Inspection Item POSITION & ELEVATION INSPECTION REPORT Area / Unit BYPASS STACK- DIVERTER DAMPER #31
E E
=
6
1
4
.
A 8
0
0
N = 398.826
F
G
SIDE VIEW
A
H
D B
C
Tolerance : ±
DIMENSION ELEVATION
Check
Check Point DESIGN ACTUAL DEVIATION REMARK DESIGN ACTUAL DEVIATION
Point
A N.398.826 N.398.823 -3 1 GL.+3800 3790 -10
B N.398.826 N.398.824 0 2 GL.+3800 3811 +11
C N.398.826 N.398.823 +2
D N.398.826 N.398.824 -2
E E.614.800 E.614.808 +8
F E.614.800 E.614.798 -2
G E.614.800 E.614.799 -1
H Ø6050 Ø6054 +4 PCD
I Ø6050 Ø6030 -20 PCD
Result : ACCEPTED REJECTED
Comment :
N = 398.826
ELEVATION
Tolerance : ± 3 mm
ELEVATION
DEVIATION REMARK
-10
+11
Owner
GRATI CCPP (PEAKER) EXTENSION PROJECT 450MW
ELEVATION INSPECTION REPORT
Inspection Item ELEVATION INSPECTION REPORT Area / Unit BYPASS STACK- DIVERTER DAMPER #32
E D C
N F B
G A
N
H
M I
L K J
EL.
Tolerance : ± mm
A 9100 9099 -1
B 9100 9097 -3
C 9100 9094 -6
D 9100 9098 -2
E 9100 9097 -3
F 9100 9096 -4
G 9100 9094 -6
H 9100 9099 -1
I 9100 9108 8
J 9100 9105 5
K 9100 9103 3
L 9100 9098 -2
M 9100 9096 -4
N 9100 9094 -6
22 - 08 - 2017
Tolerance : ± mm
REMARK
Owner