CS-AD10/4/2015-IDRB Office of the Chief Engineer,

(Investigation & Design),


IDRB, 3 rd floor,
Vikas Bhavan,
Thiruvananthapuram.
Dated: 16 /08/ 2019
From
The Chief Engineer.

To
The Chief Engineer,
Irrigation and Administration,
Thiruvananthapuram.

Sir,
Sub:- ʻPoomala Dam Tourism Projectʼ – Meeting call for-reg.

It has been decided to convene a meeting to discuss about the ʻPoomala Dam Tourism
Projectʼ and you are requested to attend the meeting on 24/08/2019 at 11.00 AM in this office with
concerned officials and relevant documents.

Yours faithfully

Chief Engineer
Copy to: (1) The Superintending Engineer, Minor Irrigation Circle, Ernakulam
(2) The Executive Engineer, Minor Irrigation Division, Thrissur.
CS-AD10/4/2015-IDRB Office of the Chief Engineer,
(Investigation & Design),
IDRB, 3 rd floor,
Vikas Bhavan,
Thiruvananthapuram.
Dated: / 08/ 2019
From
The Chief Engineer.

To
The Chief Engineer,
Irrigation and Administration,
Thiruvananthapuram.

Sir,
Sub:- ʻPoomala Dam Tourism Projectʼ -reg.

Ref:- GO(Rt) No.830/2016/WRD dated 24/09/2016

As per the reference cited you are requested to forward the estimate
through PRICE for the proposed work ʻPoomala Dam Tourism Projectʼ as per the guidelines specified
in the GO.
Yours faithfully

Chief Engineer

Copy to: (1) The Superintending Engineer, Minor Irrigation Circle, Ernakulam
(2) The Executive Engineer, Minor Irrigation Division, Thrissur.
CS-AD10/4/2015-IDRB Office of the Chief Engineer,
(Investigation & Design),
IDRB, 3 rd floor,
Vikas Bhavan,
Thiruvananthapuram.
Dated: / 08/ 2019
From
The Chief Engineer.

To
The Chief Engineer,
Irrigation and Administration,
Thiruvananthapuram.

Sir,
Sub:- ʻPoomala Dam Tourism Projectʼ -reg.

Ref:- (1) GO(Rt) No.830/2016/WRD dated 24/09/2016.


(2) Letter No.

Please see the reference cited. The Tourism activities proposed to be


conducted in the Poomala Dam premises as per the Project report prepared is approved subject to
the following conditions.
1) The site officers have to ensure that the proposed activities are being taken up for tourism
development for DTPC and the proposed activities are implemented in accordance to the
scope of work envisaged.
2) The Execution, operation, Management and revenue sharing pattern of the project should
be as per the guidelines in the Government order vide reference (1) cited above.
3) The officers of the Irrigation Department in charge of the Dam should ensure that the
project does not interfere with safety, security and operations under normal and
emergency situations and does not pollute reservoir and river downstream.
4) Clearance for the proposal has to be obtained from Kerala Dam Safety Authority.
5) The activities shall not be in any way contrary to the sections of “Kerala Irrigation and
Conservation Act, 2003”.
It is also informed that the approval of the architectural design as per the
Government order is out of purview of this office and an amendment regarding the same was
requested to the Government.
Yours faithfully,

CHIEF ENGINEER
Copy to: (1) The Superintending Engineer, Minor Irrigation Circle, Ernakulam.
(2) The Executive Engineer, Minor Irrigation Division, Thrissur.