Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Annexure III

PRODUCTION CAPACITY CERTIFICATE


(To be issued by DIC/MSME/RITES)

1 Name of the unit M/s

2 Factory address

3 Item manufactured

4 No. of working shift on the date of


issue of certificate
5 Production / manufacturing Item Qty.
Capacity as per the machinery
installed p.m.
6 Present Utilization of total Item Qty.
production / manufacturing
capacity by unit p.m.
7 Whether coal is used in the Yes / No
manufacturing process?

8 If coal is used in manufacturing


process specify whether it is used
as raw material or fuel?
9 Consumption of coal by unit per
month in M/T for the production
capacity mentioned at Sr.No.6

Date:

Place:

SEAL & SIGNATURE

You might also like