1st Corrigenda & Addenda to PWD (WB), SOR: 2014 Volume III : Road & Bridge Works

1st. ADDENDA & CORRIGENDA


TO THEPWD (WB), SCHEDULE OF RATES - 2014
Volume III: Road & Bridge Works

A. CORRIGENDA OF SCHEDULE OF RATES – 2014

1. The FORMAT – A (Page 217 of SOR 2014) to evaluate Issue Rate and Cost at Site of bitumen /
CRMB / bituminous emulsion issued by the Department is replaced by the following :

FORMAT – A
Format for analysis of rates of Bitumen / Bitumen Emulsion / CRMB supplied by Department
Step - 1 Basic Cost of materials including all taxes at the nearest source of the manufacturer as per Table I – 2. ` (A)
Step – 2 Necessary cost for loading, unloading & stacking. ` (B)
Step – 3 Necessary carriage cost from source of the manufacturer to different departmental godowns. ` (C)
(Vide Appendix–I)
Step – 4 Add storage charge for storing the materials at departmental godowns / stackyard ( @ 1% of (A)) ` (D)
Departmental Issue Rate = (A) + (B) + (C) + (D) ` (E)
Step – 5 Add loading, unloading and carriage charges from departmental godowns / stackyards to the work site. ` (F)
Step – 6 Deduct cost of container (Vide Note I-3, Table I-2) ` (G)
(in case of packed bitumen, CRMB or bituminous emulsion is considered to be used)
Rate of Material at Site = (E) + (F) – (G) = ` (H)

Deduct Contractor’s Profit already included in the analysis of the rate of the item (A) X 1/10 = ` (I)
Rate of Bitumen to be added to the item rate (H) - (I) = ` (J)

Note : 1 Unchanged.
Note : 2 The Total marked J is the net cost of the bitumen to be added to the item concerned to arrive at the complete rate of the ite m.

2. The FORMAT – D Case-(I) & Case-(II) (Page 218 of SOR 2014) to evaluate Issue Rate and Cost
at Site of Cement issued by the Department is replaced by the following :
FORMAT – D
Format for analysis of rate of items involving use of cement supplied by Department.
CASE-( I ): For items , Where costs of cement is to be included in the item rate :-
Step – 1 Rate of item as per relevant section of this Schedule. ` (A)
Step – 2 Add : Cost of cement = (Quantity of cement) x (Issue rate of cement vide Item no. 1, column – 4, Table I ` (B)
– 1 of the Schedule of Rates, 2014.).
Note: The quantity of cement shall be as per Section – 3 of this schedule of rates.
Step – 3 Deduct Contractor’s Profit already included in the analysis of the rate of the item= (B) X 1/10 = `( C )
Final rate of item = (A) - (C) = (D)

CASE-( II ) : For items , where costs of cement is already included to the item rate to arrive at the complete cost::

Step - 1 Rate of item as per relevant section of this Schedule. ` (A)


Step -2 Deduct Contractor’s Profit included in the analysis of the rate of the item =Quantity of Cement (Issue Rate ` (B)
of cement) X 1/10 =
Complete rate of the item involving use of cement supplied by the department = (A) - (B) = ` (C)

1
Volume III : Road & Bridge Works 1st Corrigenda & Addenda to PWD (WB), SOR: 2014

3. The FORMAT – F (Page 219 of SOR 2014) to evaluate Issue Rate and Cost at Site of Steel issued by the
Department is replaced by the following : FORMAT – F
Format for analysis of rate of items involving use of Steel supplied by Department.
For items, where costs of steel is to be included in the item rate to arrive at the complete cost :

Step – 1 Rate of item as per relevant section of this Schedule. (A)


Step – 2 Add : Cost of Steel = (Quantity of Steel) x (Issue rate of Steel vide Item no. 2, column – 4, Table I (B)
– 1 of the Schedule of Rates, 2014.).
Step – 3 Add : Cost of carriage of from departmental go-down to the site of work including loading and (C)
unloading .
Step – 4 Deduct Contractor’s Profit already included in the analysis of the rate of the item = Quantity of
Steel x (Basic rate of Steel vide Item no. 2, column – 5, Table I – 1 ) X 1/10
(D)

Final rate of item = (A) + (B) + (C) - (D) = (E)

Following corrections to be made to the items as shown below :


Page No. Item / Sl. No. In place of To be read as
19 The rates of major construction materials used in the The rates of other construction materials used in the
of PREAMBLE items ……………………………………….. need not be items ……………………………………….. need not be
considered further. considered further.
18 2.2 GENERAL RULES FOR THE MEASUREMENT OF GENERAL RULES FOR THE MEASUREMENT OF
WORKS FOR PAYMENT(cl. 113 of MORT&H) WORKS FOR PAYMENT
208 3.1 Approximate requirement of different materials of Theoretical Consumption of different materials of
construction in the …........... for a greater variation. construction in the …........... for a greater variation.
209 Row 3, Col. 2 of
330.00 kg 280.00 kg
TABLE 3.2
215 TABLE I-1 Kolkata / Durgapur Siliguri Kolkata / Durgapur Siliguri
2 (v) (b) ` 46000.00 per MT ` 47000.00 per MT ` 47400.00 per MT ` 48400.00 per MT
216 7 ofTABLE I-2 ` 50336.00 per MT ` 53565.00 per MT
219 FORMAT E …necessaryloading - unloading and stacking from
(Step-3) …necessaryloading - unloading from nearest…….
nearest…….
222 Note: 1 The above rates are inclusive of all charges such as The above rates are inclusive of all charges such as
below TABLE III-1 Royalty, VAT, Supervision Charges, etc. and also Royalty, VAT, Supervision Charges, etc. and also
include allowance for sinkage and/or shrinkage and include allowance for sinkage and/or shrinkage but
10% contractor’s profit excluding contractor’s profit which have been duly
incorporated in the analysis of rate of the items.
225 1.03 (A) & (B)
Tonne Cum
[Unit]
229 Note: 4 For down-hill area above Hill Cart Road, Tiger Hill Deleted.
below TABLE 1 Road above Hill Cart Road and for hill roads leading
upwards from Teesta Valley Road, Pesoke Road,
lower Rishi Road and Relli Road, rate of items for
road transport carriage shall be enhanced by 50%
over the rates provided for Darjeeling Hill area.
235 Note at the Compensation for earth will vary from place to place The rate for compensation for earth for land owned
bottom of the andwill have to be assessed realistically as per / arranged by the contractor add ` 25.00 per m3
page particularground situation. The rate for
extra over rate of E/W for land owned / arranged by
compensation for earth isto be determined by the
Superintending Engineer of theconcerned Circle. the Department & for royalty charge on earth @ `
This is applicable for all items of Earthwork where 18.00/m3 as per Govt. notification which will be
land is to be owned and arranged byContractor. paid on production of necessary documents in
support of payment made towards the royalties.
During initial payment of bill, a deduction @ `
18.00/m3 may be made.
241 Note: 1 Do Do
243 4.08 (A) & (B) Add cost at site of 1.28 m³ of the stone materials as Add cost at site of 1.28 m³ of the materials as per
[ Note ] per specified grading to arrive at the complete rate. specified grading to arrive at the complete rate.

2
1st Corrigenda & Addenda to PWD (WB), SOR: 2014 Volume III : Road & Bridge Works

Page No. Item / Sl. No. In place of To be read as


258 6.02 Construction of un-reinforced, dowel jointed, plain Construction of un-reinforced, dowel jointed, plain
(Description of cement concrete pavement over a prepared sub base cement concrete pavement over a prepared sub base
items) with 43 grade cement @ 400 kg per cum, with 43 grade cement @ minimum 360 kg per cum,
……………………………………………… as per drawing and …………………………...... as per drawing and clause
clause 602 of Specifications for Road & Bridge Works 602 of Specifications for Road & Bridge Works of
of MoRT&H (5th Revision). MoRT&H (5th Revision).
[ Note ] Construction Wing will add the cost & carriage of 0.90 Construction Wing will add the cost & carriage of
cum/m³ crushed stone & Cement @ 400 kg/cum of crushed stone, cement, sand, plasticizer, silica fume,
concrete only to arrive at consolidated rate. fly-ash, etc. as per design requirement and should
specify the required flexural strength.
259 6.05 (1) ` 465.00 per sqm ` 489.00 per sqm ` 734.00 per sqm ` 758.00 per sqm
259 6.05 (2) ` 455.00 per sqm ` 473.00 per sqm ` 572.00 per sqm ` 590.00 per sqm
260 7.01 Construction of a narrow filter sub- surface drain Construction of a narrow filter sub- surface drain
(Description of consisting of porous or perforated pipe laid in narrow consisting of porous or perforated geotextilepipe
items) trench ……………………………………………… including of150 mm dia. Laid in narrow trench ……………………
excavation and backfilling. …………. Including excavation and backfilling.
261 7.04 d) I.
(Rate of All 33500 335.00
districts)
7.04 e) Earth fill with granular material which is to be retained Back fill with granular material which is to be retained
(Description of by the wall. Granular material will be as per by the wall. Granular material will be as per
items) …………………… of MoRT&H (5th Revision). …………………… of MoRT&H (5th Revision).
272 10.09 b) One brick-on-edge laid in herring bone pattern One brick-on-edge laid in herring bond pattern
(Description of (thickness 125 mm) (thickness 125 mm)
items)
273 10.14 (Description Maintenance of 200 metre km stone by way of refitting Maintenance of 200 metre km stone by way of refitting
of items) of tilted stones repairing with cement mortar, cleaning, of tilted stones repairing with cement mortar,
repairing and lettering ……………………………… for cleaning, repainting and lettering
Rural Roads of MORD. ……………………………… for Rural Roads of MORD.
274 11.02 Add cost and carriage of materials to get the TypeA: Add the cost of cement and coarse aggregates
[ Note ] finalconsolidated item rate. to get the complete rate.
Type B: Add the cost of required sand or moorum or
granular material as the case may be.
(Rate for All districts except (Rate for Darjeeling (Rate for All districts except (Rate for Darjeeling
Darjeeling Hill Area) Hill Area) Darjeeling Hill Area) Hill Area)
274 11.03 (A) 946.00 954.00 1080.00 1087.00
(B) 680.00 685.00 783.00 788.00
(C) 567.00 572.00 651.00 656.00
(D) 350.00 353.00 402.00 405.00
274 11.04 (A) 1153.00 1161.00 1326.00 1333.00
(B) 917.00 922.00 1064.00 1069.00
(C) 771.00 776.00 893.00 898.00
(D) 394.00 397.00 455.00 458.00
275 11.05 (A) 1951.00 2129.00 2218.00 2396.00
(B) 1397.00 1408.00 1603.00 1613.00
(C) 1168.00 1178.00 1335.00 1345.00
(D) 699.00 704.00 804.00 810.00
275 11.06 (A) 2365.00 2381.00 2710.00 2726.00
(B) 1871.00 1881.00 2165.00 2176.00
(C) 1575.00 1586.00 1819.00 1829.00
(D) 788.00 793.00 910.00 915.00
284 12.10 Example – Example –
I. A (vi) Say for 35m, rate will be = `107684/- per metre. Say for 35m, the rate will be ` 102256/- per metre for
[Remarks] All districts except Darjeeling Hill Area.
3
Volume III : Road & Bridge Works 1st Corrigenda & Addenda to PWD (WB), SOR: 2014

Page No. Item / Sl. No. In place of To be read as


(Rate for All districts except Darjeeling Hill Area) (Rate for All districts except Darjeeling Hill Area)
286 12.14 a) (i) 750 mm. diameter pile. ` 2549.00 per metre ` 2729.00 per metre
(ii)1000 mm. diameter pile.
(iii)1200 mm diameter pile. ` 3873.00 per metre (i) 750 mm. diameter pile. ` 2956.00 per metre
(ii) 800 mm. diameter pile.
` 4352.00 per metre (iii) 900 mm. diameter pile. ` 3540.00 per metre
(iv) 1000 mm. diameter pile. ` 4353.00 per metre
(v) 1200 mm diameter pile.
(vi) 1500 mm diameter pile. ` 5119.00 per metre
` 5637.00 per metre
b) (i) 750 mm. diameter pile. ` 1515.00 per metre ` 1417.00 per metre
(ii)1000 mm. diameter pile.
(iii)1200 mm diameter pile. ` 1878.00 per metre (i) 750 mm. diameter pile. ` 1467.00 per metre
(ii) 800 mm. diameter pile.
` 2213.00 per metre (iii) 900 mm. diameter pile. ` 1593.00 per metre
(iv) 1000 mm. diameter pile. ` 1758.00 per metre
(v) 1200 mm diameter pile.
(vi) 1500 mm diameter pile. ` 2073.00 per metre
` 2609.00 per metre
Note: 3 The cost of dismantling the length of the pile above The rate is inclusive of cost of concrete for the
Cut off level is to be added. length of pile above cut off level (dummy length)
and cost of dismantling the same.
303 15.09 Add cost & carriage of stone materials only to arrive Add cost & carriage of 1 cum of stone and 0.2 cum
[ Note ] at the consolidated rate. of stone spallsto arrive at the consolidated rate.
308 17.04 c)
metre each
[Unit]

B. ADDENDA OF SCHEDULE OF RATES - 2014


Section Item / Sl. No. Description
PREAMBLE 21 The rates finally arrived at after adding the cost of materials as stated to be added is complete rate including all
taxes and contractor’s profit but does not include Labour Welfare Cess.
Do 22 Construction Wing should add Labour Welfare Cess @ 1% against each operated items to derive the final cost in
terms of Clause 3 of Building & Other Construction Workers’ Welfare Cess Rules, 1998
General 2.2.4 Mode of Measurement
Specification The modes of measurements of Brick / Concrete (Plain or Reinforced) Works, Reinforcement, Plaster, Painting,
Metal, Chips, Boulders, Bats, Sand, Lime, Carried Earth etc. will be as per (C) Mode of Measurement under
General Specificationsvide Page B 38 of P W D Schedule (Volume I).
Basic Cost of Note The above rates are inclusive of all taxes but exclusive of Contractor’s Profit which has been duly included in the
Materials below TABLE I-1 analysis of rate of the concerned item involving Cement and Steel materials.
Do Note - I : 6 The above rates are exclusive of Contractor’s Profit. 10% Contractor’s Profit on cost of Bitumen has been duly
below TABLE I-2 incorporated in the analysis of rate of the concerned item.
Rate (`)
Section Item / Sl. No. Description Unit (All districts except (Darjeeling
Darjeeling Hill Area) Hill Area)
Basic Cost of 9 (New)
Laterite Boulder Cum 268.00 -
Materials of TABLEII-1
(Page - 221) 10(New)
Moorum Cum 123.00 -
of TABLE II-1
Chapter 3 3.11 & 314 For compensation for earth from land owned / arranged by
(Page - 237) (Remarks) the contractor add ` 25.00 per m3 extra over rate of E/W for
land owned / arranged by the Department & for royalty
charge on earth add`18.00/m3 as per Govt. notification - -
which will be paid on production of necessary documents in
support of payment made towards the royalties. During initial
payment of bill, a deduction @ ` 18.00/m3 may be made.
Chapter 12 12.22 Providing MS casing pipe around RCC cast-in-situ bored MT 25,956.00 -
(Page - 289) (New) piles of different diameters in position including cost of all
materials, fabrication, handling etc. complete as per
direction of Engineer-in-Charge.
Note: The rate provided is exclusive of cost of steel materials

4
1st Corrigenda & Addenda to PWD (WB), SOR: 2014 Volume III : Road & Bridge Works
.Construction wing should add cost of 1.02 MT (considering
2% wastage) of steel to arrive at the final consolidated rate.

Rate (`)
Section Item / Sl. No. Description Unit (All districts except (Darjeeling
Darjeeling Hill Area) Hill Area)
Chapter 12 12.23 Cost of boring using drilling mud to stabilized the bore and
(Page - 289) (New) flushing the bore of excess mud with fresh drilling fluid for
the portion of the pile above cutoff level and up to the level of
island for providing RCC cast in situ bored pile in position
including the cost of mobilization and hire charges of all
equipment necessary for boring.
(a) Using hydraulic piling rig with power unit and complete
accessories including cost of shifting of machinery from one
bore location to other, removal of excavated earth with all
lifts and lead up to 1 km by tipper trucks:
(i) 750 mm. diameter pile. metre 2549.00 -
(ii) 800 mm. diameter pile. metre 2737.00 -
(iii) 900 mm. diameter pile. metre 3217.00 -
(iv) 1000 mm. diameter pile. metre 3873.00 -
(v) 1200 mm diameter pile. metre 4352.00 -
(vi) 1500 mm diameter pile. metre 4439.00 -
(b) Using tripod, winches and other accessories including
shifting of all machinery from one bore location to another
and removal of excavated earth with all lifts and lead upto
150 m.
(i) 750 mm. diameter pile. metre 1080.00 -
(ii) 800 mm. diameter pile. metre 1084.00 -
(iii) 900 mm. diameter pile. metre 1108.00 -
(iv) 1000 mm. diameter pile. metre 1159.00 -
(v) 1200 mm diameter pile. metre 1210.00 -
(vi) 1500 mm diameter pile. metre 1261.00 -
Chapter 17 17.05 B. v) Collection of Undisturbed soil sample from the bore hole to
(Page - 310) be made by the concerned Division / Party at their cost.
(iv) 30.0m-40.0 m each 570.00 610.00
(v) 40.0m-50.0 m each 680.00 730.00

Superintending Engineer
Planning & Monitoring Circle, PWD &
Convenor, Combined Schedule
Committee of PWD.