: 2013-14
DISTRICT :- VADODARA
DATA INPUT - A
No. Particular Unit Material Rate Reference of
Rs. source
1 2 3 4 5
A - MATERIAL
1 Cement OPC MT 5800.00 R&B
2 Unslacked lime Qtl 200.00 R&B
3 Blasting power kg 60.00 R&B
4 Fuse Each 130.00 R&B
5 Mild steel bars Qtl. 4200.00 R&B
6-(i) Cold twisted bars/HYSD Qtl. 4400.00 R&B
(ii) TMT Bars FE-415 Qtl. 4800.00 R&B
7 Water proofing material Lit/kg 50.00 R&B
8 Precast RCC Jali
A 25 mm thick Sqm 154.00 R&B
B 40 mm thick Sqm 176.00 R&B
C 50 mm thick Sqm 187.00 R&B
D 75 mm thick Sqm 220.00 R&B
E 100 mm thick Sqm 242.00 R&B
9 Through and bond stone Each 27.00 R&B
10 Planks 30 mm thick ( Kali or equivalent soft Cu.Dm 29.00 R&B
wood)
11 Planks 38mm thick ( Kali or equivalent soft Cu.Dm 30.00 R&B
wood)
12 Ballies 80 mm dia m 32.00 R&B
13 Ballies 125 mm dia m 42.00 R&B
14 Battens 50 mm x 25 mm Cu Dm 28.00 R&B
15 Battens 50 mm x 50mm Cu Dm 28.00 R&B
16 Battens 75 mm x 50 mm Cu Dm 28.00 R&B
17 Battens 75 mm x 100 mm Cu Dm 28.00 R&B
18 Clamps in two semicircular halves of M.S. kg 70.00 R&B
flat 40 mm x 3 mm
19-A Plain G.I.Sheet 10 mm thick Qtl 6700.00 R&B
20 Bolts 12mm dia, 10 cm long. kg 75.00 R&B
21 Indian teak wood Cu. Dm 65.00 R&B
22 Country wood Cu. Dm 30.00 R&B
23 Anodized Alluminium Butt hinges
A 100 mm x 63 mm x 3.2 mm 10 Nos 281.00 R&B
B 75 mm x 63 mm x 3.2 mm 10 Nos 185.00 R&B
C 75 mm x 45 mm x 3.2 mm 10 Nos 153.00 R&B
D 50 mm x 45 mm x 3.2 mm 10 Nos 145.00 R&B
24 Anodized Alluminium Screws
A 40 mm 100 Nos 92.00 R&B
B 30 mm 100 Nos 86.00 R&B
C 20 mm 100 Nos 58.00 R&B
25 Iron Hinges
A 100 mm x 58 mm x 1.9 mm 10 Nos 144.00 R&B
B 100 mm x 58 mm x 1.4 mm 10 Nos 138.00 R&B
C 75 mm x 47 mm x 1.7 mm 10 Nos 121.00 R&B
D 50 mm x 37 mm x 1.5 mm 10 Nos 109.00 R&B
26 Iron Screw
A 40 mm 100 Nos 144.00 R&B
B 30 mm 100 Nos 121.00 R&B
C 20 mm 100 Nos 92.00 R&B
27 Commericial Ply wood sheet
A 12 mm thick Sqm 425.00 R&B
B 19 mm thick Sqm 530.00 R&B
C 25 mm thick Sqm 590.00 R&B
28 Partical board sheet
A 12 mm thick Sqm 285.00 R&B
B 19 mm thick Sqm 365.00 R&B
C 25 mm thick Sqm 475.00 R&B
D 35 mm thick Sqm 630.00 R&B
29 Hard board sheet 40 mm thick Sqm 170.00 R&B
30-A Plain Asbestos sheet 5 mm thick Sqm 200.00 R&B
31 Non-decorative type 35 mm thick door Sqm 1470.00 R&B
shutters
32 Non-decorative type 25 mm thick door Sqm 1113.00 R&B
shutters
32-A Vision penel for door No 40.00 R&B
33 Nickel plated bright finished MS plane m 179.00 R&B
hinges
34 Nickel plated screw 25 mm size 100 Nos 184.00 R&B
35 Wire gauge of 0.56 mm Sqm 189.00 R&B
36 Wire gauge of 0.71 mm Sqm 242.00 R&B
37 M.S. Flat / plate Qtl 5040.00 R&B
38 Deodar wood battens and planks Cu. Dm 28.00 R&B
39 Wooden plugs Each 1.10 R&B
40 Decorative ply wood 4 m thick Sqm 350.00 R&B
41 T-iron bracket 40 mmx 40 mm x 6 mm Qtl 5520.00 R&B
42 Hard drawn steel wire fabric Sqm 288.00 R&B
43 Hood cover 0.9 mm thick m 155.00 R&B
44 Hood cover 1.25 mm thick m 162.00 R&B
45 Rolling shutter having width below 3.5 m Sqm 2645.00 R&B
46 Extra cost of R.S. having width 3.5 m & Sqm 322.00 R&B
abve coil type spring
47 Coil type spring Each 230.00 R&B
48 Structural steel MS channel joist, tees, Qtl 5290.00 R&B
Gusset plate etc.
49 M S sheet 1 mm thick Qtl 5800.00 R&B
50-A Pulleys 25 mm dia Each 127.00 R&B
B Pulleys 38 mm dia Each 132.00 R&B
51 27.5 cm long wire spring grade No. 2 for Each 753.00 R&B
rolling shutter
52 Sheet glass ordinary quality
A 3 mm thick Sqm 221.00 R&B
B 4 mm thick Sqm 233.00 R&B
53 Sheet glass selected quality
A 5 mm thick Sqm 315.00 R&B
B 6 mm thick Sqm 347.00 R&B
54 Ground glass ( frosted or obscured on one
side)
A 3 mm thick Sqm 247.00 R&B
B 4 mm thick Sqm 284.00 R&B
C 5 mm thick Sqm 357.00 R&B
55-A Plain glass 3 mm thick Sqm 242.00 R&B
B Plain glass 4 mm thick Sqm 252.00 R&B
56 Wired figured glass 6.4 mm thick Sqm 431.00 R&B
57 Light shade Pigment Kg. 95.00 R&B
58 Medium shade pigment Kg. 95.00 R&B
59 Dark Shade Pigment Kg. 89.00 R&B
60 White cement MT 20000.00 R&B
61 Marble chips upto 4mm size Qtl 872.00 R&B
62 Marble powder cum 1838.00 R&B
63 22mm thick Chequered terrazo tiles
A Light Shade Sqm 158.00 R&B
B Dark Shade Sqm 147.00 R&B
64 20mm thick Terrazo tiles
A Light Shade Sqm 137.00 R&B
B Dark Shade Sqm 126.00 R&B
65 28mm thick Chequered Terrazo tiles
A Light Shade Sqm 173.00 R&B
B Dark Shade Sqm 163.00 R&B
66 White glazed tiles (15cmx15cmx6mm) 10 Nos 90.00 R&B
67 Pre cast cement concrete tiles Sqm 105.00 R&B
68 Rough kota stone slab
A 25mm thick Sqm 204.00 R&B
B 40mm thick Sqm 275.00 R&B
69 Polished kota stone slab
A 25mm thick Sqm 275.00 R&B
B 30mm thick Sqm 286.00 R&B
C 40mm thick Sqm 308.00 R&B
70 Marble slab 18 to 20 mm thick Sqm 825.00 R&B
71 0.8mm thick corrugated G.I.Sheet class-III Qtl. 6325.00 R&B
72 0.8mm thick plain G.I.Sheet class-III Qtl. 6153.00 R&B
73 0.8mm thick semi-circular G.I.sheet class-III Qtl. 6153.00 R&B
Below mentioned rates are for the Items as per Column No.4
No. Particular Unit Year : 2012-13
1 2 3 4
Through & bond stone No
Boundary stone No 43.00 SSNL
Guard stone 20x20x75 No 43.00 SSNL
Lime KG 4.20 SSNL
Radium paint Lit 645.90 SSNL
Red oxide Lit 100.00 SSNL
Sign board with angles No 1700.00 SSNL
Geletine KG 60.00 SSNL
Elec. Detonator No. 11.00 SSNL
Km stone 45x 30x 90 cm No. 420.00 SSNL
Kerosene S81 Per liter 45.00 Market
Nut Kg 75.00 G 16A & B
Housing assembly No. 125.00 G 16A & B
Bearing No. 630.00 G 17A
Bearing No. 810.00 G 17B
75 cm 4 inch MS pipe (out let) No. 300.00 G12
Flanges No. 198.00 G12
19-B C.R.C.Sheet Qtl. 6200.00 R&B
22 - A Glass 2mm to 3mm thick Sqm. 170.00 R&B
30 - B Plain Asbestos sheet 6 mm thick Sqm 210.00 R&B
30 - C Plain Asbestos sheet 7 mm thick Sqm 221.00 R&B
126 - B Pillar tap 20 mm dia No. 418.00 R&B
127 - B Brass stop cocl 20 mm dia No. 264.00 R&B
158 - B Hectometer precast R.C.C.stone as per Each 315.00 R&B
type design
160 - B Ordinary K M precast R.C.C.stone (for N H Each 840.00 R&B
S H & MDR)
159 - B Ordinary K M precast R.C.C.Stone for ODR Each 735.00 R&B
& VR)
161 - B 5 th KM precast R.C.C.stone as per IRC Each 1260.00 R&B
type design
162 - B Indicator stone as per RCC type design Each 315.00 R&B
167 I.S. class NP2 RCC heavy duty Non Each 770.00 R&B
pressure pipe - 500 mm dia
167 - F1 I.S. class NP2 RCC heavy duty Non Each 2200.00 R&B
pressure pipe - 1100 mm dia
I.S. class NP3 RCC heavy duty Non
168 pressure pipe
H 1400 mm dia m 5830.00 R&B
I 1600 mm dia m 7700.00 R&B
J 1800 mm dia m 9900.00 R&B
170 P V C Pipes
A 20 mm dia ( 6 kg/Sqcm) m 28.00 R&B
B 25 mm dia ( 6 kg/Sqcm) m 42.00 R&B
C 32 mm dia ( 6 kg/Sqcm) m 52.00 R&B
199 Asphalt
G CRMB 60 bulk tonne 43041.00 R&B
212 - B Vitrified granite tiles 8 mm to 10 mm thick Sqm 538.00 R&B
600 X 600 mm size DARK SHED
212 -C Vitrified granite tiles 8 mm to 10 mm thick Sqm 990.00 R&B
36'' X 36'' size
214 Alluminium section any size Plain Kg 200.00 R&B
215 A Powder coating to Alluminium secton Kg 35.00 R&B
215 B Anodised to Alluminium section Kg 50.00 R&B
216 Rubber Gasket for glass beading Rmt 10.00 R&B
217 TMT Bar FE 500 D Quintal 5200.00 R&B
218 Weather Proof acrylic exterior emulsion Ltr 230.00 R&B
paint
219 A R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 520.00 R&B
Class NP=4 300 mm dia .
219 B R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 920.00 R&B
Class NP=4 450 mm dia .
219 C R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 1650.00 R&B
Class NP=4 600 mm dia .
219 D R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 3200.00 R&B
Class NP=4 900 mm dia .
219 E R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 4000.00 R&B
Class NP=4 1000 mm dia .
219 F R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 5600.00 R&B
Class NP=4 1200 mm dia .
219 G R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 7750.00 R&B
Class NP=4 1400 mm dia .
219 H R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 10200.00 R&B
Class NP=4 1600 mm dia .
219 I R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 12700.00 R&B
Class NP=4 1800 mm dia .
220 A Glass bricks 19 x 19 x 10 CM NO 115.00 R&B
220 B Glass bricks 19 x 19 x 8CM NO 110.00 R&B
221 Floor spring heavy duty No 2500.00 R&B
222 A S.S. Stopper 60 cm long of ASIS 304 No 500.00 R&B
222 B S.S. Stopper 30 cm long of ASIS 304 Grade No 250.00 R&B
231 B Labour Charges Quarter round edge for Rmt. 60.00 R&B
Granite
231 C Labour charges edge finished for Granite Rmt. 50.00 R&B
231 D Labour Charges Half round edge for Rmt. 60.00 R&B
Kota/Marble round edge for Kota/Marble
231 E Labour Charges quarter round edge for Rmt. 40.00 R&B
Kota/Marble
232 A S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 2600.00 R&B
thick with over all size 610 x 560 mm &
bowl size 560 x 410 x 200
232 B S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 1800.00 R&B
thick with over all size 510 x 432 mm & bowl
size 445 x 368 x 190
232 C S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 1550.00 R&B
thick with over all size 485x 410 mm & bowl
size 410 x 365 x 165
233 A Alluminium Composite pannel 3 mm thick Sqmtr 900.00 R&B
233 B Alluminium Composite pannel 4 mm thick Sqmtr 1000.00 R&B
234 Multy wall plycarbonate sheet 6 mm thick Sqmtr 1080.00 R&B
235 A S.S. Door /window Hinghes 4"x1"x1" NO 75.00 R&B
235 B S.S. Door /window Hinghes 3"x3/4"x3/4" NO 30.00 R&B
235 C S.S. Door /window Hinghes 3"x3/4"x3/4" NO 25.00 R&B
236 Jet Spray heavy duty with S.S. Braided hos NO 425.00 R&B
60 cm long
237 Health Fauset Heavy duty with hook with No 800.00 R&B
fitting.
S. O. R. : 2013-14
DISTRICT :- VADODARA
DATA INPUT -B
Sr.No Category of labour Unit Total Rate Reference of
source
Rs./ Day
26
Sr. No. Item Rate Unit
A B C D 5
Marbal Plate 45 x 45 1505.00 No 44
Barbed Wire 80.00 Kg 45
CC Pole 100.00 No 46
Structural steel 52900.00 MT 47
Alluminium Deco. Rail (With ends) 144.00 Rmt 48
Alluminium Deco. Rail (Without ends) 115.00 Rmt 49
28
Sr. No. Item Rate Unit
A B C D 5
(k) 1500 Cusecs(7.62M throat width) 1495194.00 No 77
Cold twisted bars (HYSD) 44000.00 M.T. 78
79
80
81
82
Labour (Daily wages) 83
Mason 1st 207.80 No 84
Mason 2nd 199.90 No 85
Labour 194.50 No 86
Bhisti 196.30 No 87
Blacksmith 199.90 No 88
Carpainter 2nd 199.90 No 89
Painter 199.90 No 90
Carriage 91
Cement 0.00 Bag 92
Sand 0.00 C.M. 93
Metal 0.00 C.M. 94
Rubble 0.00 C.M. 95
Through stone 5.75 No (L.S.) 96
Gravel 0.00 C.M. 97
M.S. Steel 0.00 MT 98
Steel Assembly 0.00 MT 99
Pedastal (15 Kg) 5.75 No (L.S.) 100
Nut Bolt (Check Dam) 2.30 (L.S.) 101
Welding Rod (Check Dam) 5.75 (L.S.) 102
Kapachi 0.00 C.M. 103
Curing Compound 1.15 (L.S.) 104
Core box 115.00 (L.S.) 105
Stone (25 x 15 x 17.5) 5.75 (L.S.) 106
Timber 0.00 C.M. 107
Brick 0.00 Th.No 108
Carriage of m/c. Boat 230.00 Hr. (L.S.) 109
Carriage of Manual Boat 23.00 Hr. (L.S.) 110
PVC wire mesh 2.30 S.M.(L.S.) 111
4 Inch AC pipe 100 dia 0.00 Rmt 112
75 mm 4 Inch M.S. Pipe with flanges 11.50 No (L.S.) 113
30
Sr. No. Item Rate Unit
A B C D 5
Labour Charges (L.S.) 0.00 122
Water charges for 1 HP 0.00 123
Pump for 8 Hr (225 mm dia) 230.00 (L.S.) 124
Pump for 8 Hr (300 mm dia) 287.50 (L.S.) 125
Pump for 8 Hr (450 mm dia) 402.50 (L.S.) 126
Lum sum Items 127
Fabrication charges 7.70 Kg 128
Welding hold fast 51.15 L.S. 129
Asphalt filler joint 20 mm deep 18.15 L.S. 130
Labour for fixing expansion joint 69.00 L.S. 131
Cement for fixing 13.80 L.S. 132
Hire charges for Machine boats 287.50 Hr 133
Hire charges for Manual boats 57.50 Hr 134
Hire charges for machinery like jack 880.00 Hr. 135
hammer with compressure
Brick bat 180.00 CM 136
Aldrop 92.00 L.S. 137
Bolt 92.00 L.S. 138
Labour charges for steel gate 2530.00 L.S. 139
GI Steple or binding wire 57.50 L.S. 140
Cement Slurry for anchor bar 23.00 L.S. 141
Drilling charges for anchor bar 34.50 L.S. 142
31
CHECK DAMS OTHER THAN S.P.P.W.C.S.
ABSTRACT
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.
1 2 3 4
C4 Providing & laying concrete of cement, sand and metal in M-10 C.M. 2632.60
(equivalent to cement concrete of 1:3:6 grade including
tamping, watering and curing, smooth finishing where
required etc. complete for lead 50 mt. and lift 2.50 mt.
C5 Filling in foundation with cement concrete of cement, sand and C.M. 2398.20
gravel in M.10 (equivalent to cement concrete of 1:3:6) grade
including tamping, watering and curing, smooth finishing
where required etc. complete for lead 50 mt. and lift 2.50 mt.
C6 Providing and laying Random Rubble Masonary in foundation C.M. 1626.10
upto the top of the check dam in mortar of cement and sand
in 1:6 proportion including striking out joints with curing
watering etc. complete.
C7 Plain cement concrete of cement sand and metal (unvibrated) in C.M. 3091.00
1:2:4 proportion laid in situ including temping smooth finishing
watering and curing for lead upto 50 m. and lift upto 1.5 m.
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.
C13 Excavation for foundation in all sorts of soil including sandy and CM 53.80
gravelly soils, soft murrum, hard murrum including depositing the
excavated stuff as and where directed including back filling the
trenches with suitable excavated stuff etc. complete for lead upto
50 m. and with all lifts. ( By Machinery)
C14 Excavation for foundation in soft rock including depositing the CM 108.70
excavated stuff as and where directed including back filling the
trenches with suitable excavated stuff etc. complete for lead upto
50 m and all lifts. ( By Machinery )
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.
C15 Providing and fixing in position the name and number plate of No. 1840.60
white marble of 2.5 cm. thickness size including engraving the
letters and filling with lead etc.complete.(45x45) cm
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.
S14 Providing temporary motorable service road during construction Km. 124763.08
including watering and maintaining the same etc. complete.
S15 Surveying including chaining, ranging, levelling jungle cutting etc. Ha. 96.80
complete of canal alignment.
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.
MISCELLANEOUS
M1 Providing and laying burnt brick pitching (Class II) in cement Sq.M. 341.20
mortar 1:6 including laying to correct slope, after necessary
trimming of earthwork filling the joint with mortar curing, watering
etc. complete.
M2 Providing and fixing metal expansion joint as per drawing etc. Rmt. 788.40
complete consisting of 50 mm x 50 mm x 6 mm size two angles
and 100 mm x 6 mm M.S. Plate with 6 mm x 20 mm x 25 cm long
hold fasts at 50 cm c/c on both side of expansion joint.
M7 Constructing R.C.C. pillar of 1:2:4 of C.C. 0.45 m x 0.45 m x 1.65 No. 4039.50
m above G.I. with Kapachi as aggregate including excavating
foundation as per drawing including 1:4:8 gravel concrete for
foundation including providing reinforcement and sand faced
cement plaster as per detailed drawings.
M8 Providing and fixing 16 mm dia alluminium rails for curtains Rmt. 284.70
including iron oxidized fastening etc. complete.
M9 Strengthening with jacketing inside well of syphon with 10 cm SM 841.70
thick RCC of M.15 grade with necessary curved form work with
lateral and verticals supports with watering curing etc. complete
as directed.
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.
M11 Providing gauge plate of following size of material fibre glass Rmt
reinforced plastic with engraved bands width and figures with
necessary clits and fasteners and fixing the same at the site of
work etc. complete as directed.
(a) 10 cm RM 5013.10
(b) 15 cm RM 6129.20
(c) 20 cm RM 7247.80
(d) 30 cm RM 9481.30
(e) 45 cm RM 15617.50
(f) 60 cm RM 18969.60
(g) 100 cm RM 27906.00
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.
M12 Supply of Fibre glass plastic (FRP) measuring cut throat flume
for accurate measurement of water flowing through channels with
moulded engraved gauze marking in Lit/Sec. and also in
centimeter including discharge table, capacity, marking, flow
direction, pipe stiffner, hold fasts and sand treatment on back
side of flume etc. (Rate is inclusive of transportation of flume
device to Division Office).
M14 Deepening of tank in all sorts of soil including soft & hard murrum C.M. 59.70
including depositing the excavated stuff in uniform layers
including breaking clods in tank's banks or as and where directed
etc. complete within lead of 1.00 km.and with all lifts.(By
machinery)
RATE ANALYSIS 2013-2014
MISCELLANEOUS
ITEM- M1 Providing & laying burnt brick pitching (Class II) in cement mortar 1:6 including laying to correct slope,
after necessary trimming the earthwork filling the joint with mortar curing, watering etc. complete.
brick on edge
(SOR CELL Vol.3 Page 282)
Unit SM
Rate for 1 SM
Sr. No. Description Quantity Unit Rate per Amount
Unit
(A) MATERIALS :
Brick 0.049 Th.No. 4200.00 205.80
Sand 0.025 Cum 210.00 5.25
Cement 0.13 Bag 290.00 37.70
248.75
(B) CARRIAGE:
Brick 0.049 Th.No 0.00
Sand 0.025 Cum 0.00
Cement 0.13 Bag 0.00
0.00
(C) LABOUR :
Mazdoor 0.15 No 194.50 29.18
Mason 0.08 No 199.90 15.99
45.17
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM- M2 Providing and fixing metal expansion joint as per drawing etc. complete consisting of 50 mm x 50 mm x
6 mm size two angles and 100 mm x 6 mm M.S. Plate with 6 mm x 20 mm x 25 cm long hold fasts at
50 cm c/c on both side of expansion joint.
(A) MATERIALS :
Steel 0.01445 M.T 42000.00 606.90
10 MM DIA BOLTS @
3.33 Nos. @ 1 meter.
Total 676.20
(B) CARRIAGE:
Steel 0.01445 M.T 0.00
Total (A + B + C) 745.20
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM- M3 Providing P.V.C. water tank of required capacity as per ISI standard & fixing the same in position and
completing the same with necessary fitting etc. complete.
Unit : No.
Rate for 1 No.
Sr. No. Description Quantity Unit Rate per UnitAmount
(A) MATERIALS :
500 liter Tank 1 No 1440.00 1440.00
1440.00
(B) CARRIAGE:
500 liter Tank 1 No 0.00
0.00
(C) LABOUR :
Plumber 0.50 No 199.90 99.95
Labour 1.00 No 194.50 194.50
294.45
Total (A + B + C) 1734.45
Rate of 1 No2029.40
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
(II) 1000 Liter As per Market inquiry
Unit : No.
Rate for 1 No.
Sr. No. Description Quantity Unit Rate per UnitAmount
(A) MATERIALS :
1000 liter Tank 1 No 2880.00 2880.00
2880.00
(B) CARRIAGE:
1000 liter Tank 1 No 0.00
0.00
(C) LABOUR :
Plumber 0.50 No 199.90 99.95
Labour 1.00 No 194.50 194.50
294.45
Total (A + B + C) 3174.45
Rate of 1 No3714.20
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
(III) 1500 Liter As per Market inquiry
Unit : No.
Rate for 1 No.
Sr. No. Description Quantity Unit Rate per UnitAmount
(A) MATERIALS :
1500 liter Tank 1 No 4320.00 4320.00
4320.00
(B) CARRIAGE:
1500 liter Tank 1 No 0.00
0.00
(C) LABOUR :
Plumber 0.50 No 199.90 99.95
Labour 1.50 No 194.50 291.75
391.70
Total (A + B + C) 4711.70
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM- M-4 Providing & laying flexible type Gabion of size 1 m x 1 m x 0.5 m consisting of rubble put in cage of
PVC wire mesh 10 cm x 12 cm dia 2.7 mm / 3.7 mm (ID/OD) laid on the surface or slope etc
complete.
Unit : SM
Rate for 100 SM
Sr. No. Description Quantity Unit Rate per UnitAmount
(A) MATERIALS
Rubble (100 x 0.5 x 62.5 C.M. 185.00 11562.50
1.25)
20762.50
(B) CARRIAGE
Rubble (100 x 0.5 x 62.5 C.M. 0.00
1.25)
0.00
(C) LABOUR
Mason 1.00 No. 207.80 207.80
Labour 4.00 No. 194.50 778.00
985.80
Total (A +B + C) 21748.30
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM- M-5 Painting gauze patta of following width on masonry or concrete surface with characters painted with oil
paint of specified colour & quality in distinct colour over pre painted dried surface in two coats as
directed etc complete.
(A) MATERIALS :
Oil Paint 2 lit 210.00 420.00
RATE ANALYSIS : YEAR 2011-12
ITEM- S1 Surveying including chaining ranging and leveling including jungle cutting etc. complete as detailed
below.
( 3 Cross sections of I km each at 150 m interval on main base line. level reading at every 30 m intervals)
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S2 Surveying including chaining ranging and leveling including jungle cutting etc. complete as detailed
below.
B. Dam Vicinity survey etc.
Rate for 0.12 km2 / day as shown in sheet herewith.
Unit : km2
Rate for 0.12 km2
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
1 Lime ( Khadi) 10 Kg. 4.20 42.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 25 No. 2.75 68.75
Sub-Total (A) Rs. 167.75
(Note : Above material consumption is for 1 km2 survey )
(B) LABOUR :
1 Mazdoor 7 No. 194.50 1361.50
Dam Vicinity survey 0.12 km2 per day with party of 7 labourers.
( 4 Cross sections of 0.5 km each at every 30 m interval on main base line on either side.)
120 m
Executive Engineer,
Vadodara Irrigation Division,
RATE ANALYSIS : YEAR 2011-12
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S3 Surveying including chaining ranging and leveling including jungle cutting etc. complete as detailed
below.
C. Dam alignment survey etc.
Rate for 3.0 km / day as shown in sheet herewith.
Unit : km
Rate for 3 Km
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
1 Lime ( Khadi) 5 Kg. 4.20 21.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 33 No. 2.75 90.75
(B) LABOUR :
1 Mazdoor 6 No. 194.50 1167.00
449.80
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S4 Taking fly levels for connecting and changing of B. M. (Single levelling).
Unit : km
Rate for : 3 km
Sr. No. Description Quantity Unit Rate per Unit Amount
Total 3 Nos.
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S5 Taking fly levels for connecting and changing of B. M. (Double levelling).
Unit : km
Rate for 3 Km
Sr. No. Description Quantity Unit Rate per Unit Amount
Total 5 Nos.
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S6 Providing and fixing B. M. and C. L. stone of 20 cm x 20 cm x 75 cm. In C.C. 1:3:6 at site of work.
Unit : No.
Rate for : 5 No
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
1 Cement (O.P.C.) 0.072 MT 5800.00 417.60
2 Sand 0.150 m3 210.00 31.50
3 Gravel/Metal/Coarse aggregate 0.290 m3 210.00 60.90
4 Dressed Stone size (20 x 20 x 75 cm.) 5 No. 15.00 75.00
286.90
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S7 Providing wooden core-boxes of required size for diamond drilling machine as per specification suggested
by Geologist without Japan painting.
Unit : No.
Rate for 1 No
Sr. No. Description Quantity Unit Rate per Unit Amount
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S8
Revenue survey charges for joint measurements for land to be acquired etc.
Unit : Hactare
Rate for 1 Hactare
(A) LABOUR
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
(A) MATERIALS
1 Lime ( Khadi) 4 kg 4.20 16.80
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 34 No. 2.75 93.50
167.30
Total (A + B) 556.30
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S10
Surveying for road work including ranging chaining paving levelling and
compass surveying including all labour material and instruments etc.
complete.
Unit : KM
Rate for 1 KM
Total (A + B) 1529.25
Labour cess 1% 15.29
1544.54
1 km approach road alignment survey will involve @ 3.80 km of linear survey per
day as shown in separate sheet.
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S11 Dog bailing the centre and toe line of embankment / cutting.
Unit : KM
Rate for 1 KM
LABOUR
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S12 Providing and fixing stones of 25 cm x 15 cm x 17.5 cms. size of approved quality for centre line or
apex point including excavation (1 : 2 : 4) concreting and fixing the stones including casting of stones etc.
complete.
Unit : No.
Rate for 1 No
(A) MATERIALS
Stone of required size 1 No. 15.00 15.00
(25 x 15 x 17.5)
Cement 0.005 MT 5800.00 29.00
Sand 0.0042 m3 210.00 0.88
Gravel 0.0084 m3 210.00 1.764
(C) LABOUR
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S13 Contour survey work for preparing contour made by taking C/s. at every 30 m. Intervals in a grid of 30 x 30
m including all labour materials and instruments.
(A) MATERIALS :
1 Lime ( Khadi) 10 Kg. 4.20 42.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 25 No. 2.75 68.75
Sub-Total (A) Rs. 167.75
(Note : Above material consumption is for 1 km2 survey )
(B) LABOUR :
1 Mazdoor 7 No. 194.50 1361.50
Dam Vicinity survey 0.12 km2 per day with party of 7 labourers.
(4 Cross sections of 0.5 km each at every 30 m interval on main base line on either side.)
120 m
Executive Engineer,
RATE ANALYSIS : YEAR 2011-12
Unit : KM
Rate for 1 KM
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
(B) CARRIAGE:
(C) LABOUR :
106038.50
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12
ITEM- S15 Surveying including chaining ranging and levelling including jungle cutting in command area.
96.80
Survey party :
2 Ranging
2 Chaining
2 Levelling Staff
1 Level Instrument
1 Water man/clearence
Total 8 Laburers party
1 km
(1) (2)
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)
RATE ANALYSIS : YEAR - 2012-13
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C2
Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)
(d) Lift 4.50 m to 6.00 m.
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)
(A) MATERIALS
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C3 Excavation for foundation in hard rock upto 3 m. including blasting and chiselling if
necessary, sorting out and stacking separately the useable rubble, including depositing the
excavated stuff as and where directed including back filling the trenches with suitable
excavated stuff etc. complete for lead upto 50 m. and all lift. (By Machinery)
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C4 Providing & laying concrete of cement, sand and metal in M-10 (equivalent to cement
concrete of 1:3:6 ) grade including tamping, watering and curing, smooth finishing
where required etc. complete for lead 50 mt. and lift 2.50 mt.
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C5
Filling in foundation with concrete of cement, sand and gravel in M.10 (equivalent to
cement concrete of 1:3:6 ) grade including tamping, watering and curing, smooth
finishing where required etc. complete for lead 50 mt. and lift 2.50 mt.
(A) MATERIALS
1 Cement 4.40 Bag 290.00 1276.00
2 Sand 0.456 C.M. 210.00 95.76
3 Gravel 0.92 C.M. 210.00 193.20
(A) Total Rs. 1564.96
(B) CARRAGE OF MATERIALS
1 Cement 6.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Gravel 0.89 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C6 Providing and laying Random Rubble Masonary in foundation upto the top of the check
dam in mortar of cement and sand in 1:6 proportion including striking out joints with
curing watering etc. complete.
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Cement 1.75 Bag 290.00 507.50
2 Sand 0.35 C.M. 210.00 73.50
3 Rubble 1.25 C.M. 185.00 231.25
(A) Total Rs. 812.25
(B) CARRAGE OF MATERIALS
1 Cement 1.75 Bag 0.00
2 Sand 0.35 C.M. 0.00
3 Rubble 1.25 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.20 No. 207.80 41.56
Mason 2nd Class 0.50 No. 199.90 99.95
Labour 2.00 No. 194.50 389.00
Bhisti 0.15 No. 196.30 29.45
(C) Total Rs. 559.96
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C7 Plain cement concrete of cement sand and metal (unvibrated) in 1:2:4 proportion laid in
situ including temping smooth finishing watering and curing for lead upto 50 m. and lift
upto 1.5 m.
(A) MATERIALS
1 Cement 5.60 Bag 290.00 1624.00
2 Sand 0.445 C.M. 210.00 93.45
3 Metal 0.89 C.M. 425.00 378.25
(A) Total Rs. 2095.70
(B) CARRAGE OF MATERIALS
1 Cement 5.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Metal 0.89 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C8A
Providing and laying M-15 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.
M15 (a) with water curing. (SOR CELL Vol.4 Page 41)
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Cement 5.60 Bag 290.00 1624.00
2 Sand 0.445 C.M. 210.00 93.45
3 Metal 0.89 C.M. 425.00 378.25
(A) Total Rs. 2095.70
(B) CARRAGE OF MATERIALS
1 Cement 5.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Metal 0.89 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82
TOTAL Rs. (A + B + C) 2554.52
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C8A
Providing and laying M-15 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.
M15 (b) with Membrane curing. (SOR CELL Vol.4 Page 41)
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Cement 5.60 Bag 290.00 1624.00
2 Sand 0.445 C.M. 210.00 93.45
3 Metal 0.89 C.M. 425.00 378.25
4 Curing compound 2.00 Lit. 31.00 62.00
(A) Total Rs. 2157.70
(B) CARRAGE OF MATERIALS
1 Cement 5.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Metal 0.89 C.M. 0.00
4 Curing compound 2.00 Lit. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82
TOTAL Rs. (A + B + C) 2616.52
(D) Cenering & scaffolding charges 3% Rs. 78.50
(E) Water Charges at 1 % of A+B+C. Rs. 26.17
(F) Tools and Plants at 1 % of A+B+C Rs. 26.17
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 392.48
(H) Labour cess 1% 26.17
Grand Total (A+B+C+D+E+F+G) Rs. 3165.99
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C8B
Providing and laying M-20 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.
(A) MATERIALS
1 Cement 6.60 Bag 290.00 1914.00
2 Sand 0.414 C.M. 210.00 86.94
3 Metal 0.829 C.M. 425.00 352.33
(A) Total Rs. 2353.27
(B) CARRAGE OF MATERIALS
1 Cement 8.10 Bag 0.00
2 Sand 0.414 C.M. 0.00
3 Metal 0.829 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 2.00 No. 194.50 389.00
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 478.27
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM :C8B
Providing and laying M-20 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.
RATE ANALYSIS : YEAR - 2012-13
(A) MATERIALS
1 Cement 6.60 Bag 290.00 1914.00
2 Sand 0.414 C.M. 210.00 86.94
3 Metal 0.829 C.M. 425.00 352.33
4 Curing compound 2.00 Lit. 31.00 62.00
(A) Total Rs. 2415.27
(B) CARRAGE OF MATERIALS
1 Cement 8.10 Bag 0.00
2 Sand 0.414 C.M. 0.00
3 Metal 0.83 C.M. 0.00
4 Curing compound 2.00 Lit. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 2.00 No. 194.50 389.00
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 478.27
TOTAL Rs. (A + B + C) 2893.54
(D) Cenering & scaffolding charges 3% Rs. 86.81
(E) Water Charges at 1 % of A+B+C. Rs. 28.94
(F) Tools and Plants at 1 % of A+B+C Rs. 28.94
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 434.03
(H) Labour cess 1% 28.94
Grand Total (A+B+C+D+E+F+G) Rs. 3501.18
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
Item : C9
Providing and Placing in position HYSD reinforce bars, including cutting, bending, welding
joints where necessary hooking etc. complete as per drawing for all lead and lift.
(A) MATERIALS
1 Steel 1.05 MT 44000.00 46200.00
2 Binding Wire 7.50 kg 55.00 412.50
(A) Total Rs. 46612.50
(C) LABOUR
Labour 6 No. 194.50 1167.00
Blacksmith 6 No, 199.90 1199.40
(C) Total Rs. 2366.40
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
Item : C9
Providing and Placing in position MS/HYSD reinforce bars, including cutting, bending,
welding joints where necessary hooking etc. complete as per drawing for all lead and lift.
(B) TMT/CRS
Unit MT
Rate for : 1 MT
(A) MATERIALS
1 Steel 1.05 MT 48000.00 50400.00
2 Binding Wire 7.50 kg 55.00 412.50
(A) Total Rs. 50812.50
(C) LABOUR
Labour 6 No. 194.50 1167.00
Blacksmith 6 No, 199.90 1199.40
(C) Total Rs. 2366.40
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
Item : C9
Providing and Placing in position M.S. reinforce bars, including cutting, bending, welding
joints where necessary hooking etc. complete as per drawing for all lead and lift.
(A) MATERIALS
1 Steel 1.05 MT 42000.00 44100.00
2 Binding Wire 7.50 kg 55.00 412.50
(A) Total Rs. 44512.50
(C) LABOUR
Labour 6 No. 194.50 1167.00
Blacksmith 6 No, 199.90 1199.40
(C) Total Rs. 2366.40
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C10 Providing and Fixing M.S. Gate with necessary hoisting arrangement
embedments fixing etc. complete for the following sizes.
(a) Size (0.80 x 0.80) m
(b) Size ( 1.0 x 1.0 ) m
(c) size (1.2 x 1.2 ) m
Unit : No. (As per Calculation)
Rate for : 1 No.
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Steel Assembly 135 Kg. 52.90 7141.50
2 Padestal with accesssaries 1 No. 430.00 430.00
3 Nut - Bolt L.S. 75.00 75.00
4 Welding Rods L.S. X X
(A) Total Rs. 7646.50
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM C11
Providing and Fixing 1.2 m long M. S. Anchor bars of 16 mm dia for anchoring by
drilling 35 mm dia hole in foundation strata including necessary cutting, bending,
hoisting bars and grouting the holes with cement slurry etc. complete (0.60 m to be
embedded in rock and 0.60 m above the ground / concrete structure).
Unit : No
Rate for : 1 No.
(C) LABOUR
Labour 0.25 No. 194.50 48.625
Drilling charges L.S 34.50 34.50
(C) Total Rs. 83.125
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13
ITEM :C-12
Filling in foundation with concrete of cement, sand and metal in M-7.5 (equivalent to
cement concrete of 1:4:8 ) grade including tamping, watering and curing, smooth
finishing where required etc. complete for lead 50 mt. and lift 2.50 mt.
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Cement 3.40 Bag 290.00 986.00
2 Sand 0.470 C.M. 210.00 98.70
3 Metal 0.89 C.M. 425.00 378.25
(A) Total Rs. 1462.95
(B) CARRAGE OF MATERIALS
1 Cement 4.50 Bag 0.00
2 Sand 0.456 C.M. 0.00
3 Metal 0.92 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.80 No. 194.50 350.10
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 439.37
TOTAL Rs. (A + B + C) 1902.32
(D) Cenering & scaffolding charges 0.5% Rs. 9.51
(E) Water Charges at 1 % of A+B+C. Rs. 19.02
(F) Tools and Plants at 1 % of A+B+C Rs. 19.02
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 285.35
(H) Labour cess 1% 19.02
Grand Total (A+B+C+D+E+F+G) Rs. 2254.25
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS - YEAR : 2013-14
ITEM NO. C-13 (For canals having capacity beyond 8.5 cumecs)
Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft murrum, hard murrum
including depositing the excavated stuff as and where directed including back filling the trenches with
suitable excavated stuff etc. complete for lead upto 50 m. and with all lifts. ( By Machinery)
Excluding dewatering.
2. Operating factor
(Excellent) (tabl = 0.92
Cost of Transportation
Dumper carriage capacity = 10 M.Ton.
Density = 1.6 m.ton / Cum
Body capacity = 10 = 6.25 Cum
1.6
CYCLE TIME
BODY CAPACITY
LOADING TIME = -----------------------------
EXCAVATOR OUTPUT
6.25 X 60.00
= --------------------------
111.39
= 3.37 MIN.
Transportation cost per Cum = Hourly use rate = 1070.00 = 23.43 Rs./hr.
Out put 45.68
Total cost of excavation,
Loading, Unloading and
transportation.= (A) = 22.53 + 23.43 = Rs. 45.96
III Cost of dressing the section, breaking clods & spreading Rs. 0.00
in uniform layers @ 20 % of cost of excavation.
Total 45.96
Add for Labour cess 1% 0.46
Tools & Plant 1% 0.46
Contractor's profit & Over heads 15% 6.89
TOTAL 53.77
Executive Engineer,
Vadodara Irrigation Division
Vadodara.
RATE ANALYSIS - YEAR : 2013-14
ITEM NO. C -14 (For canals having capacity beyond 8.5 cumecs)
Excavation for foundation in soft rock including depositing the excavated stuff as and where directed including
back filling the trenches with suitable excavated stuff etc. complete for lead upto 50 m and all lifts. ( By
Machinery )
Excluding dewatering.
93.06 Cum
Factors affecting the out put
1. Factor for depth
of cut and angle
of swing = 0.98 ( % of optimum depth = 100 )
optimum depth and swing factor
(swing=75) (C.W.C group report table G).
2. Operating factor
(Excellent) (tabl = 0.92
Cost of Transportation
Dumper carriage capacity 10 M.Ton.
Density = 2.1 m.ton / Cum
Body capacity = 10 = 4.76 Cum
2.1
CYCLE TIME
BODY CAPACITY
LOADING TIME = -----------------------------
EXCAVATOR OUTPUT
4.76 X 60.00
= --------------------------
49.08
= 5.82 MIN.
LOADED HAUL TIME 0.05 X 60.00
( SPEED = 30 KMPH ) = -------------------------------
30
= 0.10 MIN.
Transportation cost per Cum = Hourly use rate = 1070.00 = 41.79 Rs./hr. (B).
Out put 25.60
Total cost of excavation,
Loading, Unloading and
transportation.= (A) = 51.14 + 41.79 Rs. 92.93
Cost of dressing the section, breaking clods & spread @20% Rs. 0.00
in uniform layers @ 20 % of cost of excavation.
TOTAL 108.73
Executive Engineer,
Vadodara Irrigation Division
Vadodara.
RATE ANALYSIS - YEAR : 2013-14
ITEM-
C-15 Providing and fixing in position the name and number plate of white marble of 2.5 cm. thickness
size including engraving the letters and filling with lead etc.complete.(45x45) cm
Unit : No.
Rate for 1 No
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
marble plate 1 No. 1505.00 1505.00
cement LS 25.00 25.00
1530.00
(B) CARRIAGE:
marble plate 1 No. 0.00
0.00
(C) LABOUR :
59.97
Total ( A+ B + C ) 1589.97
Executive Engineer,
Vadodara Irrigation Division,
Vadodara.