Professional Documents
Culture Documents
Survey Document On Core Collection
Survey Document On Core Collection
2. Is the position of core cutting in columns previously planned? If yes then for single story columns
where is the core obtained from?
Top
Bottom
Middle
3. Are cores containing rebars/conduits/duck work tested and included in core test results?
Yes
No
9. Is it noted if the core sample is air dried or soaked? If soaked then what is the maximum soaking
period?
Yes
No
Maximum Soaking Period:
10. Are cores drilled from different directions from the same component?
Yes
No
11. Is any end preparation method followed before test to make the core end uniform?