Sl. No Description Target Date

1 Rubber bellow is not available at site for UAT#2B.

Generator bus-ducts high temperatures issue still not resolved for Unit-1. Suitable modifications to
be done by M/s. BHEL to reduce the temperatures. Prior action may be taken for Unit-2 generator
2 bus ducts to avoid the reoccurrence of the same issue.

3 Deployment of necessary manpower for completion of unit-1 & unit-2 activities

4 DP test for Unit-2 IPBD bus duct enclosure

5 3.3kV SPBD bus-duct terminations, Space heater wiring pertaining to Unit II

6 Air leakages in Unit-1 IPBD from inspection covers, welding joints and in seal off bushings
Completion of pending works in AHP, CHP, Unit-1 IPBD, Unit 1 SPBD, Unit 2 SPBD (recorded in a
7 joint inspection report and was submitted vide mail dated 13.02.2018)

8 Commissioing of Space heater wiring for Unit -1 bus ducts