Poverty Eradication Guidelines
Poverty Eradication Guidelines
Poverty Eradication Guidelines
Poverty Eradication
Guidelines
Implementation of Packages
2012
Contacts:
Office of the President: 3950805
Ministry of Agriculture: 3689339
Ministry of Labour and Home Affairs: 3912290
Ministry of Local Government: 3971916
Copyright, Government of Botswana Poverty Eradication Guidelines Ist Issue 2012
Foreword
I t is now 45 years since Botswana
attained independence. At the time of
Independence, Botswana was classified
as one of the ten poorest countries in the
world, and is now classified as one of the
middle income countries. We have also
over the years managed to reduce the
level of poverty in the country. Statistics
show that people in the country living
below the poverty datum line have
reduced from 59 percent in 1985/86
to 30 percent in 2002/03. Based on
the statistics of 2010/11 statistics, 20.7
percent of people are living below the
poverty datum line.
Owing to the dynamic environment and the underlying principle of continuous improvement
within which the Poverty Eradication Progamme operates, I expect these guidelines to be
updated every two years.
i
Governance of the Poverty Eradication
Programme
The head of the Poverty Eradication Programme is His Honour the Vice
President, Lt. Gen. M.S. Merafhe, assisted by myself, the Honorable Minister for
Presidential Affairs and Public Administration. We report to His Excellency the
President every two months on progress during the Special Cabinet Meetings.
I also chair the Poverty Eradication Cabinet Subcommittee which meets ones
a month and is comprised of the following: Assistant Minister of Finance
and Development Planning, Hon. G. Somolekae, Assistant Minister of Local
Government, Hon. B. Tshireletso; Assistant Minister of Trade and Industry,
Honourable V.T. Seretse; Assistant Minister of Education, Honourable K.
Rakhudu; and Assistant Minister of Agriculture, Honourable O. Molebatsi.
The Department of Social Services through its social workers is the key access
point to all those who seek information about the programme or are interested in
any of the poverty eradication projects.
As His Honour the Vice President and I always say, our doors are open to
anyone who wants to positively contribute to the eradication of poverty. Poverty
eradication is a challenge we can conquer if we are united in effort as Botswana
and our development partners.
ii
Table Of Contents
1. BACKGROUND 6
3. EXPECTED OUTCOMES 7
5. ELIGIBILITY CRITERIA 8
6. SKILLS TRANSFER 9
7. PROGRAMME IMPLEMENTATION 9
11. ANNEXURES 12
1
Acronyms and Abbreviations
MOESD - Ministry of Education and Skills Development
MLG - Ministry of Local Government
MLHA - Ministry of Labour and Home Affairs
MoA - Ministry of Agriculture
MEWT - Ministry of Environment, Wildlife and Tourism
MTI: Ministry of Trade & Industry: DIA - Department of Industrial Affairs
DTCA - Department of Trade & Consumer
Affairs
DoCD - Department of Cooperative
Development
DETs - District Extension Teams,
CBOs - Community Based Organizations
NGOs - Non Government Organizations
FBOs - Faith Based Organizations
MOA - Memorandum of Agreement
BOBS - Botswana Bureau of Standards
RADP - Remote Area Development Programme
BNYC - Botswana National Youth Council
DPEC - District Poverty Eradication Committee
LEA - Local Enterprise Authority.
CEDA - Citizen Entrepreneurial Development Agency
LIMID - Livestock Management and Infrastructure Development
OP - Office of the President
WAD - Women's Affairs Department
DET - District Extension Team
DSS - Department of Social services
M&E - Monitoring and Evaluation
S&CD - Social and Community Development
SSN - Social Safety Net
VDC - Village Development Committee
2
LEGAL FRAMEWORK GUIDING THE POVERTY
ERADICATION INITIATIVE
The Poverty Eradication Initiative operates within an environment where there are
legal instruments, acts and policies implemented as a matter of control of various small
businesses. The expectation is that businesses set up under the Poverty Eradication
Programme operate within the current legal framework. Table 1 outlines policies, Acts
and guidelines that have informed the preparation of these guidelines. The list is not
exhaustive.
3
8. Building Control Act 1962 MLH, MLG and Physical Planners in
Local Authorities councils and land
boards
9. Early Childhood Care and MOE&SD, Social Workers, Home
Education Policy - 2001 MLG and Local Economics Officers
Authorities and Community
Development Officers
4
Policy/Act/Guideline Implemented By Responsible Officers
21. Legislation on Pre- MoH Public Health Officers
packaging of Food, 2002
22. Forest Policy, 2011 MEWT Department of Forestry
and Range Resources
23. Forest Act, 1968 MEWT Department of Forestry
and Range Resources
24. Tourism Act, 1992 MEWT Department of Tourism
Department of Forestry
25. Agricultural Resources and Range Resources;
MEWT
Conservation Act, 1974 National Conservation
Committee
26. Herbage Preservation Department of Forestry
MEWT
Act, 1978 and Range Resources
27. National Policy on
Vocational Education and BOTA Training Institutions
Training, 1997
28. Vocational Training Act,
BOTA Training Institutions
1998
29. Revised National Food MFDP, MoA Food Security Officers
Strategy, 2000
30. BOBS Standards (relevant Botswana Bureau of Relevant Sectors
standards) Standards (BOBS)
31. Gaborone City Council Councils Enforcement Officers
General Bye-Laws, 1966
5
1.0 BACKGROUND
Botswana was classified as one of the ten poorest countries at the time of
independence in 1966 and currently it is classified as a middle income country.
Though Botswana has achieved such economic growth, the country still faces socio
economic challenges such as poverty. The spread of poverty is geographical with
some areas heavily affected than others. Botswana has introduced several initiatives
to combat poverty and these include programs for orphans and destitute persons,
subsidized Self Help Housing Agency (SHHA) and agricultural schemes. Despite
these efforts, results from the Botswana Core Welfare Indicator Survey (BCWIS)
2009/10, reveal that the poverty headcount rate stands at 20.7%, which is
relatively high for a middle income country.
6
3.0 EXPECTED OUTCOMES
The expected outcomes of the programme will be as follows:
• Economically empowered individuals and families
• Enhanced self-esteem amongst beneficiaries
• Prosperous , productive and innovative individuals
Table 2
Food items Non Food Items
Jam Kiosk
Pickles Home Based Laundry
Food catering Leather Works
Food Packaging Textiles
Backyard garden Tent Hire
Bakery Landscaping
Small Stock Hair Salon
Poultry Backyard Tree Nursery
Bee Keeping Upholstery
Handy Crafts( basketry , wood carving, pottery )
Arts, Craft and Traditional Songs
The list is non-exhaustive and will be updated as and when packages have
been appraised and approved. It must also be noted that beneficiaries will not
be allowed to engage in businesses that are deemed illegal and hazardous to
human life and the environment.
7
4.2 Financial Models
Financial models have been prepared for each package. The models have been
validated based on worst case scenario business environments and as such, actual
performances can surpass the projections. It is also true that if there is extreme
negligence in managing the operations, the business may collapse. It is expected
that the beneficiaries will use the grant to start their entrepreneurial journey and
grow their business through the years.
8
6.0 SKILLS TRANSFER
Beneficiaries shall be trained in
all aspects relating to their project
components. Additional aspects of
training will be outsourced to relevant
stakeholders. The training will also
include life skills so that beneficiaries
develop into more competitive
entrepreneurs.
Local Contact Point for the Programme: The Social and Community Development
Offices (Social Workers and Community Development Officers) will serve as the
main contact points.
9
8.0 Issues for Consideration
in Implementing the Poverty
Eradication Packages
8.1 Community Mobilisation
The concept of community mobilization involves public education about the
program, identification of projects and their goals, and activities to be undertaken.
This will involve facilitating the efforts of individual beneficiaries, and groups to
appreciate the importance of the program and participate in all decision-making
processes. This process will enhance ownership of the end product.
There will be need to involve community leaders (e.g. District Extension Teams,
Member of Parliament, Kgosi, Councilor and Village Development Committees,
Ward Development Committees, Village Health Committees, Village Youth
Committees, Village Farmers Committees, Faith Based Committees, Village
Extension Teams, etc.) who can assist in realising the desired change. Individual
and group counseling needs to be an integral part of this phase.
8.4 Training
The beneficiaries will be trained in entrepreneurial skills on the project they have
chosen. The professionals therefore, have to identify training needs and design
relevant training. The trainers will use multi disciplinary approaches in designing
training programs and are expected to coordinate their activities for effective
service delivery.
10
8.6 Resource Mobilisation
This part sensitises implementers and beneficiaries that resources have to be
mobilized and these include land, finances, transport machinery and human
resources. Implementers should work within the recommended budget line for the
project. As much as possible, it is critical to use locally available raw materials.
8.7 Marketing
Beneficiaries will be expected to market their products within their local communities.
Available possible avenues include among others, door to door, market days,
Women’s Expo, shows, exhibitions.
8.8 Gender
Gender considerations are an integral
part of any programme. These would
include taking into account the needs of a
multiplicity of vulnerable groups.
Providing sustainable and formal employment for PWDs through PEP initiatives will
in turn allow them a degree of independence, financial security and bring them
closer to mainstream into society. It is therefore incumbent upon the Government to
take affirmative action for PWDs to ensure that they are included in any programme
designed to elevate the status and well-being of the disadvantaged in the community
and by doing so, raise them from a position of government-dependency to that of
financial independence, self-reliance and dignity.
8.11 Confidentiality
Issues discussed between the beneficiary and the
appraisers should remain confidential.
11
9.0 MONITORING AND EVALUATION
District Extension Teams will monitor projects on a continuous basis and report to the
relevant structures. A standard monitoring tool will be used. The Village Extension
Team will form part of the monitoring team and give feedback to the relevant
structures on a monthly basis. Such an arrangement is crucial to ensure individual
household performance tracking.
ANNEXURES:
A1: Kiosk
Financial Plan
Item QUANTITY Unit Cost (P) Total Cost
Assumptions
12
Projections (P)
Year 1 Year 2 Year 3
Turnover 81 000.00 89 100.00 98 010.00
Cost of Goods Sold 52 650.00 57 915.00 63 707.00
Gross Profit 28 350.00 31 185.00 34 303.00
Bank Charges 240.00 264.00 290.00
Transport Charges 1 800.00 1 980.00 2 178.00
Rent - - -
Wages 6 000.00 6 600.00 7 260.00
Net Profit 20 550.00 22 605.00 24 865.00
Key Assumptions:
It is assumed that the laundry will be dealing mainly with washing and ironing
garments.
Item Monthly demand Pricing (P) Total Monthly turnover
Basket 40 75.00 3000.00
Blankets 10 60.00 600.00
Ironing 50 items 5.00/ item 250.00
TOTAL 3850.00
Cost of Goods
Water P 200.00
Detergents P 600.00
Total P800.00
13
Profit and Loss Projections
Year 1 Year 2 Year 3
Turnover 46 200 50 820 66 902
Cost of Goods Sold 9 600 10 560 11 616
Gross Profit 36 600 40 260 44 286
Fuel 6000 6600 7260
Wages 12 000 13200 14520
Total expenses 18 000 19 800 21 780
Net Profit 18 600 20 460 22 506
Key Assumption
14
Cost of Goods Sold
15
A4. JAM AND VEGETABLE PICKLES
Financial Plan
Item Cost (P)
Burner gas Rim Stove 1,500. 00
2x48kg gas cylinders 1,560.00
Retail scale (15 Kg) 2,000.00
Stainless steel table 2,500.00
2 x 30L Stainless steel pots 3,700.00
Assorted utensils 2,500.00
Working capital (Stock) 15,000.00
Contingencies 5% 1,288.00
TOTAL 30,198.00
Key Assumptions
Monthly demand Pricing (P)
Assorted jams 500 3.50
Vegetable Atchar 600 10.00
Pickled beetroots 300 3.00
Tomato purée 500 10.00
Sales
Item Sales per month (P)
Assorted jams 500x P3.50=P1,700.00
Vegetable atchar 600 x P10.00=P6,000.00
Pickled beetroots 300 x P10.00=P900.00
Tomato purée 500x P2.50= P5,000.00
Total P13,650.00
Annual turnover=P163, 800.00
16
Cost of Goods Sold
The monthly input costs
Ingredient Quantity Price (P)
Melons and Fruits 100 kg 600.00
Sugar 50 kg 1000.00
Vegetables 200 kg 3166.00
Vegetable oil 20L 335.00
Various additives - 200.00
P5301.00 per month
Financial Plan
Item Cost (P)
2 Burner gas boiling table 1,500. 00
2x48kg gas cylinders 1,560.00
Retail scale (15 Kg) 2,000.00
Stainless steel table 2,500.00
2 x 30L Stainless steel pots 3,700.00
Assorted utensils 2,500.00
Working capital 15,000.00
Contingencies 5% 1,288.00
TOTAL 30,198.00
Key Assumptions
Monthly demand Pricing (P)
Assorted jams 500 3.50
Vegetable Atchar 600 10.00
Pickled beetroots 300 3.00
Tomato purée 500 10.00
17
Profit and Loss Account
Projections (P)
Year 1 Year 2 Year 3
Turnover 163 800.00 180 180.00 198198.00
Costof Goods Sold 63 612.00 69 973.20 76 970.52
Gross Profit 100 188.00 110 206.80 121 227.48
Bank Charges 240.00 264.00 290.00
Transport Charges 3 600.00 960.00 4 356.00
Wages 18 000.00 19 800.00 21 780.00
Total charges 21840.00 24 024.00 26 426.00
Net Profit 78 588.00 86 446.80 95 091.48
18
A6. BAKERY
Financial Plan
Item Cost (P)
4 Burner Gas stove 1,400. 00
2x48kg gas cylinders 1,560.00
Confectionery fridge (small) 1,500 .00
Dumping table (small) 750,00
Bakery Scale 500.00
Assorted baking pans 2,000.00
Working capital 12,000.00
Contingencies 5% 985.50
TOTAL 20,695.50
The main sources of the raw materials are local wholesalers and supermarkets.
Key Assumptions
Monthly demand Pricing (P)
Diphaphatha 700 2.50
Mapakiwa 500 2.50
Fat cakes 1500 2.50
Queen cakes 450
Cake 4 25.00
Sales
Item Sales per month (P)
Fat cakes 1500x P2.00 = P3, 000.00
Phaphatha 700 x P2.50 = P1, 750.00
Buns 500 x P2.50 = P1, 250.00
Queen cakes 450x P2.50 = P1,125.00
Cakes 4 x P25.00=P100.00
Total P7, 225.00
19
Cost of goods sold
Projections (P)
Year 1 Year 2 Year 3
Turnover 86 700.00 95 370.00 104 907.00
Cost of Goods Sold 11 748.00 12 923.00 14 215.00
Gross Profit 74 952.00 82 447.00 90 692.00
Bank Charges 240.00 264.00 290.00
Transport Charges 3 600.00 3 960.00 4 356.00
Wages 18 000.00 19 800.00 21 780.00
Total Expenses 21 840.00 24 024.00 26 426.00
Net Profit 53 352.00 58 687.00 6 756.00
20
A7: TEXTILES
Financial plan
Item Cost (P)
Domestic overlocker 1,800.00
1 straight machine 3,000.00
Zig zag domestic machine 1,200.00
Cutting table, 4 chairs 1,100.00
Industrial ironing board 150.00
Generator (5KVA) 6,000.00
Accessories 1,000.00
Sewing material 10,000.00
Working capital 5,000.00
Contingencies 5% 1,462.50
TOTAL 30,712.50
Sales
Item Quantity per month Turnover (P)
Alterations 50 850.00
German print 3 1,200.00
Uniform 6 different sizes 900,00
Pillows 10 350.00
Curtains 5 750.00
Patched throws 8 600.00
Total 4,650.00
Annual turnover = P55, 800
Projections(P)
Year 1 Year 2 Year 3
Turnover 55 800.00 61 380.00 67 518.00
Cost of Goods Sold 11 748.00 12 923.00 14 215.00
Gross Profit 44 052.00 48 457.00 53 303.00
Bank Charges 180.00 198.00 218.00
Transport Charges 1 236.00 1 360.00 1 496.00
Wages 7 200.00 7 920.00 8 712.00
Total expenses 8 616.00 9 478.00 10 426.00
Net Profit 35 436.00 38 979.00 42 877.00
21
A8: FOOD CATERING
Financial Plan
Item Cost (P)
Three burner industrial gas stove x 2 2,900.00
Food warmers x 4 1,556.00
Pots 380.00
Catering tables x 2 2,200.00
48kg gas cylinders x 2 1,560.00
Serving spoons x 6 100.00
Disposable dishes 250.00
Deep frying pan 178.00
Bowls x 4 160.00
Cutlery 120.00
Groceries 3,000.00
Plastic serving tables x 4 + chairs 1,390.00
Shade 600.00
Contingency @ 5% 720.00
TOTAL 15,113.00
Key Assumptions
We assume that the food vendor will be supported by at least 20 customers
depending on the location of the business. Meals are charged between P16 to
P19 per plate. We assume that on average the promoter will be able to serve at
least 20 customers per day.
22
A9: TENT HIRE
Financial Plan
Item Cost (P)
2 x Tents @ 7,500 each 15,000.00
Tables x 6 1,800.00
Chairs x 50 2,250.00
Overlays 1, 500.00
Seat covers 2,250.00
Cutlery 1,500.00
Plates x 100 500.00
Glasses x 100 250.00
Flowers 780.00
Vase x 6 210.00
Contingency @ 5% 260.40
TOTAL 26,300.00
Year 1 Year 2 Year 3
Turnover 50000 55000 60500
Cost of Goods Sold 3600 3960 4356
Gross Profit 46400 51040 56144
Operational Expenses
Transport Charges 8400 9240 10164
Fuel 2100 2100 2100
Wages 18000 19800 21780
Total expenses 28500 31140 34044
Net Profit 17900 19900 22100
The Table above is constructed under worst case scenario whereby the tent is hired
only six times in a year.
Key Assumptions
Hiring of the above mentioned items is not done on a daily basis as the business
caters for special events such as weddings, parties and funerals sometimes. In
a month the items will be hired 4 times, during weekends. These are taken as a
package.
Turnover
Since small tents will be used, the package will be P8, 500 per session.
Monthly income = P8, 500 x 4 = P34, 000 (possible during peak months only)
Annual turnover = P204, 000 (normal trading)
Costs
Costs here will involve transportation of the goods and labour.
23
A10: LANDSCAPING
Financial Plan
Garden tools (wheel barrow, horse pipe, rake, scissors, spade, digging fork,
watering can, Lawn mower)
Item Cost
Garden Tools P1 000.00
Lawn mower P3 000.00
Working Capital
Seeds/seedling, P900.00
Stones, Soil, Manure,
Transport P2 300.00
Contingency 5% P 360.00
TOTAL COST P7560.00
Key Assumptions
We assume that the landscape will do 11 jobs per month,
1 major landscaping job at P3 500.00 per project, and 10 maintenance projects
at P300.00 per project.
Sales Assumptions
Job Quantity Cost
Landscaping development 1 P3500.00
Maintenance 10 P 3000.00
Total Cost P6500.00
Landscaping: Transport
soil,
stones, P200.00
manure,
P300.00
seedlings/seeds,
P200.00
Maintenance - transport P300.00
Total P1000.00
24
Operational expenses
25
A11.00 BACKYARD TREE NURSERY
Financial plan
Item Cost (P)
Shade net 60% (10 x 5 x3 x2 m) 5000.00
Treated gum poles 1830.00
U-nails 100.00
Cement 140.00
Various nursery tools 874.00
Twin roll 30,00
Nursery inputs 3600.00
Water connection 1000.00
Water tank 600.00
Sub total 13 468.00
Contingencies 10 % 1346.80
Grand total 14 814.80
Sales Assumptions
Item Sales per month (P)
Assorted tree seedlings 500 x P25.00 = P12 500.00
Potted plants for hiring 3 x P200.00 = P600.00
Total P13 100.00
26
11.5 Costs of goods sold per month
Seeds/seedling P500.00
Polythene bags/flower pots P500.00
Pesticides P300.00
Total P1300.00
27
A12.00 HAIR SALON
12.1 Financial plan
Item Cost
Hair Relaxers P100
Dryers P150
Steamers P1500
Mirrors P300
Tint P50
Braids P10
Combs P10
Water bill P100
Electricity bill P150
Shampoo P50
TOTAL P9 300.00
The services provided will be mainly confined to hair plating and hair cuts
12.4 Sales
Items Sales per month Total
Singles (plaiting) 10xP150 1500
Carrot 12xP70 840
French 15xP21 315
Re-touch 15xP50 750
Shampooing 15xP20 300
Haircut 20xP20 400
Total 4105
28
Annual Turnover P49 260.00
12.5 Cost of goods sold
Item Quantity Unit Price (p) Total
Hair relaxer 5 100 500
tint 5 20 250
Braids 10 100 1000
Shampoos 5 50 250
Total 2000.00
29
A14 BACKYARD GARDENING
Table1: Budget for Vegetables enterprise (with drip irrigation system) for the
general Population
Unit Total
Item Quantity
Price (BWP) Cost(BWP)
Capital items
Plot 1 Part Nil
Shade net 1 2000.00 2000.00
Water tank (5000L) 1 3470.00 3470.00
Tank stand 1 500.00 500.00
Family drip 1 670.00 670.00
gutter 3 (3.6x100x75) 62.00 186.00
outlet 1 30.00 30.00
Garden tools Wheel barrow,
Set 500.00 500.00
rake, and spade
Poles 9(3x75x100) 35.65 558.00
Fence (diamond mesh) 2 rolls 245.00 490.00
8 Gauge wire 5kg 65.00 65.00
Water pipes(black) 20m roll of 25mm 2.00 20.00
Saddle 1 50.00 50.00
Tap 1 60.00 60.00
Water connection
1100.00
(Water Utilities Cooperation)
Sub-total 9669.00
10% Contingency 967.00
Total 10676.00
30
Table 2: Budget for vegetables enterprise (with drip irrigation system) for People
with Visual impairment using sense of touch.
Unit Price Total Cost
Item Quantity
(BWP) (BWP)
Capital items
Plot 1 Part Nil
Shade net 1 2000.00 2000.00
Water tank (5000L) 1 3470.00 3470.00
Tank stand 1 500.00 500.00
Family drip 1 670.00 670.00
Materials for the network of ropes are as follows: 28(25x50x1.8) treated poles
and 8(30x10mm) braided plastic ropes. The construction of the rope network
assumes that the house and the tap is 20m away from the net shade house hence
8 poles and 2 ropes will be used for the network from the net shading to the tap
and house. The rest of the poles and rope will form a network on the plots with one
pole at the end of each plot.
31
Table 3: Budget for vegetables enterprise (with drip irrigation system) for People
with Physical disabilities using wheel chairs, crushes
Unit Price Total Cost
Item Quantity
(BWP) (BWP)
Capital items
Plot 1 Part Nil
Shade net 1 2000.00 2000.00
Water tank (5000L) 1 3470.00 3470.00
Tank stand 1 500.00 500.00
Family drip 1 670.00 670.00
Gutter 3 (3.6x100x75) 62.00 186.00
Out let 1 30.00 30.00
Garden tools – wheelbarrow,
Set 500.00 500.00
rake and spade
Poles 9(3.6x75x100) 35.65 558.00
Fence 2 (Diamond mesh 245.00 490.00
8 Gauge wire 5 kg 65.00 65.00
Water pipes (black) 20m roll of 25mm 2.00 20.00
Saddle 1 50.00 50.00
Tap 1 60.00 60.00
Water connection (Water
1 100
Utilities Corporation)
Raised timber plots –
(materials-treated timber poles,
8 gauge wire ) and organic P4400.00
bags-(DPC sheets, bags,
topsoil, organic manure
Sub total 14099.00
10% contingency 1409.9
Total 15508.9
NB. Materials for the raised timber plots are as follows: 20(50x75x5.4) treated
poles, 25(50x75x2.1) treated poles, 30(75x100x1.8) treated poles, 100 x 1.2m
treated droppers, 100 empty bags (50kg capacity).
32
References
1. Ministry of Local Government, Department of Social Services:
Guidelines for implementation of the rehabilitation programme for the
destitute persons, 2002.
2. Poverty Eradication Roadmap, 2010. Ministry of State President.
3. Department of Extension Services Coordination and Department of Social
Services, 2011. Manual for the Poverty Eradication Backyard Garden
Initiative.
33
Poverty Eradication
Task Team
Chada Koketso Dr. Martin kebakile Valencia Mogegeh Pauline Monare Rebecca Kgosi Kebabonye Molefhi
Office Of The President NAFTRC Dept. of Women's Affairs Economic Divesification Drive Poverty Eradication - MOA Office Of The President
Kutlwano Sebolaaphuti Agnes Setlhogile Bakane S. Bakane Delic Sehunwe John Phatshwe
Office Of The President Dept of Industrial Affairs Dept. of Women's Affairs Dept. of Social Services BNPC
Queen Turner Anthony Mokobi Lebani Nthoyiwa Ranakedi Moyo Antoinette Motiki
Bee Keeping LEA LIMID Office - MOA RIPCO DOSET
Kemoabe O. Ditedu Mophuthuludi Molatudi Peter Olekantse Boemo Keikotlhae Thibogang J. Malibala
Poverty Eradication - MOA DCEC Dept. of Forestry & Range Res. Dept. of Social Services DOSET