WORK INSTRUCTION FOR

FINAL INSPECTION

DOC. NO. : -WI-05 ISSUE NO. : 01 REV. NO. : 00 ISSUE DATE 20.03.2014

S.NO INSTRUCTIONS

Measure the finished product as per the specifications and drawings and
1.
record the result in the Inspection Report

2. Check the surface for its smoothness and finish and approve if it is OK

If there is any deviation in the size, smoothness, finish etc. it should be


3.
considered as Rework or Reject and properly identified with tag/label

4. All rework and reject items should be kept separately in a quarantine area

5. Rework and reject quantities are recorded in the Rejection/Rework Record

6.

7.

8.

9.

10.

Prepared by Reviewed by Approved by :

Production Engineer Factory Manager General Manager