HYDRAULIC PARTICULARS

1). CANAL 2). DRAINAGE


C.B.L. = 311.553 m Bed Slope 1 in
Q = 141.20 cumec Q
T.B.L = 318.053 m H.F.L. (Calculated)
Bed Width = 12.0 m Bed Level at centre
F.S.D. = 5.50 m Bed Level at U/S
F.B. = 1.0 m Bed Level at D/S
Lininig Thickness = 100 mm Impervious Floor Thickness
F.S.L. = 317.053 m Service Road Level
Velocity of flow = 1.300 m/s Inspection Path Level
Canal Side Slope = 2 H in 1 V

3). HFL CALCULATION (AREA SLOPE METHOD)

Distance Distance G.L. G.L. Difference Chainage = 30 m


U/S D/S U/S D/S Total Difference = 21.029 m
360 0 322.709 318.852 3.857 m Avg Diff. = 1.618 m
330 30 321.748 319.368 2.380 m Nalla Bed Slope = 1 in
300 60 321.534 319.458 2.076 m
270 90 321.611 319.300 2.311 m Assumed H.F.L = 320.150 m
240 120 321.672 319.850 1.822 m R = 0.920 m
210 150 321.407 319.176 2.231 m V = 1/n x R2/3 x s 1/2 for which n =
180 180 321.270 319.343 1.927 m V = 2.113 m/s
150 210 321.239 319.285 1.954 m Q = 146 cumec
120 240 320.709 319.081 1.628 m Hence assumed H.F.L. is Ok
90 270 319.968 319.279 0.689 m
60 300 319.147 319.237 -0.090 m
30 330 318.753 318.681 0.072 m
0 360 318.852 318.680 0.172 m
Total 21.029 m

HYDRAULIC DESIGN
1). DRAINAGE WATERWAY
Lacey's Regime Perimeter ( P ) = 4.83√Q = 58.161 m
Let us provide 3 compartments of 10 m clear width with 0.6 m thick partition walls
and 2 compartments of 5 m clear width with 0.40 m thick walls
Thickness of outer wall F = 0.5 m Thickness of outer wall L = 0.40 m
Total Waterway provided = 42.5 m 73 % of Lacey's water way
Thickness of trough = 0.5 m
Span of Trough = 16.25 m Free Board =
Class A Load (As per IS 7784-2-2 : 2000, Cl. No. 4.1.1)

P Q R S T

5m 5m 10m 10m

A B C D

2). AFFLUX AT H.F.L.


Contracted waterway = 40.0 m
Afflux may be claculated using Molesworth formula h = ( V 2 / 17.85 + 0.0152 ) ( ( A / a )2 - 1 )
V = Unobstructed velocity of water in drainage = 2.113 m/s Assumed Afflux
A = Unobstructed cross sectional area of drainage = 69.223 m2 Affluxed H.F.L.
a = obstructed sectional area = 57 m2 R.L. of bed at crossing
h = 0.126 m Depth of flood
Height of Parapet adopted = 2.028 m

3). CUTT - OFF AND IMPERVIOUS FLOOR


Depth of Sheet Pile shall be fixed from the consideration of a) Scour Depth, b) Exit Gradient
Scour Depth in Canal
Discharge at mid portion of canal = 1.300 x ( 5.50 x 12.0 )
Discharge Intensity = 85.80 / 12.0 = 7.150 cumec/m
Scour Depth R = 1.35 ( q2 / f )1/3 = 5.010 m Max Scour depth in canal below FSL = 1.27 R =
take f = 1.0 RL of deepest anticipated scour hole =

Scour Depth in Darinage


Discharge Intensity = 145.00 / 40.0 = 3.625 cumec/m
Scour Depth R = 1.35 ( q / f )
2 1/3
= 3.186 m Max Scour depth in canal below HFL = 1.5 R =
take f = 1.0 RL of deepest anticipated scour hole =
Assume depth of foundation of piers = 306 m

Depth of Sheet Piles


Provide d = 6.5 m deep sheet pile below canal bed.
Exit Gradient GE = H / d x 1 / π x 1 / √λ H = Affluxed H.F.L. - Bed Level of Canal =
Assuming safe exit gradient of 1 / 5 We get λ = 4.571 but, λ = 1 + √(1 + α2) / 2
Therefore α = 8.080 but, α = b/d

Hence an impervious floor of length 52 m in river bed with 6.5 m deep sheet pile should be provided.
= 765
= 145.00 cumec
= 320.150 m
= 318.852 m
= 318.873 m
= 318.831 m
= 100 mm
= 318.053 m
= 318.053 m

No. of offsets = 13

223

A = 69.223 m2
P = 75.269 m
0.03
Less than 3m/s, Hence Safe
> 145 cumec
sumed H.F.L. is Ok

m thick partition walls


m thick walls

600 mm
7784-2-2 : 2000, Cl. No. 4.1.1)

10m

E F

= 0.13 m
= 320.280 m
d at crossing = 318.852 m
= 1.428 m

= 85.8 cumec

canal below FSL = 1.27 R = 6.363 m


pated scour hole = 317.053 - 6.363
= 310.690 m

canal below HFL = 1.5 R = 4.779 m


pated scour hole = 320.280 - 4.779
= 315.501 m

8.727 m
λ = 1 + √(1 + α2) / 2
or b = 52.519 m
say = 52 m
heet pile should be provided.