Project : KING ABDULLAH BIN ABDUL AZIZ PROJECT

THIRD SAUDI EXPANSION OF HOLY HARAM


MAKKAH AND SURROUNDING AREA
Location : Holy Haram Makkah
Ref. Dwg.: See Detailed Computation

Subject: Hospital Proj- BOQ For Concreting Works

Estimated
Item Description Unit Unit Rate
Quantity

3 CONCRETE
3.1 BLINDING CONCRETE
3.1.1 Under Foundation m3 188.03
3.1.2 Under Slab on Grade and Grade Beams m3 168.69
3.2 STRUCTURAL CONCRETE
3.2.1 SUBSTRUCTURE
3.2.1.1 Cast in Situ Mat/Raft Foundation m3 5,906.46
3.2.1.2 Cast in Situ Isolated Footing m3
3.2.1.3 Cast in Situ Strip Footing m3
3.2.1.4 Cast in Situ Grade Beams m3
3.2.1.5 Cast in Situ Slab on Grade m3 337.35
3.2.1.6 Cast in Situ Column m3 173.37
Cast in Situ Column Neck m 3
26.27
3.2.1.7 Cast in Situ Retaining Wall m3
3.2.1.8 Cast in Situ Walls m3 622.59
Cast in Situ Wall Neck m3 95.51
3.2.1.9 Cast in Situ Core Walls m3 115.17
Cast in Situ Core Wall Neck m3 17.45
3.2.1.10 Cast in Situ Stairways Including Steps & Stringers m3 3.79
3.2.1.11 Mechanical Trenches and Sump Pit m3
3.2.2 SUPERSTRUCTURE
3.2.2.1 Cast in Situ Concrete Slab
3.2.2.1.1 Structural Concrete Slab m3
3.2.2.1.2 45 Mpa Structural Concrete Slab ( For Helipad)
3.2.2.2 Cast in Situ Columns m3
3.2.2.3 Cast in Situ Core Walls m3
3.2.2.4 Cast in Situ Wall m3
3.2.2.4 Cast in Situ Wall m3
3.2.2.5 Cast in Drop Panels
3.2.2.6 Cast in Situ Parapet Wall m3
3.2.2.7 Cast In Situ Beams m3
3.2.2.8 Cast in Situ Stairways Including Steps & Stringers m3

ALEX:file:///conversion/tmp/scratch/435111633.xlsx/Concrete Pages 1/99


Estimated
Item Description Unit Unit Rate
Quantity
3.2.2.9 Cast In Situ Concrete Pad m3
3.2.2.10 Cast In Situ Concrete Pad m2
3.3 PRECAST CONRETE
3.3.1 Precast Concrete Slab m3
3.3.2 Double T Precast Slab m2
3.4 NON-STRUCTURAL CONCRETE
3.4.1 Screed Topping
3.4.1.1 50 mm Thick Topping on Top of Hollowcore m2
3.4.2 Foam Concrete
3.4.2.1 On Top of Structural Concrete Slab m3
Others:
Water Proofing Membrane under Raft m2 3,327.31
Polyethelene under Raft m2 2,193.73
Polyethelene under SOG m2 2,100.60
Cyclopane Conc under Raft m3 332.73
Water Stop M 101.34
Backfilling m3 715.37
Isolation Joint m2 140.31
Note :

ALEX:file:///conversion/tmp/scratch/435111633.xlsx/Concrete Pages 2/99


Sept 17.2012

Remarks

ALEX:file:///conversion/tmp/scratch/435111633.xlsx/Concrete Pages 3/99


Remarks

ALEX:file:///conversion/tmp/scratch/435111633.xlsx/Concrete Pages 4/99


Project : KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Proj


Ref. Dwg.: See Detailed Computation

Subject: Hospital Proj - BOQ For Formworks

Estimated
Item Description Unit Quantity

3 CONCRETE
3.5 FORMWORKS
3.5.1 SUBSTRUCTURE

Edges Of Blinding Under Foundation m2 31.15


Edges Of SOG m2 62.30
Edges Of Blinding Under SOG m 2
31.15
Vertical Sides Of Mat/Raft Foundation m2 1,023.34
Sides of Isolated Footing m2 -
Sides of Strip Footing m 2
-
Sides of Grade Beams m2 -
Vertical Sides of Column m2 560.63
Vertical Sides of Column Neck m 2
84.94
Vertical Sides Retaining Wall m2 -
Vertical Sides of Wall m2 1,093.74
Vertical Sides of Wall Neck m2 173.90
Vertical Sides of Core Walls m2 485.33
Vertical Sides of Core Walls m2 73.54

3.5.2 SUPERSTRUCTURE
Soffit and Edges of Suspended Slab m2
Vertical Sides of Column m2 -
Vertical Sides of Core Walls m2
Vertical Sides of Wall m2
Vertical Sides of Parapet Wall m2
Soffit and Sides of Beams m2
Soffit and Edges of Stairways m2 23.63
Edges of Concrete Pads m2
Vertical Sides of Drop Panels m2
Vertical sides of Mechanical Trenches m2
Edges of Non-Structural Foam Concrete m2

Pre-cast R.C. Slab m2


Others
Cantilever ledge under slab m2
Cantilever ledge over slab m2
Upstand m2
Date: Sept 17,2012

Unit Rate Amount Remarks

31.15
62.30
31.15
1,023.34
-
-
-
560.63
84.94
-
1,093.74
173.90
485.33
73.54

-
-
-
-

-
23.63
-
-
-
-

-
-
-
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description CODE No.
(m/m)2
(m)
Structural Concrete & Formworks
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

S
B
C
CW
W
AREA Hvk - Hvp / Hv1-Hx15 O

CONCRETE & SOFFITS


Along Gridline Hvk - Hvp / Hx1-Hx4 1 1 809.27
Concret under SEC 7-7
Along Gridline Hvk - Hvp / Hx1-Hx4 1 1 20.24
Concret under SEC5-5
Along Gridline Hvk - Hvp / Hx1-Hx4 1 1 94.96
SIDES
Along Gridline Hvk - Hvp / Hx1-Hx4 3 1 122.50
OPENINGS
Section F7-F7 O 1 1.50 1.50
Section F5-F5 O 1 8.50 2.50
Along Gridline Hvk - Hvp /Hx4-Hx6' 1 1 313.34
Concret under SEC 6-6
Along Gridline Hvk - Hvp / Hx1-Hx4 1 1 74.86

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Foundation Pages 9/99


Length/Area Width
Item Description CODE No.
(m/m)2
(m)
SIDES
Along Gridline Hvk - Hvp / Hx1-Hx4 3 1 72.37
in Section 6-6 3 1 20.40
OPENINGS
Section F6-F6 O 1 7.90 2.30
CONCRETE & SOFFITS
Along Gridline Hvk - Hvp /Hx6-Hx9' 1 1 574.08
SIDES
Along Gridline Hvk - Hvp / Hx1-Hx4 3 1 96.26
CONCRETE & SOFFITS
Along Gridline Hvk - Hvp /Hx9-Hx15 1 1 808.79
SIDES
Along Gridline Hvk - Hvp /Hx9-Hx15 3 1 124.11
Concret under SEC7-7
Along Gridline Hvk - Hvp /Hx9-Hx15 1 1 27.24
SIDES
Along Gridline Hvk - Hvp /Hx9-Hx15 3 1 10.00
OPENINGS
Section F7-F7 along grid lineHvk-Hvp/Hx9-Hx15 O 1 1.50 1.50
Section F16-F16 along grid lineHvk-Hvp/Hx9-Hx1 O 1 1.00 1.00

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Foundation Pages 10/99


1,907.18 5,906.46 16,412.12 5.77
5,323.57 1,023.34 17,586.34
0.1732578431 concretes
concretes
Height Quantity
Area Peri CONCRETE Formula Total Unit
(m) +Qty -Qty

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2.00 809.27 - 1,618.54 1,618.54 1,618.54
- - - -
1.20 20.24 - 24.29 24.29 24.29
- - - -
2.00 94.96 - 189.92 189.92 189.92
- - - -
2.00 - 122.50 - -
- - - -
1.85 2.25 6.00 (4.16) (4.16) (4.16)
1.60 21.25 22.00 (34.00) (34.00) (34.00)
2.00 313.34 - 626.68 626.68 626.68
- - - -
2.00 74.86 - 149.72 149.72 149.72

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Foundation Pages 11/99


Height Quantity
Area Peri CONCRETE Formula Total Unit
(m) +Qty -Qty
- - - -
2.00 - 72.37 - -
2.00 - 20.40 - -
- - - -
1.55 18.17 20.40 (28.16) (28.16) (28.16)
- - - -
3.00 574.08 - 1,722.24 1,722.24 1,722.24
- - - -
3.00 - 96.26 - -
- - - -
2.00 808.79 - 1,617.58 1,617.58 1,617.58
- - - -
2.00 - 124.11 - -
- - - -
1.00 27.24 - 27.24 27.24 27.24
- - - -
1.30 - 10.00 - -
- - - -
1.30 2.25 6.00 (2.93) (2.93) (2.93)
0.50 1.00 4.00 (0.50) (0.50) (0.50)

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Foundation Pages 12/99


Date : July 8, 2012

Remaks

RAMP DETAILS NEEDED:


Conc Vol of Ramp, not yet included

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Foundation Pages 13/99


Remaks

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Foundation Pages 14/99


KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m/m)2
(m) (m)
Water Proofing Membrane
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

Water Proofing Membrane


AREA Hvk - Hvp / Hv1-Hx15
CONCRETE & SOFFITS
Along Gridline Hvk - Hvp / Hx1-Hx4 1 809.27

SBG/file:///conversion/tmp/scratch/435111633.xlsx/water proofing under raf Pages 15/99


concretes
Area Peri

809.27

SBG/file:///conversion/tmp/scratch/435111633.xlsx/water proofing under raf Pages 16/99


SBG/file:///conversion/tmp/scratch/435111633.xlsx/water proofing under raf Pages 17/99
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description No.
( m / m 2) (m)
Water Stop
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

Water Stop
Along Gridline Hvk - Hvp / Hx3-Hx4 2 21.84
Along Gridline Hvk - Hvp / Hx3-Hx4 1 7.00
Along Gridline Hvk - Hvp /Hx9'-Hx10 2 21.83
Along Gridline Hvk - Hvp /Hx9'-Hx10 1 7.00
Total
Height
Concrete(V) Units REMARKS
(m)

43.68 hor external water stop


7.00 ver external water stop
43.66 hor external water stop
7.00 ver external water stop
101.34 Lm
Date : July 8, 2012
concretes
FORMWORKS
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m/m)2
(m) (m)
Water Proofing Membrane
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

Blinding Concrete under Raft


AREA Hvk - Hvp / Hv1-Hx15

CONCRETE & SOFFITS


Along Gridline Hvk - Hvp / Hx1-Hx4 1 809.27 0.08
Along Gridline Hvk - Hvp / Hx4-Hx6 1 313.34 0.08
Along Gridline Hvk - Hvp /Hx6-Hx10 1 675.68 0.08

SBG/file:///conversion/tmp/scratch/435111633.xlsx/blinding Conc under Raf Pages 22/99


concretes
Concrete(V) Peri

60.70
23.50
50.68

SBG/file:///conversion/tmp/scratch/435111633.xlsx/blinding Conc under Raf Pages 23/99


Date : July 8, 2012

SBG/file:///conversion/tmp/scratch/435111633.xlsx/blinding Conc under Raf Pages 24/99


KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m/m)2
(m) (m)
Water Proofing Membrane
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

Polyethelene under Raft


AREA Hvk - Hvp / Hv1-Hx15

CONCRETE & SOFFITS


Along Gridline Hvk - Hvp / Hx1-Hx4 1 809.27
Along Gridline Hvk - Hvp /Hx4-Hx10 1 675.68
Along Gridline Hvk - Hvp / Hx10-Hx15 1 708.78

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Plyethelene under Raf Pages 25/99


concretes
Area (M) Peri

809.27
675.68
708.78

2,193.73

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Plyethelene under Raf Pages 26/99


Date : July 8, 2012

SBG/file:///conversion/tmp/scratch/435111633.xlsx/Plyethelene under Raf Pages 27/99


KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m/m)2
(m) (m)
Water Proofing Membrane
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

Cyclopane Concrete
Along Gridline Hvk - Hvp / Hx1-Hx4 1 809.27
Sides Along Gridline Hvk - Hvp / Hx1-Hx4 1 46.94 7.00
Sides Along Sect F7-F7 1 4.50 4.50 1.00
Sides Along Sect F5-F5 1 9.70 3.30 1.00
Along Gridline Hvk - Hvp /Hx4-Hx10 1 675.68
Sides Along Gridline Hvk - Hvp /Hx4-Hx10 1 45.30 7.00

SBG/file:///conversion/tmp/scratch/435111633.xlsx/CC Pages 28/99


concretes
Area thickness Conc Vol

809.27 0.10 80.93


328.57 0.10 32.86
18.00 0.10 1.80
26.00 0.10 2.60
675.68 0.10 67.57
317.10 0.10 31.71

SBG/file:///conversion/tmp/scratch/435111633.xlsx/CC Pages 29/99


Date : July 8, 2012

SBG/file:///conversion/tmp/scratch/435111633.xlsx/CC Pages 30/99


PROJECT THIRD SAUDI EXPANSION
Project : OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJECT (FOUNDATION)


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description Type No.
( m / m 2) (m)
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2
3.2.2.1 Column
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1TO9OF9

COLUMN

C15 3 1.00 1.00


C16 1 1.30 1.00
C29 1 1.00 0.65
C13 1 2.50 0.50
C19 1 2.50 0.50
C18 3 1.20 1.20
C23 1 2.93 1.50
C27 1 3.00 0.50
C28 1 2.93 0.80
C79 2 3.00 0.60
C55 1 2.93 1.50
C56 1 2.93 1.80
C104 1 2.70 1.50
C101 1 3.98 0.50
C102 3 1.20 0.80
C103 3 0.80 0.80
C100 2 1.00 1.00
C105 2 2.70 1.00
C110 1 0.80 0.80
C111 1 0.85 0.45
0 - -
Concrete 173.37
Formworks 560.63 formworks
ratio 3.2338017 concretes
concretes
Height Vol. of Perimeter Quantity
Deduct Formula Total
(m) Conc Sides +Qty -Qty

- - -
- - -
3.30 9.90 4.00 9.90 9.90
3.30 4.29 4.60 4.29 4.29
3.30 2.15 3.30 2.15 2.15
3.30 4.13 6.00 4.13 4.13
3.30 4.13 6.00 4.13 4.13
3.30 14.26 4.80 14.26 14.26
3.30 14.50 8.86 14.50 14.50
3.30 4.95 7.00 4.95 4.95
3.30 7.73 7.46 7.73 7.73
3.30 11.88 7.20 11.88 11.88
3.30 14.50 8.86 14.50 14.50
3.30 17.40 9.46 17.40 17.40
3.30 13.37 8.40 13.37 13.37
3.30 6.56 8.95 6.56 6.56
3.30 9.50 4.00 9.50 9.50
3.30 6.34 3.20 6.34 6.34
3.30 6.60 4.00 6.60 6.60
3.30 17.82 7.40 17.82 17.82
3.30 2.11 3.20 2.11 2.11
3.30 1.26 2.60 1.26 1.26
- - - -
Date :July 17 2012
FORMWORKS
RATIO
Unit Remaks

height of column is from top of


Foundation to top of Slab on grade

0.00
0.00
0.00
4.00
3.54
5.08
4.80
4.80
3.33
2.02
4.67
3.19
4.00
2.02
1.79
2.07
4.50
4.17
5.00
4.00
2.74
5.00
6.80
0.00
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ (FOUNDATION)


Ref. Dwg.: See Below Computation

Length/Area
Item Description code No.
( m / m2)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

WALLL

S09107-01D-PL03-FD-ST-SC-426-1OF1-REV00

WALL
Along grid line Hx-1 A 2 5.75
Along grid line Hx-1 A 1 2.73
Along grid line Hvp/Hv1-Hx1 A 1 15.70
Along grid line Hvp/Hv1-Hx1 A 1 0.96
Along grid line Hvp/Hx1-Hx2 A 1 9.85
Along grid line Hvp/Hx2-Hx4 A 1 15.15
Along grid line Hvp/Hx4-Hx10 A 1 33.30
Along grid line Hvp/Hx9-Hx13 A 1 22.85
Along grid line Hvp/Hx12-Hx15 A 1 23.56
Wall 8 A 1 3.95
Wall 7 A 1 5.00
Wall 6 (slope) A 1 8.85
Wall 2 A 1 7.43
TOTAL
Concrete 622.59
Formworks 1,093.74 formworks
ratio 1.7567451 concretes
concretes
Width Height Vol. of Perimeter Quantity
Deduct Formula
(m) (m) Conc Sides +Qty -Qty

- - - - -
0.50 3.30 18.98 12.50 18.98 18.98 -
0.50 3.30 4.50 6.46 4.50 4.50 -
1.50 3.30 77.72 34.40 77.72 77.72 -
0.50 3.30 1.58 2.92 1.58 1.58 -
1.68 3.30 54.61 23.06 54.61 54.61 -
1.50 3.30 74.99 33.30 74.99 74.99 -
1.50 3.30 164.84 69.60 164.84 164.84 -
1.50 3.30 113.11 48.70 113.11 113.11 -
0.50 3.30 38.87 48.12 38.87 38.87 -
0.30 3.30 3.91 8.50 3.91 3.91 -
0.30 3.30 4.95 10.60 4.95 4.95 -
4.00 3.30 58.41 25.70 58.41 58.41 -
0.50 3.30 6.13 15.85 6.13 6.13 -
622.59 622.59 -
Date : July 17,2012

Total Unit Remaks

Height of wall is not given, therefore


Height of wall is base in elevation of R1 and R2 flr plan

depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00


depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
FORMWORKS
RATIO

0.00
0.00
4.35
4.73
1.46
6.08
1.39
1.47
1.39
1.42
4.08
7.17
7.07
0.73
4.27
0.00
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Proj (Foundation)


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description Code No.
( m / m2) (m)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

Core Wall
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1to7of7-00

CORE WALLS
A CORE 18 A 1 3.04 0.45
A CORE18 A 1 2.88 0.30
B CORE18 B 1 0.84 0.30
A CORE 4 A 1 9.70 0.60
B CORE 4 B 2 2.70 0.60
A CORE 5 A 1 7.42 0.40
B CORE 5 B 1 2.58 0.50
B CORE 6 A 1 8.85 0.50
A CORE 6 B 1 2.50 0.60
B CORE 6 B 1 2.50 0.30
A CORE 9 A 1 5.10 0.50
A CORE 9 A 1 5.68 0.45
A CORE 9 A 1 5.55 0.70
B CORE 9 B 1 3.95 0.50
B CORE 9 B 1 2.95 0.40
B CORE 9 B 1 0.70 0.40
TOTAL
Concrete 115.17
Formworks 485.33 formworks
ratio 4.2139496 concretes
concretes
Height Vol. of Perimeter Quantity
Deduct Formula Total
(m) Conc Sides +Qty -Qty

- - - - -
3.30 4.51 6.98 4.51 4.51 -
3.30 2.85 6.36 2.85 2.85 -
3.30 0.83 1.68 0.83 0.83 -
3.30 19.21 20.60 19.21 19.21 -
3.30 10.69 5.40 10.69 10.69 -
3.30 9.79 15.64 9.79 9.79 -
3.30 4.26 5.16 4.26 4.26 -
3.30 14.60 18.70 14.60 14.60 -
3.30 4.95 5.00 4.95 4.95 -
3.30 2.48 5.00 2.48 2.48 -
3.30 8.42 11.20 8.42 8.42 -
3.30 8.43 12.25 8.43 8.43 -
3.30 12.82 12.50 12.82 12.82 -
3.30 6.52 7.90 6.52 6.52 -
3.30 3.89 5.90 3.89 3.89 -
3.30 0.92 1.40 0.92 0.92 -
115.17 115.17 -
Date :July 17, 2012
FORMWORKS
RATIO
Unit Remaks

0.00
0.00
5.10
7.36
6.67
3.54
3.33
5.27
4.00
0.30
3.33
6.67
0.30
4.80
3.22
4.00
5.00
5.00
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJECT (FOUNDATION)


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description Type No.
( m / m 2) (m)
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2
3.2.2.1 Column
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1TO9OF9

ISOLATION JOINT
C13 1 2.50 0.50
C19 1 2.50 0.50
C18 3 1.20 1.20
C27 1 3.00 0.50
C79 2 3.00 0.60
C101 1 3.98 0.50
C102 3 1.20 0.15
C103 3 0.80 0.15
C100 2 1.00 1.00
C110 1 0.80 0.80
BESIDES ON WALL 1 236.63
CORE 6 1 8.85 3.00
CORE 9 1 49.35
WALL 8 1 7.50
WALL 7 1 10.60
Concrete
Formworks
ratio Date :July 17 2012

Height Perimeter ISO JT


Unit Deduct Unit Remaks
(m) Sides Total Area

0.15 6.00 m 0.90 m2


0.15 6.00 m 0.90 m2
0.15 4.80 m 2.16 m2
0.15 7.00 m 1.05 m2
0.15 7.20 m 1.08 m2
0.15 8.95 m 1.34 m2
0.15 2.70 m 0.41 m2
0.15 1.90 m 0.29 m2
0.15 4.00 m 0.60 m2
0.15 3.20 m 0.48 m2
0.40 236.63 m 94.65 m2
0.40 23.70 m 9.48 m2
0.40 49.35 m 19.74 m2
0.40 7.50 m 3.00 m2
0.40 10.60 m 4.24 m2
379.53 m 140.31 m2
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Project


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m) (m) (m)
1 Foundation/Slab on Grade
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

Otherc Reference Drawing :


S09107-01D-PL1H-DD-ST-SC-420-1OF6-00

Along Gridline Hvk - Hvp / Hx1-Hx15 1 2,244.60 0.15


Less column
C13 -1 2.50 0.50 0.15
C19 -1 2.50 0.50 0.15
C18 -3 1.20 1.20 0.15
C23 -1 2.93 1.50 0.15
C27 -1 3.00 0.50 0.15
C28 -1 2.93 0.80 0.15
C79 -2 3.00 0.60 0.15
C55 -1 2.93 1.50 0.15
C56 -1 2.93 1.80 0.15
C104 -1 2.70 1.50 0.15
C101 -1 3.98 0.50 0.15
C102 -3 1.20 0.80 0.15
C103 -3 0.80 0.80 0.15
C100 -2 1.00 1.00 0.15
C105 -2 2.70 1.00 0.15
C110 -1 0.80 0.80 0.15
Less Wall
Wall 8 -1 3.95 0.30 0.15
Wall 7 -1 5.00 0.30 0.15
Wall 6 (under ramp) -1 7.88 0.30 0.15
Wall 6 (slope) -1 8.85 4.00 0.15
Wall 2 -1 7.43 0.50 0.15
Less Opening
Sec F7-F7 -1 1.90 1.90 0.15
Sec F36-F36 -1 8.85 3.00 0.15
Sec F7-F7 -1 1.90 1.90 0.15
Sec F16-F16 -1 1.55 1.40 0.15
Less Corewall
CORE 5 -1 7.42 0.40 0.15
CORE 5 -1 2.58 0.50 0.15
CORE 9 -1 5.10 0.50 0.15
CORE 9 -1 5.68 0.45 0.15
CORE 9 -1 5.55 0.70 0.15
CORE 9 -1 3.95 0.50 0.15
CORE 9 -1 2.95 0.40 0.15
CORE 9 -1 0.70 0.40 0.15
Addl concrete (Thickening slab beside wall)
BESIDES ON WALL 1 236.63 0.40 0.15
CORE 6 1 26.55 0.40 0.15
CORE 9 1 49.35 0.40 0.15
WALL 8 1 7.50 0.40 0.15
WALL 7 1 10.60 0.40 0.15
On slab to slab Joint 2 20.33 0.40 0.15
Total
Quantity
Total Unit
+Qty -Qty

336.69 -

- (0.19)
- (0.19)
- (0.65)
- (0.66)
- (0.23)
- (0.35)
- (0.54)
- (0.66)
- (0.79)
- (0.61)
- (0.30)
- (0.43)
- (0.29)
- (0.30)
- (0.81)
- (0.10)

- (0.18)
- (0.23)
- (0.35)
- (5.31)
- (0.56)

- (0.54)
- (3.98)
- (0.54)
- (0.33)

- (0.45)
- (0.19)
- (0.38)
- (0.38)
- (0.58)
- (0.30)
- (0.18)
- (0.04)

14.20 -
1.59 -
2.96 -
0.45 -
0.64 -
2.44 -
358.97 (21.62) 337.35 m3
Date:

Remaks
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Project


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m) (m) (m)
1 Foundation/backfilling
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

Otherc Reference Drawing :


S09107-01D-PL1H-DD-ST-SC-420-1OF6-00

Along Gridline Hvk - Hvp / Hx1-Hx15 1 2,244.60 0.35


Less column
C13 -1 2.50 0.50 0.35
C19 -1 2.50 0.50 0.35
C18 -3 1.20 1.20 0.35
C23 -1 2.93 1.50 0.35
C27 -1 3.00 0.50 0.35
C28 -1 2.93 0.80 0.35
C79 -2 3.00 0.60 0.35
C55 -1 2.93 1.50 0.35
C56 -1 2.93 1.80 0.35
C104 -1 2.70 1.50 0.35
C101 -1 3.98 0.50 0.35
C102 -3 1.20 0.80 0.35
C103 -3 0.80 0.80 0.35
C100 -2 1.00 1.00 0.35
C105 -2 2.70 1.00 0.35
C110 -1 0.80 0.80 0.35
Less Wall
Wall 8 -1 3.95 0.30 0.35
Wall 7 -1 5.00 0.30 0.35
Wall 6 (under ramp) -1 7.88 0.30 0.35
Wall 6 (slope) -1 8.85 4.00 0.35
Wall 2 -1 7.43 0.50 0.35
Less Opening
Sec F7-F7 -1 1.90 1.90 0.35
Sec F36-F36 -1 8.85 3.00 0.35
Sec F7-F7 -1 1.90 1.90 0.35
Sec F16-F16 -1 1.55 1.40 0.35
Less Corewall
CORE 5 -1 7.42 0.40 0.35
CORE 5 -1 2.58 0.50 0.35
CORE 9 -1 5.10 0.50 0.35
CORE 9 -1 5.68 0.45 0.35
CORE 9 -1 5.55 0.70 0.35
CORE 9 -1 3.95 0.50 0.35
CORE 9 -1 2.95 0.40 0.35
CORE 9 -1 0.70 0.40 0.35
Addl concrete (Thickening slab beside wall)
BESIDES ON WALL -1 236.63 0.40 0.15
CORE 6 -1 26.55 0.40 0.15
CORE 9 -1 49.35 0.40 0.15
WALL 8 -1 7.50 0.40 0.15
WALL 7 -1 10.60 0.40 0.15
On slab to slab Joint -2 20.33 0.40 0.15
Total
Quantity
Total Unit
+Qty -Qty

785.61 -

- (0.44)
- (0.44)
- (1.51)
- (1.54)
- (0.53)
- (0.82)
- (1.26)
- (1.54)
- (1.85)
- (1.42)
- (0.70)
- (1.01)
- (0.67)
- (0.70)
- (1.89)
- (0.22)

- (0.41)
- (0.53)
- (0.83)
- (12.39)
- (1.30)

- (1.26)
- (9.29)
- (1.26)
- (0.76)

- (1.04)
- (0.45)
- (0.89)
- (0.89)
- (1.36)
- (0.69)
- (0.41)
- (0.10)

- (14.20)
- (1.59)
- (2.96)
- (0.45)
- (0.64)
- (2.44)
785.61 (70.24) 715.37 m3
Date:

Remaks
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Project


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m) (m) (m)
1 Foundation/Blinding Conc under SOG
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

Otherc Reference Drawing :


S09107-01D-PL1H-DD-ST-SC-420-1OF6-00

Along Gridline Hvk - Hvp / Hx1-Hx15 1 2,244.60 0.08


Less column
C13 -1 2.50 0.50 0.08
C19 -1 2.50 0.50 0.08
C18 -3 1.20 1.20 0.08
C23 -1 2.93 1.50 0.08
C27 -1 3.00 0.50 0.08
C28 -1 2.93 0.80 0.08
C79 -2 3.00 0.60 0.08
C55 -1 2.93 1.50 0.08
C56 -1 2.93 1.80 0.08
C104 -1 2.70 1.50 0.08
C101 -1 3.98 0.50 0.08
C102 -3 1.20 0.80 0.08
C103 -3 0.80 0.80 0.08
C100 -2 1.00 1.00 0.08
C105 -2 2.70 1.00 0.08
C110 -1 0.80 0.80 0.08
Less Wall
Wall 8 -1 3.95 0.30 0.08
Wall 7 -1 5.00 0.30 0.08
Wall 6 (under ramp) -1 7.88 0.30 0.08
Wall 6 (slope) -1 8.85 4.00 0.08
Wall 2 -1 7.43 0.50 0.08
Less Opening
Sec F7-F7 -1 1.90 1.90 0.08
Sec F36-F36 -1 8.85 3.00 0.08
Sec F7-F7 -1 1.90 1.90 0.08
Sec F16-F16 -1 1.55 1.40 0.08
Less Corewall
CORE 5 -1 7.42 0.40 0.08
CORE 5 -1 2.58 0.50 0.08
CORE 9 -1 5.10 0.50 0.08
CORE 9 -1 5.68 0.45 0.08
CORE 9 -1 5.55 0.70 0.08
CORE 9 -1 3.95 0.50 0.08
CORE 9 -1 2.95 0.40 0.08
CORE 9 -1 0.70 0.40 0.08
Addl concrete (Thickening slab beside wall)
BESIDES ON WALL 1 236.63 0.40 0.08
CORE 6 1 26.55 0.40 0.08
CORE 9 1 49.35 0.40 0.08
WALL 8 1 7.50 0.40 0.08
WALL 7 1 10.60 0.40 0.08
On slab to slab Joint 2 20.33 0.40 0.08
Total
Quantity
Total Unit
+Qty -Qty

168.34 -

- (0.09)
- (0.09)
- (0.32)
- (0.33)
- (0.11)
- (0.18)
- (0.27)
- (0.33)
- (0.40)
- (0.30)
- (0.15)
- (0.22)
- (0.14)
- (0.15)
- (0.41)
- (0.05)

- (0.09)
- (0.11)
- (0.18)
- (2.66)
- (0.28)

- (0.27)
- (1.99)
- (0.27)
- (0.16)

- (0.22)
- (0.10)
- (0.19)
- (0.19)
- (0.29)
- (0.15)
- (0.09)
- (0.02)

7.10 -
0.80 -
1.48 -
0.23 -
0.32 -
1.22 -
179.49 (10.80) 168.69 m3
Date:

Remaks
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD SAUDI
Project : EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Project


Ref. Dwg.:
S09107-01D-PL1H-FD-ST-SC-014-1of1-00
S09107-01D-PL1H-DD-ST-SC-500-9to 12of16

No. of Stairs 1

Geometrical Dimension RISER Landing (if any)


Stair Mark Hor. Vert.
Height Length Width Thick RISER SIDE Length
Length Length
m m m m m m # M2 M m

S5 - B1 2.05 3.15 3.76 1.20 0.25 11 0.03 0.40 3.26


4.00
S5 - B1 2.05 3.20 3.80 1.20 0.25 10 0.03 0.40 0.00
formworks

formworks
concretes
concretes
concretes
concretes
concretes
concretes
formworks
ratio 6.24 concretes
3.79 23.63 concretes
Landing (if any) Formworks Quantity
Volume
of Conc. Forms of Landing
Width Thick Soffits Sides Riser
Stairs Soffits
Formula
+Qty
m m cu.m. sq.m. sq.m. sq.m. sq.m. sq.m.

1.20 0.25 2.389 4.510 1.503 3.780 9.793 3.912 2.39 2.39
0.00 0.25 1.398 4.560 1.520 3.840 9.921 - 1.40 1.40

3.788
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
FORMWORKS
RATIO

Quantity
Total Unit Remaks
-Qty

- 5.74
- 7.10
FORMWORKS
PROJECT THIRD SAUDI EXPANSION
Project : OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJECT (FOUNDATION)


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description Type No.
( m / m 2) (m)
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2
3.2.2.1 Column Neck
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1TO9OF9

COLUMN

C15 3 1.00 1.00


C16 1 1.30 1.00
C29 1 1.00 0.65
C13 1 2.50 0.50
C19 1 2.50 0.50
C18 3 1.20 1.20
C23 1 2.93 1.50
C27 1 3.00 0.50
C28 1 2.93 0.80
C79 2 3.00 0.60
C55 1 2.93 1.50
C56 1 2.93 1.80
C104 1 2.70 1.50
C101 1 3.98 0.50
C102 3 1.20 0.80
C103 3 0.80 0.80
C100 2 1.00 1.00
C105 2 2.70 1.00
C110 1 0.80 0.80
C111 1 0.85 0.45
0 - -
Concrete 26.27
Formworks 84.94 formworks
ratio 3.2338017252 concretes
concretes
Height Vol. of Perimeter Formworks Quantity
Deduct Formula
(m) Conc Sides Total +Qty -Qty

- - - -
- - - -
0.50 1.50 4.00 6.00 1.50 1.50
0.50 0.65 4.60 2.30 0.65 0.65
0.50 0.33 3.30 1.65 0.33 0.33
0.50 0.63 6.00 3.00 0.63 0.63
0.50 0.63 6.00 3.00 0.63 0.63
0.50 2.16 4.80 7.20 2.16 2.16
0.50 2.20 8.86 4.43 2.20 2.20
0.50 0.75 7.00 3.50 0.75 0.75
0.50 1.17 7.46 3.73 1.17 1.17
0.50 1.80 7.20 7.20 1.80 1.80
0.50 2.20 8.86 4.43 2.20 2.20
0.50 2.64 9.46 4.73 2.64 2.64
0.50 2.03 8.40 4.20 2.03 2.03
0.50 0.99 8.95 4.48 0.99 0.99
0.50 1.44 4.00 6.00 1.44 1.44
0.50 0.96 3.20 4.80 0.96 0.96
0.50 1.00 4.00 4.00 1.00 1.00
0.50 2.70 7.40 7.40 2.70 2.70
0.50 0.32 3.20 1.60 0.32 0.32
0.50 0.19 2.60 1.30 0.19 0.19
- - - - -
Date :July 17 2012
FORMWORKS
RATIO
Total Unit Remaks

height of column is from top of


Foundation to top of Slab on grade

0.00
0.00
0.00
4.00
3.54
5.08
4.80
4.80
3.33
2.02
4.67
3.19
4.00
2.02
1.79
2.07
4.50
4.17
5.00
4.00
2.74
5.00
6.80
0.00
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ (FOUNDATION)


Ref. Dwg.: See Below Computation

Length/Area
Item Description code No.
( m / m2)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

WALL Neck

S09107-01D-PL03-FD-ST-SC-426-1OF1-REV00

WALL
Along grid line Hx-1 A 2 5.75
Along grid line Hx-1 A 1 2.73
Along grid line Hvp/Hv1-Hx1 A 1 15.70
Along grid line Hvp/Hv1-Hx1 A 1 0.96
Along grid line Hvp/Hx1-Hx2 A 1 9.85
Along grid line Hvp/Hx2-Hx4 A 1 15.15
Along grid line Hvp/Hx4-Hx10 A 1 33.30
Along grid line Hvp/Hx9-Hx13 A 1 22.85
Along grid line Hvp/Hx12-Hx15 A 1 23.56
Wall 8 A 1 3.95
Wall 7 A 1 5.00
Wall 6 (under ramp) A 1 7.88
Wall 6 (slope) A 1 8.85
Wall 2 A 1 7.43
TOTAL
Concrete 95.51
Formworks 173.90 formworks
ratio 1.8206469462 concretes
concretes
Width Height Vol. of Perimeter Formworks Quantity
Deduct Formula
(m) (m) Conc Sides Total +Qty

- - - - -
0.50 0.50 2.88 12.50 12.50 2.88 2.88
0.50 0.50 0.68 6.46 3.23 0.68 0.68
1.50 0.50 11.78 34.40 17.20 11.78 11.78
0.50 0.50 0.24 2.92 1.46 0.24 0.24
1.68 0.50 8.27 23.06 11.53 8.27 8.27
1.50 0.50 11.36 33.30 16.65 11.36 11.36
1.50 0.50 24.98 69.60 34.80 24.98 24.98
1.50 0.50 17.14 48.70 24.35 17.14 17.14
0.50 0.50 5.89 48.12 24.06 5.89 5.89
0.30 0.50 0.59 8.50 4.25 0.59 0.59
0.30 0.50 0.75 10.60 5.30 0.75 0.75
0.30 0.50 1.18 16.36 8.18 1.18 1.18
4.00 0.50 8.85 25.70 6.43 8.85 8.85
0.50 0.50 0.93 15.85 3.96 0.93 0.93
95.51 95.51
Date : July 17,2012

Quantity
Total Unit Remaks
-Qty

Height of wall is not given, therefore


Height of wall is base in elevation of R1 and R2 flr plan

-
-
-
-
-
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
-
FORMWORKS
RATIO

0.00
0.00
4.35
4.73
1.46
6.08
1.39
1.47
1.39
1.42
4.08
7.17
7.07
6.92
0.73
4.27
0.00
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Proj (Foundation)


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description Code No.
( m / m2) (m)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

Core Wall Neck


Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1to7of7-00

CORE WALLS
A CORE 18 A 1 3.04 0.45
A CORE 18 A 1 2.88 0.30
B CORE 18 B 1 0.84 0.30
A CORE 4 A 1 9.70 0.60
B CORE 4 B 2 2.70 0.60
A CORE 5 A 1 7.42 0.40
B CORE 5 B 1 2.58 0.50
B CORE 6 A 1 8.85 0.50
A CORE 6 B 1 2.50 0.60
B CORE 6 B 1 2.50 0.30
A CORE 9 A 1 5.10 0.50
A CORE 9 A 1 5.68 0.45
A CORE 9 A 1 5.55 0.70
B CORE 9 B 1 3.95 0.50
B CORE 9 B 1 2.95 0.40
B CORE 9 B 1 0.70 0.40
TOTAL
Concrete 17.45
Formworks 73.54 formworks
ratio 4.213949557 concretes
concretes
Height Vol. of Perimeter Formworks Quantity
Deduct Formula
(m) Conc Sides Total +Qty -Qty

- - - - - -
0.50 0.68 6.98 3.49 0.68 0.68 -
0.50 0.43 6.36 3.18 0.43 0.43 -
0.50 0.13 1.68 0.84 0.13 0.13 -
0.50 2.91 20.60 10.30 2.91 2.91 -
0.50 1.62 5.40 5.40 1.62 1.62 -
0.50 1.48 15.64 7.82 1.48 1.48 -
0.50 0.65 5.16 2.58 0.65 0.65 -
0.50 2.21 18.70 9.35 2.21 2.21 -
0.50 0.75 5.00 2.50 0.75 0.75 -
0.50 0.38 5.00 2.50 0.38 0.38 -
0.50 1.28 11.20 5.60 1.28 1.28 -
0.50 1.28 12.25 6.13 1.28 1.28 -
0.50 1.94 12.50 6.25 1.94 1.94 -
0.50 0.99 7.90 3.95 0.99 0.99 -
0.50 0.59 5.90 2.95 0.59 0.59 -
0.50 0.14 1.40 0.70 0.14 0.14 -
17.45 17.45 -
Date :July 17, 2012
FORMWORKS
RATIO
Total Unit Remaks

0.00
0.00
5.10
7.36
6.67
3.54
3.33
5.27
4.00
2.00
3.33
6.67
2.00
4.80
3.22
4.00
5.00
5.00
FORMWORKS
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : Hospital Project


Ref. Dwg.: See Below Computation

Length/Area Width Height


Item Description No.
(m) (m) (m)
1 Polytethelene Sheet
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00

Otherc Reference Drawing :


S09107-01D-PL1H-DD-ST-SC-420-1OF6-00

Along Gridline Hvk - Hvp / Hx1-Hx15 1 2,244.60


Less column
C13 -1 2.50 0.50
C19 -1 2.50 0.50
C18 -3 1.20 1.20
C23 -1 2.93 1.50
C27 -1 3.00 0.50
C28 -1 2.93 0.80
C79 -2 3.00 0.60
C55 -1 2.93 1.50
C56 -1 2.93 1.80
C104 -1 2.70 1.50
C101 -1 3.98 0.50
C102 -3 1.20 0.80
C103 -3 0.80 0.80
C100 -2 1.00 1.00
C105 -2 2.70 1.00
C110 -1 0.80 0.80
Less Wall
Wall 8 -1 3.95 0.30
Wall 7 -1 5.00 0.30
Wall 6 (under ramp) -1 7.88 0.30
Wall 6 (slope) -1 8.85 4.00
Wall 2 -1 7.43 0.50
Less Opening
Sec F7-F7 -1 1.90 1.90
Sec F36-F36 -1 8.85 3.00
Sec F7-F7 -1 1.90 1.90
Sec F16-F16 -1 1.55 1.40
Less Corewall
CORE 5 -1 7.42 0.40
CORE 5 -1 2.58 0.50
CORE 9 -1 5.10 0.50
CORE 9 -1 5.68 0.45
CORE 9 -1 5.55 0.70
CORE 9 -1 3.95 0.50
CORE 9 -1 2.95 0.40
CORE 9 -1 0.70 0.40
Total
Quantity
Total Unit
+Qty -Qty

2,244.60 -

- (1.25)
- (1.25)
- (4.32)
- (4.40)
- (1.50)
- (2.34)
- (3.60)
- (4.40)
- (5.27)
- (4.05)
- (1.99)
- (2.88)
- (1.92)
- (2.00)
- (5.40)
- (0.64)

- (1.19)
- (1.50)
- (2.36)
- (35.40)
- (3.71)

- (3.61)
- (26.55)
- (3.61)
- (2.17)

- (2.97)
- (1.29)
- (2.55)
- (2.55)
- (3.89)
- (1.98)
- (1.18)
- (0.28)
2,244.60 (144.00) 2,100.60 m2
Date:

Remaks
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description No.
( m / m 2) (m)
Blinding Concrete under Raft
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

FORMWORKS
Blinding Concrete under Raft
AREA Hvk - Hvp / Hv1-Hx15

CONCRETE & SOFFITS


Along Gridline Hvk - Hvp / Hx1-Hx4 1 122.50
Along Gridline Hvk - Hvp / Hx4-Hx6 1 72.37
Along Gridline Hvk - Hvp /Hx6-Hx10 1 105.56
Along Gridline Hvk - Hvp / Hx10-Hx15 1 114.92
concretes
Height
Concrete(V) Peri
(m)

0.08 9.19 m2
0.08 5.43 m2
0.08 7.92
0.08 8.62

31.15 m2
Date : July 8, 2012
FORMWORKS
FORMWORKS
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description No.
( m / m 2) (m)
Blinding Concrete under SOG
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

FORMWORKS
Blinding Concrete under SOG
AREA Hvk - Hvp / Hv1-Hx15

CONCRETE & SOFFITS


Along Gridline Hvk - Hvp / Hx1-Hx4 1 122.50
Along Gridline Hvk - Hvp / Hx4-Hx6 1 72.37
Along Gridline Hvk - Hvp /Hx6-Hx10 1 105.56
Along Gridline Hvk - Hvp / Hx10-Hx15 1 114.92

Total
concretes
Height
Concrete(V) Peri
(m)

0.08 9.19 m2
0.08 5.43 m2
0.08 7.92
0.08 8.62

31.15 m2
Date : July 8, 2012
FORMWORKS
FORMWORKS
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA

Location : HOSPITAL PROJ


Ref. Dwg.: See Below Computation

Length/Area Width
Item Description No.
( m / m 2) (m)
Blinding Concrete under Raft
Foundation - Hospital Proj

3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00

FORMWORKS
Blinding Concrete under SOG
AREA Hvk - Hvp / Hv1-Hx15

CONCRETE & SOFFITS


Along Gridline Hvk - Hvp / Hx1-Hx4 1 122.50
Along Gridline Hvk - Hvp / Hx4-Hx6 1 72.37
Along Gridline Hvk - Hvp /Hx6-Hx10 1 105.56
Along Gridline Hvk - Hvp / Hx10-Hx15 1 114.92

Total
concretes
Height
Concrete(V) Peri
(m)

0.15 18.38 m2
0.15 10.86 m2
0.15 15.83
0.15 17.24

62.30 m2
Date : July 8, 2012