This document provides a 10 step calculation for determining the cargo operation of vinyl chloride monomer (VCM) in a tank. It involves calculating the volume and weight of the liquid and vapor phases of VCM using temperature and pressure measurements, density and molecular weight values. The final step is to sum the weight of the liquid and vapor phases to get the total cargo, and sum the total cargos from loading and discharging to get the net load or discharge.
This document provides a 10 step calculation for determining the cargo operation of vinyl chloride monomer (VCM) in a tank. It involves calculating the volume and weight of the liquid and vapor phases of VCM using temperature and pressure measurements, density and molecular weight values. The final step is to sum the weight of the liquid and vapor phases to get the total cargo, and sum the total cargos from loading and discharging to get the net load or discharge.
This document provides a 10 step calculation for determining the cargo operation of vinyl chloride monomer (VCM) in a tank. It involves calculating the volume and weight of the liquid and vapor phases of VCM using temperature and pressure measurements, density and molecular weight values. The final step is to sum the weight of the liquid and vapor phases to get the total cargo, and sum the total cargos from loading and discharging to get the net load or discharge.
1. VCF = AVE TEMP. 0C x DENSITY of VCM (Lihat table di DENSITY of VCM) A. TEMP. (LIQUID) RATA2 § Jika Ullage > 4.00 cm Maka : Middle Temp. + Bottom Temp. 2 § Jika Ullage = 2.50 cm Maka : Bottom Temp. 2. VOL. @ 150C = VOL. of LIQUID x VCF 3. W of LIQ. (VAC) = VOL. @ 150C x 0,92020 4. VOL. of VAP. = VOL. TANK – VOL. of LIQ. (VAC) 5. ABS. TEMP. = AVE. TEMP. 0C VAPOUR (Lihat table di ABS. TEMP.) B. TEMP (VAPOUR) RATA2 § Jika Ullage > 4.00 cm Maka : TOP TEMP. § Jika Ullage < 4.00 cm Maka : TOP TEMP. + MID. TEMP. 2 § Jika No Liquid Maka : TOP TEMP. + MID. TEMP. + BOT. TEMP. 3 C. ABS. TEMP. = 273 . ( lihat tabel Top ) 273 + AVE. TEMP. 6. ABS. PRESSURE = PRESSURE TANK (Lihat table di ABS PRESS.) D. ABS PRESS. = 1,033 + PRESS. TANK 1,033 7. MW. FACTOR = 2,790179 E. 2,790179 § 62,5 (Densuty VCM) =2.790179 22,4 § ABS MW = MW 22,4 8. W of VAPOUR (VAC) = VOL. of VAP0UR x ABS.TEMP. x ABS. PRESS. x MW. FACTOR x 0,001 x 0,99885 (Density VCM in AIR) 9. TOTAL CARGO = W of LIQUID + W of VAPOUR (VAC + VAC) 10. ROB LOAD/DISCH = TOTAL CARGO I + TOTAL CARGO II