Estimation Homeloan
Estimation Homeloan
m m m Cum
1 Earthwork in excavation
1
Sl.no Particulars No L B H Quantity
m m m m Cum
Deduction
2
Total 44.13 Cum
A2=61.20+2.31=67.80Sqm
Q=67.80x0.10=6.78 Cum
Total 6.78Cum
7 Steel-reinforcement Q=(1.5/100)x9.14x7850=1076.70kg=1.0767MT
(Assuming=1.5%)
RCC Volume=9.144cm
Density of steel=7850kg/cm
Q=1.0767MT
3
8 Cement plastering in C:M
1:6
4
Deduction for opening
D 7 0.9 2.1 - 13.23
D1 3 0.75 2.0 - 4.50
- 7.2
W 6 1.0 1.2
-
V 3 0.9 0.6 1.62
-
W1 2 0.8 1.2 - 1.92
Total -7.26Sqm
Total 170.10Sqm
Deduction
D (External) 0.5x2 0.9
2.10 1.89
D 5 0.9 9.45
2.10
D1 3 0.75 4.50
W 2.0
0.5x6 1.0 3.60
W1 1.20 0.96
0.5x2 0.8
V 0.60 0.81
0.5x3 0.9
Total 272.63Sqm
5
11 Enamel painting
W 6 x 1 x 2 x 1 x 1.2 = 14.40Sqm
Total 67.58Sqm
12 Mosaic flooring
Total 43.64Sqm
6
Abstraction of Cost:
3 Size stone masonry in C.M 1:6 30.80 Cum 3678.41 Cum 113296.02
Total= 485,180.40
Approx~ 500,000.00
Prepared by
Mr.KhiyalnessKharbani
7
B.E Civil Engineering