Civil Aviation Authority of Bangladesh: (Renewal)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

C.A.

22
CIVIL AVIATION AUTHORITY OF BANGLADESH
INSTRUMENT RATING FLIGHT TEST
(RENEWAL)

Candidate’s Name (in full): ……………………………………………………….……………………..…………….…


Type of License held:……………………No:……………....…………Valid to:…………..……………......…………..
Aircraft Type:……..…………….…………..Registration:…………….……………..….………………………………
Test conducted from (base)………………………………….Date:……………………..…..…..…..……………………
Radio Aids Selected by candidate:………………………………………….………………..…………………………...
Time of take off:……….….Landed……………….……….Duration…………………...HRS…..……………………..
Organization employee pilot:………………………………………………………………..………………………….....

Note: The examination will be conducted under actual or simulated instrument condition on an
IFR Flight Plane:

Test Date of Examiner Pass or Aircraft Airfield from which


By conducted Fail Type Reg. or into which test
Parts conducted

PART 1 PRE-FLIGHT GRADE REMARKS


1. External Checks... P
2. Instruments Checks… P
3. Radio Checks... P
4. Instrument Checks whilst taxying…. P
P
5. Take off checks ( c )…
P
6. Maintaining Direction… P
7. Unstick and initial climb… P
8. After take off checks ( c )… P
9. Transition to “clean” climb… P
10. Climbing at Roc: Power and speed… P
11. Conforming to clearance: Tracks… P
12. Conforming to clearance: Heights… P
13. Liaison with A.T.C… P
PART 2 ASSYMMETRIC POWER
1. Action after engine cut at max. Climb Critical speed/ Yaw N/A
Control Airspeed Trimming and Ancillaries.
2. Straight & level at rec. S.E. speed…
3. Rate one turns L & R on to given heading…
4. Straight descent…
5. Desc. Turn L & R on to given heading given rates…
6. Straight climb…
PART 3 AIRWAYS PROCEDURE & I.L.S.
1. Identification of Facilities… P
2. Track Interception… P
3. Track Interception… P
4. Check of Heading Indicator… P
5. Racetract Holding pattern… P
6. Altimeter setting… P
7. Conforming to clearance : Tracks… P
8. Conforming to clearance : Heights… P
9. Liaison with ATC (inc. ETA’s)… P
10. Approach checks ( c)… P
11. Intermediate Procedure… P
12. Landing checks ( c )… P
13. Turn on to final… P
14. Final Alignment P
15. Final descent to critical height… P
16. Basic I/F… P
PART 4 OVERSHOOT PROCEDURE
1. Power adjustment… P
2. Initial climb… P
3. Overshoot checks ( c )… P
4. Transition to “clean” climb… P
5. Climbing at Rac: Power and speed… P
6. Conforming to clearance : Tracks… P
7. Conforming to clearance : Heights… P
8. Liaison with ATC P

WEATHER CONDITIONS – Turbulence Factor: NIL/Slight/Moderate/Server.

ROUTE & AIRFIELD : ____________________________________

RESULT:_________ DATE RENEWAL TEST COMPLETED ________________________

INSTRUMENT RATING RENEWED AND SIGNED

NOT AVAILABLE ELIGIBLE


FOR SIGNATURE*

CANDIDATE ADVISED INSTRUMENT


FLYING PRIVILEGE SUSPENDED*
REMARKS & RECOMMENDATIONS.
It is recommended that before applying for retest the candidate undergoes at least:

Examiner’s signature____________________________ Date______________ ________

( c ) Check list to be used

*Delete as applicable
Instrument Rating certificate on lincence to be signed only if Instrument Rating.
Renewal Test is passed within 18 months of the date of the previous Instrument
Rating endorsement.

You might also like