Petron Refinery Master Plan 2

(RMP-2) Project
Field Inspection Report
Plate Load Test
REPORT No. RMP2-R-FIR-CI-SB- Date: Dec. 29, 2012
LINE or ITEM No:
AREA / LOCATION : LPGT-3 / PNU
REF. DOCUMENT:

INSPECTION DESCRIPTION: Conducting Plate Load Test @ LPGT-3 / PNU prior to heavy lifting.

SPG
NO. DESCRIPTION Subcon DPI Remarks
ACCEPT REJECT
Survey / Location
1
Backfill / Materials
2
Compaction (FDT)
3
Equipments
4
Accessories
5
Test
6
Others
7

Remarks:

SIGNED: NAME: DATE:


Sub-contractor

SIGNED: NAME: DATE:


DPI

SIGNED: NAME: DATE:


SPG