Professional Documents
Culture Documents
S.a.b.a.district 2015-16 PDF
S.a.b.a.district 2015-16 PDF
SECTION
SCHEDUL E OF RATESFOR THE YEAR: 2015-16
AHM EDABAD CI TY (R & B) DI VI SI ON, AHM EDABAD
I NDEX
SR. CHAPTER PARTI CUL ARS PAGE
NO NO. NO
1 1 Rates of Materials 1
2 2 Rates of labour & carraige of materials 29
3 3 Mortar 35
4 4 Earth work 37
5 5 Concrete work 43
6 6 Brick work 81
7 7 Stone masonry 93
8 9 Form work 99
9 10 Wood work & joinary 105
10 11 Steel, alluminium & iron work 163
11 12 Building hardware 183
12 13 Glazing 187
13 14 Paving & floor finishes 189
14 15 Roof covering 209
15 16 Ceiling & lining 217
16 17 Plastering & pointing 223
17 18 White washing, colour washing, Distempering & other 229
finishing
18 19 Painting & polishing 241
19 20 Demolition & Dismentaling 251
20 21 Repairs to building 283
21 22 Miscelleneous building item 283
22 23 Water supply, plumbing & sanitary fittings 293
23 24 Drainage & sewerage item 315
24 Conveyance charges of different materials 331
25 Standard for cement consumption 414
CHAPTER :1: BASIC RATES FOR MATERIALS.
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
1
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
2
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
3
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
104 Polished kotah stone slab 30 mm thick Smt. 286.00 286.00 243.00
105 Polished kotah stone slab 40 mm thick Smt. 308.00 308.00 262.00
109 0.80 mm thick semi circular G.I sheet Quintal. 6153.00 6153.00 5230.00
class - 3
110 G.I steam bolts and nuts 25 mm x 7 Ten 138.00 138.00 117.00
mm
4
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
5
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
173 Gun metal bib tap (ii) 20 mm Each. 209.00 209.00 178.00
diameter.
6
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
189 White vitrious china 100 mm 'P' or 'S' Each. 102.00 102.00 87.00
trap
190 12.5 litre low level white vitrious Each. 1870.00 1870.00 1590.00
flushing cistern with C.P brass Handle
etc.
191 12.5 litre high level C.I flushing & Each. 880.00 880.00 748.00
cistern with fittings.
192 Black plastic sheet with cover with Each. 342.00 342.00 291.00
brass hunger and rubber buffers white
vitrious china
193 Flat back wash basin 550 mm x 400 Each. 675.00 615.00 523.00
mm
7
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
194 White vitrious china sink 600 mm x Each. 1712.00 1712.00 1455.00
450 mm x 150 mm
195 100 mm diameter cast iron grating. Each. 44.00 44.00 37.00
196 C.P brass shower rose 100 mm Each. 330.00 330.00 281.00
diameter.
197 Bevelled edge Mirror 600 mm x 450 Each. 321.00 321.00 273.00
mm
198 600 mm x 20 mm C.P.B + Ass towel Each. 418.00 418.00 355.00
rail with pair of C.P brass brackets.
199 600 mm x 120 mm glass shelf with Each. 231.00 231.00 196.00
C.P guard rail and brackets.
200 C.P brass toilet paper holder of Each. 303.00 303.00 258.00
standandard size.
201 Glazed stone ware pipes (i) 100 mm No 41.00 41.00 35.00
diameter 60 cm long
202 Glazed stone ware pipes (ii) 150 mm No 59.00 59.00 50.00
diameter 60 cm long
203 Gully trap 150 mm x 100 mm size. No 75.00 75.00 64.00
204 GSW fittings bends (i) 100 mm Each. 59.00 59.00 50.00
diameter.
205 GSW fittings bends (ii) 150 mm Each. 70.00 70.00 60.00
diameter.
206 Taper GSW Bend 100 mm x 150 mm Each. 86.00 86.00 73.00
207 GSW Half round channel 150 mm No 54.00 54.00 46.00
diameter 60 Cm long.
208 C.I steps 50 cm x 15 cm x 2.25 cm Each. 154.00 154.00 131.00
209 C.I cover without frame. Each. 550.00 550.00 468.00
210 C.I cover 300 mm x 300 mm (7 Kg) Each. 550.00 550.00 468.00
211 C.I cover 455 mm x 610 mm (35 Kg) Each. 1128.00 1128.00 959.00
212 C.I cover 500 mm x 700 mm (25 Kg) Each. 1568.00 1568.00 1333.00
213 C.I cover 600 mm x 850 mm (65 Kg) Each. 5060.00 5060.00 4301.00
214 C.I cover for manholes (Heavy) (38 No 7810.00 7810.00 6639.00
Kg)
215 P.V.C pipe having pressure (10Kg / Meter. 30.00 30.00 26.00
Sqcm.) (i) 20 mm diameter.
216 P.V.C pipe having pressure (10Kg / Meter. 44.00 44.00 37.00
Sqcm.) (ii) 25 mm diameter.
217 P.V.C pipe having pressure (10Kg / Meter. 55.00 55.00 47.00
Sqcm.) (iii) 32 mm diameter.
8
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
218 P.V.C pipe having pressure (10Kg / Meter. 82.00 82.00 70.00
Sqcm). (iv) 40 mm diameter.
219 P.V.C pipe having pressure (10Kg / Meter. 124.00 124.00 105.00
Sqcm.) (v) 50 mm diameter.
220 P.V.C pipe having pressure (10Kg / Meter. 222.00 222.00 189.00
Sqcm.) (vi) 75 mm diameter.
221 P.V.C pipe having pressure (10Kg / Meter. 380.00 380.00 323.00
Sqcm.) (vii) 110 mm diameter.
222 P.V.C pipe having pressure (6Kg / Meter. 55.00 55.00 47.00
Sqcm). (i) 40 mm diameter.
223 P.V.C pipe having pressure (6Kg / Meter. 80.00 80.00 68.00
Sqcm). (ii) 50 mm diameter.
224 P.V.C pipe having pressure (6Kg / Meter. 152.00 152.00 129.00
Sqcm). (iii) 75 mm diameter.
225 P.V.C pipe having pressure (6Kg / Meter. 288.00 288.00 245.00
Sqcm). (iv) 110 mm diameter.
226 Diesel for roller. Litre 46.25 54.07 49.55
227 Paving bitumen 80 / 100 Bulk. Tonne. 39603.00 44005.00 35204.00
228 Paving bitumen 80 / 100 Pack Tonne. 42929.00 47505.00 38004.00
229 Pre moulded Bituminous joint filler (i) Smt. 761.00 761.00 647.00
12 mm size.
230 Pre moulded Bituminous joint filler Smt. 840.00 840.00 714.00
(ii) 20 mm size.
231 Pre moulded Bituminous joint filler Smt. 1103.00 1103.00 938.00
(iii) 25 mm size.
232 Soft brush Each. 42.00 42.00 36.00
233 Thick wire brushes. Each. 76.00 76.00 65.00
234 Hectometer stone as per type design. Each. 126.00 126.00 107.00
234 Hectometer precast R.C.C stone as per Each. 315.00 315.00 268.00
A type design.
235 Ordinary Kilometer stone for (O.D.R Each. 420.00 420.00 357.00
& V.R)
235 Ordinary Kilometer precast R.C.C Each. 735.00 735.00 625.00
A stone for (O.D.R & V.R)
236 Ordinary Kilometer stone for (N.H, Each. 473.00 473.00 402.00
S.H & M.D.R)
236 Ordinary Kilometer precast R.C.C Each. 840.00 840.00 714.00
A stone for (N.H, S.H & M.D.R)
237 Fifth Kilometer stone as per I.R.C Each. 788.00 788.00 670.00
type design.
9
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
237 Fifth Kilometer Precast R.C.C stone Each. 1260.00 1260.00 1071.00
A as per I.R.C type design.
238 Indicator stone as per type design. Each. 116.00 116.00 99.00
238 Indicator stone as per RCC type Each. 315.00 315.00 268.00
A design.
239 M.S road sign board (i) Non- Each. 1854.00 1854.00 1576.00
Reflective type.
240 M.S road sign board (ii) Reflective Each. 3267.00 3267.00 2777.00
type.
241 M.S village name board or Junction Each. 3713.00 3713.00 3156.00
board
242 Marble year plae 20 cm x 15 cm x Each. 215.00 215.00 183.00
2.50 cm.
243 Marble number plate Each. 215.00 215.00 183.00
244 I.S Class NP2 R.C.C Heavy duty Non- Meter. 363.00 363.00 309.00
Pressure Pipe (i) 300 mm diameter.
245 I.S Class NP2 R.C.C Heavy duty Non- Meter. 660.00 660.00 561.00
Pressure Pipe (ii) 450 mm diameter.
246 I.S Class NP2 R.C.C Heavy duty Non- Meter. 880.00 880.00 748.00
Pressure Pipe (iii) 600 mm diameter.
247 I.S Class NP2 R.C.C Heavy duty Non- Meter. 1320.00 1320.00 1122.00
Pressure Pipe (iv) 750 mm diameter.
248 I.S Class NP2 R.C.C Heavy duty Non- Meter. 1650.00 1650.00 1403.00
Pressure Pipe (v) 900 mm diameter.
249 I.S Class NP2 R.C.C Heavy duty Non- Meter. 1870.00 1870.00 1590.00
Pressure Pipe (vi) 1050 mm diameter.
250 I.S Class NP2 R.C.C Heavy duty Non- Meter. 2090.00 2090.00 1777.00
Pressure Pipe (vii) 1200 mm diameter.
251 I.S Class NP3 R.C.C Heavy duty Non- Meter. 413.00 413.00 351.00
Pressure Pipe (i) 300 mm diameter.
252 I.S Class NP3 R.C.C Heavy duty Non- Meter. 798.00 798.00 678.00
Pressure Pipe (ii) 450 mm diameter.
253 I.S Class NP3 R.C.C Heavy duty Non- Meter. 1265.00 1265.00 1075.00
Pressure Pipe (iii) 600 mm diameter.
254 I.S Class NP3 R.C.C Heavy duty Non- Meter. 1898.00 1898.00 1613.00
Pressure Pipe (iv) 750 mm diameter.
10
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
255 I.S Class NP3 R.C.C Heavy duty Non- Meter. 2420.00 2420.00 2057.00
Pressure Pipe (v) 900 mm diameter.
256 I.S Class NP3 R.C.C Heavy duty Non- Meter. 3630.00 3630.00 3086.00
Pressure Pipe (vi) 1050 mm diameter.
257 I.S Class NP3 R.C.C Heavy duty Non- Meter. 4180.00 4180.00 3553.00
Pressure Pipe (vii) 1200 mm diameter.
257 I.S Class NP3 R.C.C Heavy duty Non- Meter. 5830.00 5830.00 4956.00
A Pressure Pipe (vii) 1400 mm diameter.
257 I.S Class NP3 R.C.C Heavy duty Non- Meter. 7700.00 7700.00 6545.00
B Pressure Pipe (vii) 1600 mm diameter.
257 I.S Class NP3 R.C.C Heavy duty Non- Meter. 9900.00 9900.00 8415.00
C Pressure Pipe (vii) 1800 mm diameter.
258 Galvanise mild steel tubes (i) 15 mm Meter. 110.00 110.00 94.00
diameter."B" Class.
259 Galvanise mild steel tubes (ii) 20 mm Meter. 143.00 143.00 122.00
diameter.
260 Galvanise mild steel tubes (iii) 25 mm Meter. 204.00 204.00 173.00
diameter. "B" Class.
261 Galvanise mild steel tubes (iv) 32 mm Meter. 258.00 258.00 219.00
diameter. "B" Class.
262 Galvanise mild steel tubes (v) 40 mm Meter. 314.00 314.00 267.00
diameter. "B" Class.
263 Galvanise mild steel tubes (vi) 50 mm Meter. 411.00 411.00 349.00
diameter. "B" Class.
264 Galvanise mild steel tubes (vii) 65 Meter. 514.00 514.00 437.00
mm diameter. "B" Class.
265 Galvanise mild steel tubes (viii) 80 Meter. 664.00 664.00 564.00
mm diameter. "B" Class.
266 Welding charges. Centimeter. 7.00 7.00 6.00
267 Grinding, polishing, rounding of R.M 25.00 25.00 21.00
edges of glasses or glazing sheet
268 Limpet washer Cent. 41.00 41.00 35.00
269 North light adjustable ridge Pair. 112.00 112.00 95.00
270 Asbestos rope. R.M 10.00 10.00 9.00
271 Rajula stone (size to be measured) Each. 91.00 91.00 77.00
11
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
12
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
13
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
325 Crushed stone aggregate for hard Cum. 440.00 440.00 330.00
quality (v) 10 mm to 20 mm size
326 Crushed stone aggregate for hard Cum. 365.00 365.00 274.00
quality (vi) 6 mm 10 mm size.
327 Brick aggregate 40 mm size Cum. 180.00 180.00 153.00
328 Brick aggregate 20 mm size Cum. 180.00 180.00 153.00
329 Bricks (i) Conventional size 1000 Nos 4000.00 4200.00 3570.00
330 Bricks (ii) Modular size 20 cm x 20 1000 Nos 4200.00 4400.00 3740.00
cm x 10 cm
331 Rubble heavy (Weight not less than Cum. 195.00 195.00 156.00
40 Kg)
332 Screened rounded gravel (i) 10 mm Cum. 200.00 210.00 168.00
size
333 Screened rounded gravel (ii) 12 mm Cum. 200.00 210.00 168.00
size
334 Murrum/Binding material Cum. 85.00 85.00 64.00
335 Unscreened gravel. Cum. 170.00 180.00 126.00
336 Hard murrum Cum. 120.00 120.00 96.00
337 Stone dust Cum. 150.00 150.00 105.00
338 Quarry spall Cum. 120.00 120.00 84.00
339 White bela stone (size to be measured) 100 Nos. 2700.00 3300.00 2805.00
340 Fly Ash Brick (i) Conventional size 1000 Nos. 5000.00 5000.00 4250.00
341 Granite slab (18 mm thick) one side Smt. 1870.00 1870.00 1590.00
polished.
342 Vetrified tile flooring tiles 8 mm to 10 Smt. 475.00 430.00 366.00
mm thick 600 mm x 600 mm Light
shade
342 Vetrified tile flooring tiles 8 mm to 10 Smt. 990.00 990.00 842.00
A mm thick 36" x 36"
343 Ceramics flooring tiles. Smt. 360.00 360.00 306.00
344 Precast concrete block of C.C 1:3:6 100 Nos. 2660.00 2660.00 2261.00
345 Alluminium fixtures and fastenings. No 207.00 207.00 176.00
346 Iron fixtures and fastenings. No 92.00 92.00 78.00
347 35 mm thick shutters Cu.Dm. 50.00 50.00 43.00
348 Angle size 15 cm x 15 cm (Glazed) 10 Nos. 75.00 75.00 64.00
349 Flat iron bracket with nuts, bolts, Each. 126.00 126.00 107.00
bitumen and G.I washers.
350 M.S flat iron bracket Each. 44.00 44.00 37.00
351 Plastic proofing compound. Kg. 19.00 19.00 16.00
14
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
371 Brass screw down stop tap 25 mm dia. Each. 260.00 260.00 221.00
372 Gun metal wheel valve (i) 15 mm Each. 220.00 220.00 187.00
diameter.
373 Gun metal wheel valve (i) 20 mm Each. 240.00 240.00 204.00
diameter.
374 Gun metal wheel valve (ii) 32 mm Each. 370.00 370.00 315.00
diameter.
375 Chromium plated 20 mm diameter Each. 300.00 300.00 255.00
half turn flush cock.
376 Chromium plated 25 mm diameter Each. 310.00 310.00 264.00
half turn flush cock.
377 Chromium plated 32 mm diameter Each. 325.00 325.00 276.00
half turn flush cock.
378 Cromium plated bottle trap. Each. 330.00 330.00 281.00
379 Ball cock of copper 25 mm diameter Each. 157.00 157.00 133.00
380 Ball cock of copper 50 mm diameter Each. 223.00 223.00 190.00
381 Ball cock of abonite 25 mm diameter Each. 121.00 121.00 103.00
15
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
16
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
405 I.S Class NP4 R.C.C Heavy duty Non- Rmt. 3200.00 3200.00 2720.00
Pressure Pipe 900 mm diameter.
406 I.S Class NP4 R.C.C Heavy duty Non- Rmt. 4000.00 4000.00 3400.00
Pressure Pipe 1000 mm diameter.
407 I.S Class NP4 R.C.C Heavy duty Non- Rmt. 5600.00 5600.00 4760.00
Pressure Pipe 1200 mm diameter.
408 I.S Class NP4 R.C.C Heavy duty Non- Rmt. 7750.00 7750.00 6588.00
Pressure Pipe 1400 mm diameter.
409 I.S Class NP4 R.C.C Heavy duty Non- Rmt. 10200.00 10200.00 8670.00
Pressure Pipe 1600 mm diameter.
410 I.S Class NP4 R.C.C Heavy duty Non- Rmt. 12700.00 12700.00 10795.00
Pressure Pipe 1800 mm diameter.
411 Glass brick 19 x 19 x 10 cm No 115.00 115.00 98.00
412 Glass brick 19 x 19 x 8 cm No 110.00 110.00 94.00
413 Floor spring heavy duty No 2500.00 2500.00 2125.00
414 S.S stopper 60 cm long of ASIS 304 No 500.00 500.00 425.00
grade
415 S.S stopper 30 cm long of ASIS 304 No 250.00 250.00 213.00
grade
416 S.S stopper 20 cm long of ASIS 304 No 175.00 175.00 149.00
grade
417 S.S Aldrap 20 cm long of ASIS 304 No 300.00 300.00 255.00
grade
418 S.S Aldrap 25 cm long of ASIS 304 No 450.00 450.00 383.00
grade
419 S.S Aldrap 30 cm long of ASIS 304 No 550.00 550.00 468.00
grade
420 S.S Handle for door / window 10 cm No 75.00 75.00 64.00
size of ASIS Grade 304
421 S.S Handle for door / window 15 cm No 105.00 105.00 89.00
size of ASIS Grade 304
422 S.S Pipe Handle for door 30 cm size No 1200.00 1200.00 1020.00
of ASIS Grade 316
423 S.S Pipe railing of 50 mm diameter x Rmt. 1394.00 1394.00 1185.00
16 G of ASIS Grade 304
424 S.S railing square pipe of 32 mm x 32 Rmt. 630.00 630.00 536.00
mm x 16 G of ASIS Grade 304
425 S.S Pipe railing of 16 mm diameter x Rmt. 508.00 508.00 432.00
16 G of ASIS Grade 304
17
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
18
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
445 S.S door / widow hinges 4" x 3/4" x No 30.00 30.00 26.00
3/4"
446 S.S door / widow hinges 3" x 3/4" x No 25.00 25.00 21.00
3/4"
447 Jet spray heavy duty with S.S braided No 425.00 425.00 361.00
hose 60 cm long
448 Health Fauset heavy duty with hook & No 800.00 800.00 680.00
fittings
449 Vetrified tile flooring tiles 8 mm to 10 Smt. 699.00 699.00 595.00
mm thick 600 mm x 600 mm Antiskid
450 R.C.C Heavy duty Non-Pressure Pipe Rmt. 672.00 571.00
IS class NP3 casted by Vertically
Vibrated Technology (i) 300 mm
diameter.
451 R.C.C Heavy duty Non-Pressure Pipe Rmt. 1032.00 877.00
IS class NP3 casted by Vertically
Vibrated Technology (ii) 450 mm
diameter.
452 R.C.C Heavy duty Non-Pressure Pipe Rmt. 1312.00 1115.00
IS class NP3 casted by Vertically
Vibrated Technology (iii) 500 mm
diameter.
453 R.C.C Heavy duty Non-Pressure Pipe Rmt. 1483.00 1261.00
IS class NP3 casted by Vertically
Vibrated Technology (iv) 600 mm
diameter.
454 R.C.C Heavy duty Non-Pressure Pipe Rmt. 2687.00 2284.00
IS class NP3 casted by Vertically
Vibrated Technology (v) 900 mm
diameter.
455 R.C.C Heavy duty Non-Pressure Pipe Rmt. 4508.00 3832.00
IS class NP3 casted by Vertically
Vibrated Technology (vi) 1000 mm
diameter.
456 R.C.C Heavy duty Non-Pressure Pipe Rmt. 5937.00 5046.00
IS class NP3 casted by Vertically
Vibrated Technology (vii) 1200 mm
diameter.
19
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
20
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
21
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
22
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
23
Sr. Materials. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 13 2013 - 14 2015 - 16
24
CHAPTER : 2: BASIC RATES FOR LABOURS.
Sr. Labour. Unit Basic Rate Basic Rate Basic Rate
No. for the Year for the Year for the Year
2012 - 2013 2013 - 2014 2015 - 2016
(1) (2) (3) (4) (5) (6)
24
CARRAIGE OF MATERIALS.
24
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
35
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
36
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
37
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
38
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
4 0.0 Extra for additional depth more than 5.0 mt cum 6.00
for excavation for foundation including
sorting out and stacking of useful materials
and disposing off the excavation stuff upto
50 mt lead. (A) Loose or soft soil.
5 0.0 Add extra for disposing off the excavated cum 9.00
stuff of above items for lead of (A) 50 mt
to 100 mt.
39
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
40
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
11 4.28 Extra for under reaming inside the bore Each 124.00
holes for under reamed piles of following
diameter. (I) 200 mm.
41
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
42
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
12 4.29 Add to or deduct from the rate for bore Each 104.00
holes of 3.5 mt depth, if bore holes are
made deeper or shallower than 3.50 mt for
piles of following diameter. (I) 200 mm.
43
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
44
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
45
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
46
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
47
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
48
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
16 5.4.13 Extra for additional lift of concrete for all per floor per 36.00
R.C.C work above floor two level cum
excluding cost of reinforcement.
17 5.4.13 Extra for additional lift of reinforcing steel per floor per 0.50
A for all R.C.C work above floor two level. kg.
49
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
50
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
22 5.6.9 Extra for additional lift for providing and per floor per 4.50
fixing in position precast R.C.C units sqm
above floor two level.
5.8.1 (B) Walls from top of foundation level upto cum 3963.00
floor two level.
51
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
52
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
5.8.1 (D) Columns, pillars, posts and struts upto cum 3994.00
floor two level.
5.8.1 (K) Vertical and horizontal fins upto floor cum 4077.00
two level.
5.8.2 (B) Walls from top of foundation level upto cum 4394.00
floor two level.
5.8.2 (D) Columns, pillars, posts and struts upto cum 4425.00
floor two level.
5.8.2 (K) Vertical and horizontal fins upto floor cum 4448.00
two level.
5.8.3 (B) Walls from top of foundation level upto cum 5278.00
floor two level.
53
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
54
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
5.8.3 (D) Columns, pillars, posts and struts upto cum 5309.00
floor two level.
0.0 (II) Slabs having more than 8 cm and upto cum 5073.00
10 cm thickness.
0.0 (II) Slab having more than 8 cm and upto cum 5388.00
10 cm thickness.
0.0 (III) Slab having more than 10 cm and upto cum 5149.00
13 cm thickness.
0.0 (IV) Slab having more than 13 cm and upto cum 4911.00
15 cm thickness.
55
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
56
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
0.0 (II) Slabs having more than 8 cm and upto cum 5616.00
10 cm thickness.
0.0 (II) Slab having more than 8 cm and upto cum 5931.00
10 cm thickness.
0.0 (III) Slab having more than 10 cm and upto cum 5601.00
13 cm thickness.
0.0 (IV) Slab having more than 13 cm and upto cum 5273.00
15 cm thickness.
57
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
58
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
0.0 (B) Beams [II] Having cross sectional area cum 6404.00
more than 0.08 and upto 0.12 Smt.
0.0 (B) Beams [III] Having cross sectional area cum 5686.00
more than 0.12 and upto 0.18 Smt.
59
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
60
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
0.0 (A) Beams. [II] Having cross sectional area cum 6863.00
more than 0.08 and upto 0.12 Smt.
0.0 (A) Beams. [II] Having cross sectional area cum 7719.00
more than 0.08 and up to 0.12 Smt.
61
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
62
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
63
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
64
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
65
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
66
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
67
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
68
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
69
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
70
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
71
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
72
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
73
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
74
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
43 0.0 Carting charges for read Mix Concrete by Per Cum 15.00
transit mixer beyond beyond 10 Km lead Per K.m
Addtional lead (Beyond 10 km)
75
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
76
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
77
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
78
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
79
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
80
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
81
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
82
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
6 6.19 Extra for brickwork in superstructure above per floor per 80.00
plinth level upto floor two level. (A) cum
Modular
0.0 Extra for brickwork in superstructure above per floor per 84.00
plinth level upto floor two level using fly cum
ash bricks.
7 6.20 Extra for brickwork in superstructure above per floor per 27.80
floor two level. (A) Modular Item No 6.12 cum
83
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
84
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
6.20 Extra for brickwork in superstructure above per floor per 27.00
floor two level. (A) Modular Item No 6.13 cum
0.0 Extra for brickwork in superstructure above per floor per 26.00
floor two level using flyash bricks in cum
cement mortar 1:6 (6.12 C)
6.20 Extra for brickwork in superstructure above per floor per 26.70
floor two level. 3(A) Modular Item No 0.0 cum
6.20 Extra for brickwork in superstructure above per floor per 20.00
floor two level. 4(A) Modular Item No 0.0 cum
6.20 Extra for brickwork in superstructure above per floor per 25.60
floor two level. 5(A) Modular Item No 0.0 cum
85
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
86
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
0.0 Half brick masonry in fly ash bricks having sqm 358.00
crushing strength not less than 35kg/cm2 in
cement mortar 1:4 (1 cement : 4 coarse
sand) (B) Conventional
0.0 Half brick masonry in fly ash bricks having sqm 348.00
crushing strength not less than 35kg/cm2 in
cement mortar 1:5 (1 cement : 5 coarse
sand) (B) Conventional
6.30 III Half brick masonry in common burnt clay- sqm 310.00
building bricks having crushing strength
not less than 35kg/cm2 in lime mortar 1:1.5
(1 lime : 1.5 coarse sand) (A) Modular
87
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
88
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
6.30 III Half brick masonry in common burnt clay- sqm 314.00
building bricks having crushing strength
not less than 35kg/cm2 in lime mortar 1:1.5
(1 lime : 1.5 coarse sand) (B) Conventional
89
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
90
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
13 0.0 Brick work using fly ash bricks having cum 2680.00
crushing strength not less than 35kg/Sqcm.
in foundation and plinth. In cement mortar
1:5 (1 cement : 5 fine sand)
14 0.0 Brick work using fly ash bricks having cum 2596.00
crushing strength not less than 35kg/Sqcm.
in foundation and plinth. In cement mortar
1:6 (1 cement : 6 fine sand)
15 0.0 Brick work using fly ash bricks having cum 2514.00
crushing strength not less than 35kg/Sqcm.
in foundation and plinth. In cement mortar
1:8 (1 cement : 8 fine sand)
16 0.00 Half brick masonry in fly ash bricks having sqm 456.00
crushing strength not less than 35kg/cm2 in
cement mortar 1:3 (1 cement : 3 coarse
sand) with 2 Nos of 6 mm mild steel round
bars after every three course embedded in
cement mortar in foundation and plinth.
91
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
92
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
93
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
94
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
6 7.20 Extra for additional lift in superstructure per floor per 33.00
above floor two level. cum
95
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
96
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
97
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
98
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
99
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
100
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
9.1 (G) Columns, pillars, posts and struts (1) sqm 187.00
Square, rectangular, polygonal in plan
9.1 (G) Columns, pillars, posts and struts (2) sqm 240.00
Circular or curved in plan.
9.1 (N) Vertical fins and vertical sun breakers. sqm 229.00
101
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
102
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
9.2 (II) Height more than 5.0 mt & upto 6.0 mt. sqm 364.00
9.2 (III) Height more than 6.0 mt & upto 7.1 sqm 518.00
mt.
9.7 (G) Columns, pillars posts and struts. (1) sqm 54.30
Square, rectangular, polygonal in plan.
9.7 (G) Columns, pillars posts and struts. (2) sqm 54.30
Circular or curved in plan.
9.7 (H) (1) Sides and soffits of beams, beam sqm 54.30
haunchings, cantilever, girders' bracings,
lintels not exceeding to 1.0 mt in depth.
9.7 (H) (2) Sides and soffits of beams, beam sqm 54.30
haunchings, cantilever, girders' bracings,
lintels exceeding to 1.0 mt in depth.
103
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
104
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
9.7 (Q) Vertical fins and vertical sun breakers. sqm 54.30
10.12 (A) Indian teak wood (II) Fully glazed. sqm 2130.00
10.12 (A) Indian teak wood (III) Partly panalled sqm 2480.00
& partly glazed.
105
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
106
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
10.13 (A) Indian teak wood (II) Fully glazed. sqm 2060.00
10.13 (A) Indian teak wood (III) Partly panalled sqm 2410.00
& partly glazed.
10.15 (A) Indian teak wood (II) Fully glazed. sqm 1710.00
10.15 (A) Indian teak wood (III) Partly panalled sqm 1927.00
& partly glazed.
10.16 (A) Indian teak wood (II) Fully glazed. sqm 1700.00
10.16 (A) Indian teak wood (III) Partly panalled sqm 1916.00
& partly glazed.
107
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
108
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
10.23 (A) Indian teak wood (B) Particle board sqm 2374.00
panels.
10.23 (A) Indian teak wood (C) Hard board sqm 2352.00
panels.
10.23 (A) Indian teak wood (D) Asbestos sheet sqm 2361.00
panels.
10.24 (A) Indian teak wood (B) Particle board sqm 2307.00
panels.
10.24 (A) Indian teak wood (C) Hard board sqm 2285.00
panels.
10.24 (A) Indian teak wood (D) Asbestos sheet sqm 2294.00
panels.
109
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
110
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
12 10.37 Extra for using bright finished M.S piano sqm 649.00
hinges of (A) Nickel plated piano hinges.
13 10.39 Extra for providing vision panel not sqm of door 7.00
exceeding 0.10 Smt in all type of flush area
doord (A) Rectangular or square.
111
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
112
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
113
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
114
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
26 10.102 Providing and fixing hard drawn steel wire sqm 651.00
not fabric 75 mm x 25 mm mesh of weight
less than 7.75 Kg per Smt to window
frames etc. including 60 mm x 20 mm
beading of Indian teakwood.
115
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
116
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
30 0.0 Providing and fixing 35mm th. shutters for sqm 3735.00
doors, windows & clear storey windows
including Indian teak wood frames 10 cm x
7 cm size including anodised alluminium
fixtures & fastening including primer coat
of approved quality and two coats of oil
paint etc. complete. (I) Fully glazed.
31 0.0 Providing and fixing 35mm th. shutters for sqm 3550.00
doors, windows & clear storey windows
including Indian teak wood frames 10 cm x
7 cm size including black enamelled iron
oxidised fixtures & fastening including
primer coat of approved quality and two
coats of oil paint etc. complete. (I) Fully
glazed.
117
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
118
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
32 0.0 Providing and fixing 35mm th. shutters for sqm 3965.00
doors, windows & clear storey windows
including Indian teak wood frames 12 cm x
7 cm size including anodised alluminium
fixtures & fastening including primer coat
of approved quality and two coats of oil
paint etc. complete. (I) Fully glazed.
33 0.0 Providing and fixing 35mm th. shutters for sqm 3780.00
doors, windows & clear storey windows
including Indian teak wood frames 12 cm x
7 cm size including black enamelled iron
oxidised fixtures & fastening including
primer coat of approved quality and two
coats of oil paint etc. complete. (I) Fully
glazed.
119
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
120
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
121
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
122
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
Providing and fixing 30mm thick
37 0.0 FACTORY MADE SOLID BOTH SIDE sqm 2574.13
PRELAM PANEL PVC DOOR
SHUTTER consisting of frame made out of
M.S. tubes of 19 gauge thickness and size
of 19mm x 19mm for stiles, top and bottom
rails. M.S. frame shall have a coat of steel
primer of approved makde and
manufactures. M.S frame covered with
5mm thick heat moulded prelim PVC ‘C’
channel of siz 30mm thickness, 70 mm
width of which 50mm shall be flat and
20mm shall be tapered in 45 degree Angle
on either side forming stiles, and 5mm
thick, 95mm wide pream PVC sheet out of
which 75mm shall be flat and 20mm shall
be tapered in 45 degree on the inner side ot
form top and bottom rail and 115mm wide
prelim PVc sheet out of which 75nmm
shall be flat and 20mm shall be tapered on
both side to form lock rail, Top, bottom and
lock rails shall be provided either side of
the panel. 10mm (5mm x 2) thick 20mm
wide cross PVC sheet shall be provided as
gap insert for top rail and bottom rails.
Panelling of 5mm thck both side prelim
PVC sheet to be fitt sheet beading of 15mm
the M.S. frame welded, sealed to the stiles
and rails with 7mm (5mm + 2 mm) thick x
15mm wide PVC sheet beading on inner
side, and joined togeth with solvent cement
adhesive. An additional 5mm thick PVC
strip of 20mm width is to be stuck on the
interior side of the ‘C” chanel using PVC
solvent adhesive etc. complete as per
direction of Engineering in charge,
manufacture’s specification and drawing.
123
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
124
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
125
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
126
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
127
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
128
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
129
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
130
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
131
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
132
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
133
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
134
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
135
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
136
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
137
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
138
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
139
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
140
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
141
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
142
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
143
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
144
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
145
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
146
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
147
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
148
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
149
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
150
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
55 0.0 Providing and fixing full height Prelam PVC sqm 2502.00
partition system 50mm thick consisting of
40mm sandwich PVC panel made out of 36mm
high density expanded polystyrene sheet
(E.P.S. Thermocol) stuck on both side with
2mm thick prelim PvC sheet reinforced with
frame work made from 35mm x 5mm M.S.
angle. In between two M.S. angles 4 mm with
feathered edges shall be fixed on floor and 50 x
75 mm with feathered edges prelim PVC “C”
channel of size 50mm x 75mm with feathered
edges prelim PVC panel shall be inserted in the
PVC ‘C” channel The first and last M.S. angle
should be erected such that it is inside a PVC C
channel of size 50 x 75mm In between
adjoining EPS sandwiched PVC partition panel
4mm thick x 75 mm width prelim PVC sheet
feathered at edges shall be stuck on front and
back face using solvent cement etc. An
additional 4mm thick PVC strip of 40mm width
is to be stuck on the intrior side of the ‘C”
channel using PVC solvent adhesive
completeas per direction of Engineer in charge.
Manufacture’s specification an sheet bea
151
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
152
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
153
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
154
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
155
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
156
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
157
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
158
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
159
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
160
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
62 0.0 Extra rate for using polyester fiber (12mm) 1 Packet of 30.00
with triangular of equivalent cross section 125 gms
with specific gravity 1.35 to 1.40 (as a
secondary reinforcement) in concrete of
any grade at the rate of 125 gms per 50 kg
of Cement consumption.
161
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
162
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
63 0.0 Extra rate for using polyester fiber (6mm) 1 Packet of 30.00
with triangular cross of equivalent section 125 gms
with specific gravity 1.35 to 1.40 (as a
secondary reinforcement) in mortar of any
grade at the rate of 125 gms per 50 kg of
cement consumption.
163
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
164
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
11.9 (B) Shutters having width 3.5 mt. and sqm 3162.00
above.
165
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
166
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
9 11.20 Providing and fixing M.S fan clamps type I Each 84.00
of 16 mm diameter M.S bar bent to shape
with hooked ends to R.C.C slabs during
laying including painting the exposed
portion of loops, all as per standard design
complete.
10 11.21 Extra over rate of item 11.20 for providing Cm Height 1.00
and fixing M.S fan clamps type II as per
standard design in R.C.C beams during
laying towards additional height of the
clamps due to beam rib.
167
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
168
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
0.0 (B) Shutters having width 3.5 mt. and sqm 4185.00
above.
169
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
170
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
171
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
172
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
173
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
174
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
175
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
176
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
177
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
178
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
179
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
180
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
181
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
182
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
4 12.10 Fixing metllic gates and shutter hooks and Each. 1.00
eyes of sizes (Hooks & eyes to be paid
under separate items)
183
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
184
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
185
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
186
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
CHAPTER : 13 : GLAZING
1 13.1 Providing and fixing sheet glass selected sqm 782.00
quality (type-C) bedded in putty and fixed
with wooden beading including the cost of
wooden beadings of first class teak wood
and necessary cutting of glass. [1] 5 mm.
thick.
2 13.3 Providing and fixing rough cast wired glass sqm 782.00
6 mm thick bedded in putty and fixed with
wooden beading including the cost of
wooden beadings of Indian teak wood and
necessary cutting of glass. [C] Wired-
figure glass.
187
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
188
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
14.2 (B) Light shade pigment with white cement sqm 617.00
(in top layer only)
14.2 (D) White cement without any pigment (in sqm 574.00
top layer only)
189
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
190
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
14.4 (B) Light shade pigment with white cement sqm 478.00
(in top layer only)
14.4 (D) White cement without any pigment (in sqm 455.00
top layer only)
191
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
192
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
14.19 [B] Medium shade using approx 50% white sqm 437.00
cement & 50% ordinary cement.
14.21 [B] Medium shade using approx 50% white sqm 634.00
cement & 50% ordinary cement.
193
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
194
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
195
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
196
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
197
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
198
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
18 14.87 Extra for rubbing and polishing the precast sqm 83.00
cement concrete tiles in flooring, skirting or
dedo.
199
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
200
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
201
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
202
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
25A 0.0 Providing and laying 36" x 36" Vitrified 8 sqm 1233.00
mm thick tile flooring over 20 mm
(average) base of cement mortar 1:6 (1
cement : 6 coarse sand) or L.M 1:1.5 laid
on new surface or fixing on existing
flooring by adhesive material including
dismentalling of existing flooring and
jointed with colour cement slurry including
finished with flush pointing & cleaning the
surface etc.complete For light shade
203
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
204
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
25C 0.0 Providing and laying 24" x 24" Vitrified 8 sqm 1193.00
mm thick tile flooring over 20 mm
(average) base of cement mortar 1:6 (1
cement : 6 coarse sand) or L.M 1:1.5 laid
on new surface or fixing on existing
flooring by adhesive material including
dismentalling of existing flooring and
jointed with colour cement slurry including
finished with flush pointing & cleaning the
surface etc.complete For Antiskid
205
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
206
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
207
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
208
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
209
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
210
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
211
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
212
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
213
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
214
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
16 15.94 Providing and fixing for wall plugs and Each 46.00
standard hold bat clamps comprising of two
semicircular halves of flat iron and cast
iron base screwed on wooden plugs. (B) 80
mm diameter.
215
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
216
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
15.95 (K) Junction equal double angle (5) 100 Each 46.00
mm diameter without door.
217
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
218
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
219
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
220
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
221
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
222
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
223
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
224
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
7 17.70 (A) Extra over items 17.58 to 17.67 for sqm per bag 49.00
providing and mixing water proofing of 50 kg of
material in cement mortar in proportion cement used
recommended by the manufactures. in mix
225
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
226
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
227
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
228
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
229
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
230
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
4 18.14 Extra over items 11 for white washing with sqm 0.40
lime on ceiling and/or slopping roofs.
5 18.15 Extra over items 12 for white washing with sqm 0.16
lime on ceiling and slopping roofs.
11 18.21 Extra over item 18.19 for colour washing sqm 0.60
on ceiling and slopping roofs.
231
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
232
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
15 18.34 Extra over item 33 for removing dry oil sqm 0.40
bound distemper on ceiling and slopping
roof.
233
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
234
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
235
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
236
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
237
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
238
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
32 18.59 Extra for item 57 for every subsequent coat sqm 23.10
of wall painting with plastic emulsion paint
of approved brand and manufacture.
33 18.60 Extra for item 57 for painting with plastic sqm 1.70
emulsion paint of approved brand and
manufacture on ceilings and sloping roofs.
34 18.62 Extra for item 59 for every susequent coat sqm 0.70
of painting with plastic emulsion paint on
ceilings and sloping roofs.
239
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
240
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
241
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
242
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
9 19.59 Applying priming coat over new wood and sqm 27.30
wood based surfaces after including
preparing the surface by throughly cleaning
oil, grease, dirt and other foreign matter,
sand papering & knotting (B) ready mixed
paint, brushing wood primer pink.
243
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
244
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
245
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
246
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
21 19.98 Coal taring two coats on new wood and sqm 22.60
wood based surfaces using 0.16 & 0.12
liters of coal tar per Sq. mt in the first and
second coat respectively to give an even
shade including cleaning of all dirt, dust
and other foreign matter.
22 19.100 Extra over item 19.98 for every subsequent sqm 12.40
coat of paint.
247
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
248
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
24 19.121 Extra over item 19.119 for using thick Per 10 letters 0.10
white paint instead black japan paint. (I) per Cm
Block (letters/figure) height
249
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
250
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
251
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
252
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
253
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
254
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
17 0.0 Scraping oil paint from steel and other sqm 15.00
metal surface and making the surface even
(with hand scraping)
255
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
256
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
257
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
258
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
259
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
260
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
261
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
262
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
263
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
264
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
265
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
266
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
267
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
268
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
269
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
270
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
271
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
272
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
273
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
274
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
275
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
276
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
277
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
278
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
279
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
280
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
281
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
- - - 91.76
- - - 49.07
282
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
283
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
284
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
285
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
286
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
287
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
288
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
289
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
290
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
291
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
292
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
293
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
294
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
295
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
296
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
297
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
298
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
299
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
300
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
301
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
302
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
9 23.87 Providing and fixing cast iron (spun) Nahni Each 401.00
trap of the following nominal diameter of
self cleansing design with C.I scread down
or hinged grating including the cost of
cutting and making good the walls and
floors 100 mm inlet and 50 mm outlet.
303
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
304
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
15 23.116 Providing & fixing 12.5 lit. high level C.I Each 1145.00
flushing cistern with a pair of C.I.or mild
steel brackets complete with fittings such as
syphonic arrangement, 15mm nominal size
brass ball valve with polythene float, level,
G.I chain (60 cm) & pull unions and
couplings for connections with inlet,outlet
& overflow pipe etc. including cutting
holes in walls & making good the same,
(Over flow pipe to be measured and paid
for seperately).
305
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
306
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
18 23.121 Providing and fixing plastic seat & cover Each 372.00
for wash down water closet with C.P brass
hinges and rubber buffers. (B) Black plastic
seat & cover.
21 23.135 Providing and fixing C.P brass waste for Each 77.00
wash basin or sink (A) 32 mm diameter.
22 23.136 Providing and fixing M.I fisher union for Each 93.00
wash basin or sink (A) 32 mm diameter.
307
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
308
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
24 23.141 Providing and fixing C.P brass shower rose Each 349.00
with 15 mm or 20 mm inlet. (A) 100 mm
diameter.
26 23.144 Providing and fixing C.P brass towel rail Each 639.00
complete with C.P brass bracket fixed to
wooden plugs with C.P brass screws. (B)
600 mm x 20 mm size.
28 23.146 Providing and fixing toilet paper holder (A) Each 413.00
C.Brass.
29 23.92 Providing and fixng screw down bib taps of Each 204.00
following size (A) Brass screw down bib
tap polished bright (I) 15 mm diameter.
23.92 (A) Brass screw down bib tap polished Each 256.00
bright (II) 20 mm diameter.
23.92 (B) Brass chromium plated screw down bib Each 233.00
tap (I) 15 mm diameter.
23.92 (B) Brass chromium plated screw down bib Each 268.00
tap (II) 20 mm diameter.
309
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
310
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
23.92 (C) Gun metal screw down bib tap (I) 15 Each 198.00
mm diameter.
23.92 (C) Gun metal screw down bib tap (II) 20 Each 222.00
mm diameter.
31 23.95 Providing and fixng brass screw down stop Each 256.00
tap (A) 15 mm diameter.
311
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
312
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
36 23.134 Providing and fixing rubber plug for sink Each 21.00
or wash basin.
40 0.0 Providing and fixing G.I rain water spout Each 125.40
of 50 mm diameter and 30 cm length.
313
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
314
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
315
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
316
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
4 24.17 Extra over item 24.1 for providing alst Each 66.00
glazed stoneware fitting. (I) Bends of
required degree (any radious) of following
internal diameters. (A) 100 mm diameter.
6 24.19 Providing and fixing S.W. Gully trap with Each 1270.00
C.I. grating brick masonry chamber &
water tight C.I. cover with frame of 300
mm x 300 mm.size (inside) with standard
weight. [I] Square mouth trap (A) 100 mm.
x 100 mm. size P-type.
317
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
318
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
7 24.19 Providing and fixing S.W. Gully trap with Each 1294.00
C.I. grating brick masonry chamber &
water tight C.I. cover with frame of 300
mm x 300 mm.size (inside) with standard
weight. [I] Square mouth trap (B) 150 mm.
x 100 mm. size P or R type.
319
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
320
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
24.27 (2) B-type depth 1.50 meter for 150 mm Each 16681.00
diameter sewer.
24.27 (3) C-type depth 2.24 meter for 150 mm Each 19405.00
diameter sewer.
24.27 (4) D-type depth 3.15 meter for 150 mm Each 24909.00
diameter sewer.
10 24.28 Extra rate for constructing B.B masonry for Each 393.00
every additional depth 0.10 meter or part
thereof over item 24.27 (I) for depth from
0.90 meter to 1.50 meter.
321
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
322
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
24.28 Extra rate for constructing B.B masonry for Each 302.00
every additional depth 0.10 meter or part
thereof over item 24.27 (II) for depth from
1.50 meter to 2.25 meter.
24.28 Extra rate for constructing B.B masonry for Each 331.00
every additional depth 0.10 meter or part
thereof over item 24.27 (III) for depth from
2.25 meter to 3.15 meter.
24.28 Extra rate for constructing B.B masonry for Each 503.00
every additional depth 0.10 meter or part
thereof over item 24.27 (IV) for depth
above 3.15 meter.
11 24.33 Providing and fixing iron steps of size 500 Each 119.00
mm x 150 mm x 22.5 mm and painting
with two coats of anticorrosive paint etc.
complete.
323
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
324
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
325
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
326
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
18 24.46 Extra over item 24.44 for every additional Each 175.00
depth of 0.10 meter or part thereof beyond
450 mm depth for brick masonry chamber.
(I) For 455 mm x 610 mm
24.46 Extra over item 24.44 for every additional Each 192.00
depth of 0.10 meter or part thereof beyond
450 mm depth for brick masonry chamber.
(II) For 500 mm x 700 mm
327
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
328
SR. Item No as ITEM DESCRIPTION UNIT Rate for
NO. per N.B.O 2011-12
Rs.
(1) (2) (3) (4) (5)
24.46 Extra over item 24.44 for every additional Each 236.00
depth of 0.10 meter or part thereof beyond
450 mm depth for brick masonry chamber.
(III) For 600 mm x 850 mm
19 0.0 (A) Providing sock pit of 2.0 Cmt volume Each 1115.00
including excavating, filling brick bats with
dry masonry work at top for 45 cm height
including providing vatas in cement mortar
1:3 with finishing, curing etc. complete.
0.0 (B) Providing sock pit of 5.0 Cmt volume Each 2787.00
including excavating, filling brick bats with
dry masonry work at top for 45 cm height
including providing vatas in cement mortar
1:3 with finishing, curing etc. complete.
329
Rate for Rate for Rate for Rate for Rate for
2012-13 2013-14 2014-15 2015-16 2016-17
Rs. Rs. Rs. Rs. Rs.
(6) (7) (8/) (9) (10)
330
SCHEDUL E OF RATES FOR CONVEYANCE OF M ATERI AL
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
331
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
332
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
2.0 Ear th
A. 0.50 km cum 65.78
333
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
334
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
335
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
336
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
337
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
338
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
339
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
340
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
341
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
342
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
343
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
344
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
345
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
346
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
3.2.2 Br icks
347
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
348
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
3.2.3 Tiles
349
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
350
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
3.2.6 Cement
351
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
352
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
3.2.7 Steel
Note: For item No 3.2.7 add Rs. 10.00 per
M.T as handaling charges for the lead from
0.50 to 5.0 km only.
A. 0.50 km M.T 113.98
353
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
354
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
3.2.8 Timber
Rate per unit for specific loead of
A. 0.50 km cum 52.62
355
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
356
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
357
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
358
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
359
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
360
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
361
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
362
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
363
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
364
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
365
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
366
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
367
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
368
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
369
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
370
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
371
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
372
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
373
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
374
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
375
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
376
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
377
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
378
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
379
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
380
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
381
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
382
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
383
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
384
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
385
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
386
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
387
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
388
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
389
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
390
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
391
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
392
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
RATE FOR QUARRY MATERI ALS MORE THAN 10.00 TON CAPACI TY TRUCK / DUMPER
1 3.2.1 (A) L ime, mur r um, building r ubbish,
manur e or sludge and excavated r ock
and fly ash
393
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
394
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
2.0 Ear th
A. 0.50 km cum -----
395
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
396
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
397
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
398
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
399
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
400
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
401
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
402
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
403
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
404
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
405
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
406
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
407
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
408
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
3.2.6 Cement
409
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
410
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
3.2.7 Steel
Note: For item No 3.2.7 add Rs. 10.00 per
M.T as handaling charges for the lead from
0.50 to 5.0 km only.
A. 0.50 km M.T -----
411
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
412
Sr . I tem No Descr iption Unit Rate of Year
No as per 2007-08
N.B.O
Foot Notes : (1) The above rates include contractor's profit and overhead
(2) The above rates include the loading, unloading and stacki ng
413
Rate of Year Rate of Year Rate for Rate for Rate for Rate for
2008-09 2011-12 2012-13 2013-14 2014-15 2015-16
Rs. Rs. Rs. Rs.
414
Standard for cement
consumption
GOVERNMENT OF GUJARAT
Road & Buildings Department
Circular No SOR / 1085 / 7 / H (1)
Sachivalaya, Gandhinagar
Dated : 8 - 12 - 1986
1 The question of fixing uniform rate of cement consumption for various items was
under consideration of Government since some time. A standard cement consumption
statement is now prepared and enclosed herewith for guidance of field officers
(Statement No 1)
2 The consumption of cement for controlled cement concrete depends upon properties of
concreting materials and water cement ratio. Therefore in case of controlled concrete
the consumption should be taken as the one considered in design mix. However it will
be necessary to fix standard for assessing cement requirement for the purpose of fixing
quantity in Schedule - A, placing indents etc. For this purpose only a statement
showing standards of cement consumption for controlled concrete items is also
prepared and enclosed (Statement no 2)
3 The consumption specified in the norms forwarded herewith are on an average basis
and variation to the extent of + or - 5% is permissible.
D.A: Statement No 1
Statement No 2
To,
All Superintending Engineer (including Panchayat) Circles
414
STATEM ENT NO 1
Standard for cement consumption for different items of work included in the schedule of
rates (Except controlled concrete items)
BUI L DI NG I TEM S
5. CONCRETE WORK
415
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
6. BRI CK WORK
416
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
M I SCEL L ANEOUS
417
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
M I SCEL L ANEOUS
9 0.0 White stone Bela masonry in partition wall sqm 5.70
in cement mortar 1:4 (1 Cement : 4 sand)
14. FL OORI NG
TERRAZZO FL OORI NG
1 14.2 40 mm thick marble chips flooring with
under layer 30 mm thick cement concrete
1:2:4 and top layer 10 mm thick with
marble chips laid in cement marble powder
mix 3:1 (3 Cement : 1 marble powder by
weight) in proportion 4 : 7 (4 Cement
marble powder mix : 7 marble chips by
volume)
418
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
TI L E FL OORI NG
419
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
New items included in this S.O.R for the year 1985-86 vide Government letter No SOR - 1083 / 12 / H
(i) dated 19-03-1986
420
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
421
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
422
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
15. ROOFI NG
7 15.26 Filling cement concrete 1:2:4 (1 Cement : 2 metre 1.91
coarse sand : 4 stone aggregate) in gaps of
A.C sheet corrugation and wings of ridges
13 15.88 Providing and fixing M.S holder bat clamps Each 1.60
to G.I or S.S pipes embedded in and
including cement concrete blocks 100 mm x
100 mm x 100 mm size of 1:2:4 (1 Cement
: 2 coarse sand : 4 stone aggregate) etc.
complete.
423
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
424
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
425
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
64, 66 (A) Providing and cast in situ controlled cement cum 400.00
74 (A), concrete M-200 for R.C.C work
91 (A)
93 (A)
103 (A)
426
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
(2) The cement consumption specified in the above statement are on an average
± 5% variation in the specified consumption may be permitted.
427
STATEM ENT NO 2
(See Note-2 and 3 below)
Standard for cement consumption for controlled concrete items of work included in the
schedule of rates for the purpose of assessing cement did not for observi ng in actual
execution.
BUI L DI NG I TEM S
5. CONCRETE WORK
14, 19, Providing and cast in situ controlled cement cum 400.00
36, 45 concrete M 200
428
Sr . No in I tem No Br ief descr iption of item Unit Quantity of cement
chapter in in S.O.R to be used per unit
S.O.R quantity of wor k (in
K ilogr ams)
(1) (2) (3) (4) (5)
429
SIGNATURE SLIP
Schedule of rates Rate in Signature of Signature of sanctioning Remarks.
for the year Col. No. Executive Engineer &
counter-signing
2015-16 9 Rates in Col No 9 higher
than Col. No 8 upto 15%
are sanctioned at Circle
level and above 15% are
sanctioned by Goernment
vide letter No
The following percentage is used for restricting the rate at ceiling given by Government hence never delete it
otherwise detailed rate Analysis will not be done.
Government instructed if rate is found more than 15% of the rate of previous S.O.R, restrict the rate at 15% of
previous rates given in S.O.R hence we give figure like 1.15 as shown below
Rate restricting to 15 %
Rate restricting to 1.15 time of previous S.O.R
Considering Contractor profit and over head is 15%, hence multiplying figure will be 0.15
Contractor's 0.15
profit & overhead
: