Plant Operation Procedure
Plant Operation Procedure
STEP 1 (BACKWASH)
• Check all the valves are open in the Backwash Pump
• Reduce pressure from the sand filter drum with the aid of valve
• Run the Backwash Pump 1 or Backwash Pump 2 from the panel in manual mode with the
aid of selector switch.
• Make sure to run the backwash pump for 20 minutes
- Check the color of the water in the reject water tank to assure the backwash is happening
properly
STEP 2 (RINSE)
• Shut down the backwash pump from the panel with the aid of selector switch.
• Release pressure from the sand filter drum with the aid of valve.
STEP 3 (FLUSHING)
• Check the valves of the flushing tank and the flushing pump.
• Check the level of water in the tank. (The water in the tank is filled automatically as the tank
has float valve installed in it. In case the float valve malfunctions, use the valve mentioned
below to fill the water in the tank manually)
• Start the Flushing Pump from the Panel in manual mode with the aid of switch.
• Shift all the Pumps in the panel to AUTO once the pressure reaches 2 bar in the pressure guage
connected to the filter feed pump.
ADJUSTMENTS
• PRE-CHLORINE DOSING PUMP
It is used to remove the bacteria or disinfect the water. The range the PRE-CHLORINE
DOSING PUMP should be set to 20 – 20. Increasing the dosing of the chlorine will result in
the increase of odor and also increase the ORP (Oxidation Reduction Potential).
• SULPHURIC ACID DOSING PUMP
It is used to reduce the fouling smell of the water. The range of the SULPHURIC ACID
DOSING PUMP should be set to (5 – 25). Increasing the dosing will result in the decrease of
the pH level of the water. Check the pH level of the water from the valve at the end of the
membrane. The pH range should be between 6 – 6.5. Incase the pH is lower, reduce the dosing.