentrated Live Load (2)


1 P cos a L3 0.1 x 0.9986 x 20.797
δx = x = 0.0208 x
48 E Ix 2100 x 181
= 0.114 cm
1 P sin a L3 0.1 x 0.0523 x 20.797
δy = x = 0.0208 x
48 E Iy 2100 x 181
= 0.006 cm
Displacement due to Wind Load (3)
5 (qw) cos a L4 5 0.0102 x 0.9986 x 57.191
δx = x = x
384 E Ix 384 2100 x 181
= 0.020 cm
5 (qw) sin a (L/3) 4
5 0.0102 x 0.0523 x 0.7061
δy = x = x
384 E Iy 384 2100 x 181
= 0.000 cm
Total Displacement

δtot = δx2 + δy2 = (δx1 + δx2 + δx3)2 + (δy1 + δy2 + δy3)2

δtot = 0.139 cm < δijin = 1.1458 cm OK

DOC. NO. CB3-EC-50-CA-007-A4 Page 22 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 23 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

5.0 STEEL DESIGN

5.1 Stress Check


Steel stress is checked in accordance to AISC. In STAAD.Pro, this stress check is
presented with the I.R, i.e. ratio between actual member stress to the allowable member
stress. This stress check is based on factored load combination for steel design.

Following are maximum values for each type member.


Beam No. Member Type Shape Ratio Result
Rafter CNP-150x75x6.5 0.248 OK
Column CNP-150x75x6.5 0.75 OK
Beam CNP-150x75x6.5 0.184 OK
Overstek CNP-150x75x6.5 0.0199 OK

5.2 Deflection Check


Deflection check for steel structure is performed based on unfactored load combination
Allowable horisontal deflection, δh = H/200, where : H = Member Height
Allowable vertical deflection, δv = L/240, where : L = Member Length

DOC. NO. CB3-EC-50-CA-007-A4 Page 23 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Horizontal Deflection
Height Displ.
Joint Load Case Remarks
mm mm mm
δhx 3200 2014 0.04 16.00 OK

Vertical Deflection
Length Displ.
Beam Load Case Remarks
mm mm mm
δhy 3000 2014 0.12 12.50 OK

DOC. NO. CB3-EC-50-CA-007-A4 Page 24 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO. CB3-EC-50-CA-007-A4 Page 25 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

6.0 FOUNDATION DESIGN

F1

F1

F1

F1

6.1 Reaction For Footplat Foundation :

DOC. NO. CB3-EC-50-CA-007-A4 Page 26 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

6.2 Footplat Analysis

SOIL DATA
The depth of the foundation, Df = 0.70 m
Unit weight of soil, g = 16.50 kN/m3
Cohesion, c= 5.36 kPa
Prisoners tip (SPT test results), N= 5.00
Conus (qc), qc = 13.00 kg/cm2
DIMENSIONS
Foundation width x direction, Bx = 0.70 m
Foundation width y direction, By = 0.70 m
Thick foundation, h= 0.25 m
Column width direction x, bx = 0.25 m
Column width y direction, by = 0.35 m
The position of the column (in = 40, edge = 30, angle = 20) as = 20.00
MATERIAL PROPERTIES
Compressive strength of concrete, fc' = 22.8 MPa
Yield strength of steel reinforcement, fy = 400.00 MPa
Unit Weight concrete, gc = 24.00 kN/m3
DESIGN LOAD FOUNDATION
Axial force due to the factored loads, Pu = 5.05 kN

DOC. NO. CB3-EC-50-CA-007-A4 Page 27 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Moment x direction due to the factored loads, Mux = 0.00 kNm


Moment y direction due to the factored loads, Muy = 0.00 kNm

B. SOIL BEARING CAPACITY

1. ACCORDING BOWLESS (1968)


Soil bearing capacity according to Bowles (1968):
qa = 20 Nfor
KdB ≤ 4 ft (kg/cm2)
qa = N (1+1/B)
for B >/12
2
4 ft 4 ft = 1.2192 m
N = SPT test results
B =foundation width (m) B = By = 0.70 m
Df = Foundation depth (m) Df = 0.70 m
For value B : < 1.219
qa = N / 8 = 1.625
qa = N (1+1/B)2/12 = - kg/cm2
License bearing capacity of the soil, qa = 162.50 kN/m2
2. ACCORDING MEYERHOFF (1956)
Soil bearing capacity by Meyerhof (1956):
qa = qc / 33 * [ ( B + 0.3 ) / B ] 2 * Kd (kg/cm2)
with, Kd = 1 + 0.33 * Df / B must £ 1.33
qc = Conical average prisoner sondir results on the basis of the foundation (kg / cm 2)
B =foundation width (m)
Df = Foundation depth (m)
B = By = 0.70 m
Df = 0.70 m
Kd = 1 + 0.33 * Df / B = 1.330 < 1.33
Kd = 1.330
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 0.75 kg/cm2
75.45 kN/m2
License bearing capacity of the soil, qa = 75.45 kN/m2

4. SOIL BEARING CAPACITY USED

Soil bearing capacity of the soil according to Meyerhof: qa = 162.50 kN/m2


Soil bearing capacity of the soil according to Bowles: qa = 75.45 kN/m2

DOC. NO. CB3-EC-50-CA-007-A4 Page 28 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Soil bearing capacity is used: qa = 75.45 kN/m2

C.CHECK SOIL PRESSURE

Area foot base plate, A = Bx * By = 0.4900 m2


moment of inertia direction x, Wx = 1/6 * By * Bx2 = 0.057 m3
moment of inertia direction y, Wy = 1/6 * Bx * By2 = 0.057 m3
Foot high above the ground plate, z = Df - h = 0.4500 m
Pressure due to heavy foot and the ground plate, q = h * gc + z * g = 13.425 kN/m2
Eccentricity on the foundation:
ex = Mux / Pu = 0.0000 m < Bx / 6 = 0.1167 m (OK)
ey = Muy / Pu = 0.0000 m < By / 6 = 0.1167 m (OK)
The maximum pressure that occurs at the base of the foundation:
Q=R
a1 = Bx/2 - ex = 0.350 m
a2 = 3 a1 = 1.050 m
qmax = 2 * Q /(3 * Bx * (By/2 - ex)) = - kN/m2
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 23.73 kN/m2
qmax = 23.73 kN/m2
qmax < qa ® SAFE (OK)
The minimum pressure that occurs at the base of the foundation:
qmin = Pu / A - Mux / Wx - Muy / Wy + q = 23.731 kN/m2

DOC. NO. CB3-EC-50-CA-007-A4 Page 29 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)
qmin = 0.000 kN/m2
qmin = 23.73 kN/m2
qmin > 0 ® NOT TENSION (OK)

D. SHEAR FORCE FOUNDATION


1.SHEAR FORCE DIRECT X

Distance center to the outer side of the concrete reinforcement, d' = 0.075 m
Effective foot thick plate, d = h - d' = 0.175 m
Distance fields critical to the outside of the foot plate, ax = ( Bx - bx - d ) / 2 = 0.138 m
Soil pressure at the critical field shear direction x,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 23.73 kN/m2
Shear direction x, Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 0.99 kN
The width of the shear field to review the direction of x, b = By = 700 mm
Footplat effective thickness, d = 175 mm
The ratio of long side to the short side of the column, bc = bx / by = 0.714
Shear strength foot plate x direction, taken the smallest value of Vc obtained from the following
equation

Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 370 kN


Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10 =
-3
341 kN
Vc = 1 / 3 * √ fc' * b * d * 10 =
-3
195 kN

DOC. NO. CB3-EC-50-CA-007-A4 Page 30 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Taken, shear strength foot plate, Vc = 195 kN


Shear strength reduction factor, f = 0.750
Shear strength foot plate, f * Vc = 146 kN
Conditions to be met,
f * Vc ≥ Vux
146.2 > 0.99 ® SAFE (OK)

2. .SHEAR FORCE DIRECT Y

Distance center to the outer side of the concrete reinforcement, d' = 0.075 m
Effective foot thick plate, d = h - d' = 0.18 m
Distance fields critical to the outside of the foot plate, ay = ( By - by - d ) / 2 = 0.0875 m
Soil pressure at the critical field shear direction y,
qy = qmin + (By - ay) / By * (qmax - qmin) = 23.731 kN/m2
Shear direction y, Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 0.6313 kN
The width of the shear field to review the direction of y, b = Bx = 700 mm
Footplat effective thickness, d = 175 mm
The ratio of long side to the short side of the column, bc = bx / by = 0.7143

Shear strength foot plate y direction, taken the smallest value of Vc obtained from the following
equation

DOC. NO. CB3-EC-50-CA-007-A4 Page 31 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 370.5 kN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3 = 341.2 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 195.0 kN
Taken, shear strength foot plate, Vc = 195.0 kN
Shear strength reduction factor, f = 0.750
Shear strength foot plate, f * Vc = 146.2 kN
Conditions to be met,
f * Vc ≥ Vuy
146.2 > 0.63 ® SAFE (OK)
3. CHECK PUNCH SHEAR

Distance center to the outer side of the concrete reinforcement, d' = 0.075 m
Effective foot thick plate, d = h - d' = 0.18 m
The width of the shear field puncher x direction, cx = bx + 2 * d = 0.60 m
The width of the shear field pons y direction, cy = by + 2 * d = 0.70 m
Punch shear forces that occur,
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 1.66 kN
Wider field sliding punch, Ap = 2 * ( cx + cy ) * d = 0.46 m2
The width of the shear field pons, bp = 2 * ( cx + c y ) = 2.60 m
The ratio of the long side of an eye. the short side of the column, bc = bx / by = 0.71
Punch shear stress, taken the smallest value of fp is obtained from the following equation:
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 3.024 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 1.331 MPa
fp = 1 / 3 * √ fc' = 1.592 MPa
The shear stress required pons, fp = 1.331 MPa
Punch shear strength reduction factor, f = 0.750
Punch shear strength, f * Vnp = f * Ap * fp * 10 = 454.4 kN
3

Terms: f * Vnp ≥ Vup


454.4 > 1.66 ® SAFE (OK)
f * Vnp ≥ Pu
454.4 > 5.05 ® SAFE (OK)

DOC. NO. CB3-EC-50-CA-007-A4 Page 32 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

E. REINFORCEMENT
1. FLEXULAR REINFORCEMENT X DIRECTION

Distance beyond the edge of the column to the foot plate, ax = ( Bx - bx ) / 2 = 0.225 m
Soil pressure at the edge of the column,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 23.73 kN/m2
Moments that occur in the foundation plate due to soil pressure
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 0 kNm
The width of the foundation plate under review, b = By = 700 mm

Foundation plate thickness, h = 250.00 mm


Distance center reinforcement thd. the outside of the concrete, d' = 75 mm
Effective plate thickness, d = h - d' = 175.00 mm
Compressive strength of concrete, fc' = 22.80 MPa
Yield strength of steel reinforcement, fy = 400.00 MPa
Elastic modulus of steel, Es = 200000 MPa
Concrete stress distribution factor, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02
Flexural strength reduction factor, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.00
Mn = Mux / f = 0.23 kNm
Rn = Mn * 10 / ( b * d ) =
6 2
0.01

Required reinforcement ratio,


r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0000
The minimum reinforcement ratio, rmin = 0.0025
Reinforcement ratio used, r = 0.0025

DOC. NO. CB3-EC-50-CA-007-A4 Page 33 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

The area of reinforcement is required, As = r * b * d = 306 mm2


Diameter of reinforcement is used, D 13 mm
Distance reinforcement is required, s = p / 4 * D * b / As =
2
303 mm
Maximum reinforcement spacing, smax = 200 mm
Distance reinforcement is used, s= 200 mm
Used reinforcement, D 13 - 200
The area of reinforcement used, As = p / 4 * D2 * b / s = 464.6 mm2
2. FLEXULAR REINFORCEMENT Y DIRECTION

Distance beyond the edge of the column to the foot plate, ay = ( By - by ) / 2 = 0.175 m
Soil pressure at the edge of the column,
qy = qmin + (By - ay) / By * (qmax - qmin) = 24 kN/m2

Moments that occur in the foundation plate due to soil pressure


Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 0 kNm
The width of the foundation plate under review, b = Bx = 700 mm
Foundation plate thickness, h = 250.00 mm
Distance center reinforcement thd. the outside of the concrete, d' = 75 mm
Effective plate thickness, d = h - d' = 175.00 mm
Compressive strength of concrete, fc' = 22.80 MPa
Yield strength of steel reinforcement, fy = 400.00 MPa
Elastic modulus of steel, Es = 200000 MPa
Concrete stress distribution factor, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02
Flexural strength reduction factor, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.00
Mn = Muy / f = 0.14 kNm

DOC. NO. CB3-EC-50-CA-007-A4 Page 34 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)
Rn = Mn * 106 / ( b * d2 ) = 0.01
Rn < Rmax ® (OK)
Required reinforcement ratio,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0000
The minimum reinforcement ratio, rmin = 0.0025
Reinforcement ratio used, r = 0.0025
The area of reinforcement is required, As = r * b * d = 306 mm2
Diameter of reinforcement is used, D 13 mm
Distance reinforcement is required, s = p / 4 * D * b / As = 303.39 mm
2

Maximum reinforcement spacing, smax = 200.00 mm


Distance reinforcement is used, s = 200.00 mm
Used reinforcement, D 13 - 200.00
The area of reinforcement used, As = p / 4 * D2 * b / s = 465 mm2

3. REINFORCING SHRINKAGE

Minimum shrinkage reinforcement ratio, rsmin = 0.0014


Shrinkage reinforcement wide x direction, Asx = rsmin* d * Bx = 172 mm2
Extensive shrinkage reinforcement y direction, Asy = rsmin* d * By = 172 mm2
Diameter of reinforcement is used, D 13 mm
Distance reinforcement shrinkage direction x, sx = p / 4 * Æ * By / Asx =
2
542 mm
Shrinkage reinforcement maximum distance x direction, sx,max = 200 mm
Distance x direction shrinkage reinforcement is used, sx = 200 mm
Shrinkage reinforcement distance y direction, sy = p / 4 * Æ * Bx / Asy =
2
542 mm
The maximum shrinkage reinforcement distance y direction, sy,max = 200 mm

DOC. NO. CB3-EC-50-CA-007-A4 Page 35 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

Distance y direction shrinkage reinforcement is used, sy = 200 mm


Used shrinkage reinforcement direction x, D 13 - 200
Used shrinkage reinforcement y direction, D 13 - 200

F. SETTLEMENT

Footing dimension
Width Length Depth Footing
L/B
(m) (m) (m) Shape
0.70 0.70 0.70 1 SQU

Footing shape L/B = 1, : Square (SQU) and Circular Footings (CIR)


L/B ≥ 10, : Continuous Footings (CON)
1< L/B < 10, : Rectangular Footings (REC)

Depth of influence = 2.1 m


where, Square or Rec Shape = Df + 2B = 2.1 m
Continuous Shape = Df + 4B = 3.5 m

Effective stress at a depth Df below the ground surface (σ'vo)


- σ'vo = 11.55 kN/m2 GWL = - 1.70 m
where,
For Case-1 : σ'vo = (γs x Df) = 11.55 kN/m2
For Case-2 : σ'vo = (γs x hf) + (γs - γw) x (Df - hf) = - kN/m2
Initial vertical effective stress at a depth of I zp (σ'zp)
- σ'zp = 17.325 kN/m2 : (For Square Shape Footing)
where,

DOC. NO. CB3-EC-50-CA-007-A4 Page 36 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)
σ'zp(squ) = (γs x hf) + (γs - γw) x (Df + B/2 - hf) : For hf < Df + B/2 = - kN/m2
σ'zp(squ) = γs x (Df + B/2) : For hf > Df + B/2 = 17.325 kN/m2
Bearing pressure at bottom of footing (q)
qa = 75.45 kN/m2
Peak strain influence factor (Izp)
- Izp(squ) = 0.5 + 0.1 √ (q' / σ'zp(squ)) = 0.692
- Izp(con) = 0.5 + 0.1 √ (q' / σ'zp(con)) = 0.692
Depth factor (C1)
- C1 = 1 - 0.5 (σ'vo / q') = 0.910
Secondary creep factor (C2)
- C2 = 1 + 0.2 log10 (t - 0.1) = 1.340
Time since application of load (yr)
-t= 50 year (t ≥ 0.1 yr)
Shape factor (C3)
- C3 = 1.03 - 0.03 (L / B) ≥ 0.73 = 1.00

Top Bottom Es zf Hi δ
Soil Type zf / B Iz(squ) Izi Hi / Es
(m) (m) (kN/m2) (m) (m) (mm)
0.0 1.5 20000 Clay
1.7 1.9 20000 Clay 1.10 1.57 0.198 0.20 1.98E-06 0.182
2.1 2.3 20000 Clay 1.50 2.14 0.000 0.20 0.00E+00 0.000
2.5 2.7 20000 Clay 1.90 2.71 0.000 0.20 0.00E+00 0.000
2.9 3.1 20000 Clay 2.30 3.29 0.000 0.20 0.00E+00 0.000
3.3 3.5 20000 Clay 2.70 3.86 0.000 0.20 0.00E+00 0.000
3.7 3.9 20000 Clay 3.10 4.43 0.000 0.20 0.00E+00 0.000
4.1 4.3 20000 Clay 3.50 5.00 0.000 0.20 0.00E+00 0.000
4.5 4.7 20000 Clay 3.90 5.57 0.000 0.20 0.00E+00 0.000
4.9 5.1 20000 Clay 4.30 6.14 0.000 0.20 0.00E+00 0.000
Σtotal δ = 0.182

DOC. NO. CB3-EC-50-CA-007-A4 Page 37 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

6.3 Pedestal

B= 0.30 m
H = 0.23 m

DOC. NO.CB3-EC-50-CA-007-A4 Page 36 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

DOC. NO.CB3-EC-50-CA-007-A4 Page 37 of 36 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

ATTACHMENT
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 15-May-15
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 3 3 0 0; 4 3 2.8 0; 7 0 0 2.75; 9 3 0 2.75; 13 0 -0.4 0; 14 3 -0.4 0;
15 0 -0.4 2.75; 16 3 -0.4 2.75; 17 -2.38419e-007 2.8 0; 18 3 2.25 2.75;
19 -2.38419e-007 2.25 2.75; 20 3 2.99 -0.95; 21 -2.38419e-007 2.99 -0.95;
22 3 2.06 3.7; 23 -2.38419e-007 2.06 3.7;
MEMBER INCIDENCES
1 19 23; 2 17 19; 3 21 17; 4 7 19; 5 1 17; 6 13 1; 7 15 7; 8 19 18; 9 17 4;
10 14 3; 11 16 9; 12 9 18; 13 3 4; 14 18 22; 15 4 18; 16 20 4;
SUPPORTS
13 TO 16 PINNED
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1.2e-005
DAMP 0.03
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY JAPANESE
4 5 12 13 TABLE ST C150X75X6.5
1 TO 3 8 9 14 TO 16 TABLE ST C150X75X6.5
MEMBER PROPERTY JAPANESE
6 7 10 11 PRIS YD 0.225 ZD 0.3
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

CONSTANTS
BETA 270 MEMB 12 13
BETA 90 MEMB 4 5
MATERIAL STEEL MEMB 1 TO 5 8 9 12 TO 16
MATERIAL CONCRETE MEMB 6 7 10 11
LOAD 1 LOADTYPE Dead TITLE DEAD
SELFWEIGHT Y -1 LIST 1 TO 16
UNIT METER KG
MEMBER LOAD
1 TO 3 14 TO 16 UNI GY -30
LOAD 2 LOADTYPE Live TITLE LIVE
MEMBER LOAD
1 TO 3 14 TO 16 UNI GY -25
LOAD 3 LOADTYPE Wind TITLE WIND (X+)
MEMBER LOAD
4 5 UNI GX 61.341
12 13 UNI GX 38.338
LOAD 4 LOADTYPE Wind TITLE WIND (X-)
MEMBER LOAD
12 13 UNI GX -61.341
4 5 UNI GX -38.338
LOAD 5 LOADTYPE Wind TITLE WIND (Z+)
MEMBER LOAD
5 13 UNI GZ 66.917
4 12 UNI GZ 41.823
LOAD 6 LOADTYPE Wind TITLE WIND (Z-)
MEMBER LOAD
4 12 UNI GZ -66.917
5 13 UNI GZ -41.823
LOAD 7 LOADTYPE Seismic TITLE EQ (X+)
JOINT LOAD
4 17 TO 19 FX 6.836
LOAD 8 LOADTYPE Seismic TITLE EQ (X-)
JOINT LOAD
4 17 TO 19 FX -6.836
LOAD 9 LOADTYPE Seismic TITLE EQ (Z+)
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

JOINT LOAD
4 17 TO 19 FZ 6.836
LOAD 10 LOADTYPE Seismic TITLE EQ (Z-)
JOINT LOAD
4 17 TO 19 FZ -6.836
LOAD COMB 1001 LC-1001
1 1.4
LOAD COMB 1002 LC-1002
1 0.9 3 1.0
LOAD COMB 1003 LC-1003
1 0.9 4 1.0
LOAD COMB 1004 LC-1004
1 0.9 5 1.0
LOAD COMB 1005 LC-1005
1 0.9 6 1.0
LOAD COMB 1006 LC-1006
1 0.9 7 0.3 9 1.0
LOAD COMB 1007 LC-1007
1 0.9 7 0.3 10 1.0
LOAD COMB 1008 LC-1008
1 0.9 8 0.3 9 1.0
LOAD COMB 1009 LC-1009
1 0.9 8 0.3 10 1.0
LOAD COMB 1010 LC-1010
1 0.9 7 1.0 9 0.3
LOAD COMB 1011 LC-1011
1 0.9 7 1.0 10 0.3
LOAD COMB 1012 LC-1012
1 0.9 8 1.0 9 0.3
LOAD COMB 1013 LC-1013
1 0.9 8 1.0 10 0.3
LOAD COMB 1014 LC-1014
1 1.2 2 1.6
LOAD COMB 1015 LC-1015
1 1.2 2 1.6 3 0.5
LOAD COMB 1016 LC-1016
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

1 1.2 2 1.6 4 0.5


LOAD COMB 1017 LC-1017
1 1.2 2 1.6 5 0.5
LOAD COMB 1018 LC-1018
1 1.2 2 1.6 6 0.5
LOAD COMB 1019 LC-1019
1 1.2 2 1.6 7 0.3 9 1.0
LOAD COMB 1020 LC-1020
1 1.2 2 1.6 7 0.3 10 1.0
LOAD COMB 1021 LC-1021
1 1.2 2 1.6 8 0.3 9 1.0
LOAD COMB 1022 LC-1022
1 1.2 2 1.6 8 0.3 10 1.0
LOAD COMB 1023 LC-1023
1 1.2 2 1.6 7 1.0 9 0.3
LOAD COMB 1024 LC-1024
1 1.2 2 1.6 7 1.0 10 0.3
LOAD COMB 1025 LC-1025
1 1.2 2 1.6 8 1.0 9 0.3
LOAD COMB 1026 LC-1026
1 1.2 2 1.6 8 1.0 10 0.3
LOAD COMB 1027 LC-1027
1 1.2 2 1.0 3 1.6
LOAD COMB 1028 LC-1028
1 1.2 2 1.0 4 1.6
LOAD COMB 1029 LC-1029
1 1.2 2 1.0 5 1.6
LOAD COMB 1030 LC-1030
1 1.2 2 1.0 6 1.6
LOAD COMB 2001 LC-2001
1 1.0
LOAD COMB 2002 LC-2002
1 1.0 3 1.0
LOAD COMB 2003 LC-2003
1 1.0 4 1.0
LOAD COMB 2004 LC-2004
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

1 1.0 5 1.0
LOAD COMB 2005 LC-2005
1 1.0 6 1.0
LOAD COMB 2006 LC-2006
1 1.0 7 0.3 9 1.0
LOAD COMB 2007 LC-2007
1 1.0 7 0.3 10 1.0
LOAD COMB 2008 LC-2008
1 1.0 8 0.3 9 1.0
LOAD COMB 2009 LC-2009
1 1.0 8 0.3 10 1.0
LOAD COMB 2010 LC-2010
1 1.0 7 1.0 9 0.3
LOAD COMB 2011 LC-2011
1 1.0 7 1.0 10 0.3
LOAD COMB 2012 LC-2012
1 1.0 8 1.0 9 0.3
LOAD COMB 2013 LC-2013
1 1.0 8 1.0 10 0.3
LOAD COMB 2014 LC-2014
1 1.0 2 1.0
LOAD COMB 2015 LC-2015
1 1.0 2 1.0 3 1.0
LOAD COMB 2016 LC-2016
1 1.0 2 1.0 4 1.0
LOAD COMB 2017 LC-2017
1 1.0 2 1.0 5 1.0
LOAD COMB 2018 LC-2018
1 1.0 2 1.0 6 1.0
LOAD COMB 2019 LC-2019
1 1.0 2 1.0 7 0.3 9 1.0
LOAD COMB 2020 LC-2020
1 1.0 2 1.0 7 0.3 10 1.0
LOAD COMB 2021 LC-2021
1 1.0 2 1.0 8 0.3 9 1.0
LOAD COMB 2022 LC-2022
Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) (Lomanis - Tasikmalaya)

1 1.0 2 1.0 8 0.3 10 1.0


LOAD COMB 2023 LC-2023
1 1.0 2 1.0 7 1.0 9 0.3
LOAD COMB 2024 LC-2024
1 1.0 2 1.0 7 1.0 10 0.3
LOAD COMB 2025 LC-2025
1 1.0 2 1.0 8 1.0 9 0.3
LOAD COMB 2026 LC-2026
1 1.0 2 1.0 8 1.0 10 0.3
LOAD COMB 2027 LC-2027
1 1.0 2 1.0 3 0.25
LOAD COMB 2028 LC-2028
1 1.0 2 1.0 4 0.25
LOAD COMB 2029 LC-2029
1 1.0 2 1.0 5 0.25
LOAD COMB 2030 LC-2030
1 1.0 2 1.0 6 0.25
UNIT MMS NEWTON
PERFORM ANALYSIS
LOAD LIST 2001 TO 2030
UNIT METER KG
PARAMETER 1
CODE AISC
CHECK CODE MEMB 1 TO 5 8 9 12 TO 16
START CONCRETE DESIGN
CODE ACI
UNIT MMS NEWTON
FC 22.8 MEMB 6 7 10 11
DESIGN COLUMN 6 7 10 11
END CONCRETE DESIGN
FINISH
This correlation is only for fine grained non expansive soils with a soaked CBR < 100% (AASHTO, 1993). Moreover, Powell et

Elevasi deck = +3m

HAT=+1,636 m

MSL=+0,588 m

LAT=±0,00 m
ASHTO, 1993). Moreover, Powell et. al (1984) proposed a correlation of the CBR with E as,