Petron Refinery Master Plan 2 (RMP-2) Project: Field Inspection Report
Petron Refinery Master Plan 2 (RMP-2) Project: Field Inspection Report
(RMP-2) Project
Field Inspection Report
Plate Load Test
REPORT No. RMP2-R-FIR-CI-SB- Date: Dec. 29, 2012
LINE or ITEM No:
AREA / LOCATION : LPGT-3 / PNU
REF. DOCUMENT:
INSPECTION DESCRIPTION: Conducting Plate Load Test @ LPGT-3 / PNU prior to heavy lifting.
SPG
NO. DESCRIPTION Subcon DPI Remarks
ACCEPT REJECT
Survey / Location
1
Backfill / Materials
2
Compaction (FDT)
3
Equipments
4
Accessories
5
Test
6
Others
7
Remarks: