The document lists 9 items worked on yesterday and proposed rate analysis targets for today. Yesterday's work included analyzing rates for excavation, asphalt, earthwork and pipe laying. Today's targets involve further rate analysis of pipe installation components like curb stones, HDPE pipes, house connections, valves and hydrants.
The document lists 9 items worked on yesterday and proposed rate analysis targets for today. Yesterday's work included analyzing rates for excavation, asphalt, earthwork and pipe laying. Today's targets involve further rate analysis of pipe installation components like curb stones, HDPE pipes, house connections, valves and hydrants.
The document lists 9 items worked on yesterday and proposed rate analysis targets for today. Yesterday's work included analyzing rates for excavation, asphalt, earthwork and pipe laying. Today's targets involve further rate analysis of pipe installation components like curb stones, HDPE pipes, house connections, valves and hydrants.
No. 1 BOQ for Main Boulevard Rate Analysis of P/L Curb Stones 2 Rate Analysis of Clearing and Grubbing Rate Analysis of P/L curb stone for foot path Rate of Providing, laying, cutting, jointing, 3 Rate Analysis of Natural Ground Compaction testing & disinfecting class "B" HDPE pipe Rate of Backfilling carefully the excavated 4 Rate of Asphalt Wearing Course material 5 Rate of Asphalt Base Rate of 32mm PE pipe for house connection 6 Rate Analysis of Earthwork Rate of Installation of Saddle Clamp. 7 Rate Analysis of Laying of Subbase Rate of Installation of 32mm male elbow. 7 Rate Analysis of Laying of W.B.M Rate of Installation of Tee pipe. 8 Rate of Excavation for W.S pipes Rate of Installation of End Plug. Rate of Providing & fixing C.I. sluices valves and making their chambers i/c C.I. surface box 9 Rate of P/L sand cushion for trench etc. Rate of Installation of Fire Hydrant Rate of Installation of Air Relif Valve