Foundation QTY
Estimated
Item Description Unit Unit Rate
Quantity
3 CONCRETE
3.1 BLINDING CONCRETE
3.1.1 Under Foundation m3 188.03
3.1.2 Under Slab on Grade and Grade Beams m3 168.69
3.2 STRUCTURAL CONCRETE
3.2.1 SUBSTRUCTURE
3.2.1.1 Cast in Situ Mat/Raft Foundation m3 5,906.46
3.2.1.2 Cast in Situ Isolated Footing m3
3.2.1.3 Cast in Situ Strip Footing m3
3.2.1.4 Cast in Situ Grade Beams m3
3.2.1.5 Cast in Situ Slab on Grade m3 337.35
3.2.1.6 Cast in Situ Column m3 173.37
Cast in Situ Column Neck m 3
26.27
3.2.1.7 Cast in Situ Retaining Wall m3
3.2.1.8 Cast in Situ Walls m3 622.59
Cast in Situ Wall Neck m3 95.51
3.2.1.9 Cast in Situ Core Walls m3 115.17
Cast in Situ Core Wall Neck m3 17.45
3.2.1.10 Cast in Situ Stairways Including Steps & Stringers m3 3.79
3.2.1.11 Mechanical Trenches and Sump Pit m3
3.2.2 SUPERSTRUCTURE
3.2.2.1 Cast in Situ Concrete Slab
3.2.2.1.1 Structural Concrete Slab m3
3.2.2.1.2 45 Mpa Structural Concrete Slab ( For Helipad)
3.2.2.2 Cast in Situ Columns m3
3.2.2.3 Cast in Situ Core Walls m3
3.2.2.4 Cast in Situ Wall m3
3.2.2.4 Cast in Situ Wall m3
3.2.2.5 Cast in Drop Panels
3.2.2.6 Cast in Situ Parapet Wall m3
3.2.2.7 Cast In Situ Beams m3
3.2.2.8 Cast in Situ Stairways Including Steps & Stringers m3
Remarks
Estimated
Item Description Unit Quantity
3 CONCRETE
3.5 FORMWORKS
3.5.1 SUBSTRUCTURE
3.5.2 SUPERSTRUCTURE
Soffit and Edges of Suspended Slab m2
Vertical Sides of Column m2 -
Vertical Sides of Core Walls m2
Vertical Sides of Wall m2
Vertical Sides of Parapet Wall m2
Soffit and Sides of Beams m2
Soffit and Edges of Stairways m2 23.63
Edges of Concrete Pads m2
Vertical Sides of Drop Panels m2
Vertical sides of Mechanical Trenches m2
Edges of Non-Structural Foam Concrete m2
31.15
62.30
31.15
1,023.34
-
-
-
560.63
84.94
-
1,093.74
173.90
485.33
73.54
-
-
-
-
-
23.63
-
-
-
-
-
-
-
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description CODE No.
(m/m)2
(m)
Structural Concrete & Formworks
Foundation - Hospital Proj
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
S
B
C
CW
W
AREA Hvk - Hvp / Hv1-Hx15 O
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2.00 809.27 - 1,618.54 1,618.54 1,618.54
- - - -
1.20 20.24 - 24.29 24.29 24.29
- - - -
2.00 94.96 - 189.92 189.92 189.92
- - - -
2.00 - 122.50 - -
- - - -
1.85 2.25 6.00 (4.16) (4.16) (4.16)
1.60 21.25 22.00 (34.00) (34.00) (34.00)
2.00 313.34 - 626.68 626.68 626.68
- - - -
2.00 74.86 - 149.72 149.72 149.72
Remaks
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
809.27
Length/Area Width
Item Description No.
( m / m 2) (m)
Water Stop
Foundation - Hospital Proj
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
Water Stop
Along Gridline Hvk - Hvp / Hx3-Hx4 2 21.84
Along Gridline Hvk - Hvp / Hx3-Hx4 1 7.00
Along Gridline Hvk - Hvp /Hx9'-Hx10 2 21.83
Along Gridline Hvk - Hvp /Hx9'-Hx10 1 7.00
Total
Height
Concrete(V) Units REMARKS
(m)
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
60.70
23.50
50.68
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
809.27
675.68
708.78
2,193.73
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
Cyclopane Concrete
Along Gridline Hvk - Hvp / Hx1-Hx4 1 809.27
Sides Along Gridline Hvk - Hvp / Hx1-Hx4 1 46.94 7.00
Sides Along Sect F7-F7 1 4.50 4.50 1.00
Sides Along Sect F5-F5 1 9.70 3.30 1.00
Along Gridline Hvk - Hvp /Hx4-Hx10 1 675.68
Sides Along Gridline Hvk - Hvp /Hx4-Hx10 1 45.30 7.00
Length/Area Width
Item Description Type No.
( m / m 2) (m)
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2
3.2.2.1 Column
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1TO9OF9
COLUMN
- - -
- - -
3.30 9.90 4.00 9.90 9.90
3.30 4.29 4.60 4.29 4.29
3.30 2.15 3.30 2.15 2.15
3.30 4.13 6.00 4.13 4.13
3.30 4.13 6.00 4.13 4.13
3.30 14.26 4.80 14.26 14.26
3.30 14.50 8.86 14.50 14.50
3.30 4.95 7.00 4.95 4.95
3.30 7.73 7.46 7.73 7.73
3.30 11.88 7.20 11.88 11.88
3.30 14.50 8.86 14.50 14.50
3.30 17.40 9.46 17.40 17.40
3.30 13.37 8.40 13.37 13.37
3.30 6.56 8.95 6.56 6.56
3.30 9.50 4.00 9.50 9.50
3.30 6.34 3.20 6.34 6.34
3.30 6.60 4.00 6.60 6.60
3.30 17.82 7.40 17.82 17.82
3.30 2.11 3.20 2.11 2.11
3.30 1.26 2.60 1.26 1.26
- - - -
Date :July 17 2012
FORMWORKS
RATIO
Unit Remaks
0.00
0.00
0.00
4.00
3.54
5.08
4.80
4.80
3.33
2.02
4.67
3.19
4.00
2.02
1.79
2.07
4.50
4.17
5.00
4.00
2.74
5.00
6.80
0.00
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area
Item Description code No.
( m / m2)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00
WALLL
S09107-01D-PL03-FD-ST-SC-426-1OF1-REV00
WALL
Along grid line Hx-1 A 2 5.75
Along grid line Hx-1 A 1 2.73
Along grid line Hvp/Hv1-Hx1 A 1 15.70
Along grid line Hvp/Hv1-Hx1 A 1 0.96
Along grid line Hvp/Hx1-Hx2 A 1 9.85
Along grid line Hvp/Hx2-Hx4 A 1 15.15
Along grid line Hvp/Hx4-Hx10 A 1 33.30
Along grid line Hvp/Hx9-Hx13 A 1 22.85
Along grid line Hvp/Hx12-Hx15 A 1 23.56
Wall 8 A 1 3.95
Wall 7 A 1 5.00
Wall 6 (slope) A 1 8.85
Wall 2 A 1 7.43
TOTAL
Concrete 622.59
Formworks 1,093.74 formworks
ratio 1.7567451 concretes
concretes
Width Height Vol. of Perimeter Quantity
Deduct Formula
(m) (m) Conc Sides +Qty -Qty
- - - - -
0.50 3.30 18.98 12.50 18.98 18.98 -
0.50 3.30 4.50 6.46 4.50 4.50 -
1.50 3.30 77.72 34.40 77.72 77.72 -
0.50 3.30 1.58 2.92 1.58 1.58 -
1.68 3.30 54.61 23.06 54.61 54.61 -
1.50 3.30 74.99 33.30 74.99 74.99 -
1.50 3.30 164.84 69.60 164.84 164.84 -
1.50 3.30 113.11 48.70 113.11 113.11 -
0.50 3.30 38.87 48.12 38.87 38.87 -
0.30 3.30 3.91 8.50 3.91 3.91 -
0.30 3.30 4.95 10.60 4.95 4.95 -
4.00 3.30 58.41 25.70 58.41 58.41 -
0.50 3.30 6.13 15.85 6.13 6.13 -
622.59 622.59 -
Date : July 17,2012
0.00
0.00
4.35
4.73
1.46
6.08
1.39
1.47
1.39
1.42
4.08
7.17
7.07
0.73
4.27
0.00
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description Code No.
( m / m2) (m)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00
Core Wall
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1to7of7-00
CORE WALLS
A CORE 18 A 1 3.04 0.45
A CORE18 A 1 2.88 0.30
B CORE18 B 1 0.84 0.30
A CORE 4 A 1 9.70 0.60
B CORE 4 B 2 2.70 0.60
A CORE 5 A 1 7.42 0.40
B CORE 5 B 1 2.58 0.50
B CORE 6 A 1 8.85 0.50
A CORE 6 B 1 2.50 0.60
B CORE 6 B 1 2.50 0.30
A CORE 9 A 1 5.10 0.50
A CORE 9 A 1 5.68 0.45
A CORE 9 A 1 5.55 0.70
B CORE 9 B 1 3.95 0.50
B CORE 9 B 1 2.95 0.40
B CORE 9 B 1 0.70 0.40
TOTAL
Concrete 115.17
Formworks 485.33 formworks
ratio 4.2139496 concretes
concretes
Height Vol. of Perimeter Quantity
Deduct Formula Total
(m) Conc Sides +Qty -Qty
- - - - -
3.30 4.51 6.98 4.51 4.51 -
3.30 2.85 6.36 2.85 2.85 -
3.30 0.83 1.68 0.83 0.83 -
3.30 19.21 20.60 19.21 19.21 -
3.30 10.69 5.40 10.69 10.69 -
3.30 9.79 15.64 9.79 9.79 -
3.30 4.26 5.16 4.26 4.26 -
3.30 14.60 18.70 14.60 14.60 -
3.30 4.95 5.00 4.95 4.95 -
3.30 2.48 5.00 2.48 2.48 -
3.30 8.42 11.20 8.42 8.42 -
3.30 8.43 12.25 8.43 8.43 -
3.30 12.82 12.50 12.82 12.82 -
3.30 6.52 7.90 6.52 6.52 -
3.30 3.89 5.90 3.89 3.89 -
3.30 0.92 1.40 0.92 0.92 -
115.17 115.17 -
Date :July 17, 2012
FORMWORKS
RATIO
Unit Remaks
0.00
0.00
5.10
7.36
6.67
3.54
3.33
5.27
4.00
0.30
3.33
6.67
0.30
4.80
3.22
4.00
5.00
5.00
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description Type No.
( m / m 2) (m)
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2
3.2.2.1 Column
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1TO9OF9
ISOLATION JOINT
C13 1 2.50 0.50
C19 1 2.50 0.50
C18 3 1.20 1.20
C27 1 3.00 0.50
C79 2 3.00 0.60
C101 1 3.98 0.50
C102 3 1.20 0.15
C103 3 0.80 0.15
C100 2 1.00 1.00
C110 1 0.80 0.80
BESIDES ON WALL 1 236.63
CORE 6 1 8.85 3.00
CORE 9 1 49.35
WALL 8 1 7.50
WALL 7 1 10.60
Concrete
Formworks
ratio Date :July 17 2012
336.69 -
- (0.19)
- (0.19)
- (0.65)
- (0.66)
- (0.23)
- (0.35)
- (0.54)
- (0.66)
- (0.79)
- (0.61)
- (0.30)
- (0.43)
- (0.29)
- (0.30)
- (0.81)
- (0.10)
- (0.18)
- (0.23)
- (0.35)
- (5.31)
- (0.56)
- (0.54)
- (3.98)
- (0.54)
- (0.33)
- (0.45)
- (0.19)
- (0.38)
- (0.38)
- (0.58)
- (0.30)
- (0.18)
- (0.04)
14.20 -
1.59 -
2.96 -
0.45 -
0.64 -
2.44 -
358.97 (21.62) 337.35 m3
Date:
Remaks
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA
785.61 -
- (0.44)
- (0.44)
- (1.51)
- (1.54)
- (0.53)
- (0.82)
- (1.26)
- (1.54)
- (1.85)
- (1.42)
- (0.70)
- (1.01)
- (0.67)
- (0.70)
- (1.89)
- (0.22)
- (0.41)
- (0.53)
- (0.83)
- (12.39)
- (1.30)
- (1.26)
- (9.29)
- (1.26)
- (0.76)
- (1.04)
- (0.45)
- (0.89)
- (0.89)
- (1.36)
- (0.69)
- (0.41)
- (0.10)
- (14.20)
- (1.59)
- (2.96)
- (0.45)
- (0.64)
- (2.44)
785.61 (70.24) 715.37 m3
Date:
Remaks
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA
168.34 -
- (0.09)
- (0.09)
- (0.32)
- (0.33)
- (0.11)
- (0.18)
- (0.27)
- (0.33)
- (0.40)
- (0.30)
- (0.15)
- (0.22)
- (0.14)
- (0.15)
- (0.41)
- (0.05)
- (0.09)
- (0.11)
- (0.18)
- (2.66)
- (0.28)
- (0.27)
- (1.99)
- (0.27)
- (0.16)
- (0.22)
- (0.10)
- (0.19)
- (0.19)
- (0.29)
- (0.15)
- (0.09)
- (0.02)
7.10 -
0.80 -
1.48 -
0.23 -
0.32 -
1.22 -
179.49 (10.80) 168.69 m3
Date:
Remaks
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD SAUDI
Project : EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
No. of Stairs 1
formworks
concretes
concretes
concretes
concretes
concretes
concretes
formworks
ratio 6.24 concretes
3.79 23.63 concretes
Landing (if any) Formworks Quantity
Volume
of Conc. Forms of Landing
Width Thick Soffits Sides Riser
Stairs Soffits
Formula
+Qty
m m cu.m. sq.m. sq.m. sq.m. sq.m. sq.m.
1.20 0.25 2.389 4.510 1.503 3.780 9.793 3.912 2.39 2.39
0.00 0.25 1.398 4.560 1.520 3.840 9.921 - 1.40 1.40
3.788
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
Date : May 1, 2012
FORMWORKS
RATIO
Quantity
Total Unit Remaks
-Qty
- 5.74
- 7.10
FORMWORKS
PROJECT THIRD SAUDI EXPANSION
Project : OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description Type No.
( m / m 2) (m)
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2
3.2.2.1 Column Neck
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-401-1TO9OF9
COLUMN
- - - -
- - - -
0.50 1.50 4.00 6.00 1.50 1.50
0.50 0.65 4.60 2.30 0.65 0.65
0.50 0.33 3.30 1.65 0.33 0.33
0.50 0.63 6.00 3.00 0.63 0.63
0.50 0.63 6.00 3.00 0.63 0.63
0.50 2.16 4.80 7.20 2.16 2.16
0.50 2.20 8.86 4.43 2.20 2.20
0.50 0.75 7.00 3.50 0.75 0.75
0.50 1.17 7.46 3.73 1.17 1.17
0.50 1.80 7.20 7.20 1.80 1.80
0.50 2.20 8.86 4.43 2.20 2.20
0.50 2.64 9.46 4.73 2.64 2.64
0.50 2.03 8.40 4.20 2.03 2.03
0.50 0.99 8.95 4.48 0.99 0.99
0.50 1.44 4.00 6.00 1.44 1.44
0.50 0.96 3.20 4.80 0.96 0.96
0.50 1.00 4.00 4.00 1.00 1.00
0.50 2.70 7.40 7.40 2.70 2.70
0.50 0.32 3.20 1.60 0.32 0.32
0.50 0.19 2.60 1.30 0.19 0.19
- - - - -
Date :July 17 2012
FORMWORKS
RATIO
Total Unit Remaks
0.00
0.00
0.00
4.00
3.54
5.08
4.80
4.80
3.33
2.02
4.67
3.19
4.00
2.02
1.79
2.07
4.50
4.17
5.00
4.00
2.74
5.00
6.80
0.00
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area
Item Description code No.
( m / m2)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00
WALL Neck
S09107-01D-PL03-FD-ST-SC-426-1OF1-REV00
WALL
Along grid line Hx-1 A 2 5.75
Along grid line Hx-1 A 1 2.73
Along grid line Hvp/Hv1-Hx1 A 1 15.70
Along grid line Hvp/Hv1-Hx1 A 1 0.96
Along grid line Hvp/Hx1-Hx2 A 1 9.85
Along grid line Hvp/Hx2-Hx4 A 1 15.15
Along grid line Hvp/Hx4-Hx10 A 1 33.30
Along grid line Hvp/Hx9-Hx13 A 1 22.85
Along grid line Hvp/Hx12-Hx15 A 1 23.56
Wall 8 A 1 3.95
Wall 7 A 1 5.00
Wall 6 (under ramp) A 1 7.88
Wall 6 (slope) A 1 8.85
Wall 2 A 1 7.43
TOTAL
Concrete 95.51
Formworks 173.90 formworks
ratio 1.8206469462 concretes
concretes
Width Height Vol. of Perimeter Formworks Quantity
Deduct Formula
(m) (m) Conc Sides Total +Qty
- - - - -
0.50 0.50 2.88 12.50 12.50 2.88 2.88
0.50 0.50 0.68 6.46 3.23 0.68 0.68
1.50 0.50 11.78 34.40 17.20 11.78 11.78
0.50 0.50 0.24 2.92 1.46 0.24 0.24
1.68 0.50 8.27 23.06 11.53 8.27 8.27
1.50 0.50 11.36 33.30 16.65 11.36 11.36
1.50 0.50 24.98 69.60 34.80 24.98 24.98
1.50 0.50 17.14 48.70 24.35 17.14 17.14
0.50 0.50 5.89 48.12 24.06 5.89 5.89
0.30 0.50 0.59 8.50 4.25 0.59 0.59
0.30 0.50 0.75 10.60 5.30 0.75 0.75
0.30 0.50 1.18 16.36 8.18 1.18 1.18
4.00 0.50 8.85 25.70 6.43 8.85 8.85
0.50 0.50 0.93 15.85 3.96 0.93 0.93
95.51 95.51
Date : July 17,2012
Quantity
Total Unit Remaks
-Qty
-
-
-
-
-
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
- depth ,not specified on plan S09107-01D-PL03-FD-ST-SC-426-R00
-
FORMWORKS
RATIO
0.00
0.00
4.35
4.73
1.46
6.08
1.39
1.47
1.39
1.42
4.08
7.17
7.07
6.92
0.73
4.27
0.00
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description Code No.
( m / m2) (m)
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-014-1of1-00
CORE WALLS
A CORE 18 A 1 3.04 0.45
A CORE 18 A 1 2.88 0.30
B CORE 18 B 1 0.84 0.30
A CORE 4 A 1 9.70 0.60
B CORE 4 B 2 2.70 0.60
A CORE 5 A 1 7.42 0.40
B CORE 5 B 1 2.58 0.50
B CORE 6 A 1 8.85 0.50
A CORE 6 B 1 2.50 0.60
B CORE 6 B 1 2.50 0.30
A CORE 9 A 1 5.10 0.50
A CORE 9 A 1 5.68 0.45
A CORE 9 A 1 5.55 0.70
B CORE 9 B 1 3.95 0.50
B CORE 9 B 1 2.95 0.40
B CORE 9 B 1 0.70 0.40
TOTAL
Concrete 17.45
Formworks 73.54 formworks
ratio 4.213949557 concretes
concretes
Height Vol. of Perimeter Formworks Quantity
Deduct Formula
(m) Conc Sides Total +Qty -Qty
- - - - - -
0.50 0.68 6.98 3.49 0.68 0.68 -
0.50 0.43 6.36 3.18 0.43 0.43 -
0.50 0.13 1.68 0.84 0.13 0.13 -
0.50 2.91 20.60 10.30 2.91 2.91 -
0.50 1.62 5.40 5.40 1.62 1.62 -
0.50 1.48 15.64 7.82 1.48 1.48 -
0.50 0.65 5.16 2.58 0.65 0.65 -
0.50 2.21 18.70 9.35 2.21 2.21 -
0.50 0.75 5.00 2.50 0.75 0.75 -
0.50 0.38 5.00 2.50 0.38 0.38 -
0.50 1.28 11.20 5.60 1.28 1.28 -
0.50 1.28 12.25 6.13 1.28 1.28 -
0.50 1.94 12.50 6.25 1.94 1.94 -
0.50 0.99 7.90 3.95 0.99 0.99 -
0.50 0.59 5.90 2.95 0.59 0.59 -
0.50 0.14 1.40 0.70 0.14 0.14 -
17.45 17.45 -
Date :July 17, 2012
FORMWORKS
RATIO
Total Unit Remaks
0.00
0.00
5.10
7.36
6.67
3.54
3.33
5.27
4.00
2.00
3.33
6.67
2.00
4.80
3.22
4.00
5.00
5.00
FORMWORKS
PROJECT THIRD SAUDI EXPANSION OF
Project : HOLY HARAM MAKKAH AND
SURROUNDING AREA
2,244.60 -
- (1.25)
- (1.25)
- (4.32)
- (4.40)
- (1.50)
- (2.34)
- (3.60)
- (4.40)
- (5.27)
- (4.05)
- (1.99)
- (2.88)
- (1.92)
- (2.00)
- (5.40)
- (0.64)
- (1.19)
- (1.50)
- (2.36)
- (35.40)
- (3.71)
- (3.61)
- (26.55)
- (3.61)
- (2.17)
- (2.97)
- (1.29)
- (2.55)
- (2.55)
- (3.89)
- (1.98)
- (1.18)
- (0.28)
2,244.60 (144.00) 2,100.60 m2
Date:
Remaks
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description No.
( m / m 2) (m)
Blinding Concrete under Raft
Foundation - Hospital Proj
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
FORMWORKS
Blinding Concrete under Raft
AREA Hvk - Hvp / Hv1-Hx15
0.08 9.19 m2
0.08 5.43 m2
0.08 7.92
0.08 8.62
31.15 m2
Date : July 8, 2012
FORMWORKS
FORMWORKS
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description No.
( m / m 2) (m)
Blinding Concrete under SOG
Foundation - Hospital Proj
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
FORMWORKS
Blinding Concrete under SOG
AREA Hvk - Hvp / Hv1-Hx15
Total
concretes
Height
Concrete(V) Peri
(m)
0.08 9.19 m2
0.08 5.43 m2
0.08 7.92
0.08 8.62
31.15 m2
Date : July 8, 2012
FORMWORKS
FORMWORKS
KING ABDULLAH BIN ABDUL AZIZ PROJECT THIRD
Project : SAUDI EXPANSION OF HOLY HARAM MAKKAH AND
SURROUNDING AREA
Length/Area Width
Item Description No.
( m / m 2) (m)
Blinding Concrete under Raft
Foundation - Hospital Proj
3 Reference Drawing :
3.2 S09107-01D-PL1H-FD-ST-SC-014-1of1-00
3.2.2 SUPERSTRUCTURE
3.2.2.1 Foundation
Reference Drawing :
S09107-01D-PL1H-FD-ST-SC-400-1 to 7OF7-00
FORMWORKS
Blinding Concrete under SOG
AREA Hvk - Hvp / Hv1-Hx15
Total
concretes
Height
Concrete(V) Peri
(m)
0.15 18.38 m2
0.15 10.86 m2
0.15 15.83
0.15 17.24
62.30 m2
Date : July 8, 2012
FORMWORKS
FORMWORKS