REHEARSAL ROOM STAGE STORAGE WORK ROOM ADMIN BLOCKS GUARD HOUSE

EARTH WORKS  Storm Water  Storm Water  Storm Water  Storm Water  Storm Water
Design Design Design Design Design
SANITATION  Sewer Pipe Sizing  Toilet and Basin  Toilet and Basin  Toilet and Basin  Toilet and Basin
 Sewer Pipe Schedules Schedules Schedules Schedules
Schedule  Sewer Reticulation  Sewer Reticulation  Sewer Reticulation  Sewer Reticulation
 Shower Invert Levels Invert Levels Invert Levels Invert Levels
Specifications  Sewer Pipe Sizing  Sewer Pipe Sizing  Sewer Pipe Sizing  Sewer Pipe Sizing
 Existing Sanitation  Sewer Pipe  Sewer Pipe  Sewer Pipe  Sewer Pipe
Invert Levels Schedule Schedule Schedule Schedule
 Shower  Shower  Existing Sanitation  Existing Sanitation
Specifications Specifications Invert Levels Invert Levels
 Existing Sanitation  Existing Sanitation
Invert Levels Invert Levels
FOUNDATION  Schedules of Steel  Schedules of Steel  Schedules of Steel  Schedules of Steel  Schedules of Steel
 Floor Screed Detail  Floor Screed Detail  DPC Specification  Floor Screed Detail  Floor Screed Detail
 Ramp Detailing  Ramp Detailing  Floor Screed Detail  Ramp Detailing  Ramp Detailing
 Ramp Detailing
WALLS,  Brick Material  Brick Material  Brick Material  Brick Material  Brick Material
WINDOWS AND Specification Specification Specification Specification Specification
DOORS  Mortar  Mortar  Mortar  Mortar  Mortar
Specification Specification Specification Specification Specification
 Brick Force not  Brick Force not  Brick Force not  Brick Force not  Brick Force not
Specified Specified Specified Specified Specified
 Doors Schedule  Doors Schedule  Doors Schedule  Doors Schedule  Doors Schedule
Missing Missing Missing Missing Missing
 Window Schedule  Window Schedule  Glass Specification  Glass Specification  Window Schedule
Missing Missing  Lintel Details  Lintel Details Missing
 Glass Specification  Glass Specification  Painting  Wall openings not  Glass Specification
 Lintel Details  Lintel Details Specification specified  Lintel Details
 Painting  Painting Missing  Painting  Painting
Specification Specification  Boundary or Specification Specification
Missing Missing Parameter Wall Missing Missing
 Boundary or  Boundary or Details  Boundary or  Boundary or
Parameter Wall Parameter Wall Parameter Wall Parameter Wall
Details Details Details Details
ROOFING  Ceiling  Ceiling  Ceiling  Ceiling  Ceiling
Specification Specification Specification Specification Specification
AESTHETICS  Verification of Gap  Verification of Gap  Verification of Gap  Verification of Gap  Verification of Gap
behind Wash behind Wash behind Wash behind Wash behind Wash
Basins and Urinals Basins and Urinals Basins and Urinals Basins and Urinals Basins and Urinals
 Land Scaping  Land Scaping  Land Scaping  Land Scaping  Land Scaping
Layout Layout Layout Layout Layout
LIGHTING  Redesign lighting  Redesign lighting  Redesign lighting  Redesign lighting  Two switches do
circuits. circuits. circuits. circuits. not show which
Insufficient Insufficient Insufficient Insufficient lights they are
luminaires luminaires luminaires luminaires controlling
 Symbol un-defined  Symbol un-defined  Shift one light
in the legend in the legend switch to the
corridor
 Position the light in
the corridor more
centrally to
adequately
illuminate the
corridor.
ELECTRICALS  DB design  DB design  DB design  DB design  DB design
drawings missing.  Socket reticulation drawings missing. drawings missing. drawings missing.
 Socket reticulation design to be  Socket reticulation  Socket reticulation
design to be redone drawings design to be design to be
redone missing. redone redone
RETICULATION  Cable routing,  Cable routing,  Cable routing,  Cable routing,  Cable routing,
lengths and sizes lengths and sizes lengths and sizes lengths and sizes lengths and sizes
from the Kiosks to from the Kiosks to from the Kiosks to from the Kiosks to from the Kiosks to
the buildings the buildings the buildings the buildings the buildings
missing. missing. missing. missing. missing.
 Cable schedule  Cable schedule  Cable schedule  Cable schedule  Cable schedule
missing. missing. missing. missing. missing.
 Kiosk design  Kiosk design  Kiosk design  Kiosk design  Kiosk design
drawings missing. drawings missing. drawings missing. drawings missing. drawings missing.
HVAC  Air-conditioning  Air-conditioning  Air-conditioning  Air-conditioning  Air-conditioning
design drawings design drawings design drawings design drawings design drawings
missing. Need to missing. Need to missing. Need to missing. Need to missing. Need to
design. design. design. design. design.
 Ventilation  Ventilation  Ventilation  Ventilation  Ventilation
drawings missing. drawings missing. drawings missing.. drawings missing. drawings missing.