S. O. R.

: 2013-14
DISTRICT :- VADODARA
DATA INPUT - A
No. Particular Unit Material Rate Reference of
Rs. source
1 2 3 4 5
A - MATERIAL
1 Cement OPC MT 5800.00 R&B
2 Unslacked lime Qtl 200.00 R&B
3 Blasting power kg 60.00 R&B
4 Fuse Each 130.00 R&B
5 Mild steel bars Qtl. 4200.00 R&B
6-(i) Cold twisted bars/HYSD Qtl. 4400.00 R&B
(ii) TMT Bars FE-415 Qtl. 4800.00 R&B
7 Water proofing material Lit/kg 50.00 R&B
8 Precast RCC Jali
A 25 mm thick Sqm 154.00 R&B
B 40 mm thick Sqm 176.00 R&B
C 50 mm thick Sqm 187.00 R&B
D 75 mm thick Sqm 220.00 R&B
E 100 mm thick Sqm 242.00 R&B
9 Through and bond stone Each 27.00 R&B
10 Planks 30 mm thick ( Kali or equivalent soft Cu.Dm 29.00 R&B
wood)
11 Planks 38mm thick ( Kali or equivalent soft Cu.Dm 30.00 R&B
wood)
12 Ballies 80 mm dia m 32.00 R&B
13 Ballies 125 mm dia m 42.00 R&B
14 Battens 50 mm x 25 mm Cu Dm 28.00 R&B
15 Battens 50 mm x 50mm Cu Dm 28.00 R&B
16 Battens 75 mm x 50 mm Cu Dm 28.00 R&B
17 Battens 75 mm x 100 mm Cu Dm 28.00 R&B
18 Clamps in two semicircular halves of M.S. kg 70.00 R&B
flat 40 mm x 3 mm
19-A Plain G.I.Sheet 10 mm thick Qtl 6700.00 R&B
20 Bolts 12mm dia, 10 cm long. kg 75.00 R&B
21 Indian teak wood Cu. Dm 65.00 R&B
22 Country wood Cu. Dm 30.00 R&B
23 Anodized Alluminium Butt hinges
A 100 mm x 63 mm x 3.2 mm 10 Nos 281.00 R&B
B 75 mm x 63 mm x 3.2 mm 10 Nos 185.00 R&B
C 75 mm x 45 mm x 3.2 mm 10 Nos 153.00 R&B
D 50 mm x 45 mm x 3.2 mm 10 Nos 145.00 R&B
24 Anodized Alluminium Screws
A 40 mm 100 Nos 92.00 R&B
B 30 mm 100 Nos 86.00 R&B
C 20 mm 100 Nos 58.00 R&B
25 Iron Hinges
A 100 mm x 58 mm x 1.9 mm 10 Nos 144.00 R&B
B 100 mm x 58 mm x 1.4 mm 10 Nos 138.00 R&B
C 75 mm x 47 mm x 1.7 mm 10 Nos 121.00 R&B
D 50 mm x 37 mm x 1.5 mm 10 Nos 109.00 R&B
26 Iron Screw
A 40 mm 100 Nos 144.00 R&B
B 30 mm 100 Nos 121.00 R&B
C 20 mm 100 Nos 92.00 R&B
27 Commericial Ply wood sheet
A 12 mm thick Sqm 425.00 R&B
B 19 mm thick Sqm 530.00 R&B
C 25 mm thick Sqm 590.00 R&B
28 Partical board sheet
A 12 mm thick Sqm 285.00 R&B
B 19 mm thick Sqm 365.00 R&B
C 25 mm thick Sqm 475.00 R&B
D 35 mm thick Sqm 630.00 R&B
29 Hard board sheet 40 mm thick Sqm 170.00 R&B
30-A Plain Asbestos sheet 5 mm thick Sqm 200.00 R&B
31 Non-decorative type 35 mm thick door Sqm 1470.00 R&B
shutters
32 Non-decorative type 25 mm thick door Sqm 1113.00 R&B
shutters
32-A Vision penel for door No 40.00 R&B
33 Nickel plated bright finished MS plane m 179.00 R&B
hinges
34 Nickel plated screw 25 mm size 100 Nos 184.00 R&B
35 Wire gauge of 0.56 mm Sqm 189.00 R&B
36 Wire gauge of 0.71 mm Sqm 242.00 R&B
37 M.S. Flat / plate Qtl 5040.00 R&B
38 Deodar wood battens and planks Cu. Dm 28.00 R&B
39 Wooden plugs Each 1.10 R&B
40 Decorative ply wood 4 m thick Sqm 350.00 R&B
41 T-iron bracket 40 mmx 40 mm x 6 mm Qtl 5520.00 R&B
42 Hard drawn steel wire fabric Sqm 288.00 R&B
43 Hood cover 0.9 mm thick m 155.00 R&B
44 Hood cover 1.25 mm thick m 162.00 R&B
45 Rolling shutter having width below 3.5 m Sqm 2645.00 R&B
46 Extra cost of R.S. having width 3.5 m & Sqm 322.00 R&B
abve coil type spring
47 Coil type spring Each 230.00 R&B
48 Structural steel MS channel joist, tees, Qtl 5290.00 R&B
Gusset plate etc.
49 M S sheet 1 mm thick Qtl 5800.00 R&B
50-A Pulleys 25 mm dia Each 127.00 R&B
B Pulleys 38 mm dia Each 132.00 R&B
51 27.5 cm long wire spring grade No. 2 for Each 753.00 R&B
rolling shutter
52 Sheet glass ordinary quality
A 3 mm thick Sqm 221.00 R&B
B 4 mm thick Sqm 233.00 R&B
53 Sheet glass selected quality
A 5 mm thick Sqm 315.00 R&B
B 6 mm thick Sqm 347.00 R&B
54 Ground glass ( frosted or obscured on one
side)
A 3 mm thick Sqm 247.00 R&B
B 4 mm thick Sqm 284.00 R&B
C 5 mm thick Sqm 357.00 R&B
55-A Plain glass 3 mm thick Sqm 242.00 R&B
B Plain glass 4 mm thick Sqm 252.00 R&B
56 Wired figured glass 6.4 mm thick Sqm 431.00 R&B
57 Light shade Pigment Kg. 95.00 R&B
58 Medium shade pigment Kg. 95.00 R&B
59 Dark Shade Pigment Kg. 89.00 R&B
60 White cement MT 20000.00 R&B
61 Marble chips upto 4mm size Qtl 872.00 R&B
62 Marble powder cum 1838.00 R&B
63 22mm thick Chequered terrazo tiles
A Light Shade Sqm 158.00 R&B
B Dark Shade Sqm 147.00 R&B
64 20mm thick Terrazo tiles
A Light Shade Sqm 137.00 R&B
B Dark Shade Sqm 126.00 R&B
65 28mm thick Chequered Terrazo tiles
A Light Shade Sqm 173.00 R&B
B Dark Shade Sqm 163.00 R&B
66 White glazed tiles (15cmx15cmx6mm) 10 Nos 90.00 R&B
67 Pre cast cement concrete tiles Sqm 105.00 R&B
68 Rough kota stone slab
A 25mm thick Sqm 204.00 R&B
B 40mm thick Sqm 275.00 R&B
69 Polished kota stone slab
A 25mm thick Sqm 275.00 R&B
B 30mm thick Sqm 286.00 R&B
C 40mm thick Sqm 308.00 R&B
70 Marble slab 18 to 20 mm thick Sqm 825.00 R&B
71 0.8mm thick corrugated G.I.Sheet class-III Qtl. 6325.00 R&B
72 0.8mm thick plain G.I.Sheet class-III Qtl. 6153.00 R&B
73 0.8mm thick semi-circular G.I.sheet class-III Qtl. 6153.00 R&B

74 G.I.Seam bolts and nuts 25mmx7mm 10 Nos 138.00 R&B


75 G.I.Plain Washer 100 Nos 104.00 R&B
76 G.I.Bitumen Washer 100 Nos 58.00 R&B
77 G.I.J Or L Hooks 10 Nos 104.00 R&B
78 Corrugaed A.C.Sheets
A 6mm thick Sqm 235.00 R&B
B 7mm thick Sqm 246.00 R&B
79 A.C.sheet ridge 1.22M.Long Pair 203.00 R&B
80 A.C.socketed Half round Gutter
A 150mm dia Each 219.00 R&B
B 300mm dia Each 235.00 R&B
81 A.C.North light Curves Each 300.00 R&B
82 Manglore tiles 1000 Nos 3600.00 R&B
83 Fibre base bitumen saturated under layer Sqm 105.00 R&B
type-I
84 Residual Bitumen MT 7875.00 R&B
85 Fibre base self finished felt type-II grade Sqm 121.00 R&B
86 Fuel steam coal Qtl. 200.00 R&B
87 A.C.pipe 2.0 M long
A 80mm dia Each 68.00 R&B
B 100mm dia Each 79.00 R&B
88 Bat clamps 80mm dia Each 15.00 R&B
89 Bat Clamps 100mm dia Each 21.00 R&B
90 A.C.Bend without Door
A 80 mm dia Each 20.00 R&B
B 100 mm dia Each 23.00 R&B
91 - A Offset (I) 50mm - 80mm dia Each 25.00 R&B
B Offset (II) 50mm - 100mm dia Each 29.00 R&B
C Offset (I) 75mm- 80mm dia Each 25.00 R&B
D Offset (II) 75mm - 100mm dia Each 30.00 R&B
92 Junction Equal Single
A 80mm dia Each 33.00 R&B
B 100mm dia Each 41.00 R&B
93 Junction Equal Double
A 80mm dia Each 35.00 R&B
B 100mm dia Each 39.00 R&B
94 Standard Shoe
A 80mm dia Each 29.00 R&B
B 100mm dia Each 33.00 R&B
95 Fibre Insulation Board
A 12mm dia Sqm 221.00 R&B
B 18mm dia Sqm 320.00 R&B
C 25mm dia Sqm 410.00 R&B
96 - A Plywood Sheet 9mm thick Sqm 330.00 R&B
B Plywood Sheet 6mm thick Sqm 215.00 R&B
97 Lime for white washing Qtl 420.00 R&B
98 Distemper primer lit 80.00 R&B
99 Dry Distemper Kg 50.00 R&B
100 Oil Bound Distemper Kg 70.00 R&B
101 Water proofing cement paints lit 40.00 R&B
102 Plastic Emulsion paint lit 230.00 R&B
103 Enamel Paint lit 210.00 R&B
104 Bituminous Paint lit 60.00 R&B
105 Enamel Primer lit 135.00 R&B
106 Spirit lit 60.00 R&B
107 Bees wax Kg 85.00 R&B
108 Linseed oil lit 140.00 R&B
109 Turpentine oil lit 55.00 R&B
110 Kerosene lit 45.00 R&B
111 Varnish lit 85.00 R&B
112 Coal tar lit 33.00 R&B
113 Synthetic Enamel paint lit 210.00 R&B
114 Black Japan Paint lit 60.00 R&B
115 White Paint lit 205.00 R&B
116 Ready mixed red lead paint lit 100.00 R&B
117 Shella kg 65.00 R&B
118 G.I.Barbed wire Qtl 8000.00 R&B
119 Glasses 2 mm to 3 mm thick Sqm 175.00 R&B
120 Emulsion with Dialdrin lit 175.00 R&B
121 Black stone for cookuing platform ( 1.50 Each 650.00 R&B
Sqm)
122 Gun metal for bib Tab
A 15 mm dia No. 187.00 R&B
B 20 mm dia No. 209.00 R&B
123 Gun metal wheel valve
A 25 mm dia No. 495.00 R&B
B 40 mm dia No. 781.00 R&B
124 Brass screw down bib tap
A 15 mm dia No. 193.00 R&B
B 20 mm dia No. 242.00 R&B
125 Chroum plated brass bib tap
A 15 mm dia No. 220.00 R&B
B 20 mm dia No. 253.00 R&B
126 - A Pillar tap 15 mm dia No. 363.00 R&B
127 - A Brass stop cock 15 mm dia No. 242.00 R&B
128 C.I. Nahni trap No. 187.00 R&B
129 Urinal
A Flat back No. 514.00 R&B
B Squatting type No. 589.00 R&B
130 Rubber plug No. 18.00 R&B
131 White vtrious china water closet No. 401.00 R&B
Squattin pan (Indian type) 580 mm size
132 White vitrious china wash sown W.C. No. 696.00 R&B
( European type)
133 White vitrious china foot-rest for W.C. pair 75.00 R&B
134 White viitrious china 100 mm P or S trap Each 102.00 R&B
135 Flushing cistern white citrious with C P Each 1870.00 R&B
brass handle etc.12.5 lit low level
136 C.I. flushing cistern with fittings 12.5 lit High Each 880.00 R&B
level
137 Black plastic sheet with cover wiith C P Each 342.00 R&B
brass hinges and rubber butterss white
vitrious china
138 Flat back wash basin 550 mm x 400 mm Each 615.00 R&B
139 White vitrious cbins sink 600 mm x 450 mm Each 1712.00 R&B
x 150 mm
140 100 mm dia cast iron gratting Each 44.00 R&B
141 C P brass shower rose 100 mm dia Each 330.00 R&B
142 Beveled edge mirror 600 mm x 450 mm Each 321.00 R&B
143 600 mmx 20mm C P brass towel rail with Each 418.00 R&B
pair of C P brass brackets
144 600mm x 120mm glass self with C P guard Each 231.00 R&B
rail and brackets
145 C P brass toilet paper holder of standard Each 303.00 R&B
size
146 Glazed stone ware pipes
A 100 mm dia 600mm long No 41.00 R&B
B 150 mm dia 600mm long No 59.00 R&B
147 S W gully trap 150mmx100mm size No 75.00 R&B
148 G S W fitting bends
A 100 mm dia Each 59.00 R&B
B 150 mm dia Each 70.00 R&B
149 Taper G S W bans 100mm x 150 mm Each 86.00 R&B
150 G S W half round channel 150 mm dia 600 Each 54.00 R&B
mm long piece
151 C I Steps 50cmx15cmx2.25cm Each 154.00 R&B
152 - A C I cover 300mmx300mm (7 kg) Each 550.00 R&B
B C I cover 455mmx610mm (15 kg) Each 1128.00 R&B
C C I cover 500mmx700mm (25 kg) Each 1568.00 R&B
D C I cover 600mmx850mm (65 kg) Each 5060.00 R&B
153 C I cover manholes ( 38 kg) Each 7810.00 R&B
154 Diesel lit 54.07 R&B

155 Premoulded bitumineous joint filler


A 12 mm size Sqm 761.00 R&B
B 20 mm size / 18 mm size Sqm 840.00 R&B
C 25 mm size Sqm 1103.00 R&B
156 Soft brush Each 42.00 R&B
157 Thick wire brush Each 76.00 R&B
158 - A Hectometer stone as per type design Each 126.00 R&B
159 - B Ordinary K M stone (for N H S H & MDR) Each 473.00 R&B
160 - A Ordinary K M Stone for ODR & VR) Each 420.00 R&B
161 - A 5 th KM stone as per IRC type design Each 788.00 R&B
162 - A Indicator stone as per IRC type design Each 116.00 R&B
163 M S Road sign board/ Village Name Board
A Non reflective type Each 1854.00 R&B
B Reflective type Each 3267.00 R&B
164 M S village name board or junction board Each 3713.00 R&B
165 Marble year plate ( 20x15x2.50 cm) Each 215.00 R&B
166 Marble number plate Each 215.00 R&B
167 I.S. class NP2 RCC heavy duty Non
pressure pipe
A 300 mm dia m 363.00 R&B
B 450 mm dia m 660.00 R&B
C 600 mm dia m 880.00 R&B
D 750 mm dia / 800 mm dia m 1320.00 R&B
E 900 mm dia m 1650.00 R&B
F 1000 mm dia m 1870.00 R&B
G 1200 mm dia m 2090.00 R&B
168 I.S. class NP3 RCC heavy duty Non
pressure pipe
A 300 mm dia m 413.00 R&B
B 450 mm dia m 798.00 R&B
C 600 mm dia m 1265.00 R&B
D 800 mm dia m 1898.00 R&B
E 900 mm dia m 2420.00 R&B
F 1100 mm dia m 3630.00 R&B
G 1200 mm dia m 4180.00 R&B
169 P V C Pipes
A 20 mm dia ( 10 kg/Sqcm) m 30.00 R&B
B 25 mm dia ( 10 kg/Sqcm) m 44.00 R&B
C 32 mm dia ( 10 kg/Sqcm) m 55.00 R&B
D 40 mm dia ( 10 kg/Sqcm) m 82.00 R&B
E 50 mm dia ( 10 kg/Sqcm) m 124.00 R&B
F 75 mm dia ( 10 kg/Sqcm) m 222.00 R&B
G 110 mm dia ( 10 kg/Sqcm) m 380.00 R&B
170 P V C Pipes
D 40 mm dia ( 6 kg/Sqcm) m 55.00 R&B
E 50 mm dia ( 6 kg/Sqcm) m 80.00 R&B
F 75 mm dia ( 6 kg/Sqcm) m 152.00 R&B
G 110 mm dia ( 6 kg/Sqcm) m 288.00 R&B
171 Galvanised mild steel tubes
A 15 mm dia "B" class m 110.00 R&B
B 20 mm dia "B" class m 143.00 R&B
C 25 mm dia "B" class m 204.00 R&B
D 32 mm dia "B" class m 258.00 R&B
E 40 mm dia "B" class m 314.00 R&B
F 50 mm dia "B" class m 411.00 R&B
G 65 mm dia "B" class m 514.00 R&B
H 80 mm dia "B" class m 664.00 R&B
172 Welding charges cm 7.00 R&B
173 Grinding, polisjhing, rounding of edges of m 25.00 R&B
glass /of glazing sheet
174 Limpet washer 100 Nos 41.00 R&B
175 North light adjustable ridge pair 112.00 R&B
176 Asbestos rope m 10.00 R&B
177 Rajula stone I size to be measured) each 91.00 R&B
178 Bilimora bricks 1000 Nos 4280.00 R&B
179 GIMS tee 65mmx65mm each 316.00 R&B
180 GIMS nut 5mm thick 80mm dia each 75.00 R&B
181 C.I. Spigot & Socket soil pipe
A 75 mm dia No 1348.00 R&B
B 100 mm dia No 1623.00 R&B
182 C I cowel
A 75 mm dia No 341.00 R&B
B 100 mm dia No 473.00 R&B
183 Waste pipe for wash basin C I
A 32 mm dia No 73.00 R&B
B 40 mm dia No 96.00 R&B
184 M I fisher union
A 32 mm dia No 88.00 R&B
B 40 mm dia No 99.00 R&B
185 C P brass screw and washers 25 m size No 20.00 R&B
186 Spun yarn kg 57.00 R&B
187 GSW junction
A 100 mm dia No 75.00 R&B
B 150 mm dia No 139.00 R&B
188 C I gratting 100mmx100mm No 80.00 R&B
189 C I cap grill as per standard design No 61.00 R&B
190 Gauge plate Qtl 5500.00 R&B
191 Hire charges for
A Roller Hr 770.00 R&B
B Boiler Hr 165.00 R&B
C Bituminous mixer Hr 220.00 R&B
192 Labour charges for hot mix plant MT 468.00 R&B
193 Guard stone No 43.00 R&B
194 Boundary stone No 43.00 R&B
195 Junction board RCC No 749.00 R&B
196 Painting charges ( Board) No 54.00 R&B
197 Painting charges ( letter) No 6.00 R&B
198 Red flag No 19.00 R&B
199 - A Asphalt Grade 80/100 ( bulk) MT 44005.00 R&B
B Asphalt Grade 80/100 ( packed) MT 47505.00 R&B
C Asphalt Grade 60/70 ( bulk) MT 44966.00 R&B
D Asphalt Grade 60/70( packed) MT 48466.00 R&B
E Asphalt CRMB 50 ( bulk) MT 48775.00 R&B
F Asphalt CRMB 55 Bulk MT 49644.00 R&B
200 Binding wires kg 55.00 R&B
201 Cast steel rocker bearing MT 69300.00 R&B
202 Cast steel roller rocker bearing MT 69300.00 R&B
203 Cement bags ( empty) Each 3.30 R&B
204 High tensile steel wire MT 78430.00 R&B
205 M S fixed plate bearing MT 60500.00 R&B
206 M S rocker bearing MT 60500.00 R&B
207 M S roller bearing MT 60500.00 R&B
208 Neoprene bearing Cu cm 1.21 R&B
(480mmx310mmx48mm)
209 Oil of 30 number / Mobile Oil lit 215.00 R&B
210 Petrol lit 71.89 R&B
211 Granite slab ( 18 mm thick) One side Sqm 1870.00 R&B
polished
212 - A Vitrified granite tiles 8 mm to 10 mm thick Sqm 430.00 R&B
600 X 600 mm size LIGHT SHED
213 Ceramics tiles Sqm 360.00 R&B
Quarry Materials
214 Fine sand Cum 210.00 R&B
215 Coarse sand Cum 230.00 R&B
216 Hand broken aggregates
i 90 mm to 25 mm size Cum 230.00 R&B
ii 63mm to 40mm Cum 270.00 R&B
217 Crushed stone aggregates of hard quality
i 40 mm to 63 mm size Cum 390.00 R&B
ii 40 mm size Cum 425.00 R&B
iii 20 mm size Cum 550.00 R&B
iv 10 mm size Cum 520.00 R&B
v 10 mm to 20 mm size Cum 440.00 R&B
vi 6 mm to 10 mm size Cum 365.00 R&B
218 Brick aggregates/bats
i 40 mm size Cum 180.00 R&B
ii 20 mm size Cum 180.00 R&B
219 Bricks
i Convensional size 1000 Nos 4200.00 R&B
ii Modular size ( 20cmx20cmx10cm) 1000 Nos 4400.00 R&B
220 Rubble Cum 185.00 R&B
221 Rubble heavy ( weight not less than 40 kgs) Cum 195.00 R&B

222 Quarry spaull Cum 120.00 R&B


223 White bela stone ( size 23 cm measured) 100 Nos 3300.00 R&B
224 Screened rounded gravel
i 10 mm size Cum 210.00 R&B
ii 12 mm size Cum 210.00 R&B
225 Murrum binding material Cum 85.00 R&B
226 Unscreened gravel Cum 180.00 R&B
227 Hard murrum Cum 120.00 R&B
228 Stone dust Cum 150.00 R&B
229 Fly Ash brick (i) Convensional size ) 1000 Nos 5000.00 R&B

FROM SSNNL FOR CANALS


231 Anchor bolt Kg 75.00 SSNNL
232 Gravel Double screennned. Cum 210.00 SSNNL
233 Crude oil lit 26.00 SSNNL
234 150mm dia G.I. PIPE Gr.I Blue strip m 1154.00 SSNNL
235 100mm dia G.I. PIPE Gr.I Blue strip m 723.00 SSNNL
236 38 mm G.I. Pipe m 314.00 R&B
237 150 mm C.I. Pipe m 1292.00 SSNNL
238 SWG PIPE 200 MM DIA m 265.00 SSNNL
239 SWG PIPE 250 MM DIA m 315.00 SSNNL
240 Red oxide lit 100.00 SSNNL
241 Asphalt filler joint 20 mm m 6.70 SSNNL
242 225 mm PVC water stop m 263.00 SSNNL
243 300 mm PVC water stop m 368.00 SSNNL
244 Long. PVC STRIP m 34.70 SSNNL
245 Transverse PVC STRIP m 31.50 SSNNL
246 12 mm thick PVC sheet Sqm 3906.30 SSNNL
247 Pidilite Ps 41 Kg 465.00 SSNNL
248 Polysulphide sealent m 157.50 SSNNL
249 Bitumen paper Sqm 6.20 SSNNL
250 Tar paper Sqm 6.20 SSNNL
251 Polythelene film 100 micron Kg 131.25 SSNNL
252 PRV 50 mm dia No 189.20 SSNNL
253 PRV 150 mm dia No 461.20 SSNNL
254
255
256 Geletine Kg 60.00 MARKET
257 Elec. Detonator No 11.00 SSNNL
258 Km stone 45 x 30 x 90 cm No 420.00 R&B
259 Radium paint lit 645.90 SSNNL
260 Welding rods No 15.50 SSNNL
Guage plate 5 mm thick
261 10 cm wide No 134.30 SSNNL
262 15 cm wide No 232.50 SSNNL
263 25 cm wide No 310.00 SSNNL
264 225 mm dia NP-2 Class Pipes m 246.10 SSNNL
NP-4,IRS PIPE
265 300MM m 520.00 R&B
266 450MM m 920.00 R&B
267 600MM m 1650.00 R&B
268 900MM m 3200.00 R&B
269 1000MM m 4000.00 R&B
270 1200MM m 5600.00 R&B
271 1400MM m 7750.00 R&B
272 Empty Jute bag ( 100 kg ) No. 9.00 SSNNL
273 Anchore Bolts for joist No. 2.50 SSNNL
274 Curing compound lit 31.00 SSNNL
275 Core box No 826.70 SSNNL
276 Pedestal ( 15 kg) No 430.00 SSNNL
277 Steel Assembly kg 52.90 SSNNL
278 Header No. 190.00 SSNNL*
279 PVC Tank 500 Lit. No. 1440.00 SSNNL
280 PVC Tank 1000 Lit. No. 2880.00 SSNNL
281 PVC Tank 1500 Lit. No. 4320.00 SSNNL
282 No.
283 No.
284 Marble Plate 30 x 30 cm No. 645.00 SSNNL
285 Marble Plate 45 x 45 cm No. 1505.00 SSNNL
286 Alluminium Decorative Rail ( With Ends) m 144.00 SSNNL
287 -- // -- ( Without Ends) m 115.00 SSNNL
288 Fuse coil m 3.25 Market
289 C.C. Pole No 100.00 SSNNL
290 Wire Net 10 Gauge ( 10 x 10 cm) Sqm 33.00 SSNNL
Gauge Plate ( Fibre Glass)
291 10 cm Rmt. 4236.00 Market
292 15 cm Rmt. 5190.00 Market
293 20 cm Rmt. 6146.00 Market
294 30 cm Rmt. 8055.00 Market
295 45 cm Rmt. 13251.00 Market
296 60 cm Rmt. 16116.00 Market
297 100 cm Rmt. 23754.00 Market
298 Grease kg 205.00 Market
299 Detonator ( Ordinary) No 51.00 Market
300 35 mm dia bit No 2500.00 SSNNL
301 75 mm dia bit No 4400.00 SSNNL
302 Bit (Toungoton Carbide Diamond 75 mm SSNNL
dia) No 6000.00
303 Core barrel Single No 1075.00 SSNNL
304 Core barrel Double No 1840.00 SSNNL
305 Casing pipe 100 mm, m 225.00 SSNNL
306 Upheaval Gauge No 2500.00 SSNNL
307 AEA ( Air Entering Agent) kg 31.00 SSNNL
308 Black Steel pipe with coupling- 75 mm dia. m 302.00 SSNNL
309 Black Steel pipe with coupling-100 mm dia. SSNNL
m 456.00
310 Counter Sunk Pluge No. 63.00 SSNNL
311 G.I.Tee ( 50-80 mm) No 130.00 SSNNL
312 Lead wool kg 44.00 SSNNL
313 G.I. Nipple 12 mm Dia).0.30 m long. No 30.00 SSNNL
314 Khanki ( 30 x 45 x 45 ) cm. No 192.00 SSNNL
315 Copper Sealing Strip No 152.00 SSNNL
316 Steam pipe (18 mm dia) kg 88.00 SSNNL
317 PVC Sealing Strip kg 46.00 SSNNL
318 Screw Bolt 18 mm diameter kg 63.00 SSNNL
319 20 mm premoulded Asphalt joint Sqm 440.00 SSNNL
320 Bitumen Sheet 12 mm Sqm 264.00 SSNNL
321 C. I. Pipe ( 45 cm long) One end 10 cm dia , SSNNL
another 15 cm dia ( Bell mouth) No. 780.00
322 C. I. Pipe ( 15 cm ) No. 517.00 SSNNL
323 Iron Grilling No. 25.00 SSNNL
324 Coupling 40 mm diameter No. 25.00 SSNNL
325 Coupling 100 mm diameter No. 50.00 SSNNL
Half round pipe
326 20 cm diameter m 81.00 SSNNL
327 30 cm diameter m 88.00 SSNNL
Non Return Alluminium Flap valve.
328 5 cm Diameter No 114.00 SSNNL
329 10 cm Diameter No 132.00 SSNNL
330 30 cm Diameter No 290.00 SSNNL
331 C.I.Double flanged pipe 300 mm SSNNL
diameter m 930.00
332 C.I. Bell mouth 300 mm diameter No 385.00 SSNNL
333 C.I. Bend 300 mm diameter No 385.00 SSNNL
334 C.I. taper 300 mm diameter No 380.00 SSNNL
335 C.I.Double flahged non rising spindal type SSNNL
sluice valve incl thurst valve worm gear,
indicator etc. No 1450.00
336 C. I. Step ( 15 x 38 cm, 35 mm thick) kg 36.00 SSNNL
337 Rust remover Lit 467.00 SSNNL
338 Silver grey S.E. paint ( Double coat) Lit 157.00 SSNNL
339 Wire brush. ( 15 x 6 Row) No 42.00 SSNNL
340 Cotton waste kg 31.00 SSNNL
341 Emery paper No 5.00 SSNNL
342 Alluminium paint lit 253.00 SSNNL
343 Resin kg 539.00 SSNNL
344 Hardner kg 511.00 SSNNL
345 Flow control agent kg 37.00 SSNNL
346 Quarts Sand kg 0.35 SSNNL

FOR CANAL GATES


347 Cast Iron ( I.S. 210 ) kg 57.00 SSNNL
348 Stainless steel ( I.S.: 1570 part-V) kg 228.00 Mech.
349 Bronze I.S.: 306 kg 380.00 SSNNL
350 Bronze I.S.: 318 kg 350.00 SSNNL
351 Rubber seals Flat 55 x 12 mm m 102.00 SSNNL
352 Rubber seals Flat 48 x 12 mm m 102.00 SSNNL
353 Welding Rods S.S. No 25.00 Mech.
354 Welding Rods M.S. No 5.00 Mech.
355 S.S. Screw No 21.00 SSNNL
356 Carbon steel ( I.S. : 1570 ) C-30 kg 48.00 SSNNL
357 Carbon steel ( I.S. : 1570 ) C-50 kg 50.00 SSNNL
358 Spherical roller thurst bearing- 29328 b No 32340.00 SSNNL
359 29324 b No 27500.00 SSNNL
360 51216 No 2833.00 SSNNL
361 Taper roller bearing 30210 No 1045.00 SSNNL
362 30209 No 363.00 SSNNL
363 30208 No 495.00 SSNNL
364 Lubricating sump gasket etc complete 506.00 SSNNL
365 Electric Motor 1 HP 200 RPM No 13860.00 SSNNL
366 1.5 HP 147 RPM No 14520.00 SSNNL
367 1.5 HP 200 RPM No 14520.00 SSNNL
368 2 HP 200 RPM No 15180.00 SSNNL
369 2 HP 228RPM No 15180.00 SSNNL
370 3 HP 228RPM No 21648.00 SSNNL
371 Electromagnetic brake > 3 MT Capacity No 3520.00 SSNNL
372 Electromagnetic brake < 3 MT Capacity No 3157.00 SSNNL
373 Manual drive mechaniisum No 12375.00 SSNNL
374 Cables for gate operation m 165.00 SSNNL
375 Contrrol cabinet and power panel No 56925.00 SSNNL
376 Fabrication charges including testing and SSNNL
painting MT 11000.00
377 Machining charges kg 10.50 Mech.
378 Second stage concreting M-20 grade. Cum SSNNL
379 Tranpotation of all components upto SSNNL
erection site. MT 215.00
380 Erection of gate and embeded parts of SSNNL
vertical gate. > 2MT (Rs. 4800) MT 4500.00
381 --- // ---- < 2MT ( Rs. 5300) MT 7600.00 SSNNL
CHECKDAM & MISC, S&I.
382 Wooden Peg No. 2.75 SSNNL
383 PVC wire mesh Sqm 23.00 Market
Cut throat device
384 0.5 Cusec Sec. 10 cm x 90 cm No 5020.00 Market
385 1.0 Cusec Sec. 20 cm x 90 cm No 11573.00 Market
386 2.0 Cusec Sec. 20 cm x 90 cm No 12650.00 Market
387 3.0 Cusec Sec. 20 cm x 90 cm No 13700.00 Market
388 4.0 Cusec Sec. 20 cm x 90 cm No 15005.00 Market
389 5 Cusec Sec. 40 cm x 180 cm No 37666.00 Market
390 6 Cusec Sec. 40 cm x 180 cm No 39955.00 Market
391 8 Cusec Sec. 40 cm x 180 cm No 42237.00 Market
392 10 Cusec Sec. 40 cm x 180 cm No 44527.00 Market
393 12 Cusec Sec. 40 cm x 180 cm No 46818.00 Market
394 15 Cusec Sec. 40 cm x 180 cm No 51792.00 Market
395 18 Cusec Sec. 40 cm x 180 cm No 53692.00 Market
396 20 Cusec Sec. 40 cm x 180 cm No 55982.00 Market
397 25Cusec Sec. 100 cm x 270 cm No 92542.00 Market
398 30 Cusec Sec. 100 cm x 270 cm No 95907.00 Market
399 35 Cusec Sec. 100 cm x 270 cm No 102645.00 Market
400 40 Cusec Sec. 100 cm x 270 cm No 109373.00 Market
401 50 Cusec Sec. 100 cm x 270 cm No 116114.00 Market
402 60 Cusec Sec. 100 cm x 270 cm No 126216.00 Market
403 70 Cusec Sec. 100 cm x 270 cm No 132858.00 Market
404 80 Cusec Sec. 100 cm x 270 cm No 143049.00 Market
Flume device
405 100 Cusecs (2.40 M throat width) No 346308.00 Market
406 150 Cusecs(2.40 M throat width) No 369058.00 Market
407 200 Cusecs(3.05M throat width) No 662915.00 Market
408 250 Cusecs(3.05 M throat width) No 679801.00 Market
409 300 Cusecs(3.66 M throat width) No 696065.00 Market
410 400 Cusecs(3.66M throat width) No 736700.00 Market
411 500 Cusecs(3.66 M throat width) No 1217136.00 Market
412 750 Cusecs(4.07 M throat width) No 1298741.00 Market
413 1000 Cusecs(6.10 M throat width) No 1376387.00 Market
414 1250 Cusecs(6.10 M throat width) No 1429880.00 Market
415 1500 Cusecs(7.62M throat width) No 1495194.00 Market
DAMs ( Concrete & Masonry)
416 Casing Pipe m 225.00 Market
417 Upheavial Gauge No. 2500.00 Market
418 Bitumen Kg. 40.00 Market
419 Anchor Bolt for joist No. 2.50 Market
420 Painting Brush No. 66.00 Market

Below mentioned rates are for the Items as per Column No.4
No. Particular Unit Year : 2012-
13
1 2 3 4
Through & bond stone No
Boundary stone No 43.00
Guard stone 20x20x75 No 43.00
Lime KG 4.20
Radium paint Lit 645.90
Red oxide Lit 100.00
Sign board with angles No 1700.00
Geletine KG 60.00
Elec. Detonator No. 11.00
Km stone 45x 30x 90 cm No. 420.00
Kerosene S81 Per liter 45.00
Nut Kg 75.00 G 16A & B
Housing assembly No. 125.00 G 16A & B
Bearing No. 630.00 G 17A
Bearing No. 810.00 G 17B
75 cm 4 inch MS pipe (out let) No. 300.00 G12
Flanges No. 198.00 G12
19-B C.R.C.Sheet Qtl. 6200.00 R&B
22 - A Glass 2mm to 3mm thick Sqm. 170.00 R&B
30 - B Plain Asbestos sheet 6 mm thick Sqm 210.00 R&B
30 - C Plain Asbestos sheet 7 mm thick Sqm 221.00 R&B
126 - B Pillar tap 20 mm dia No. 418.00 R&B
127 - B Brass stop cocl 20 mm dia No. 264.00 R&B
158 - B Hectometer precast R.C.C.stone as per Each 315.00 R&B
type design
160 - B Ordinary K M precast R.C.C.stone (for N H Each 840.00 R&B
S H & MDR)
159 - B Ordinary K M precast R.C.C.Stone for ODR Each 735.00 R&B
& VR)
161 - B 5 th KM precast R.C.C.stone as per IRC Each 1260.00 R&B
type design
162 - B Indicator stone as per RCC type design Each 315.00 R&B
167 I.S. class NP2 RCC heavy duty Non Each 770.00 R&B
pressure pipe - 500 mm dia
167 - F1 I.S. class NP2 RCC heavy duty Non Each 2200.00 R&B
pressure pipe - 1100 mm dia
I.S. class NP3 RCC heavy duty Non
168 pressure pipe
H 1400 mm dia m 5830.00 R&B
I 1600 mm dia m 7700.00 R&B
J 1800 mm dia m 9900.00 R&B
170 P V C Pipes
A 20 mm dia ( 6 kg/Sqcm) m 28.00 R&B
B 25 mm dia ( 6 kg/Sqcm) m 42.00 R&B
C 32 mm dia ( 6 kg/Sqcm) m 52.00 R&B
199 Asphalt
G CRMB 60 bulk tonne 43041.00 R&B
212 - B Vitrified granite tiles 8 mm to 10 mm thick Sqm 538.00 R&B
600 X 600 mm size DARK SHED
212 -C Vitrified granite tiles 8 mm to 10 mm thick Sqm 990.00 R&B
36'' X 36'' size
214 Alluminium section any size Plain Kg 200.00 R&B
215 A Powder coating to Alluminium secton Kg 35.00 R&B
215 B Anodised to Alluminium section Kg 50.00 R&B
216 Rubber Gasket for glass beading Rmt 10.00 R&B
217 TMT Bar FE 500 D Quintal 5200.00 R&B
218 Weather Proof acrylic exterior emulsion Ltr 230.00 R&B
paint
219 A R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 520.00 R&B
Class NP=4 300 mm dia .
219 B R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 920.00 R&B
Class NP=4 450 mm dia .
219 C R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 1650.00 R&B
Class NP=4 600 mm dia .
219 D R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 3200.00 R&B
Class NP=4 900 mm dia .
219 E R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 4000.00 R&B
Class NP=4 1000 mm dia .
219 F R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 5600.00 R&B
Class NP=4 1200 mm dia .
219 G R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 7750.00 R&B
Class NP=4 1400 mm dia .
219 H R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 10200.00 R&B
Class NP=4 1600 mm dia .
219 I R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 12700.00 R&B
Class NP=4 1800 mm dia .
220 A Glass bricks 19 x 19 x 10 CM NO 115.00 R&B
220 B Glass bricks 19 x 19 x 8CM NO 110.00 R&B
221 Floor spring heavy duty No 2500.00 R&B
222 A S.S. Stopper 60 cm long of ASIS 304 No 500.00 R&B
222 B S.S. Stopper 30 cm long of ASIS 304 Grade No 250.00 R&B

222 C S.S. Stopper 20 cm long of ASIS 304 Grade No 175.00 R&B

223 A S.S. Aldrop 20 cm long of ASIS 304 Grade No 300.00 R&B


223 B S.S. Alldrop 25 cm long of ASIS 304 Grade No 450.00 R&B
223 C S.S. Aldrop 30 cm long of ASIS 304 Grade No 550.00 R&B
224 A S.S. Handle for Door 10 Cm size of ASIS No 75.00 R&B
304 Grade
224 B S.S. Handle for Door 15 Cm size of ASIS No 105.00 R&B
304 Grade
224 C S.S. Pipe Handle for Door 15 cm size of No 1200.00 R&B
ASIS 304 Grade
225 A S.S. Railling Sq. pipe 50 mm x 16 G ASIS Rmt. 1394.00 R&B
304 Grade
225 B S.S. Railling Sq. pipe 32x32mm x 16G ASIS Rmt. 630.00 R&B
304 Grade
225 C S.S. Railling Sq. pipe 16x16 G mm x 16G Rmt. 508.00 R&B
ASIS 304 Grade
226 C.P. Pillar cock 15 mm O Heavy duty swan NO 890.00 R&B
neck
227 C.P. Angle stop cock 15 mm O Heavy duty No 560.00 R&B
with cap
228 C.P. Bib cock 15 mm O Heavy duty with cap No 550.00 R&B

229 Concealed cock 15 mm O Heavy duty with No 675.00 R&B


cap
230A Glass 12mm thick Sqmtr 1130.00 R&B
230 B Glass 10 mm thick Sqmtr 965.00 R&B
230 C Glass 8 mm thick Sqmtr 750.00 R&B
231 A Labour Charges Half round edge for Granite Rmt. 100.00 R&B

231 B Labour Charges Quarter round edge for Rmt. 60.00 R&B
Granite
231 C Labour charges edge finished for Granite Rmt. 50.00 R&B
231 D Labour Charges Half round edge for Rmt. 60.00 R&B
Kota/Marble round edge for Kota/Marble
231 E Labour Charges quarter round edge for Rmt. 40.00 R&B
Kota/Marble
232 A S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 2600.00 R&B
thick with over all size 610 x 560 mm &
bowl size 560 x 410 x 200
232 B S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 1800.00 R&B
thick with over all size 510 x 432 mm & bowl
size 445 x 368 x 190
232 C S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 1550.00 R&B
thick with over all size 485x 410 mm & bowl
size 410 x 365 x 165
233 A Alluminium Composite pannel 3 mm thick Sqmtr 900.00 R&B
233 B Alluminium Composite pannel 4 mm thick Sqmtr 1000.00 R&B
234 Multy wall plycarbonate sheet 6 mm thick Sqmtr 1080.00 R&B
235 A S.S. Door /window Hinghes 4"x1"x1" NO 75.00 R&B
235 B S.S. Door /window Hinghes 3"x3/4"x3/4" NO 30.00 R&B
235 C S.S. Door /window Hinghes 3"x3/4"x3/4" NO 25.00 R&B
236 Jet Spray heavy duty with S.S. Braided hos NO 425.00 R&B
60 cm long
237 Health Fauset Heavy duty with hook with No 800.00 R&B
fitting.
S. O. R. : 2013-14
DISTRICT :- VADODARA
DATA INPUT -B
Sr.No Category of labour Unit Total Rate Reference of
source
Rs./ Day

1 Mazoor ( Male) Each 194.50 R&B


2 Mazoor ( Female) Each 194.50 R&B
3 Bhistie Each 196.30 R&B
4 Mate Each 194.50 R&B
5 Excavator Each 194.50 R&B
6 Breaker Each 194.50 R&B
7 Hole driller Each 194.50 R&B
8 Bullock with driver for mortar mill Each 207.80 R&B
9 Chowkidar Each 194.50 R&B
10 Mason ( 1 st class) Each 207.80 R&B
11 Mason ( 2 nd class) Each 199.90 R&B
12 Bandhani Each 194.50 R&B
13 Carpenter (1 st class) Each 207.80 R&B
14 Carpenter (2 nd class) Each 199.90 R&B
15 Mistry Each 196.30 R&B
16 Blacksmith (1 st class) Each 207.80 R&B
17 Blacksmith (2 nd class) Each 199.90 R&B
18 Welder Each 196.30 R&B
19 Fitter Each 196.30 R&B
20 Glassier Each 199.90 R&B
21 Painter Each 199.90 R&B
22 White washer Each 196.30 R&B
23 Polisher Each 196.30 R&B
24 Plumber Each 207.80 R&B
25 Plumber/Fitter Asstt. Each 199.90 R&B
26 Sprayman Each 199.90 R&B
27 Hand cart with mazdoor Each 309.40 R&B
28 Crane man with Helper Each 347.00 R&B
29 Extra labour for sinking and chiselling Each 1259.40 R&B
30 Supervisor for machinery Each 207.80 R&B
31 Winch Operator Each 199.90 R&B
32 Compressor Operator Each 207.80 R&B
33 ELECTRICIAN Each 199.90 SSNNL

34 KARKOON Each 196.30 SSNNL

35 Sawer Each 196.30 SSNNL

36 Rock cutter Each 196.30 SSNNL


37 Helper Each 194.50 SSNNL

38 Tapkar Each 196.30 MIC


39 Khalasi Each 194.50 R&B
Note: 1. The above basic rate for skilled and unskilled labour ate adopted as Notification of Labour an
Employment Departmentdate 11/02/2009 Labour Commissioner letter dated 19/10/11 for increas
in DA.
2 Zone - II shall comprise all the areas in the state of Gujarat other than the limits of Municipal
Corporation.
S. O. R. : 2013-14
DISTRICT :-VADODARA
DATA INPUT : C
C - MACHINERY
Sr.No Name of machinery Unit Rate in Reference of
Rs./unit source
1 2 3 4 5
1 Hydraulic Excavator Ex-200 LC Hour Annexure-1 SSNNL
96 HP/115 HP/120 HP 2510.00
2 Excavator - 275 HP Mech
3 Excavator - 210 HP Mech
4 TIPPER / DUMPER / WATER Hour Annexure-2 SSNNL
TANKER 1070.00
5 Dumper 180 HP / 210 HP Hour 1708.00 Mech
6 Dumper 280 HP Hour 1307.00 Mech
7 Dumper 320 HP Hour Mech
8 Dumper 380 HP / 400 HP Hour Mech
9 Tripper 90 HP Hour Mech
10 DOZER Hour 5680.00 Annexure-3 SSNNL
11 DOZER 165 HP Hour 2415.00 Mech
12 DOZER 180 HP Hour Mech
13 DOZER 300 HP Hour Mech
14 DOZER 410 HP Hour 5161.00 Mech
15 AIR COMPRESSOR Hour 600.00 Annexure-4 SSNNL
16 JACK HAMMER with Hour Annexure-5 SSNNL
compressure 880.00
17 Jack hammer with compressure Hour 880.00 Mech
18 VIBRATORY COMPACTOR Hour Annexure-6 SSNNL
( ROLLER) 1890.00
19 JCB-4CX Hour 1450.00 Annexure-7 SSNNL
20 TRACTOR WITH TRAILOR Hour 440.00 Annexure-8 SSNNL
21 OIL ENGINE Hour 220.00 Annexure-9 SSNNL
22 Cost of Hiring and running Hour Annexure-10 SSNNL
charges of way bacning &
transportation 467.00
23 LOADER Hour 1020.00 Annexure-11 SSNNL
24 LOADER - 208 / 275 HP Hour Mech
25 LOADER - 388 HP Hour Mech
26 DRAGLINE 140 hp / 125 hp Hour Mech
27 SHAVEL / DRAGLINE 230 hp Hour Mech
28 DRAGLINE 320 hp Hour Mech
29 WEIGH BATCHING AND MIXING Hour Annexure-12 SSNNL
PLANT 2040.00
30 DIESEL GENERATING SET Hour 1410.00 Annexure-13 SSNNL
31 TRANSIT MIXER Hour 1620.00 Annexure-14 SSNNL
32 PAVER Hour 2080.00 Annexure-15 SSNNL
33 Vibrator Hour 100.00 Annexure-17 SSNNL
34 Scrapper 425 Hp Hour 4650.00 Mech
35 Sheep foot Rollar Hour. Market
36 Water Pump (10 H.P.) Hour. 160.00 SSNNL.
37 Water Pump HP/Hour. Market
38 Wagon drilling Machine Hour. Market
39 Groutting Pump Hour. Market
40 Gunniting Machine Hour. Market
41 Concrete Mixture Machine Hour. Market
42 Cost of Hiring and running cum 100.60 Annexure-18
charges of Weigh batching &
mixing
43 Truck Hour. 412.50 R&B
44 Truck - 33 TON Hour SSNNL
45 PCR for Rolling Hour SSNNL
46 Truck Hour. 412.50 R&B
47 Bharat 80 D Tractor Hour. Mech
S. O. R. : 2013-14
DISTRICT :- VADODARA
DATA INPUT :D
D - LUMPSUM PROVISIONS
No. Particular Unit Material Rate

Rs. Unit
1 2 3 4 5
1 Hire charges for truck w/o diesel 3300.00 day
10 mm dia bolts for Metal expansion joint
2 34.10 For fixing 1m lengh
3 Welding hold fast with MS plate( labour) 51.15 For fixing 1m lengh
4 Fixing in position expansion joint (labour) 18.15 For fixing 1m lengh
5 Non corroding jali 17.05 For 100 mm AC pipe weep hole
6 Marble plate fixing charges 45.43 for 1 marble plate
7 Lettering Charges 102.30 for 1 marble plate
8 MS grill erection and painting 1395.10 MT
9 GI pipe iron gratting and hold fast. 45.10 For one water spout
10 Scaffolding for plaster 140.00 For 100 m2 pointing
11 Carting of Stoneware pipes 1.73 Per No.
12 Diesel pump set 10 hp 160.00 Hp/hr
13 Membrane curing 826.70 100m2
14 Mech.Mixure 130.00 per Cum
15 gunny cloth 7.20 for 10m2 asphalt painting
16 Scaffolding 41.30 For one Cum masonry
17 Heating charges for asphalt 258.40 MT
18 Water charge to fill in tanker 300.00 10000 ltr
19 Charges of road roller 3900.00 per day
20 Charges of crane 35.00 Cum of conct
21 Fabrication charges for pipe railing 3.85 Kg
22 Fabrication and fixing charges for str. Steel 7.70 Kg
Lumpsum charges for hot mix plant, paver,
23 roller, dumper 465.00 Per MT
Cost of pipe line or Utilising water 100 m
away from the line and its instalation its
maintenance labour cost for 10 Hp./Hr.
( Rs. 86/- per day 0f 8 hours)
24 10.75 Per Hour
25 Nut-Bolt 75.00
26 Welding Rod (Check dam) X
27 Water charges for 1 HP pump 0.00
for 225 mm dia for 8 hour.. 230.00
for 300 mm dia for 8 hour.. 287.50
for 450 mm dia for 8 hour.. 402.50
28 Welding , hold fast 57.50
29 Asphalt filler joint 20 mm deep 34.50
30 Labour for fixing expansion joint 69.00
31 Cement for fixing 13.80
32 Hire charges for machine boat 287.50 Hour
33 Hire charges for manual boat 57.50 Hour
34 Bolt 92.00
35 Labour charges for steel gate 2530.00
36 G. I. Staple or binding wire 57.50
37 Cement for anchor bar 23.00
38 Drilling charge for anchore bar 34.50
39 Welding Charges 23.00
40 Centering / Shutering Struting / Scaffolding 230.00
41 Hire charge of vibrator 23.00
CHECKDAM & MISC, S&I.
Carriage ( LS )
41 Through stone 5.75 No (L.S.)
42 Pedastal (15 Kg) 5.75 No (L.S.)
43 Nut Bolt (Check Dam) 2.30 (L.S.)
44 Welding Rod (Check Dam) 5.75 (L.S.)
45 Curing Compound 1.15 (L.S.)
46 Core box 115.00 (L.S.)
47 Stone (25 x 15 x 17.5) 5.75 (L.S.)
48 Carriage of m/c. Boat 230.00 Hr. (L.S.)
49 Carriage of Manual Boat 23.00 Hr. (L.S.)
50 PVC wire mesh 2.30 S.M.(L.S.)
51 75 mm 4 Inch M.S. Pipe with flanges 11.50 No (L.S.)
52 Aldrin emulsion 2.30 S.M.(L.S.)
53 Wire net 10 gauge (10 x 10 cm) 2.30 S.M.(L.S.)
54 Kerosene 1.15 (L.S.)
55 Oil 1.15 (L.S.)
56 Grease 1.15 (L.S.)
Labour Charges (L.S )

57 Water charges for 1 HP


58 Pump for 8 Hr (225 mm dia) 230.00 (L.S.)
59 Pump for 8 Hr (300 mm dia) 287.50 (L.S.)
60 Pump for 8 Hr (450 mm dia) 402.50 (L.S.)
Lumpsum Items (Masonry Dams)
61 Item No.22 Fixture (A.-3) 20.70 L.S.
62 Item No.23 Scaffolding 287.50 L.S.
63 Item No.24 (C) 287.50 L.S.
64 Item No.25 (C) 28.75 L.S.
65 Item No.26 (C) 28.75 L.S.
66 Item No.27 (C) 28.75 L.S.
67 Item No.28 (C) 3.45 L.S.
68 Item No.29 (C) 287.50 L.S.
69 Item No.30 (C) 28.75 L.S.
70 Item No.31 (C) 287.50 L.S.
71 Item No. 32 (2) (E) 1127.00 L.S.
72 Item No.32 ( 3 ) (E) 1150.00 L.S.
73 Item No.32 ( 4 ) (E) 1132.75 L.S.
74 Item No.32 ( 5 ) (E) 1282.25 L.S.
75 Item No.32 ( 6 ) (E) 1276.50 L.S.
76 Item No.32 ( 7 ) (E) 1380.00 L.S.
77 Item No.32 ( 8 ) (E) 1357.00 L.S.
78 Item No.32 ( 9 ) (E) 1380.00 L.S.
79 Item No.32 ( 10 ) (E) 1380.00 L.S.
80 Item No.32 ( 11 ) (E) 1380.00 L.S.
81 Item No.32 ( 12 ) (E) 1362.75 L.S.
82 Item No.32 ( 13 ) (E) 1483.50 L.S.
83 Item No.32 ( 14 ) (E) 1466.25 L.S.
84 Item No.32 ( 15 ) (E) 1454.75 L.S.
85 Item No.32 ( 16 ) (E) 1518.00 L.S.
86 Item No.32 ( 17 ) (E) 1569.75 L.S.
87 Item No.33 ( i ) (D) 1380.00 L.S.
88 Item No.33 ( ii ) (D) 1380.00 L.S.
89 Item No.34 (D) 1150.00 L.S.
90 Item No.35 (D) 86.25 L.S.
91 Item No.35 (E) 115.00 L.S.
92 Item No.36 (E) 126.50 L.S.
93 Item No.37 (A-4) 172.50 L.S.
94 Item No.37 (E) 345.00 L.S.
95 Item No.38 (C) 132.25 L.S.
96 Item No.39 (C) 132.25 L.S.
97 Item No.40 (A-4) 17.25 L.S.
98 Item No.40 (B) 172.50 L.S.
99 Item No.40 (c) 17.25 L.S.
100 Item No.43 (B-1) 201.25 L.S.
101 Item No.43 (B-2) 80.50 L.S.
102 Item No.43 (C) 34.50 L.S.
103 Item No.45 (A-2) 5.75 L.S.
104 Item No.45 (A-3) 17.25 L.S.
105 Item No.45 (C) 34.50 L.S.
106 Item No.46 (A-2) 5.75 L.S.
107 Item No.46 (A-3) 17.25 L.S.
108 Item No.46 (C) 34.50 L.S.
109 Item No.47 ( i ) (C) 40.25 L.S.
110 Item No.47 ( ii ) (C) 40.25 L.S.
111 Item No.48 (C) 0.00 L.S.
112 Item No.49 (C) 28.75 L.S.
113 Item No.50 (C) 0.00 L.S.
114 Item No.51 (i) (B) 28.75 L.S.
115 Item No.51 (i) (C) 11.50 L.S.
116 Item No.51 (ii) (B) 28.75 L.S.
117 Item No.51 (ii) (C) 11.50 L.S.
118 Item No.51 (iii) (B) 57.50 L.S.
119 Item No.51 (iii) (C) 11.50 L.S.
120 Item No.52 (B) 28.75 L.S.
121 Item No.52 (C) 11.50 L.S.
122 Item No.53 (B) 11.50 L.S.
123 Item No.53 (C) 11.50 L.S.
124 Item No.54 (C) 11.50 L.S.
125 Item No.55 (A-2) 1.15 L.S.
126 Item No.55 (C) 3.45 L.S.
127 Item No.56 (C) 920.00 L.S.
128 Item No.57 (C) 3825.00 L.S.
129 Item No.58 (A) 13.80 L.S.
130 Item No.58 (C) 3.45 L.S.
131 Item No.59 (C) 3.45 L.S.
132 Item No.59 (A) 13.80 L.S.
133 Item No.60 (C) 69.00 L.S.
Labour charges for casting including painting
134 3.45 Kg

Lumpsum Items (Canal)


Item No.G15 (A) lab charges for threading
1 500.00 L.S.
2 Item No.G15 (B) lab charges for threading 550.00 L.S.
3 Item No.G15 (C) lab charges for threading 600.00 L.S.
4 lab chrges for removing old parts rust and 100.00
fixing new rod incl cutting fixingloasding
unloading and carting at the site
L.S.
Item No.G15 (A) & (B)
Item No.G16 (A) & (B)
Item No.G17 (A) & (B)
5 Item No.S11 Steel unloading 30.00 L.S.
Centering and Scaffolding (for Item No.D) 2.00
6 L.S.
Reference
of source

6
R&B
SSNNL
SSNNL
SSNNL
mm AC pipe weep hole
SSNNL
SSNNL
SSNNL
water spout
m2 pointing
SSNNL
SSNNL
SSNNL
SSNNL
asphalt painting
Cum masonry
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
Mech.

SSNNL

SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
SSNNL
LUMP SUM
Sr. No. Item No. Particular Amount
1 2 3 4
Earthwork by manually
1 14 Anchor bar 115.00
2 18 White wash 11.50
3 1 Construction of tin sheds for 2.30
accommodation, stores 0.00
work shop etc. 0.00
4 1 Light charges for staff medical 1.73
Facilities water supply etc. 0.00
5 1 Labour for slope dressing 3.45
watering arrangement trip 0.00
counting and similar 0.00
project managerial asspects 0.00
6 1 Haul road maintenance 0.60
7 ITEM NO 3(A) Hire charge of vibrator 23.00
10 ED-5 Hire charge of roller 131.10
Gates
8 Item No.1 Bolt Nuts and Washers 2530.00
9 Item No.2 Bolt Nuts and Washers 2875.00
10 Item No.3 Bolt Nuts and Washers 2530.00
11 Item No.3A Bolt Nuts 1380.00
12 Item No.4 Bolt Nuts 2875.00
13 Item No.4(a) Bolt Nuts 1725.00
14 Item No.5 Bolt Nuts 2530.00
15 Item No.6 Bolt Nuts 2875.00
16 Item No.8 Bolt Nuts 2875.00
17 Item No.11 Bolt Nuts 1380.00
18 Item No.11 Wiring 13800.00
19 Item No.12 Bolt Nuts 1725.00
20 Item No.12 Wiring 13800.00
21 Item No.15 Rust remover & brush 115.00
22 Item No.16A Anchor bar 115.00
Maintanance of dam
23 RD-4 1. Labour charges for 10.00
Scrapping 0.00
24 RD-4 2) Painting per letter 6.00
25 Item no.12 Scaffoling & Safety 1150.00
arrangements

L.S. Page 31
Sr. No. Item No. Particular Amount
1 2 3 4

L.S. Page 32
S.O.R : 2013-14
DISTRIC : VADODARA
DATA INPUT
Year 2013-14

Particular Unit Material Rate


Sr. Rs. Lead Carting Total rate
No. in current col. 4+6
Km. year
1 2 3 4 5 6 7
(A) MATERIALS :
For Earth dam Manually
1 Gelatine Kg. 60.00 60.00
2 Detonator (ordi) No. 51.00 10.00
3 Detonator (elect.) No. 11.00 11.00
4 Fuse coil Rmt. 3.25 3.25
5 sand Cmt. 210.00 210.00
6 Gravel Cmt. 210.00 210.00
7 Metal Cmt. 425.00 425.00
8 Rubble Rmt. 185.00 185.00
9 Hume Pipe 30 Cm dia Rmt. 363.00 363.00
10 Agregate 40 mm Cmt. 425.00 425.00
11 G.I. 25 mm dia Rmt. 204.00 204.00
12 K.M. Stone No. 473.00 473.00
13 Header stone No. 23.00 23.00
14 Quarry spaul Cmt. 120.00 120.00
15 Steel 10 Gage Kg. 40.00 40.00
16 Indicator stone No. 116.00 116.00
17 White washing. m2 2.50 2.50
18 Excavation m3 95.30 95.30
19 Guard stone No. 43.00 43.00
20 Cement Concrete 1:4:8C.C. m3 1796.0 1796.00
21 Cement M.T. 5800.0 5800.00
22 Cement Beg 290.00 290.00
23 Half round pipe 30 Cm ø Rmt. 88.00 88.00
24 Brick 1000 No. 4200.0 4200.00
25 Hume pipe 150 mm dia. Rmt. 225.00 225.00
26 M.S.Angle 130 x 75 x 5 Rmt. 160.00 160.00
27 Enamel Guage Plate 15 Cm. Kg. 55.00 55.00
28 Hum Pipe 30 Cm ø Rmt. 363.00 363.00
29 C.I.Frame and cover No. 1568.00 1568.00
30 M.S.Steel Tone 42000.00 42000.00
31 Turfing Kg. 15.40 15.40
32 Manure Kg. 6.60 6.60

R. Mat.
Particular Unit Material Rate
Sr. Rs. Lead Carting Total rate
No. in current col. 4+6
Km. year
33 Asphalt Kg. 44.01 44.01
34 G.I.Pipe 100 mm ø Rmt. 723.00 723.00
35 Enamelled gauge plate 15 Cm. Wide Rmt. 232.50 232.50
36 diesel Lit. 54.07 54.07
37 Impervious soil m3 84.00 84.00
38 Drill Rod No 2500.00 2500.00
Head Regulator
1 Pump HP/hr 0.00 16.00
2 Hire charge of vibrator L.S. 23.00 23.00
3 A.C. Pipe 10 Cm ø(2m. Long) Rmt. 79.00 79.00
4 N.P4 900 mm ø Rmt. 4000.00 4000.00
5 N.P4 1100 mm ø Rmt. 5600.00 5600.00
6 N.P4 1200 mm ø Rmt. 7750.00 7750.00
7 Angle 50 x 30 x 6 mm M.T. 52900 52900.00
8 N.P1 900 mm ø hume pipe Rmt. 880 880.00
9 N.P1 1100 mm ø hume pipe Rmt. 1375 1375.00
10 N.P1 1200 mm ø hume pipe Rmt. 1540 1540.00

R. Mat.
Particular Unit Material Rate
Sr. Rs. Lead Carting Total rate
No. in current col. 4+6
Km. year
11 P.V.C. Water stop 225 mm size Rmt. 263.00 263.00
12 Mild steel / Tore steel M.T. 42000 42000.00
13 Binding wire Kg. 55.00 55.00
14 Steel R.S.J. M.T. 52900.00 52900.00
15 Stainless Steel Plate 1.6 mm Kg. 228.00 228.00
16 Bearing No. 5700 5700.00
17 Cast steel Roller No. 1265 1265.00
18 Hoisting arrangment No. 63250 63250.00
19 Stem rod Kg. 52.90 52.90
20 Bronge Bush Kg. 352.00 352.00
21 Coupler Kg. 46.00 46.00
22 Electroplating No. 253.00 253.00
23 Stainless Steel pin Kg. 228.00 228.00
24 Erection Charges Ton 3575.00 3575.00
25 Stainless steel Plate Kg. 228.00 228.00
26 Alrvent Hume pipe 23 cm dia. Rmt. 246.10 246.10
27 Hume Pipe 60 Cm. Ø Rmt. 880.00 880.00
28 Hume Pipe 75 Cm ø Rmt. 1320.00 1320.00
29 Hume pipe 90 Cm. Ø Rmt. 1650.00 1650.00
30 Red Oxid Lit. 100.00 100.00
31 Oil Paint Lit. 210.00 210.00
32 Febraction Charge. L.S. 1150.00 1150.00
33 Angle 75 x 75 x 10 mm Kg. 52.90 52.90
34 G.I.Pipe 38 mm ø Rmt. 314.00 314.00
35 35 mm thick steel Sq.m. 2645.00 2645.00
36 10 Cm x 7 Cm. Steel pipe Sq.m. 396.00 396.00
37 Marble Plate No. 215.00 215.00
7 Gate
1 Structral steel MT 52900.00 52900.00
2 1.6 mm S.S. Plate Kg 228.00 228.00
3 S.S. welding rod No. 25.00 25.00
4 M.S. Welding rod No. 5.00 5.00
5 Oxygen gas m3 36.00 36.00
6 Acetylene gas m3 254.00 254.00
7 Primar paint /Red oxide Lit. 100.00 100.00
8 Rubber seal ' Z ' type 128 X 76X 19 mm Rmt. 500.00 500.00
9 Flat type bottom seal 80 X 10 mm Rmt. 154.00 154.00
10 G.I. Pipe 15 mm Rmt. 110.00 110.00
11 Guide roller dia 100 mm x 50 mm width m 535.00 535.00
12 Guide roller dia 120 mm x 50 mm width m 1010.00 1010.00
13 GI pipe 40 mm ø Rmt. 314.00 314.00
14 Cast steel Kg 57.00 57.00
15 Bearing No. 2222 No. 13750.00 13750.00
16 Bearing No. 2217 No. 4626.60 4626.60
17 Bearing No. 2211 No. 1295.80 1295.80
18 Wire Rop drum Kg 57.00 57.00
19 G.M. bushing Kg 231.00 231.00
20 Plumber block No. H-322 No. 2951.30 2951.30
R. Mat.
21 Plumber block No. H-317 No. 1273.80 1273.80
22 Plumber block No. H-211 No. 624.80 624.80
23 Wire rope 25 mm dia Rmt. 453.20 453.20
Referance of
Source

SSNNL
Market
Market
Market
R&B
R&B
R&B
R&B
R&B
R&B
R&B
R&B
Market
R&B
Market
R&B
R&B
S.O.R.
R&B
R.A.
R&B
R&B
Marke
R&B
Marke
Market
R&B
R&B
R&B
R&B
Market
Market

R. Mat.
Referance of
Source

R&B
SSNNL
SSNNL
R&B
Market
Market

Market
Market
R&B
R&B
R&B
R&B
R&B
R&B
R&B
R&B

R. Mat.
Referance of
Source

SSNNL
R&B
R&B
R&B
Mech
Market
Market
Market
R&B
Market
Market
Mech
Mech
Mech
Mech
Market
R&B
R&B
R&B
SSNNL
R&B
R&B
R&B
R&B
R&B
Market
R&B

R&B
Mech
Mech
Mech
Market
Mech
SSNNL
Mech
Mech
R&B
Market
Market
R&B
Mech
Mech
Mech
Mech
Mech
Market
Mech
R. Mat.
Mech
Mech
Mech
Sheet- 2 RATE OF LABOUR

Sr no. Labour Unit Rate


1 Bhisty No 196.30
2 Blcksmith No 207.80
3 Driller No 194.50
4 Electrican No 199.90
5 Fitter II No 196.30
6 Foreman No 207.80
7 Helper No 194.50
8 Hole Driller No 194.50
9 Karkoon No 196.30
10 Mason First Class No 207.80
11 Mason Second Class. No 199.90
12 Mazdoor No 194.50
13 Mechanic No 207.80
14 Operator No 207.80
15 Painter No 199.90
16 Plumber No 207.80
17 Rock cutter No 196.30
18 Sawar No 194.50
19 Turner No 194.50
20 Welder No 196.30
21 Whitewasher No 196.30
22 Carpenter (1st class) No 207.80
23 Carpenter (2st class) No 199.90
24 Mistri No 196.30

Lab.rate Page 39
Sheet - MACHINARY
Sr no. MACHINARY Unit Rate

1 Dozzer 165 H.P. Hr. 2415.00


2 Dozzer 180 H.P. Hr. 2750.00
3 Dozzer 300 H.P. Hr. 3320.00
4 Dozzer 410 H.P. Hr. 5161.00
5 Hydraulic Excavator 115 H.P. Hr. 2510.00
6 Hydraulic Excavator 120 H.P. Hr. 2510.00
7 Hydraulic Excavator 96 H.P. Hr. 2510.00
8 Loader 275 H.P. Hr. 0.00
9 Loader 388 H.P. Hr. 0.00
10 Loader 208 H.P. Hr. 0.00
11 Dragline 149 H.P. Hr. 0.00
12 Shovel/ Dragline 230 H.P. Hr. 2690.00
13 Dragline 320 H.P. Hr. 0.00
14 Dragline 125 H.P. Hr. 0.00
15 Dumper 180 H.P. Hr. 1708.00
16 Dumper 210 H.P. Hr. 1708.00
17 Dumper 280 H.P. Hr. 1307.00
18 Dumper 320 H.P. Hr. 0.00
19 Dumper 400 H.P. Hr. 0.00
20 Dumper 380 H.P. Hr. 0.00
21 Tipper 90 H.P. Hr. 0.00
22 Tra Excavator 275 H.P. Hr. 0.00
23 Tra Excavator 210 H.P. Hr. 0.00
24 Truck 33 ton Hr. 0.00
25 Scraper 425 H.P. Hr. 4650.00

Jack Hammer with Compressor


26 165 H.P 380 CFM Hr. 880.00
27 PCR (for Rolling) Hr. 0.00
28 Water Pump (10 H.P.) Hr. 160.00
29 S.F.R. Hr. 325.00
30 Bharat 80 D Tractor Hr. 0.00
31 Drillingmachine Hr. 0.00
32 Compressor Machine Hr. 600.00
33 Wagon drill including driller Hr. 291.50

R.Machi. Page 40
EARTHEN DAM
Item No. Description Unit RATE 2013-14

ED-1 Clearing the seat of dam by removing bushes, shrubs etc.including Cu. M 37.25
depositing the materials outside the seat of dam beyond 50m,from the
toe line of dam as directed etc.completed.

ED-2(A) Stripping the seat of dam/borrow area in all sort of soil, soft murrum, hard Cu. M 37.25
murum, including deposting the material outside the toe line of dam
beyound 50m.and up to 100 m. as and where directed etc. completed.

ED-2B Stripping the seat of dam and removing boulders on dam seat (with Cu. M. 180.00
blastingif required) including depositing the same stacking useful
meterials outside the seat of dam beyond 50 m. from the toe line as and
where directed etc. complete.

ED-3 Dewatering the cut off trench of earthen dam foundation trenches and Hp/Hr 18.80
releasing water 50 m away from toe line or as directed with diesel or
electrical pumping arrangement including all cost of pipe line, fillings
labours for all lift etc.Comp.

ED-4(A) Excavation of cut off trench as per design for the strats and lift shown Cu M 67.80
below including shoring, strutting, cleaning of all the loose and
objectionable materials slush etc. from the bottom and sides depositing
the useful meterials in stracks beyond 50 m from the toe of the dam of
spreading the useful meterial in layers of specified thickness and
specified zone within lead below stated etc complete .

Lead 100 Mt.


ED-4 (B) Lead 1 Km. Cu M 95.30

ED-4 (C) Soft Rock Cu.m. 160.00


ED-4 (D) Hard Rock (With Blasting) Cu.m. 272.10
ED-4 (E) Hard Rock (Without Blasting) Cu.m. 567.25
ED-5 Rehandling transporting the useful material from source of obligatory Cu.m. 109.10
excavation of cut off trench foundation of spillway approach Channel ,
Tail Channel and / or stock pile for embankment raising in suitable Zones
including spreading in uniform layers of specified thickness dressing
breaking clods, removing roots oversize material watering at O.M.C. and
rolling with suitable type of roller for all lift and lead upto 1 km. etc.
complete.

ED--6 Extra charges for compaction of earthwork in C.O.T. and in embankment Cu.m. 43.20
of any one with suitable type of roller to the required compaction
including watering at O.M.C. etc. complete

ED-7 Quarrying suitable materials from approved borrow areas transporting


the same and spreading the same material in respective zone in uniform
layers of specified thickness dressing breaking clods removing oversize
material roots etc. morning to O.M.C. rolling with suitable type of roller for
all lifts and lead upto 1 Km. etc. complete.

ED-7-A IMPERVIOUS ZONE Cu.m 168.10


ED-7-B CASING ZONE/S.P.ZONE Cum. 169.40
ED-7-C ROCK FILL CuM. 330.66
Item No. Description Unit RATE 2013-14

ED-8 Quarring transporting suitable filter materials specified gradation from


approved borrow pit area/stock piles, spreading the materials in specified
thickness dressing removing oversize materials roots etc. watering up to
staturation rolling with suitable type of roller for all lifts and leads upto 1
Km etc. complete.
ED-8-A Sand Cu.m 314.40
ED-8-B gravel Cu.m 314.40
ED-8-C Sand gravel mixture Cu.m 314.40
ED-8-D Quarry spauls Cu.m 206.44
ED-9 Excavating the drain at the down stream toe of earthen dam in any strata Cu.m 68.05
and all lift as per approved drawing and in grade and depositing the
material as directed.
ED-10 Quarrying and transporting suitable filter materials rubble for laying in for Cu.m. 447.10
drain layers of required thickness of filter material of specified gradation
as per approved drawing laying position open jointed 30 cm. Dia NP.2
class hume pipe including filling and packing the remaining space of
drain with suitable size of rubble watering and light compaction for all lift
and lead upto 1.0 km.

ED-11 Quarrying and transporting suitable rubbles stone spauls of specified size
from approved quarries and or stock pile and laying hand placed rip-rap
of specified thickness as per approved drawing using header stones
(rough through stones) in a grade of 1.5 m x 1.5 m after trimming and /or
dressing the slopes including hand packing the stones using light
hammer driven stone wedges in to gaps around stone into for all lifts and
lead upto 1.0 km. etc complete.

ED-11-A (A) Thickness 30 Cm Cm 217.79


ED-11-B (B) Thickness 45 Cm Sq.m. 279.64
ED-11 C (C) Thickness 60 Cm Sq.m. 414.60
ED-12 Providing and fixing in position of constructing paved drains ( Chutes) Rmt. 182.10
along the slope of earth dam and longitudinal collecting drains on forms
at the down stream sides as per approved drawing including excavation
with all leads and lifts etc Complete.
(Precast half round pipe 0.6 m dia)

ED-13 Providing and fixing gauge posts with 15 Cm. Wide enamelled gauge Rmt 462.10
plate including M.S. channel (130 mm x 75 mm x 5 mm) of standard
design and section and of required length of specified location etc.
complete.

ED-14 Constructing 1 m. wide steps in brick/ stone masonry in c.m. 1 :5 dam Rmt 2304.80
slopes as per approved drawing including excavation etc. complete for all
leads and lifts.
(a) Using bricks works

ED-15 providing and raising turfing on the down stream slopes of earthen dam Sq.m. 27.80
using seeds or readily available turf with necessary soil convering
manuring watering and maintaining till its full growth etc. complete for all
leads and lifts.
Item No. Description Unit RATE 2013-14

ED-16 Dismentalling the existing rock toe and the layer of filter materials, Cu.m 68.60
stacking and/or using the materials as directed including necessary
excavation to maintain the slope of earth dam for all leads lifts etc
complete.

ED-16-A Dismentalling the existing Rip-rap and the layers of filter material Sq.m. 41.10
stacking and/or using the material as directed including clearing the slope
of earth dam for all leads and lifts etc complete.
(A) WITHOUT FILTER LAYER
(I) 30 CM

ED-16-B (B) WITH FILTER LAYER 45 CM Sq.m. 76.85


ED-17 Dismentaling the existing longitudianl and/or along the slopping surface Rmt 45.75
the collecting drains removing pipe, dismentalling any masonry work,
stacking and or using the useful materials as and where directed etc
complete with all leads and lifts.

ED-18 Removing the existing guard stone stacking and /or using the stones as No 4.70
and when directed etc complete with all leads and lifts.
Item No. Description Unit RATE 2013-14

MAINTENANCE & REPAIRS OF DAM


RD-1 Dismentaling the existing masonry in lime or cement mortar and stacking Cu.m 156.60
the material as directed etc. complete with all leads and lifts(a) in lime
mortar.
RD-1(b) In cement mortar Cu.m 236.70
RD-2 Constructing gutter in brick masonry in C.M. 1.5 proportion including Rmt 667.60
plaster in C.M. 1 :3, 12 mm thick including curing on D/s slope of earthen
dam as per detailed drawing and design as directed etc. complete
RD -3 Spreading the following materials as directed levelling and removing Cu.m 33.75
stones etc. complete
(A) Sand
ITEM NO (B) Hard murrum Cu.m 36.40
RD -3 b Painting and figuring K.M. stone including scrapping etc. complete
RD-4 No. 102.40

RD-5 Providing and applying epoxy mortar of thickness 6 mm. To 20 mm in Unit 2323.60
proportion 1:7 by weight of epoxy and quartzr sand (epoxy consists of 1
part of araldite and 0.5 part of hardner) at temperature 30 C or below on
the epoxy coated surface of spillway bucket Ogee, vertical face of pier
etc. including the cost of materials labour. tools & plants necessary of
scaffolding and safety measures required for carrying out the work etc.
complete for all leads & Lifts

HEAD REGULATOR
HR-1 Providing Fabricating and erecting a steel ladder M.S. Angle 50 X 30 X 6 Rmt 1171.20
mm in the H.R. well as per design to approach the H.R. gates from top
of H.R. well etc complete as directed
HR-2(1) Providing and laying NP-1 hume pipe as conduit including laying in Rmt 1211.10
position as per approved drawing making joint in C.M. (1:1) curing testing
with all leads and lifts etc complete
(I) 900 mm dia (internal)
HR-2(ii) Providing and laying NP-1 hume pipe as conduit including laying in Rmt 1844.30
position as per approved drawing making joint in C.M. (1:1) curing testing
with all leads and lifts etc complete

(ii) 1100 mm dia (internal)


HR-2(iii) Providing and laying NP-1 hume pipe as conduit including laying in Rmt 2169.40
position as per approved drawing making joint in C.M. (1:1) curing testing
with all leads and lifts etc complete
(iii) 1200 mm dia (internal
VOLUME II

CHAPTER -19A

Maintenance and repairs of dam


RATE ANALYSIS 2013-14
As per S.R.A. Vol.II Chapter No.19 A Page No.238

RD-1 Dismentaling the existing masonry in lime or cement mortar and stacking the material
as directed etc. complete with all leads and lifts
Page No 238
Cost for 1 M³

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs.
(a) In Lime mortar
(A) Labour
1. Mazdoor 0.69 No 194.50 134.21

(C) Add 1% for T & P 1% 1.34

(D) Add 15 % for Contractors


profit & overhead charges 15% 20.13
Add 1% for LABOUR CESS 1% 1.34
Total Cost For 1 M³ 157.02
Cost of 1 M³ 157.02
Rate for 1 M³ Say Rs. 157.10
LTD to 10% 156.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
As per S.R.A. Vol.II Chapter No.19 A Page No.238

RD-1(b) In Cement Mortar

(A) Labour

1. Mazdoor 1.04 No 194.50 202.28

(B) Add 1% for T & P 1% 2.02

(C) Add 15 % for Contractors


profit & overhead charges 15% 30.34
Add 1% for LABOUR CESS 1% 2.02
Total Cost For 1 M³ 236.67
Cost of 1 M³ 236.67
Rate for 1 M³ Say Rs. 236.70

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
As per S.R.A. Vol.I IChapter No.19 A Page No.239
RD-2 Constructing gutter in brick masonry in C.M. 1:5 proportion including plaster in C.M. 1
:3, 12 mm thick including curing on D/s slope of earthen dam as per detailed drawing
and design as directed etc. complete
Page No 239
Cost for 10.0 M length

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs.
(A) Materials
1) Bricks 780 No 4200.00 3276
2) Cement 0.121 M.T. 5800.00 701.8
3) Sand 0.46 M³ 210.00 96.6
(B) Labour
1) Masson 1.8 No 207.80 374.04
2) Mazdoor 580.0% No 194.50 1128.1
3) Bhisti 0.41 No 196.30 80.483
Total A to B 5657.02
(C) Add 1% for water charges 1% 56.57

(D) Add 1% for T & P 1% 56.57

(E) Add 15 % for Contractors 15% 848.55


profit & overhead charges
Add 1% for LABOUR CESS 1% 56.57
Total Cost For 10 M 6675.29

Rate for 1 M 667.53


Say Rs. 667.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
As per S.R.A. Vol.I Chapter No.19 A Page No.253

RD -3 Spreading the following materials as directed levelling and removing debrisstones


etc. complete
SAND
Cost for 1 M³
Page No 253
Sr.No. Particular Qty Unit Rate Amount
Rs. Rs.

(A) Labour
1. Mazdoor 0.15 No 194.50 29.175

(B) Add 1% for T & P 1% 0.29


(C) Add 15 % for Contractors
profit & overhead charges 15% 4.38
Total Cost For 1 M³ 33.84
Cost of 1 M³ 33.84
Rate for 1 M³ Say Rs. 33.90
LTD to 10 % 33.75

ITEM NO
RD -3 b Hard Murrum
(A) Labour
1. Mazdoor
0.16 No 194.50 31.12
(B) Add 1% for T & P 1% 0.31
Add 15 % for Contractors
(C) profit & overhead charges 15% 4.67
Add 1% for LABOUR CESS 1% 0.31
Total Cost For 1 M³ 36.41
Cost of 1 M³ 36.41
LTD to 10 % Say Rs. 36.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14

As per S.R.A. Vol.II Chapter No.19 A Page No.259


RD-4 Painting and figuring K.M. stone including scrapping etc. complete Cost for 1 No.

Page No 259

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs.

(A) Material
1) Painting of letters 0.88 m2 54.00 47.52
2) Painting 5 Letter 6.00 30.00

(A) Labour
1. Labour charges for L.S. 10.00 10.00
Scrapping
Total ……. 87.52

(C) Add 1 % & T & P 1% 0.88

(D) Add 15% for Contractors 15% 13.13


profit & overhead charges
Add 1% for LABOUR CESS 1% 0.88
Total Cost For 1 No. 102.40

Rate for 1 No..Rs. 102.40


Say Rs. 102.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
As per S.R.A. Vol.I I Chapter No.19 A Page No.286

RD-5 Providing and applying epoxy mortar of hickness 6 mm.to 20 mm. in proposition 1:7
by weight of epoxy and quartz sand (epoxy consist of 1 part of araldite and 0.5 part
of hardner ) at temp. 30 C or below on the epoxy coated surface of spillway bucket
,ogee, vertical face of pier etc. incl. the cost of material labour & tools plants
necessary scafolding & safety measures required for carrying out the work etc.
comp. for all lead and lift. Rate analysis for
240 Kg. of epoxy mortar or 10 m2. of work.
Page No 286
Sr.No. Particular Qty Unit Rate Amount
Rs. Rs.
(A) Material
Resin 20 Kg. 539.00 10780
Hardner 10 Kg. 511.00 5110
Flow Control agents 0.6 Kg. 37.00 22
(A) Quartz sand 210 Kg. 0.35 74
(including transportation 15985.70
of approprite lead)

(B) Labour
Labours 11 Each 194.50 2139.50
Mason 2.00 Each 207.80 415.60
(B) Total …. 2555.10
(C) Scaffoling & Safety
arrangements L.S. 1150 1150.00
Total of A to C 19690.8

(C) Add 1 % T & P 1% 196.91


Contigencies (Viz Soap.
Warm water brush etc.
(D) Add 15% for Contractors 15% 2953.62
profit & overhead charges

(F) Add 1 % for laboratory charges and testing 1% 196.91


Add 1% for LABOUR CESS 1% 196.91
Total .. Rs. 23235.1
cost of 240 Kg of epoxy
mortar ….Rs
cost of 1 Kg of epoxy
mortar : X/240 =10 sq.m. Rs= /Kg 23235.14
Rate for 1 sqm. 2323.51
Say Rs. 2323.60
Supply of Cement concrete in proportion 1:4:8 at the site of work

Description Qty. Unit Rate in Rs. Amount in Rs.


MATERIALS
(a) Coarse aggregate 0.89 Cum. 390.00 347.10

(b) Sand 0.47 Cum. 210.00 98.70

(c) Cement 0.17 MT 5800.00 986.00

total = 1431.80
LABOURS
(a) Unskilled Majdoor 0.60 each 194.50 116.70

(b) Masson I st.class 0.00 each 207.80 0.00

© Masson II st.class 0.00 each 199.90 0.00

(d) Bhisti 0.30 each 196.30 58.89

total = 175.59
CARRIAGE OF MATERIAL

(a) Coarse aggregate 0.89 Cum. 0.00 0.00

(b) Sand 0.47 Cum. 0.00 0.00

(c) Cement 0.17 MT 0.00 0.00

total = 0.00
HIRING AND RUNNING CHARGES.
(a) Mechanical mixer & vibrator etc. LS 40.00

CENTERING &SHUTTERING
(a) Cost of Centering & Shuttering 0.00

TOTAL FOR 1.0 CUM = 1647.39

Water charges 1% 16.47


T & P charges 1% 16.47
Add. for Contractor's profit&Overhead charges.@ 15% 99.21
Add 1% for LABOUR CESS 1% 16.47
COST FOR 1.0 CUM = 1796.02

Say. Rs. = 1796.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
EARTH DAM
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.136


ED-1 Clearing the seat of dam by removing bushes, shrubs etc.including depositing the
materials outside the seat of dam beyond 50m,from the toe line of dam as
directed etc.completed.
Page No. 136
Rate for 1M 3 .

Particular Qty Unit Rate Amount


Rs. Ps Rs. Ps
1 Machinery
Dozzer (Crawler) 410 h.p. 0.0063 hr. 5161.00 32.51

Contractors profit and over


head charges 15% 4.88

Labour cess 1% 0.33

Total 37.72
LTD to 10% Say Rs. 37.25

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14
As per S.R.A. Vol.I Chapter No.1 Page No.137

ED-2(A) Stripping the seat of dam/borrow area in all sort of soil, soft murrum, hard murum,
including deposting the material outside the toe line of dam beyound 50m.and up
to 100 m. as and where directed etc. completed.

Rate for 1M 3

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs. Ps
1 Machinery
Dozzer (Crawler) 410 h.p. 0.0063 hr. 5161.00 32.51

Contractors profit and over


head charges 15% 4.88

Labour cess 1% 0.33


37.72

Say Rs. 37.25


LTD to 10% ###

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.11

ED-2B Stripping the seat of dam and removing boulders on dam seat (with blasting if

required) including depositing the same stacking useful meterials outside the seat

of dam beyond 50 m. from the toe line as and where directed etc. complete.
RATE FOR 10M 3 :
Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
Gelatine 0.8 Kg 60.00 48.00
Detonator (Ord.) 5.00 No. 10.00 50.00
Detonator (Elect.) 5.00 No. 11.00 55.00
Fuse coil 9.00 Rmt. 3.25 29.25
Drill rod 0.01 No. 2500.00 25.00
(B) Labour

Mazdoor (Male) 6.05 No. 194.50 1176.73


Rock cutter 0.35 No. 196.30 68.71
Hole Driller 0.35 No. 194.50 68.08
(C) Machinary
Jack hammer with compressor 0.02 Hr. 880.00 17.60
Total 1538.36
(D) T&P1% 15.38

(E) Contractors profit and over 230.75


head charges (15 % Of)

Labour cess 1% 15.38


Total A to D = 1799.88

Rate per 1 m³ = 179.99

Say Rs. 180.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.15

ED-3 Dewatering the cut off trench of earthen dam foundation trenches and releasing
water 50 m away from toe line or as directed with diesel or electrical pumping
arrangement including all cost of pipe line, fillings labours for all lift etc.comp.

RATE FOR HP/HR:


Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
(B) LABOURS Ps.
(C) Machineries
hp/hr
Pump 1 16.00 16.00

0.746 KWH.

(D) T & P (1% of) 0.16

(E) Contractors profit and over 2.40


head charges (15 % of )

Labour cess 1% 0.16


Total A to E = 18.72

Rate per hp/hr = 18.72

Say Rs. 18.80

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.143


ED-4(A) Excavation for C.O.T. as per design for the strata and lift shown below including

cleaning OF all loose and objectionable material, slush etc. from the bottom &

sides depositing the unuseful materials or useful materials in stacks beyound 50

mts.from the toe or spreading the useful material in layers of specified thickness

and in specified zone within lead of 1km.etc. completed.


A. Dry or Moist Condition : Lead 100 Mt.
(a)Overburden Rate for 1 m 3

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
1 MACHINERY
Alt-1
(1) Dozzer (crawler) 410 h.p 0.0091 hr 5161.00 46.9651

ALT-II
(1) Dozzer 180 h.p 0.024 hr 2750.00 66.00

ALT-III
(1) Scraper 425 h.p. 16 m3 0.0086 hr 4650.00 39.99
struck-33 Ton (2 nos.)
(2) Dozzer (Cralwer) 410 hp 0.0043 hr 5161.00 22.19
(1 no.) 62.18
Average Value Alt. I + II + III 175.15 58.38 58.38
3 3
Contractors profit and over
head charges 15% 8.76

Labour cess 1% 0.58


Total 67.72
Say Rs. 67.80

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.144

(a)Overburden Lead beyond 100 m & Up to 1Km


ED-4 (B) Rate for 1 m 3

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
1 MACHINERY
Alt-1
(1) Scraper 425 h.p. 16 m3 0.0129 hr 4650.00 59.99

struck-33 Ton (3 nos.)


(2) Dozzer (Cralwer) 410 hp 0.0043 hr 5161.00 22.19
(1 no.) 82.18

Contractors profit and over


head charges 15% 12.33

Labour cess 1% 0.82

95.33
Say Rs. 95.30

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.151

ED-4 (C) Soft Rock Lead Up to 1 Km


Rate for 1 M 3
(A) for execavation & haulings
Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
1 MACHINERY
Alt-1
(1) Scraper 425 h.p. 16 m3 0.0129 hr 4650.00 59.99

struck-33 Ton (3 nos.)


(2) Dozzer (Cralwer) 410 hp 0.0043 hr 5161.00 22.19
(1 no.) 82.18

(B) FOR RIPPING & DOZZING


Alt-I
1. Dozzer (Crawler) 410 h.p. 0.009 hr 5161.00 46.45
(for ripping) (1 No)
46.45
(C) For Loss of production Due to Void
20% Charges for machinary used for ripping & dozzing
= Alt-1 Alt-I + 20% of charge for
machinary used for
= 82.18 46.45 ripping & dozing (B)

82.18 46.45 9.29 137.92


Contractors profit and over
head charges 15% 20.69

Labour cess 1% 1.38

159.98
Say Rs. 160.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.22


ED-4 (D)
Hard Rock (With Blasting)

RATE FOR 10 m³

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps

(A) Material
Gelatine 1.6 Kg. 60.00 96.00
Detonator (Ord.) 10 No 10.00 100.00
Detonator (Elect) 10 No 11.00 110.00
Fuse Coil 18 Rmt 3.25 58.50
Drill rod 0.1 No. 2500.00 250.00
(B) LABOURS
Mazdoor 7.3 No. 194.50 1419.85
Rock Cutter 0.7 No 196.30 137.41
Hole Driller 0.7 No 194.50 136.15
(C) Machineries
Jack hammer with compressor 0.02 Hr. 880.00 17.60
(D) TRANSPORTATION
TRANSPORTATION charges
for 1 km. 10 m³ 0 0.00
Total 2325.51
(E) T&P1% 23.26
(F) Water Charges (1% of) 0.00
(G) Contractors profit and over 348.83
head charges (15 % of)
Labour cess 1% 23.26
Total A to G = 2720.85
Rate per 10 m³ = 2720.85
Rate Per m³ 272.08
Say Rs. 272.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.25


ED-4 (E)
Hard rock (Without Blasting)

RATE FOR 10 m³

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps

(A) Material
(B) LABOURS
Mazdoor 25 No. 194.50 4862.5
(C) 1) Painting of letters
(D) TRANSPORTATION
TRANSPORTATION charges
for 1 km. 10 m³ 0 0
(E) Centering Shutting Scaffolding
Shoring and Struting
Total 4862.5

(F) T&P1% 48.63


(G) Water Charges (1% of) 0.00
(H) Contractors profit and over
head charges (15 % of) 729.38

Labour cess 1% 48.63


Total A to H = 5689.13
Rate per 10 m³ = 5689.13

Rate Per m³ 568.91

LTD 10% Say Rs. 567.25

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.28


ED-5 Rehandling, transporting the useful material from source of obligatory excavation
of cut off trench foundation of spillway approach Channel , Tail Channel and / or
stock pile for embankment raising in suitable Zones including spreading in
uniform layers of specified thickness, dressing, breaking clods, removing roots,
oversize material watering at O.M.C. and rolling with suitable type of roller for all
lift and lead upto 1 km. etc. complete.
RATE FOR 10 m³:

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
(B) LABOURS
Mazdoor 3.6 No. 194.50 700.2
Bhisti 0.2 No. 196.30 39.26
(C) Machineries
Hire charges of roller 1 Hr. 131.1 131.1
Diesel 1 Lit. 54.07 54.07
(D) TRANSPORTATION
TRANSPORTATION charges
for 1 km. 10 m³ 0 0
Total 924.63
(E) T&P1% 9.25
(F) Water Charges (1% of) 9.25
(G) Contractors profit and over 138.69
head charges (15 % of)
Labour cess 1% 9.25
Total A to H = 1091.06
Rate per 10 m³ = 1091.06

Rate per m³ 109.11

Say Rs. 109.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.165

ED--6 Extra charges for compaction of earthwork in C.O.T. and in embankment of any
one with suitable type of roller to the required compaction including watering at
O.M.C. etc. complete
Rate for 1 m 3

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
1 MACHINERY
a) S.F.R. 0.0167 hr 325.00 5.43
b) Dozzer 180 h.p 0.008 hr 2750.00 22.00
C) Water pump (10H.P) 0.014 hr 160.00 2.24
Total 29.67
2 Water charges 15 % of charges for 4.45
machinary used above.

3 Contractors profit and over


head charges 15% 4.45

Labour cess 1% 0.30


4.75

Say Rs. 43.61


LTD to 10% 43.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.40

ED-7 Quarrying suitable materials from approved borrow areas transporting the same
and spreading the same material and respective zone in uniform layers of
specified thickness, dressing ,breaking clods, removing oversize material, roots
etc. Watering to O.M.C. rolling with suitable type of roller for all lifts and lead upto
1 Km. etc. complete.

7-A A.IMPERVIOUS ZONE


i) Lead upto 1Km.
Rate for 1 M³
Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
1 Machinery
Komatsu scrapper - pusher unit
Alt-I
1 Scraper 425 h.p. 16m³ struck-33 0.0143 hr. 4650.00 66.50
Ton (3No.)
2 Dozzer(crawler) 410 h.p. 0.0048 hr. 5161.00 24.77
91.27
In Alt.I additional charge for ripping will have to be added because
I.P. material cannot be loaded without ripping

e) Additional charge for ripping I.P.


dozzer 300 h.p. for 1/2. (1No) 0.0062 hr. 3320.00 20.58
111.85

Contractors profit and over


head charges 15% 16.78
Labour cess 1% 0.21
Total 128.84
Say Rs. 128.80
B. FOR ROLLING & WATERING
Rate for 1 M³
Machinery
Alt.-I
S.F.R. 0.0167 hr. 325.00 5.43
Dozzer 180 h.p. 0.008 hr. 2750.00 22.00
Water pump 10 h.p. 0.014 hr. 160.00 2.24
29.67
Water charge : 15 % of the charges
of machinary used for rolling & 4.45
watering
34.12
Contractors profit and over
head charges 15% 5.12
Labour cess 1% 0.04

Total 39.28
Add for Impervious zone 128.80
168.08
Say Rs. 168.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.176


ED-7-B Casing zone/ S.P. zone

Rate for 1 M3
Lead upto 1 K.M.
A. WITHOUT ROLLING & WATERING
Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
1 Machinary:
Alt.-I
1 Shovel/dragline 230 h.p. 0.01 hr. 2690.00 26.9

1.91 m³(1No.)
2. Dumper 210 h.p. 15 t. (11.5 m) 0.02 hr. 1708.00 34.16
(2 nos)
3. Dozzer 300 h.p.(1 No.) 0.01 hr. 3320.00 33.2
3. Dozzer 165 h.p.(1 No.) 0.01 hr. 2415.00 24.15
118.41
2 Machinary for rolling &watering
SFR 0.0167 hr. 325.00 5.43
Dozer 0.008 hr. 2750.00 22.00
Waterpump 10 H.P. 0.014 hr. 160.00 2.24
29.67

Total 148.08
Contractors profit and over
head charges 15% 22.21
Labour cess 1% 0.02

Total 170.31
LTD 10% Say R.S. 169.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.43


ED-7-C Rock fill
Rate for 10 m³
Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps

(A) Material
Gelatine 1.6 Kg. 60.00 96
Detonator (Ord.) 1 No 10.00 10
Detonator (Elect) 1 No 11.00 11
Fuse Coil 1.8 Rmt 3.25 5.85
(B) LABOURS
Mason 4 No 207.80 831.20
Mazdoor 8 No. 194.50 1556
Rock Cutter 0.7 No 196.30 137.41
Hole Driller 0.7 No 194.50 136.15
(C) Machineries
(D) TRANSPORTATION
TRANSPORTATION charges
for 1 km. 10 m³ 0 0
(E) Centering Shutting Scaffolding
Shoring and Struting
Total 2783.61
(F) T&P1% 27.84
(G) Water Charges (1% of) 27.84
(H) Contractors profit and over 417.54
head charges (15 % of)
Labour cess 1% 27.84
Total A to H = 3284.66
Rate per 10 m³ 3284.66
Rate per 1 m³ 328.47
LTD to 10% Say Rs. 330.66

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.55

ED-8 Quarring transporting suitable filter materials specified gradation from approved
borrow pit area/stock piles, spreading the materials in specified thickness
dressing removing oversize materials roots etc. watering up to staturation rolling
with suitable type of roller for all lifts and leads upto 1 Km etc. complete.
RATE FOR 10 m³ (a) SAND :

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps

(A) Material
Sand 10 m³ 210.00 2100
(B) LABOURS
Mazdoor 2.7 No. 194.50 525.15
Bhisti 0.2 No. 196.30 39.26
(C) Machineries
(D) TRANSPORTATION
for 10m³ Materials for
1 Km 10 m³ 0 0
Total 2664.41

(E) T&P1% 26.64


(F) Water Charges (1% of) 26.64
(G) Contractors profit and over 399.66
head charges (15 % of)

Labour cess 1% 26.64


Total A to H = 3144.00
Rate per 10 m³ 3144.00
Rate per 1 m³ 314.40
Say Rs. 314.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.57

ED-8-B Gravel

RATE FOR 1 m³ =

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
Gravel 10 m³ 210.0 2100
(B) Labour
Mazdoor 2.7 No. 194.5 525.15
Bhisti 0.2 No. 196.3 39.26
Total 2664.41

© T&P1 1% 26.64
(D) Water Charges (1% ) 1% 26.64
(E) Contractors profit and over
head charges (15 % ) 15% 399.66
Labour cess 1% 26.64
Total A to E = 3144.00
Rate per 10 m³ 3144.00
Rate per 1 m³ 314.40
Say Rs. 314.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.59

ED-8-C SAND GRAVEL MIXTURE

RATE FOR 1 m³:

This is filter sand & gravel mixture, considering 50%- 50% each
average rate for Item no. 11(A) sand & 11(B) gravel can be taken

1\2( 314.40 + 314.4 )

= 314.4
Say Rs.= 314.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.60

ED-8-D Quarry spauls

Rate per 1 m³ =
Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
Quarryspauls 10 m³ 120.00 1200
(B) Labour
Mazdoor 2.7 No. 194.5 525.15
Bhisti 0.2 No. 196.3 39.26
Total 1764.41

© T&P1 1% 17.64
(D) Water Charges (1% )
(E) Contractors profit and over
head charges (15 % ) 15% 264.66
Labour cess 1% 17.64
Total A to E = 2064.36
Rate per 10 m³ 2064.36
Rate per 1 m³ 206.44
Say Rs. 206.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.61

ED-9 Excavating the drain at the down stream toe of earthen dam in any strata and all

lift as per approved drawing and in grade and depositing the material as directed.
RATE FOR 10 m³ :

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps

(A) Material
(B) LABOURS
Mazdoor 3 No. 194.50 583.5

(C) Machineries
(D) TRANSPORTATION
Total 583.5

(E) T&P1% 5.84


Contractors profit and over
(F) head charges (15 % of 87.53

Labour cess 1% 5.84


Total A to G =
Rate per 10 m³ = 682.70
Rate per 1 m³ = 68.27

LTD to 10% Say Rs. 68.05

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.62


ED-10 Quarrying and transporting suitable filter materials rubble for laying in for drain

layers of required thickness of filter material of specified gradation as per

approved drawing laying position open jointed 30 cm. Dia NP.2 class hum pipe

including filling and packing the remaining space of drain with suitable size of

rubble watering and light compaction for all lift and lead upto 1.0 km.
RATE FOR 10 m/1 m³ (for 10 m³- Volume = 39.68 m³) :

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
Cement 1 bag 290.00 290
Sand 8.5 m³ 210.00 1785.00
Gravel 9.18 m³ 210.00 1927.80
Rubble 22 m³ 185.00 4070
Hume pipe 30 Cm dia 10 Rmt 363.00 3630
(Open Jointed)
(B) LABOURS
Mason 2 No. 207.80 415.6
Mazdoor 15 No. 194.50 2917.5
(C) TRANSPORTATION
Sand (1 Km) 8.5 m³ 0 0
Gravel (For 1 Km) 9.18 m³ 0 0
Rubble (For 1 km) 22 m³ 0 0
Total 15035.90
(D) T&P1% 150.36
(E) Water Charges (1% of) 150.36
(F) Contractors profit and over 2255.39
head charges (15 % of
Labour cess 1% 150.36
Total A to F = 17742.36
Rate per 1 m³ = 17742.36 447.14
39.68
Say Rs. 447.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14
As per S.R.A. Vol.I Chapter No.1 Page No.72

ED-11 Quarrying and transporting suitable rubbles stone spauls of specified size from
approved quarries and or stock pile and laying hand placed rip-rap of specified
thickness as per approved drawing using header stones (rough through stones) in
a grade of 1.5 m x 1.5 m after trimming and /or dressing the slopes including
hand packing the stones using light hammer driven stone wedges in to gaps
around stone into for all lifts and lead upto 1.0 km. etc complete.
(A) Thickness 30 Cm.
For 2.25 Sq.m.
Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
Header stone 4 No. 23.00 92.00
spauls 0.22 ]m³ 120.00 26.40
Rubble 0.84 m³ 185.00 155.40
(B) LABOURS
Mason 0.1 No. 207.80 20.78
Mazdoor 0.5 No. 194.50 97.25
Rock Cutter 0.06 No. 196.30 11.78
Hole driller 0.06 No. 194.50 11.67
(C) TRANSPORTATION
FOR (1 Km)
Gravel (0.22 m³) 0.22 m³ 0 0.00
Rubble (0.84 m³) 0.84 m³ 0 0
Total 415.28
(D) T&P1% 4.15
(E) Water Charges (1% of) 4.15
(F) Contractors profit and over 62.29
head charges (15 % Of)
Labour cess 1% 4.15
Total A to G = 490.03
Rate per 2.25 Sq.m = 490.03
Rate per 1 Sq.m = 217.79

Say Rs. 217.80

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.74

ED-11-B Thickness 45 Cm

Rate for 2.25 m2

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
Header stone 4 No. 23.00 92
spauls 0.34 m³ 120.00 40.80
Rubble 1.26 m³ 185.00 233.10
(B) LABOURS
Mason 0.15 No. 207.80 31.17
Mazdoor 0.7 No. 194.50 136.15
(C) TRANSPORTATION

Spaults (0.34 m) 0.34 m³ 0 0


Rubble (0.84 m) 1.26 m³ 0 0
Total 533.22

(D) T&P1% 5.33


(E) Water Charges (1% of) 5.33
(F) Contractors profit and over 79.98
head charges (15 % Of)

Labour cess 1% 5.33


Total A to G = 629.20
Rate per 2.25 Sq.m = 629.20
Rate per 1 Sq.m = 279.64
Say Rs. 279.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.76

ED-11 C Thickness 60 Cm

Rate for 2.25 m2

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
Header stone 4 No. 23.00 92.00
spauls 0.45 m³ 120.00 54.00
Rubble 1.68 m³3 185.00 310.80
(B) LABOURS
Mason 0.67 No. 207.80 139.226
Mazdoor 1 No. 194.50 194.50
(C) TRANSPORTATION
(FOR 1 Km)
Gravel (0.45 m) 0.45 No. 0 0.00
Rubble (0.84 m) 1.68 No. 0 0.00
Total 790.53

(D) T&P1% 7.91


(E) Water Charges (1% of) 7.91
(F) Contractors profit and over 118.58
head charges (15 % Of)

Labour cess 1% 7.91


Total A to G = 932.82
Rate per 2.25 Sq.m = 932.82
Rate per 1 Sq.m = 414.59
Say Rs. 414.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.92

ED-12 Providing and fixing in position of constructing paved drains ( Chutes) along the
slope of earth dam and longitudinal collecting drains on forms at the down stream
sides as per approved drawing including excavation with all leads and lifts etc
Complete.(a) Precast half round pipe 0.6m dia
Rate for 10 m

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
Cement 0.6 Bag 290.00 174.00
Sand 0.55 m³ 210.00 115.50
30 Cms dia precast
half round pipe 10 m 88.00 880.00
(B) LABOURS
Mason 0.5 No. 207.80 103.9
Mazdoor 1.5 No. 194.50 291.75
(C) Machineries
(D) TRANSPORTATION
Total 1565.15

(E) T&P1% 15.65


(F) Water Charges (1% of) 15.65
(G) Contractors profit and over 208.67
head charges (15 % Of)

Labour cess 1% 15.65


Total A to G = 1820.78
Rate per 10 m = 1820.78
Rate per 1 .m = 182.08

Say Rs. 182.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.100


ED-13 Providing and fixing gauge posts with 15 Cm. Wide enamelled gauge plate
including M.S. channel (130 mm x 75 mm x 5 mm) of standard design and section
and of required length of specified location etc. complete.
Rate for 5 m LENGTH

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
M.S. Angles 5m 160.00 800
(130 X 75 X 5)
Enamelled gauge 5m 232.50 1162.5
Plate 15 Cm Wide
(B) LABOURS
Mazdoor 0.5 No. 194.50 97.25
(C) Machineries
(D) TRANSPORTATION
Cement 0.6 Bag 0 0
Sand 0.55 M 0 0
Total 2059.75

(E) T&P1% 20.60


(F) Water Charges (1% of) 20.60
(G) Contractors profit and over 188.96
head charges (15 % Of)

Labour cess 1% 20.60


Total A to G = 2310.51
Rate per 5 m = 2310.51
Rate per 1 m = 462.10

Say Rs. 462.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.101

ED-14 Constructing 1 m. wide steps in brick/ stone masonry in c.m. 1 :5 dam slopes as
per approved drawing including excavation etc. complete for all leads and lifts.
(a) Using bricks work.
Rate for 10 M

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
Cement 13.98 Bag 290.00 4054.20
Sand 2.16 m³ 210.00 453.60
Bricks 2605 No. 4.200 10941.00
Aggregates 1.73 m³ 425.00 735.25
(B) LABOURS
Mason 4.35 No. 207.80 903.93
LABOURS 13.6 No. 194.50 2645.2

Bhisti 1.6 No. 196.30 314.08


(C) Miscellaneous
Total 20047.26

(E) T&P1% 1% 200.47


(F) Water Charges (1% of) 1% 200.47
(G) Contractors profit and over 2398.96
head charges (15 % Of)

Labour cess 1% 200.47


Total A to G = 23047.64

Rate per 1 m = 2304.76

Say Rs. 2304.80

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.112

ED-15 Providing and raising turfing on the down stream slopes of earthen dam using
seeds or readily available turf with necessary soil covering manuring watering
and maintaining till its full growth etc. complete for all leads and lifts.
Rate for 100 m2

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
(a) Turfing 25 Kg 15.40 385
(b) Manure 6.25 Kg 6.60 41.25
© Impervious soil 15 m³ 84.00 1260
(B) LABOURS
(a) Mazdoor 3.15 No. 194.50 612.68
(b) Bhisti 0.3 No. 196.30 58.89
(C) Machineries

Total 2357.82

(E) T&P1% 23.58


(F) Water Charges (1% of) 23.58
(G) Contractors profit and over 353.67
head charges
(15 % of

Labour cess 1% 23.58


Total A to G = 2782.22
Rate per 100 m2 = 2782.22
Rate per 1 m2 = 27.82

Say Rs. 27.80

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.126

ED-16 Dismentalling the existing rock toe and the layer of filter materials, stacking
and/or using the materials as directed including necessary excavation to maintain
the slope of earth dam for all leads lifts etc complete.
Rate for 10 m³ .

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material

(B) LABOURS
Mazdoor 3 No. 194.50 583.5
(C) Machineries
(D) TRANSPORTATION
(E) Centering Shuttering
Scaffolding Shoring

and strutting
Total 583.50

(E) T&P1% 5.84


(F) Water Charges (1% of) 5.84
(G) Contractors profit and over 87.53
head charges (15 % Of)

Labour cess 1% 5.84


Total A to G = 688.53
Rate per 10 m³ = 688.53
Rate per m³ = 68.85

LTD to 10 % Say Rs. 68.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.127

ED-16-A Dismentalling the existing Rip-rap and the layers of filter material stacking and/or
using the material as directed including clearing the slope of earth dam for all
leads and lifts etc complete.
(A) WITHOUT FILTER LAYER (I) 30 CM
Rate for 100 m2 .

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material

(B) LABOURS
Mazdoor 18 No. 194.50 3501
(C) Machineries
(D) TRANSPORTATION
(E) Centering Shuttering
Scaffolding Shoring

and strutting

Total 3501

(E) T&P1% 35.01


(F) Water Charges (1% of) 35.01
(G) Contractors profit and over 525.15
head charges (15 % Of)

Labour cess 1% 35.01


Total A to H = 4131.18
Rate per m2 = 41.31

LTD to 10 % Say Rs. 41.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.131

ED-16-B WITH FILTER LAYER 45 CM

Rate for 100 m2.

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
(B) LABOURS
Mazdoor 33.6 No. 194.50 6535.2

(C) Machineries
(D) TRANSPORTATION
(E) Centering Shuttering
Scaffolding Shoring

and strutting

Total 6535.2

(E) T&P1% 65.35


(F) Water Charges (1% of) 65.35
(G) Contractors profit and over 980.28
head charges (15 % Of)

Labour cess 1% 65.35


Total A to H = 7711.54
Rate per 100 m2 = 7711.54
Rate per 1 m2 = 77.12

LTD to 10 % Say Rs. 76.85

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.133

ED-17 Dismentaling the existing longitudianl and/or along the slopping surface the
collecting drains removing pipe, dismentalling any masonry work, stacking and or
using the useful materials as and where directed etc complete with all leads and
lifts.

Rate for 10 m .

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material

(B) LABOURS
Mazdoor 2 No. 194.50 389
(C) Machineries
(D) TRANSPORTATION
(E) Centering Shuttering
Scaffolding Shoring

and strutting
Total 389

(E) T & P (1% of) 3.89


(F) Water Charges (1% of) 3.89
(G) Contractors profit and over 58.35
head charges (15 % Of)

Labour cess 1% 3.89


Total A to H = 459.02
Rate per 10 m = 459.02
Rate per m = 45.90

LTD to 10 % Say Rs. 45.75

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2013-14

As per S.R.A. Vol.I Chapter No.1 Page No.134

ED-18 Removing the existing guard stone stacking and /or using the stones as and when
directed etc complete with all leads and lifts.
Rate for 100 Nos .

Amount
Sr.No. Particular Qty Unit Rate
Rs. Ps
(A) Material
(B) LABOURS
Mazdoor 2.08 No. 194.50 404.56

(C) Machineries
(D) TRANSPORTATION
(E) Centering Shuttering
Scaffolding Shoring

and strutting
Total 404.56

(E) T&P1% 4.05


(F) Water Charges (1% of) 4.05
(G) Contractors profit and over 60.68
head charges (15 % Of)

Labour cess 1% 4.05


Total A to H = 477.38
Rate per 100 No. = 477.38
Rate per 1 No. = 4.77

LTD to 10 % Say Rs. 4.70

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
STANDARD RATE ANALYSIS

VOLUME - I

CHAPTER NO. 3
HEAD REGULATOR
RATE ANALYSIS 2013-14
(As per S.R.A. Vol. I Chapter No. 1 Page No.437
HR-1 Providing and laying "NP-4 pipe as conduit in position as per approved drawing
making joints in cement mortar 1:1 curing testing with all leads and lifts
etc.comp.
(ii) For 1100 mm dia (internal)

Cost For 10 M

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs.
(A) Materials
1. Cement 0.092 M.T. 5800.00 533.60
2. Sand 0.07 m³ 210.00 14.70
3. N. P-4 pipe 1100 mm 10 Rmt. 5600 56000.00
(B) LABOURS
1. Mason II Class 2.82 No 199.90 563.72
2. Mazdoor 5.33 no 194.50 1036.69
3. Bhisty 0.55 no 196.30 107.97
(C) Carriage of material
1. Cement 0.092 mt 0.00 0
2. Sand 0.07 m³ 0.00 0
3. N. P-4 Pipe 1100 mm 10 Rmt. 0.00 0
Total 58256.67
(D) Water charges 1% 582.57

(E) T & P etc. 3% 1747.70


(F) Contractor profit
& Overhead charges 15% 8658.46
Labour cess 1% 582.57

Rate for 10 M 69245.39


Rate for 1 M 6924.54
Say Rs. 6924.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
(As per S.R.A. Vol. I Chapter No. 1 Page No.447
HR-1 Providing Fabricating and erecting a steel ladder M.S. Angle 50 X 30 X 6 mm
in the H.R. well as per design to approach the H.R. gates from top of H.R. well
etc complete as directed

Cost For 1.0 m

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs.

(A) Materials
1. Angle 50 x 30 x 3 mm 0.018 MT 52900 952.20
(considering 5% wastage (3.5
K.G/Rmt) including bredcets
(B) Febrication charges 0.018 mt 9493 170.874

(C) Eraction charges


including carriage L.S. 0
Total 1123.07
(D) T & P etc. 1% 11.23

(E) Contractor profit


& Overhead charges 15% 25.63
Labour cess 1% 11.23

Rate for 1.0 m 1171.17


Say Rs. 1171.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
(As per S.R.A. Vol. I Chapter No. 1 Page No.448
HR-2(1) Providing and laying NP-1 hume pipe as conduit including laying in position as
per approved drawing making joint in C.M. (1:1) curing testing with all leads
and lifts etc complete (I) 900mm dia (internal)

Cost For 10m


Sr.No. Particular Qty Unit Rate Amount
Rs. Rs.

(A) Materials
1. Cement 0.071 M.T. 5800.00 411.80
2. Sand 0.05 m³ 210.00 10.50
3.900 mm dia N. P-1 hume pipe 10 Rmt. 880.00 8800.00
(B) LABOURS
1. Mason II Class 2.5 No 199.90 499.75
2. Mazdoor 3 no 194.50 583.50
3. Bhisty 0.5 no 196.30 98.15

(C) Carriage of material


1. Cement 0.071 mt 0.00 0
2. Sand 0.05 m³ 0.00 0
3.900 mm dia N. P-1 hume pipe 10 Rmt. 0.00 0

Total 10403.7
(D) Water charges 1% 104.04
(E) T & P etc. 1% 104.04
(F) Contractor profit
& Overhead charges 15% 1498.79
Say Rs. 1499.00
Labour cess 1% 104.04
Rate for 10.0 m 12110.56
Rate for 1.0 m 1211.06
Rate for 1.0 m Say Rs. 1211.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
(As per S.R.A. Vol. I Chapter No. 1 Page No.449
HR-2(ii) Providing and laying NP-1 hume pipe as conduit including laying in position as
per approved drawing making joint in C.M. (1:1) curing testing with all leads
and lifts etc complete
ii) 1100 mm dia (internal)
Cost For 10m

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs.
(A) Materials
1. Cement 0.092 M.T. 5800.00 533.60
2. Sand 0.064 m³ 210.00 13.44
3.1100 mm dia N. P-1 hume pipe 10 Rmt. 1375.00 13750.00
(B) LABOURS
1. Mason II Class 1.28 No 199.90 255.87
2. Mazdoor 5.33 no 194.50 1036.69
3. Bhisty 0.55 no 196.30 107.97

(C) Carriage of material


1. Cement 0.092 mt 0.00 0
2. Sand 0.064 m³ 0.00 0
3.1100 mm dia N. P-1 hume pipe 10 Rmt. 0 0
Total 15697.56
(D) Water charges 1% 156.98
(E) T & P etc. 1% 156.98
(F) Contractor profit
& Overhead charges 15% 2274.59
Labour cess 1% 156.98
Rate for 10.0 m 18443.08
Rate for 1.0 m 1844.31
Say Rs. 1844.30

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS 2013-14
(As per S.R.A. Vol. I Chapter No. 1 Page No.450
HR-2(iii) Providing and laying NP-1 hume pipe as conduit including laying in position as
per approved drawing making joint in C.M. (1:1) curing testing with all leads
and lifts etc complete
ii) 1200 mm dia (internal)
Cost For 10m

Sr.No. Particular Qty Unit Rate Amount


Rs. Rs.
(A) Materials
1. Cement 0.102 M.T. 5800.00 591.60
2. Sand 0.071 m³ 210.00 14.91
3.1200 mm dia N. P-1 hume pipe 10 Rmt. 1540.00 15400.00
(B) LABOURS
1. Mason II Class 3.18 No 199.90 635.68
2. Mazdoor 8.67 no 194.50 1686.32
3. Bhisty 0.67 no 196.30 131.52
(C) Carriage of material
1. Cement 0.102 mt 0.00 0
2. Sand 0.071 m³ 0.00 0
3.1200 mm dia N. P-1 hume pipe 10 Rmt. 0 0
Total 18460.03
(D) Water charges 1% 184.60
(E) T & P etc. 1% 184.60
(F) Contractor profit
& Overhead charges 15% 2680.26
Labour cess 1% 184.60

Rate for 10.0 m 21694.09


Rate for 1.0 m 2169.41
Say Rs. 2169.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
GATE
Item No. Description of Item Unit Year
2011-12
1 2 3 5
RG-1 Fabrication of embeded parts viz. sill beam, wall plate, M.T. 74520.60
anchor girder, anchor rods etc. complete including cost of
materials, cost of labours, cutting welding and painting with
one coat of primer paint, jigs and fixtures etc. complete as
per drawing and specification.
Gate size 30' x 20' (9.144 m x 6.1m)

RG-2 Fabrication of embeded parts viz. sill beam, wall plate, M.T. 72719.40
anchor girder, anchor rods etc. complete including cost of
materials, cost of labours, cutting, welding and painting with
one coat of primer paint, jigs and fixtures etc. complete as
per drawing and specification.
Gate size 41' x 27' (12.497 m x
8.83m)
RG-3 Fabrication of gate assembly consisting of skin plate, arm 66680.00
assembly. Horizontal girders, lifting brackets, guide roller
Rubber seals etc. complete including cost of labours, cutting,
bending welding and painting with one coat of primer paint,
jigs and fixture etc. complete as per drawing and M.T.
specification. Gate
size (30' x 20') 9.144 m x 6.1 m

RG-3A Providing and erecting end shield 890mm width on radial 23489.80
gate, size(30'x20') 9.144 m.x 6.10 m. Rmt.
(for one meter length)

4 Fabrication of gate assembly consisting of skin plate, arm M.T. 71204.20


assembly. Horzontal girders, lifting brackets, guide roller
Rubber seals etc. complete including cost of materials,cost
of labours, cutting, bending welding and painting with one
coat of primer paint, jigs and fixture etc. complete as per
drawing and specification. Gate size (41' x 27')
12.497 m x 8.83 m

RG-4A Providing and erecting end shield 870mm width on radial Rmt. 33775.00
gate, size(41'x27') 12.497m x 8.23 m. (for one
meter length)

RG-5 Fabrication of hoist platform consisting of host girders with M.T. 70987.00
base plate, cross members, chequered plate and hand
railing etc. complete including cost of materials, cost of
labours, cutting, welding and painting with one coat of primer
paint jigs and fixtures etc. complete as per drawings and
specification.
Gate size (30' x 20') 9.144 m x 6.10 m

RG-6 Fabrication of hoist platform consisting of host girders with M.T. 68996.90
base plate, cross members, chequered plate and hand
railing etc. complete including cost of materials, cost of
labours, cutting, welding and painting with one coat of primer
paint jigs and fixtures etc. complete as per drawings and
specification.
Gate size (41' x 27') 12.497 m x 8.23 m
Item No. Description of Item Unit Year
2011-12
1 2 3 5
RG-7 Manufacturing & supplying reduction unit consisting of rope Set 514660.90
drum, cast steel spur gears and pinions, shafts, bushing,
bearing, plumber block etc. including fabricationn of gear
case with cover and assembling above components
complete with cost of materials, cost of labour and painting
with one coat of primer paint, jigs, fixtures greasing etc.
complete as per drawing and specification.
Gate size (30' x 20') 9.144 m x
6.10 m

RG-8 Manufacturing & supplying reduction unit consisting of rope Set 1064706.10
drum, cast steel spur gears and pinions, shafts, bushing,
bearing, plumber block etc. including fabricationn of gear
case with cover and assembling above components
complete with cost of materials, cost of labour and painting
with one coat of primer paint, jigs, fixtures greasing etc.
complete as per drawing and specification.
Gate size (41' x 27') 12.497 m x
4.23 m

RG-9 Manufacturing and supplying trunion assembly consisting of Set 123438.20


tronion hub, trunion bracket, tunion pin, bronze bush etc.
complete with cost of materials, cost of labour, & machining,
electrio plating etc. complete duly assembled as per drawing
and specification. (b)
Gate size (30' x 20') 9.144 m x 6.10 m
RG-10 Manufacturing and supplying trunion assembly consisting of Set 303417.80
tronion hub, trunion bracket, tunion pin, bronze bush etc.
complete with cost of materials, cost of labour, & machining,
electrio plating etc. complete duly assembled as per drawing
and specification. (a)
Gate size (41' x 27') 12.497 m x 8.23 m

RG-11 Manufacturing & supplying central drive unit consisting of Unit 123691.20
electric motor-worm reduction unit, magnetic brake starter,
switch, limit switch, hand operation device, dial indicator
system etc. complete with steel fabricated cabin, assembling
with wiring and painting etc. complete as per drawing and
specification.
For gate size 30' x 20' (9.144 m x 6.1 m)

RG-12 : Manufacturing & supplying central drive unit consisting of electric motor- Unit 140775.00
worm reduction unit, magnetic brake starter, switch, limit switch, hand
operation device, dial indicator system etc. complete with steel fabricated
cabin, assembling with wiring and painting etc. complete as per drawing
and specification.
For gate size 41' x 27' (12.497 m x 8.23 m)
Item No. Description of Item Unit Year
2011-12
1 2 3 5
RG-13 Manufacturing and supplying cast steel turn buckles, wire Set 33096.80
rope socket and M.s. pin with casting matching, galvanising
etc. with cost of materials, cost of labour etc. complete as
per drawing and specification.
(b) For gate size 30' x 20' (9.14 m x 6.10 m)

RG-13A Manufacturing and supplying cast steel turn buckle, wire Set 33096.80
rope socket and M.S. pin with casting machining,
galvanising etc. with cost of materials, cost of labour etc.
complete as per drawing and specification.
(a) For gate size 41' x 27' (12.497 m x
8.23 m)
RG-14 : Erection of embeded prts viz. sill beam, wall plates, anchor girder ad M.T. 8667.30
anchor bolts etc. with all accessories inclusive of cost of labour, joining the
pieces by welding, painting, conveyance from Deptt, store at site to site of
erection and erecting in position etc. as per drawings and specification
(excluding concreting) including supplying and fitting all required bolts,
nuts and washer.
RG-15 : Erection of Radial gate assly. Consisting of skin plates, horizontal girders M.T. 8667.30
arms, trunion hub, bracket, and pin, lifting brackets, guide rollers, etc.
complete with all accessories inclusive of cost of labour, joining the pieces
by welding and fixing all required bolts, nuts, washers flat and Z type
rubber seals as per drawings and specification, fitting of guide rollers, site
welding, painting with two coats of anticorrosive paint, conveyance of
parts form departmental stores at site to the site of erection, Erecting in
position as per drawing and specification.

RG-16 : Erection of hoist platform consisting of hoist girder, chequered plate, M.T. 8667.30
cross members. G.I. Pipe, railing arrangements etc. inclusive of coat of
labour, joining the pieces by welding painting with two coats of
anticorrosive paint, conveyance of part form deptl. store at site to the site
of erection, cutting the chequered plate, tools, tackless, scaffolding etc.
and erecting into the position as per drawing and specfication.

RG-17 : Erection of hoist mechanism consisting of central drive unit, end M.T. 8667.30
reduction gear units and accessories like line shaft, flange and muff,
coupling, wire rope, bolts nuts, washers, rubber, bush etc. complete
inclusive of cost of labour, site welding, paintig with two coats of
anticorrosive paint applying grease to wire rope, gear unit, and
conveyance of parts form dept stores at site to the site of errection tools,
tackles scaffolding etc. and erection and alligning in position and testing
for full opening and full closing etc. complete as per drawing and
specification.
Item No. Description of Item Unit Year
2011-12
1 2 3 5
RG-18 Providing electrification to gates with remote control system Per Gate 176619.00
and digital dial indicator, pannel boards, earthing etc.
complete including supply of materials, installation and
testing of gates, etc. as per drawing and specification.
(A) Size of gate _____ 41' x
27' Total No. of gates considered 20
Nos.

RG-19A Providing electrification to gates with remote control system Per Gate 120442.00
and digital dial indicator, pannel boards, earthing etc.
complete including supply of materials, installation and
testing of gates, etc. as per drawing and specification.
(B) Size of gate 30'
x 20' Total No. of gates
considered 9 Nos.

RG-20 : Fabricating supplying and erecting steel truss including walkway platform M.T. 95466.00
fitting of chequered plate, railling etc. complete including cost of materials,
fabrication cutting, welding etc. and painting with one primer coat and two
costs of anticorrosive paint etc. compelte as per drawing and specification.
(A) Gate size 30' x 20' (9.144
m x 6.10 m)
RG-20A : Fabricating supplying and erecting steel truss including walkway platform M.T. 98504.60
fitting of chequered plate, railling etc. complete including cost of materials,
fabrication cutting, welding etc. and painting with one primer coat and two
costs of anticorrosive paint etc. compelte as per drawing and specification.
(B) Gate size 41' x 27' (12.497
m x 8.23 m)

RG-21 : Fabrication of embeded parts viz, sill beam, Track girders. Guide M.T. 82728.00
channel, nose angle, anchor bolts etc. complete including cost of
materials, cost of labour, cutting, welding, painting with one coat of primer
paint, jigs and fixtrues etc. complete as per drawing and specification.
Vertical Lift Crest
gates 30' x 8'

RG-22 Fabrication of gates easy consists of skin plate, horizontal M.T. 87911.00
girders, main and guide roller assy. Seal assy. Side and
bottom seals etc. complete inccluding cost of materials, cost
of labour cutting. Welding. Painting with one coat of primer
paint jigs and fixtures etc. complete as per drawing and
specification.

RG-23 Fabrication of hoist platform consisting of hoist girders with M.T. 69795.00
base plate, cross members, chequered plate and hand
railing etc. complete including cost of materials, cost of
labour cutting, welding and painting with one coat of primer
paint, jigs fixtures etc. complete as per drawings and
specification.
Item No. Description of Item Unit Year
2011-12
1 2 3 5
RG-24 Mfg. And supplying end reduction unit consisting of rope Set 371584.00
drum, cast steel spur gears and pinions, shafts, bushing,
bearing, plummer blocks, spacer etc. complete with
fabrication of gear case with cover and assembling above
components, cost of materials, cost of labourers and
painting with one coat of primer paint, Jigs, and fixtures etc.
complete as per drawing and specification.

RG-25 Manufacturing and supplying central drive Unit consisting of Unit 121590.00
electric motor, worm, reduction unit, magnetic brake, starter,
switch, limit switch, hand operation device, dial indicator
system etc. complete with steel fabricated cabin and
assembling of above components with wiring and painting
etc. complete as per drawing and specifications.

RG-26 Manufacturing and supplying cast steel turn buckle, Gate Set. 21891.00
connecting link, wire rope socket and M.S. pin with casting,
matching, galvanising etc. with cost of materials, cost of
labour etc. complete as per drawing and specification.

RG-27 Erection of embeded parts consisting of sill beam, track M.T. 8668.00
girders. Guide channel with plate, nose angles, seal seat
plate Assy. Etc. in line and level, placing anchor bolts in
position including its welding, painting the parts with two
coats of anticorrosive paint, labour, conveyance of materials
for departmental store at site to the site of erection, joining
the parts in line and level by welding. tools, tackles,
scaffolding etc. complete as per drawing and specification
and fixing all required bolts, nuts and washer.

RG-28 Erection of gate assy. Consisting of skin plate, horizontal M.T. 8668.00
girders, main rollers guide rollers, etc. including fixing of side
and bottom rubber seals, bolts nuts, washers etc. complete
with all accessories, inclusive of cost of labours, joining the
pieces by welding, painting with two coats of anticorrosive
paint, conveyance of parts form departmental store at site to
site of work tools, tackles, fixtures scaffolding and erecting in
position as per drawing and specification.

RG-29 Erection of hoist platform consisting of hoist girder, M.T. 8668.00


chequered plate, cross members, G.I.Pipe railing etc.
inclusive of cost of labour, joining the pieces by welding,
painting with 2 coats of anticorrosive paint, conveyance of
parts form departmental store at site to site of erection,
cutting chequered plate and welding tools tackles,
scaffolding etc. and erecting in the position as per drawing
and specification and supplying and fixing all required bolts,
nuts, washers etc.
Item No. Description of Item Unit Year
2011-12
1 2 3 5
RG-30 Erection of hoist mechanism consisting of Central drive Per Gate 8668.00
Unit, and reduction gear unit supplying fixing bolts, nuts, C.I.
Coupling, wire rope and fitting of turn buckles, line shaft etc.
in line and level inclusive of cost of labour field welding,
painting with 2 coats of anticorrosive paint, greasing to wire
rope and gears and other components, filling oil in worm
reduction unit, conveyance of parts from departmental store
at site to the site of work tools tackles, scaffolding etc. and
erecting in line & level as per drawing and specification
including testing the gate upto full opening and closing.

RG-31 Providing electrification to gates with remote control system M.T. 121453.00
and digital dial indicator, pannel boards earthing etc.
complete including supply of materials installation and
testing of gates etc. as per drawing and specification.
Size of gate 30' x 8'
Total No. of gates considered
9 gates.
RG-32 Manufacture, supply erection and testing, commissioning of M.T. 103174.60
service gates for river stuice with their embeded parts and
hoisting arrangement and including of materials, providing 3
coats of anti corrosive paints wherever require, cost of
labour scaffolding. tools trackles etc. complete as per
drawing and specifications.
Size 1 m x 1 m Waterhead : 17
Meter
RG-33 Manufacture, supply erection and testing, commissioning of M.T. 97504.00
emergency gates for river stuice with their embeded parts
and hoisting arrangement and including of materials,
providing 3 coats of anti corrosive paints wherever required,
cost of labour scaffolding. tools trackles etc. complete as per
drawing and specifications.
Size 1 m x 1 m Waterhead : 17 M

RG-34 (A) Providing Diesel Hoist drive mechanism - Radial gate Unit 156107.00
size 30' x 20' 10 H.P. Diesel engine.
Rate for one unit.

RG-35A Providing Diesel Hoist drive mechanism-Radial gate size 41' Unit 162767.90
x 27' 15 H.P. Diesel engine.
Rate for one unit.
RG-35B Providing Diesel Hoist drive mechanism-vertical gate size Unit 158565.50
30' x 8' 10 H.P. Diesel engine.
Rate for one unit.