Consolidate into Master Process

Concept:
This process will be used to consolidate the picked material into master LPN’s.

1. Move the shaded area to ‘Default’ and hit ‘Enter’.

2. Enter the user name > Hit ‘Enter’ > Enter the password > Hit ‘Enter’.

3. Select the required responsibility: Move the shaded area to ‘Whse Mgmt’ and hit
‘Enter’.

4. Select the required menu: Move the shaded area to ‘GNTX Custom’ and hit
‘Enter’.
5. Select the required menu: Move the shaded area to ‘GNTX Consolidate’ and hit
‘Enter’.

6. Enter the required organization: Enter facility code and hit ‘Enter’.

7. Scan the Master LPN.

8. Scan the Child LPN from the Box.


9. To Pack More Select the <Save/Next LPN> Button.

10. Scan the other LPN’s that need to be consolidated into this LPN.

11. Hit “Enter” on the <Close Master> Button to Pack the LPN into Master and to
Print the Label for the Master LPN.
13. The Master is Packed and the Label is Printed.