Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Survey Document on Core Collection, Handling and Testing

1. Is presence microcracking considered during core drilling and core handling?


 Yes
 No

2. Is the position of core cutting in columns previously planned? If yes then for single story columns
where is the core obtained from?
 Top
 Bottom
 Middle

3. Are cores containing rebars/conduits/duck work tested and included in core test results?
 Yes
 No

4. Is the core drill firmly attached before drilling the core?


 Yes
 No

5. Is caution taken to prevent the core from damage during transportation?


 Yes
 No

6. In moisture protection method followed to provide a moisture distribution on core specimen?


 Yes
 No
7. Is the l/d ratio checked during core drilling and testing?
 Yes
 No

8. What is the minimum diameter of the tested core?

9. Is it noted if the core sample is air dried or soaked? If soaked then what is the maximum soaking
period?
 Yes
 No
 Maximum Soaking Period:

10. Are cores drilled from different directions from the same component?
 Yes
 No
11. Is any end preparation method followed before test to make the core end uniform?

You might also like