2019

hydropower
status report
sector trends and insights
For more information: hydropower.org/congress

IHAThe seventhOffice
Central World Hydropower Congress is JoinDisclaimer
us
organised by the International Hydropower Latest information on the programme
With respect to any information available from this
Chancery House
Association (IHA) and hosted in partnership with andpublication,
speakersneither
will beIHA,announced at or members
nor its employees
St Nicholas Way make any warranty, express or implied, including
UNESCO’s International Hydrological Programme. hydropower.org/congress.
warranties of merchantability and fitness for a particular
Sutton
purpose, nor does IHA assume any legal liability or
London SM1 1JB from up to 100 countries are expected
Delegates Contact us at for
responsibility congress@hydropower.org
the accuracy, completeness, or
United usefulness of any information, product, or process
toKingdom
be represented at the biennial event in Paris, for early registration
disclosed, nor does IHAand to participate
represent that its use would
T: +44France,
20 8652between
5290 14 and 16 May 2019. not infringe upon privately
in preparatory meetings. owned rights.
F: +44 20 8643 5600
With the theme of ‘The Power of Water in a
E: iha@hydropower.org
Copyright
Sustainable, Interconnected World’, the Congress Become a partner
will focus attention on hydropower’s role in © 2019 International
To become a strategicHydropower
partner Association
and learn Limited.
IHAdelivering
Regional and National Offices
on the Paris Climate Agreement
The “International Hydropower Association” name and
about
logosponsorship
are the propertyopportunities, please
of International Hydropower
and the Sustainable Development Goals. Association
contact Limited, a not-for-profit
iha@hydropower.org company limited by
IHA China Office guarantee, incorporated in England (No. 08656160), the
operator of the International Hydropower Association.
c/o China Institute of Water Resources and Hydropower Research
Contact: iha@hydropower.org www.hydropower.org
A1 Fuxing Road
All rights reserved. No part of this publication may be
Beijing, 100038 reproduced, stored or transmitted without the prior
permission of the publisher.
China
E: china@hydropower.org

IHA South America Office


c/o Itaipu Binacional
Av. Tancredo Neves, 6.731
CEP 85856-970 Foz do Iguaçu
Paraná, Brasil Cover and inner cover image: The Itaipú hydropower
plant on the Paraná River on the border between
E: southamerica@hydropower.org Brazil and Paraguay. Credit: Itaipu Binacional.
2 | International Hydropower Association | Hydropower Status Report 2018
Acknowledgements
Contributing Ministers: IHA Board 2017-2019: External Reviewers:
Hon. Amarjeet Sohi, Minister of Natural Ken Adams, IHA President Anne-Raphaelle Audoin - WaterPower
Resources - Canada Canada
Richard Taylor, IHA Chief Executive
Hon. Bambang P. Soemantri Anton-Louis Olivier - REH
Antoine Badinier,
Brodjonegoro, Minister of National IHA Vice President - EDF Arturo Alarcon - IDB
Development Planning - Indonesia
Lin Chuxue, IHA Vice President Diana Carolina Salazar Ortiz - EPM
H.E. Barsha Man Pun, Minister of - China Three Gorges Corporation
Diego Fernando Quintana Rojas - Itaipu
Energy, Water Resources and Irrigation
Colin Clark, IHA Vice President Binational
- Nepal
- Brookfield Renewable
Farukh Sultantov - Consultant
Hon. Irene Nafuna Muloni, Minister Roger Gill, IHA Vice President
of Energy and Mineral Development - Husam Beides - World Bank
- Consultant
Uganda Juergen Schuol - Voith
Gil Maranhão Neto, IHA Vice President
Hon. Guillermo Moncecchi, Minister of - Engie Brasil Kathrin Roeck - Voith
Industry, Energy and Mining - Uruguay
Christine Cantin - Hydro-Québec Mei Zhihong - Independent expert
Editorial: Tammy Chu - Entura, Hydro Tasmania Nikki Bahr - Sustainable Strategies
Researched, written and edited
Mauro Corbellini - Itaipu Binacional Pierre Levasseur - EDF
by the team at IHA Central Office:
Tron Engebrethsen - Statkraft AS Pierre Lundal - WaterPower Canada
Analysts:
Awadh Giri - HydrofE3 Pimhein Kool - FMO
Bill Girling
Cristina Díez Santos Moisés Machava - Hidroelétrica de Qu Ang - CTG
David Samuel Cahora Bassa
Ramesh Vaidya - ICIMOD
María Ubierna Kelly Malone - King & Spalding
Mathis Rogner Ravi Kalra - Voith
Nicholas Troja Segomoco Scheppers - Eskom
Ren Jinghuai - CSHE
Samuel Law Óli Grétar Blöndal Sveinsson
- Landsvirkjun Renata de Biasi Ribeiro - Itaipu
Interns: Binational
Claire Nakabugo Sharbini Suhaili - Sarawak Energy Berhad
Rodrigo Fernández Ordóñez - Vice
Pan Ei Ei Phyoe Evgeniy Tikhonov - EuroSibEnergo Minister of Energy & Mines, Guatemala
Sabrina Upadhyay
Uwe Wehnhardt - Voith Hydro Rufino Andres Rojas - Itaipu Binational
Sustainability: Yves Rannou - Individual Member Thais Soares - Engie Brasil
João Costa Xiaoping Wang - World Bank
Alain Kilajian
Zheng Chunzhou - Independent expert
Editor:
Will Henley

Production:
Louis Scorza

| 1
The Gordon Dam in the south-west of
Tasmania, Australia.
Credit: Hydro Tasmania.

CONTENTS
Acknowledgements 1

About IHA 4
Regions in Focus
Foreword 6
Report methodology
Executive Summary Map of new hydropower capacity added in 2018 48
Statistics for the Hydropower
Key trends and developments 8 Map of hydropower capacity and generation by region 50
Status Report are compiled by
North and Central America 52 IHA using data from published
Regional trends in brief 10 sources, IHA members, government
South America 60 representatives, industry sources
Infographics 12 and media monitoring.
Policy Perspectives Africa 68
IHA’s database lists more than
Canada: Minister of Natural Resources 16 Europe 76 13,000 stations in 150 countries.
For hydropower generation,
Indonesia: Minister of National Development Planning 18 South and Central Asia 84 statistics are a combination of
official government reports and
Nepal: Minister of Energy, Water Resources and Irrigation 20 East Asia and Pacific 92 IHA estimates based on averaged
capacity factors.
Uganda: Minister of Energy and Mineral Development 22 Table: World Hydropower Data 100
The data is tracked, stored
Uruguay: Minister of Industry, Energy and Mining 24 IHA Membership Information 102 and updated to account for
new information as it is received.
Trends in Focus Data verification exercises are
an ongoing process, leading to
Benefits of hydropower 30 corrections as and when required.
Climate resilience 32

Modernisation 34

Pumped storage 36

Regional interconnections 38

Sustainability 40

2 | International Hydropower Association | Hydropower Status Report 2019 | 3


About IHA

ABOUT IHA
Advancing sustainable hydropower
The International Hydropower Association (IHA) is a non-profit
membership organisation committed to sustainable hydropower.

IHA’s vision is a world where water Knowledge building Sustainability


and energy services are delivered to
IHA’s programmes increase IHA is a champion of good practices
all in a sustainable way.
awareness of hydropower’s and continuous improvement in the
Our mission is to advance sustainable value to clean energy systems hydropower sector.
hydropower by building and sharing and sustainable development,
We support project assessments and
knowledge on its role in renewable promoting collaborative,
training as the management body
energy systems, responsible adaptive approaches to river
for the Hydropower Sustainability
freshwater management and climate basin development and regional
Assessment Tools. These tools
change solutions. interconnections.
are used to guide and assess
We achieve this through monitoring We provide practical advice and performance against a range of
the sector, advancing strategies support to members on operations environmental, social, technical and
that strengthen performance, and and maintenance and have economic criteria.
building an open, innovative and developed tools for dealing with
trusted platform for knowledge. new challenges such as assessing
reservoir carbon emissions and Find out more:
building climate resilience.
www.hydropower.org

Download our 2018-19 Activity and Strategy Report:


hydropower.org/activity2019

4 | International Hydropower Association | Hydropower Status Report 2019 | 5


Foreword

FOREWORD
The Hydropower Status Report is an authoritative guide
to key trends in hydropower development, featuring policy
insights and latest global capacity and generation data.

The 2019 Hydropower Status Report, Four years on since the Sustainable for hydropower development aimed
published by the International Development Goals were agreed at boosting industrial growth and
Hydropower Association (IHA), offers at the United Nations in 2015, reducing carbon emissions. Minister
insights on hydropower development governments increasingly recognise of National Development Planning
across all regions of the world. hydropower as playing a vital role Bambang P. Soemantri Brodjonegoro
in national strategies for delivering explains that his country is committed
Now in its sixth edition, this report
affordable and clean energy, to reduce GHG emissions by 29
is compiled by a team of analysts
managing freshwater, combatting per cent by 2030, through which
using information provided by
climate change and improving “increasing and promoting the use of
our members, industry sources
livelihoods. new and renewable energy is critical.”
and government representatives,
published sources and media We are honoured that five leading The challenge for many emerging
monitoring. government ministers from Canada, economies and developing countries,
Indonesia, Nepal, Uganda and however, is to raise the investment
Our research found that, during 2018,
Uruguay, with responsibility for capital to build and sustain conventional renewable energies, professionals, recognises that urgent
hydropower projects added almost 22
energy, water and infrastructure hydropower projects, while also redoubling the commitment to action is required to deliver clean
gigawatts (GW) of installed capacity
planning, have shared their ensuring national institutions have comply with the SDGs.” energy to limit the effects of climate
worldwide. This brought existing
perspectives and policy priorities in sufficient capacity to ensure projects change, and to meet people’s basic
capacity to 1,292 GW, resulting in an Through the pages of this report,
this report. are delivered in accordance with needs for freshwater and affordable
estimated 4,200 terawatt hours (TWh) we highlight tools, trends and topics
good practice on environmental and energy.
in clean electricity generation last In Canada, six out of every 10 homes of direct interest to hydropower
social performance.
year. and businesses are powered by developers, operators, investors, Our mission is to advance sustainable
hydroelectricity and the sector is In Nepal, the government is seeking governments and, ultimately, local hydropower by building and sharing
Hydropower development today
widely recognised for job creation. to attract foreign investment in communities. These subjects range knowledge on its role in renewable
is most active in fast growing
Writing in these pages, Minister of hydropower and is exploring regional from efforts to assess the benefits of energy systems, responsible
economies and emerging markets,
Natural Resources Amarjeet Sohi energy interconnections as a way of hydropower, through to financing freshwater management and climate The Fierza Hydroelectric Power
with the East Asia and the Pacific Station on the Drin cascade in
welcomes industry efforts to build reducing reliance on fossil fuels and pumped storage projects and solutions. We do this through
region, followed by South America, Albania. Credit: KESH.
partnerships with indigenous increasing off-grid access. Minister adapting operations to new digital programmes aimed at lifting the
adding the highest additional
communities that “create new, long- of Energy, Water Resources and technology. sector’s performance and improving
capacity last year. The United States,
term economic opportunities” while Irrigation, Barsha Man Pun, writes understanding on good practices.
which was previously surpassed The year 2018 saw the launch
reducing reliance on diesel in remote that his government is considering
by China, has now been eclipsed of a suite of new sustainability We encourage all organisations and
communities. distributed electricity generation
by Brazil as the second largest tools by IHA and the Hydropower individuals that share our vision of
through a mix of hydropower
hydropower country by installed Elsewhere, in countries such as Sustainability Assessment Council, a world where water and energy
projects, solar, and wind.
capacity. Indonesia, Nepal and Uganda, a multi-stakeholder coalition services are delivered to all in a
hydropower holds the potential In South America, Uruguay has of representatives of social and sustainable way to join us in this
to accelerate social and economic reached close to 100 per cent environmental NGOs, industry, endeavour.
progress and reduce poverty through renewable electricity generation government and multilateral
widening access to electricity. thanks to the contribution of institutions. These tools include the

1,292 GW “For Uganda to achieve sustainable


development,” writes Minister of
Energy and Minerals Irene Nafuna
hydropower. Importantly, the
government also recognises the
“strong complementarity” between
Hydropower Sustainability Guidelines,
which present definitions of good
practice in the planning, operation
worldwide hydropower hydroelectric and other variable and implementation of hydropower
installed capacity in 2018 Muloni, “the hydropower resources
renewable energy forms. Minister projects, and a new Environmental,
that remain untapped will have to be
of Industry, Energy and Mining Social and Governance Gap Analysis
developed so as to bring to fruition
Guillermo Moncecchi explains that Tool for identifying and address gaps
plans aimed at increasing access to
hydroelectric power has “not only had against good practice.

4,200 TWh
electricity and per capita electricity
a relevant role in the past, ensuring
consumption.” IHA, as a not-for-profit association
the sustainability of the electricity
In line with the Paris Agreement, mix, but also in the present, acting
whose members include public Ken Adams
and private companies, national Richard Taylor
estimated electricity generated Indonesia has developed a strategy as a platform to develop non- President
from hydropower in 2018 organisations and hydropower Chief Executive

6 | International Hydropower Association | Hydropower Status Report 2019 | 7


Executive summary

EXECUTIVE SUMMARY
The Vieux-Emosson dam and reservoir in Valais,
Switzerland. Credit: © Alpiq.

Electricity generation from hydropower sources


reached record heights in 2018.

Key trends and developments Understanding hydropower’s Building resilience to climate change Turbo-charging the energy The digital revolution
benefits transition FASTEST GROWING
In 2018, electricity generation from Hydropower produces almost The global hydropower fleet COUNTRIES BY NEW
hydropower reached an estimated Hydropower delivers a range two-thirds of the world’s renewable Pumped hydropower storage has is adapting to a new era of INSTALLED CAPACITY
4,200 terawatt hours (TWh), setting of benefits to society and the electricity generation and is making proven to be an essential component digitalised design, operations and IN 2018
the highest ever contribution from a environment. Power-related a major contribution to delivering on for modern and future clean energy maintenance. Digitalisation will be
renewable energy source. benefits include clean and flexible the ambition of the Paris Agreement systems. The significant increase in instrumental in helping to bring

China
generation and storage, as well as and the Sustainable Development variable renewable electricity sources new efficiencies to clean energy
An estimated 21.8 gigawatts (GW) of
reduced dependence on fossil fuels Goals. Without this contribution, the like wind and solar coupled with generation.
hydropower capacity was put into
and avoidance of pollutants. objective of limiting climate change to their displacement of conventional
operation last year, including nearly Read more on pages 34-35.
1.5 or 2 degrees above pre-industrial generators has put increasing

8.54 GW
2 GW of pumped storage, bringing More challenging to quantify are
levels would likely be out of reach. pressure on power grids and Regional cooperation in power
the world’s total installed capacity to the non-power benefits associated
underlined the need for pumped markets
1,292 gigawatts (GW). with a hydropower project. These Hydropower projects offer countries
hydropower ‘water batteries’.
include economic improvements protection against the impacts of by Integrating electricity markets
The East Asia and Pacific region
to livelihoods and local supply climate change and extreme weather, While we are witnessing renewed through regional interconnections
once again held its position as
chains, enhanced navigation and such as floods and drought, however interest in pumped hydropower

Brazil
helps countries use hydropower and
the fastest growing last year, with
transportation, and investment in variable climate conditions also make as the technology evolves to other renewable energy resources
9.2 GW of hydropower installed
community services. Freshwater these projects susceptible to climate ensure grid stability, markets more efficiently. The Nordic Power
capacity added. It was followed by
management benefits including risks due to their dependency on around the world have been slow Market offers a blueprint for other

3.87 GW
South America (4.9 GW), South and
supply for homes, industry and precipitation and runoff. to recognise and reward its value, world regions to follow.
Central Asia (4.0 GW), Europe (2.2
agriculture, and mitigation against pointing to deficiencies in how
GW), Africa (1.0 GW) and North and New guidance for the hydropower Read more on pages 38-39.
floods and drought. liberalised markets are incentivising
Central America (0.6 GW). sector published by IHA will
development. Local capacity in sustainable
With the goal of improving support operators and investors to
Forty-eight countries added
hydropower capacity in 2018. The
countries with the highest individual
understanding about the
underreported benefits of
demonstrate robust ways of achieving
climate resilience. This will address the
If pumped hydropower storage is
to continue to deliver grid services,
hydropower
Capacity-building among local
Pakistan 2.49 GW
hydropower, IHA is undertaking a need for international good practice either through existing or new stakeholders and institutions
increases in installed capacity were
China (8.5 GW) and Brazil (3.7 GW).
Among the top five were Pakistan
global study of projects categorised
as either single or multi-purpose,
on how to assess climate risks and
incorporate resilience into project
projects, the market framework
and regulatory treatment of this
supports the regional development
of water and energy services, guided Turkey 1.09 GW
for example providing power planning, design, and operations. technology will need to evolve by international good practices in
(2.5 GW), Turkey (1.1 GW) and
Angola (0.7 GW).
generation, water supply, irrigation
To be launched at the 2019
accordingly. Pumped storage should sustainability. Angola 0.67 GW
and flood control. not be seen merely as a back-up
World Hydropower Congress, the Read more on pages 40-43.
With Brazil reaching 104 GW
Multi-purpose hydropower projects Hydropower Sector Climate Resilience
generator or a provider of ancillary Tajikistan 0.61 GW
in installed capacity, the South grid services, but as a resource that
predominate in South and Central Guide has been tested by project
American nation has now overtaken
Asia, whereas South America has the operators around the world, with
provides benefits across a whole Ecuador 0.56 GW
the United States (103 GW) as spectrum of roles within local and
lowest percentage of multi-purpose technical and financial support from India 0.54 GW
the second largest country by regional water and energy systems.
dams. While most hydropower the European Bank for Reconstruction
hydropower capacity.
projects were built for a single and Development (EBRD) and the Read more on pages 36-37.
See the map on pages 48-51 and the purpose, a significant share were World Bank and its Korea Green
tables on pages 100-101 for data for constructed to support additional Growth Trust Fund.
each country and region. services, or were later recognised to
Read more on pages 32-33.
provide these services.
Read more on pages 30-31.
2018 HIGHLIGHTS

4, 200 TWh 1,292 GW 160.3 GW 21.8 GW 1.9 GW The Rogun hydropower


Electricity generated from Global hydropower Global pumped storage Capacity added in 2018, Pumped storage capacity project under construction in
hydropower in 2018 installed capacity installed capacity including pumped storage added in 2018 Tajikistan. Credit: PA Images.

8 | International Hydropower Association | Hydropower Status Report 2019 | 9


Executive summary

EXECUTIVE SUMMARY
Regional trends in brief
North and Central America South America Africa Europe South and Central Asia East Asia and Pacific
Hydropower remains the dominant South America was the second fastest Africa has the highest percentage As variable renewables continue Installed hydropower capacity in South East Asia and the Pacific again saw
electricity source across North and growing region, adding 4,855 MW in of untapped technical hydropower their rapid growth, hydropower is and Central Asia grew by almost 4 the highest annual increase in
Central America, although year-on- installed hydropower capacity in 2018. potential in the world. 1,009 MW was increasingly recognised in Europe for GW in 2018, continuing the growth hydropower installed capacity in 2018.
year growth in hydropower installed added in 2018, bringing total installed its flexible services to maintain secure, trajectory from 2017.
Brazil contributed 80 per cent of the 9.2 GW was added last year, bringing
capacity is the lowest on a global scale. capacity to 36.3 GW. affordable and sustainable energy
region’s added hydropower capacity India categorised large hydropower total installed capacity across the
In 2018, 575 MW of conventional and is the second fastest growing In 2018, Angola commissioned two supply. projects as renewable energy, which region to over 480 GW. The region
hydropower capacity was added in country in the world after China. Brazil more power generating units for the Europe added an estimated 2.2 GW in along with supporting measures, also accounted for over a third of the
Canada, while the United States and has now overtaken the USA as the 2,070 MW Laúca hydropower station. 2018, including 384 MW of pumped signifies a major step forward in world’s total hydropower generation.
Central America added a further 80 world’s second largest country by Once fully operational in 2019, it storage, of installed capacity in 2018, national policy.
Over 90 per cent of the added
MW in 2018. installed hydropower capacity. will provide over 25 per cent of the bringing the total to 252 GW, including Pakistan’s installed hydropower capacity came from China, including
country’s electric installed capacity. 57.4 GW pumped storage.
Canada has four major hydropower Climate variability has increased the capacity grew by over 25 per cent in 1.5 GW from pumped storage, which
projects under construction, which will need for regional interconnections to Several modernisation projects Turkey led the region in new installed 2018 alone, as large-scale projects increased its total installed capacity to
add another 2,900 MW of capacity over import electricity from countries with were completed in 2018, including capacity additions, adding over 1 GW came online boosting grid supply 352 GW.
the next five years. growing surpluses like Bolivia, and the 300 MW Kariba South Bank at greenfield sites. capacity.
Significant activity took place in
diversify renewable energy sources in expansion project in Zimbabwe, the
New legislation introduced in the Austria added significant new and Tajikistan passed an important Myanmar where, after some delay,
countries such as Argentina and Chile. 32 MW Mwadingusha plant in the
US Congress formally recognises innovative pumped storage capacity milestone with the construction of the the government issued a notice to
Democratic Republic of Congo and
hydropower in the definition of There is increasing need for to support wind and solar and overall Rogun hydropower project, as the first proceed for both the 1,050 MW Shweli
the 36 MW Nkula project in Malawi.
renewable energy and facilitates modernisation of ageing large system efficiency, including the 360 600 MW unit entered into operation. 3 and the 60 MW Deeoke projects.
a timelier process for new project hydropower infrastructure to extend In Uganda, construction of the 183.2 MW Obervermuntwerk II project. Across Central Asia, there is growing Cambodia took an important step
approvals and existing project asset life and boost electricity MW Isimba project was completed
Norway completed the 370 MW interest in regional interconnections forward in achieving its energy
relicensing. The US Department of generation to cope with growing and it was commissioned in March
Lysebotn II project, which replaced and power markets for hydropower goals with the commissioning of the
Energy has placed increased emphasis electricity demand. 2019.
its 210 MW predecessor. Iceland development, including bilateral 400 MW Lower Sesan II project, the
on grid reliability and flexibility
Initially set to be commissioned In Cameroon, the 200 MW Memve’ele added 100 MW at the Búrfell II project, agreements signed between BBIN country’s largest hydropower project.
attributes provided by pumped
in 2018, the 2,400 MW Ituango project was completed, with the first utilising existing infrastructure from countries (Bhutan-Bangladesh-India-
hydropower. Australia continued to progress with
hydropower plant in Colombia 80 MW put into operation in April Búrfell I. Nepal) in South Asia, and construction
the development of several pumped
Several Central American countries, suffered a three-year delay following 2019. of the CASA 1000 cross-border
In the Iberian peninsula hydropower storage projects, with Snowy Hydro’s
including Costa Rica, Guatemala and a series of events in May that resulted transmission project.
Egypt inaugurated the 32 MW New generation recovered after a significant 2,000 MW ‘Snowy 2.0’ project receiving
Panama, produce the majority of their in the untimely filling of the reservoir,
Assiut Barrage project and contracts period of drought in the previous year. Modernisation programmes at large, the green light to proceed in early
electricity from renewable sources, affecting communities downstream.
were signed for the 2,400 MW Ataqa older stations continued across Russia, 2019.
largely due to hydropower. Steps have been taken to mitigate In France, major projects under
pumped storage project. Georgia and other Central Asian
the damage and Hidroituango is construction include the 92 MW Across the Pacific, in Fiji, the Solomon
Under the leadership of new President countries, with some rehabilitated
progressing with project works. The region’s total hydropower Romanche-Gavet hydropower plant, Islands and Samoa, a number of small
Andrés Manuel López Obrador, Mexico units coming back into service in 2018.
installed capacity is expected to grow and the 330 MW La Coche pumped hydropower projects are under active
plans on significantly increasing In Brazil, a group of hydropower
by over 40 GW over the next two to storage plant, which will add a 240 MW Read more on pages 84-91. development.
hydropower generation by building developers and operators formed
three years due to major new projects turbine.
new plants and rehabilitating existing the Forum for the Development Read more on pages 92-99.
coming online.
facilities. of Midsize Hydropower Plants to Read more on pages 76-83.
strengthen private sector investments Read more on pages 68-75.
Read more on pages 52-59.
in hydropower.
Read more on pages 60-67.

The Cambambe power station in


Angola. Credit: Voith Hydro.
10 | International Hydropower Association | Hydropower Status Report 2019 | 11
Hydropower Status Report 2019

HYDROPOWER KEY FACTS


NEW INSTALLED CAPACITY BY REGION (MW)
HYDROPOWER INSTALLED CAPACITY WORLDWIDE East Asia
and Pacific
9,169 MW

REST OF THE WORLD 269


South America 4,855 MW
CHINA 352
South and
COLOMBIA 12 Central Asia 3,962 MW
IRAN 12
MEXICO 12
Europe 2,202 MW 21.8 GW
Africa 1,009 MW Total new installed

4,200
AUSTRIA 15 capacity (2018)
VENEZUELA 15 North and
Central America 620 MW
SWEDEN 16
VIETNAM 17 T Wh
SWITZERLAND 17
SPAIN 20 s2ta0ll1ed8 capa
city NEW INSTALLED CAPACITY BY COUNTRY (MW)
in
New
ITALY 23
FRANCE 26
TURKEY 28
BRAZIL 104
NORWAY 32
RUSSIA 49 UNITED
INDIA 50 STATES 103 1,085
8,540 3,866 2,487 668 605 556 535 419 401
JAPAN 50 CANADA 81
China Brazil Pakistan Turkey Angola Tajikistan Ecuador India Norway Canada
Hydropower installed capacity (GW) of top 20 countries and
rest of the world including pumped storage in 2018. 1,292 Total hydropower
installed capacity in 2018
Source: IHA 2018 GW

HYDROPOWER GROWTH THROUGHOUT THE DECADES


PUMPED HYDROPOWER STORAGE WORLDWIDE
1500 4500

4000
1250
160.3 GW 3500

Annual average generation (TWh)


37.2 Rest of the World
1000 3000
30.0 China

Capacity (GW)
Total worldwide 27.6 Japan 2500
hydropower 22.9 United States 750
pumped storage 2000
in 2018 7.6 Italy
7.0 France 500 1500
6.8 Germany
6.2 Spain 1000
250
5.5 Austria
500
4.8 India
4.7 South Korea 0 0
1950-1959 1960-1969 1970-1979 1980-1989 1990-1999 2000-2009 2010-2018

Pumped hydropower storage capacity (GW) of top 10 countries and rest of the world in 2018.
Added capacity Cumulative capacity Annual average generation
Source: IHA 2018. (GW) (GW) (TWh)

12 | International Hydropower Association | Hydropower Status Report 2019 | 13


HYDROPOWER BENEFITS ELECTRICITY GENERATION Source: IEA 2019

HYDROPOWER KEY FACTS


Hydropower is the world’s largest source of renewable electricity generation
Affordable and reliable energy

15.9%
Hydropower is the lowest cost source of electricity generation in many markets,
with a global weighted average cost of USD 0.05 per kWh for new hydropower of global
projects (IRENA 2018).
RENEWABLE electricity was
ELECTRICITY produced by
hydropower
Enabling solar, wind and other renewables
Hydropower supports growth in variable renewables such as wind and
solar, meeting demand when these sources are unavailable. 25.6%
4.6% WIND
74.4% MORE THAN
Protecting from floods and drought 2.5% BIOMASS
WASTE
AND
ALL OTHER
The storage infrastructure provided by a hydropower reservoir mitigates against
2.1% SOLAR PV RENEWABLES
the risks posed by climate change, including extreme weather events such as FOSSIL
floods and drought. FUELS AND COMBINED
NUCLEAR 0.5% OTHER
RENEWABLES

Managing freshwater responsibly


Hydropower provides a vital means of safely managing freshwater, REDUCING EMISSIONS Source: IPCC 2014 / *IHA 2018
providing water supply for homes, businesses and agriculture.
850
18.5*

Median lifecycle carbon equivalent intensity


750 820 490 230 48 38 11
Boost to economic growth and jobs

COAL

GAS

BIOMASS

SOLAR PV

GEOTHERMAL

HYDROPOWER

WIND ONSORE
The hydropower industry employs a reported 1.8 million workers worldwide, 650
and many more in connected supply chains (IRENA 2018).

(gCO2-eq/kWh)
550

450
Avoiding pollutants and emissions
Hydropower is a low-carbon technology which helps to offset the 350
carbon emissions and pollutants caused by fossil fuels.
250

150
Improving infrastructure and waterways
Hydropower development delivers greater regional connectivity in distribution 0
and transport networks. Hydropower has one of the lowest lifecycle GHG emissions per kilowatt hour among all energy sources

Enhancing cooperation between countries


AVOIDING POLLUTION Source: IHA 2018

Long distance electricity transmission across national boundaries


promotes strong inter-governmental cooperation. Using hydropower instead

4 BILLION
If hydropower of coal each year avoids:
was replaced

Community investments in rural areas


with burning
coal, up to
TONNES
of additional greenhouse gases
PM2.5 148 million tonnes
of particulates
Hydropower development can bolster investment in local communities,
including education, healthcare and other services.
would be emitted per year PM10 62 million tonnes
of sulfur dioxide

SOx
NOx 8 million tonnes

10%
of nitrogen oxide
and global
emmisions from
Recreational activities and tourism fossil fuels and
HIGHER
Hydropower reservoirs can offer regional development through the creation industry would
of tourism, recreational activities and fisheries. be at least

14 | International Hydropower Association | Hydropower Status Report 2019 | 15


Policy perspectives

POLICY PERSPECTIVES
View from Canada

Canada’s clean energy priorities need


hydropower
The Canadian government will work with international
partners to promote opportunities for hydropower,
eliminate barriers for renewable energy, and share best
practices and benefits around the world, writes the
Honourable Amarjeet Sohi, Minister of Natural Resources.

With its vast landmass and years, Canada has been developing create new, long-term economic Canada is well on its way to realising
diverse geography, Canada has an its water resources to produce clean, opportunities from coast to coast this vision and hydropower is
abundance of renewable energy sustainable, reliable and affordable while helping to reduce reliance at the forefront of our energy
sources that are helping power our electricity. on diesel fuel in off-grid, rural and transformation. Currently, six
Caribou Falls Generating
Station, Ontario. communities. That is part of Canada’s remote communities. Canadian provinces and territories
Hydropower generates tremendous
Credit: OPG. natural advantage; we not only have generate more than 94 per cent White Dog Falls Generating
economic opportunities and provides
abundant resources, we have the of their electricity from renewable Station, Ontario.
thousands of jobs in communities
expertise and experience to develop sources. This creates opportunities Credit: OPG.
across the country – all the while
those resources – sustainably and for more trade in clean electricity
helping to ensure low electricity
competitively. between provinces and territories,
Hydropower is a great example of
prices for Canadians. In fact, six
out of every 10 Canadian homes Hydropower is while boosting our economy,
creating jobs and protecting our
that advantage. For close to 140 and businesses are powered by
hydropower. at the forefront environment.
We are also using technologies that
The industry has also built new
partnerships by developing projects
with indigenous communities that
of our energy improve the reliability, resiliency and
flexibility of our new renewables-
sourced energy systems. This
transformation technology will allow us to increase
our energy security and provide
consumers with a wider range of
energy choices.
For all of these reasons, our
government sees a bright future
In 2017, our government launched
for Canada’s hydropower industry
Generation Energy, a nationwide
– at home and abroad. We will
conversation on Canada’s energy
continue with international partners
future. More than 380,000
to promote these opportunities,
individuals participated, including
eliminate barriers for renewable
experts, industry stakeholders, and
energy, and share best practices and
indigenous people. Their views were
benefits around the world.
heard and included, and the final
report outlines four clean energy
paths to Canada’s energy future –
including the use of more renewable
energy like hydropower.

16 | International Hydropower Association | Hydropower Status Report 2019 | 17


Policy perspectives

POLICY PERSPECTIVES
View from Indonesia

Indonesia promotes hydropower to create


the demand for industrial development
The Indonesian government’s strategy for hydropower
development aims at boosting industrial growth, reducing
carbon emissions and achieving energy independence,
writes Honourable Bambang P. Soemantri Brodjonegoro,
Minister of National Development Planning.

Electricity infrastructure plays Until 2017, the total installed create demand. Timika in Papua,
a pivotal role in development. capacity of national power plants Konawe in Sulawesi and Kayan
It provides and conveys energy reached around 60.8 GW. PLN, the in North Kalimantan regions are
for increasing prosperity and Indonesian state-owned electricity examples of potential locations for
encouraging economic activities. company, generated around 41.7 increasing demand. In these areas
Indonesia’s National Long-Term GW (68.6 per cent), and independent mining activities and industrial
Development Plan 2005-2025 power producers and other smelting could be supported by
mandates the fulfilment of reliable providers generated around 19.1 hydropower projects with a large
and efficient electricity supply GW (31.4 per cent). Based on the capacity. The goal is to increase
according to needs and increased type of energy source, hydropower the competitiveness of industry by
access to equitable energy services. plants (including mini hydro and creating low cost electricity.
micro hydro) produced around
The National Energy Policy It is expected that the private
5.45 GW (8.8 per cent). The biggest
(NEP) 2014-2050 underlines the sector can participate in 10 per cent; and import duty
hydropower potential is located in
principles of fairness, sustainability projects as independent power exemptions for equipment and
Papua Island (22.4 GW), Kalimantan
and environmental protection producers through Public Private
in achieving national energy
independence and security. The
Island (21.6 GW), Sumatera Island
(15.6 GW) and Sulawesi Island (10.2
Partnership (PPP) schemes. PPP
schemes themselves continue to
machinery that cannot be produced
in Indonesia. The critical point
GW), while Java-Bali is 4.2 GW and It is expected that these various
government targets at least 23
per cent in 2025 – and 31 per cent
Nusa Tenggara-Maluku is 1.1 GW.
undergo transformation in their
implementation in Indonesia, policies could accelerate the
development of hydropower
in developing
in 2050 – the portion of new and If we consider the requirements marked by the issuance of The weir of the 56 MW run-of-
renewable energy in our national
energy mix.
of our industrial zones or specific
economic zones, electricity demand
Presidential Regulation No. 38
regarding cooperation between
sustainably and create a big impact
in our economic development. hydropower is river Semangka hydropower
plant in Sumatra, Indonesia.
Credit: Voith Hydro.
will be drastically increased. For government with business entities The critical point in developing
As part of the G20, Indonesia has
ratified international agreements
example, domestic demand in
Kayan-North Kalimantan is only 60
in providing infrastructure. hydropower is making sure
that the project is ready and making sure
in the field of environmental The Government of Indonesia has attractive for investment. Thus,
protection, especially in reducing
CO2 emissions. Under the
MW but when the industrial zone
is developed, demand will increase
to 1,000 MW. This demand could be
formulated several policies for
incentivising the private sector in
the comprehensive assessment
of social, technical, economic and
that the project
Paris Agreement, Indonesia the development of renewable
has committed to reduce GHG
emissions by 29 per cent in 2030
covered by the hydropower plant on
the Kayan River which has potential
energy. Namely: developers can
obtain a 5 per cent reduction in the
environmental aspects should be
promoted. is ready and
to deliver up to 6,000 MW. We look forward to cooperating
from “business as usual”. Therefore,
a reduction in the use of fossil fuel In the Draft of the National Mid-
income tax rate for their investment
each year for a period of six years; more productively with the
International Hydropower
attractive for
energy by increasing and promoting Term Development Plan 2020- accelerated depreciation of fixed
the use of new and renewable
energy is critical.
2024, the strategy for hydropower
development is to be changed
assets can be completed within ten
years; the income tax on dividends
Association (IHA) to accelerate the
development of hydropower in investment
to not just follow demand, but to for foreign investors is at Indonesia.

18 | International Hydropower Association | Hydropower Status Report 2019 | 19


Policy perspectives

POLICY PERSPECTIVES
The upper-dam site for
the planned Upper Arun
Hydroelectric Project.
Credit: CSPDR-SINOTECH JV in
View from Nepal association with SOIL TEST.

Ensuring access to affordable, reliable


and sustainable energy
Nepal’s government is seeking to attract investment in
the country’s vast hydropower resources, while exploring
regional energy interconnections, as a way of reducing
reliance on fossil fuels, increasing off-grid access, and
reaching middle-income status, writes H.E. Barsha Man
Pun, Minister of Energy, Water Resources and Irrigation.

In Nepal, after having enabled a prospective independent power solar, and wind as complementary direct investments in the sector. electricity trade. We believe
political environment with a new producers. Out of these, around 2.4 to the strengthening and expansion that these developments shall
Over the past couple of years,
constitution and the formation of GW is expected to be online within of the grid electricity distribution give confidence to prospective
we have accelerated the pace
government at federal, provincial the next four years. system. developers.
of reforms in the sector. Even
and local levels, overall economic
In the energy mix for the year 2016, The optimum exploitation of though it has been challenging to We are working to have a regional or
development is now the foremost
the total energy produced was hydropower resources with seasonal unbundle the sole public utility in sub-regional power interconnection.
priority. The present government’s
around 13 million tonnes of oil and daily storage capacities along the sector, we have been successful We are signatory to the South
campaign for a ‘prosperous Nepal
equivalent (MTOE), out of which the with the use of locally available in creating a generation company Asian Association for Regional
and happy Nepali’ cannot be
majority, around 66 per cent, came renewable energy sources like solar and a transmission grid company. Cooperation (SAARC) Framework
realised without the complete
from fuel wood. The contribution and wind will be the key factor for Seven distribution companies are Agreement on Energy Cooperation,
economic transformation of the
country. Energy, being the key driver
for economic development, has
of energy from renewables and
electricity accounted for little
a stronger and stable energy mix.
This will greatly reduce our heavy
now being planned to function
in different provinces. Legal
and also party to the understanding
reached for the establishment
In five years, we
over 6 per cent. For our energy dependence on imported fossil fuels instruments are already in place of the Bay of Bengal Initiative
become the main area of focus for
the government. We are committed
requirement for the year 2050,
estimated at around 17 MTOE, we
through substitution with clean and
renewable energy sources. By the
for the formation of a regulatory
mechanism in the electricity sector
for Multi-Sector Technical and
Economic Cooperation (BIMSTEC)
intend to provide
to adequate energy production and
supply of electricity to achieve the
accelerated double-digit growth of
intend to source 33 per cent of it
from electricity and renewables
next ten years, we are planning to
develop 10,000 MW of generation
through which the Electricity
Regulation Commission will become
Grid Interconnection. Eventually,
such sub-regional or regional access to 100
next to 34 per cent from fuel wood for domestic consumption alone, functional very soon. interconnections should help us to
the Nepalese economy.
Nature has bestowed enormous
and biomass. Thus, we foresee a
substantial dominance of electricity
with another 5,000 MW for cross-
border trading.
One of the basic policies of the
government is to promote private
optimise our power systems and
lower operating costs. per cent of the
hydropower potential, of about and renewables in the projected
83 GW, on us. Of this about 42
GW is deemed technically and
energy mix for the target year 2050.
We have initiated a programme,
‘Nepal’s Water - Citizen’s
investments in the power sector. To
that end, we have investor-friendly
We envision Nepal to be an
enterprise-friendly middle-income population
The Government of Nepal has set Investment’, through which we regulations which treat national country by 2030. We are populated
economically feasible. We have
targets in the power sector for the aim to mobilise financial resources and foreign parties on par. We by a vibrant and youthful middle-
been able to develop about 1.1
next ten years. In five years, we from the public as an equity share have been successful in opening class with absolute poverty in the
GW of installed capacity with a few
intend to provide access to 100 per for hydropower development, up opportunities for accessing low single digits and decreasing.
pondage run-of-river projects and
cent of the population through a creating opportunities for people’s neighbouring power markets Under this overarching vision,
numerous run-of-river projects.
mix of grid and off-grid systems. In participation, and to develop a beyond our political borders. The Nepal is continuously pursuing to
The storage facility of Nepal’s
the meantime, we are implementing sense of ownership in hydropower Power Trade and Transmission meet, among others, the target of
power system accounts only for
several transmission and distribution development. Investment that can Interconnection Agreement Sustainable Development Goal 7
92 MW. On the brighter side, with
system reinforcement projects to be generated within Nepal is limited, with India and understandings which deals with ensuring access to
the encouraging involvement of
provide reliable electricity services so is the case for debt as domestic reached with China as well as affordable, reliable, sustainable and
the private sector, around 2.5 GW
to the people. The government is lending is inadequate for the with Bangladesh for cooperation modern energy for all.
of installed capacity is actively
considering distributed electricity development of larger projects. This in the power sector have laid
undergoing construction by
generation through micro-hydro, clearly points to the need for foreign the foundation for cross-border

20 | International Hydropower Association | Hydropower Status Report 2019 | 21


Policy perspectives

POLICY PERSPECTIVES
Uganda’s President Yoweri
Museveni plants a tree
during an inauguration
ceremony for the Isimba
Hydropower Plant in March
View from Uganda 2019. Credit: PA Images.

Access to electricity is inextricably linked


to socio-economic transformation
The Government of Uganda is committed to the sustainable
development of its hydropower resources. Like many
countries in Africa however, Uganda faces challenges in
raising investment capital and enhancing local technical
and management capacity, writes Honourable Minister of
Energy and Mineral Development Irene Nafuna Muloni.

Access to clean energy in general hydropower dates back to 1947 Additionally, hydropower is sensitive
and electricity in particular is an with the first two hydropower plants to the climate driven hydrological Authority (NEMA) is in place to Kiba (290 MW). Regarding small for the past 65 years and has the
essential input in the growth and being commissioned in 1954 – the cycle thus necessitating proper ensure that resettlement and hydropower projects, the current lowest tariff in the energy mix.
economic, social and political Owen Falls plant, now Nalubaale, management of the river catchment environmental issues are well policy is that their development
Therefore, for Uganda to achieve
development of a country. with a capacity of 150 MW, and areas. The prolonged drought addressed during the development is undertaken by the private
sustainable development, the
Electricity is inextricably linked to Mobuku I with a capacity of 5 MW experienced in Uganda between of these projects. sector. The Renewable Energy
hydropower resources that remain
socio-economic transformation at which was to supply electricity 2003 and 2007 led to a decline in Feed-in Tariffs (REFiT) are in place
To ensure that we develop untapped will have to be developed
individual household and business to the copper mines of Kilembe hydropower generation of over 60 to promote investment in small
our hydropower resources in so as to bring to fruition plans
levels, as well as at aggregate in western Uganda. Over the last per cent, thus necessitating the hydropower and other renewable
a sustainable manner, in 2010 aimed at increasing access to
national level. three decades, there has been deployment of expensive thermal power projects.
the government undertook a electricity and per capita electricity
significant growth of power demand power to reduce load shedding
As a critical input in the hydropower development master The current contribution of consumption, and to contribute to
in Uganda, averaging 8 per cent per which had negatively impacted our
development process, electricity plan study. The study targeted sites hydropower in Uganda’s electricity the achievement of the Sustainable
annum. The majority of this demand economic growth.
consumption has multiplier effects above 50 MW mainly along the River generation mix is 87 per cent. This Development Goals.
has been met by the construction of
on the economy. For a country To address the challenge of Nile. The objective of the study was figure will go up to 92 per cent
additional hydropower generating
to have adequate and reliable financing, the Government of to prepare a master plan that is in once Karuma is commissioned.
plants which included: the
electricity supply that matches Uganda put in place an Energy line with the long-term power and Hydropower is a key component
refurbishment of Owen Falls dam
demand, it calls for deliberate Investment Fund which enabled transmission development plan. The in electricity generation expansion
policies and efforts to plan and
develop electricity generation
and increasing its capacity to 180
MW, and the development of Kiira
(200 MW), which was commissioned
us to commence the construction
of Bujagali hydropower plant as
hydropower master plan prioritised
potential hydropower sites based on
plan in line with our Vision 2040
strategy.
Hydropower
capacity based primarily on national we awaited financial closure. The technical, environmental, economic
natural energy resources.
in 2000, Bujagali hydropower plant
(250 MW), commissioned in 2012,
250 MW Bujagali hydropower plant
was developed under a public-
and financial aspects, to prepare
preliminary designs thereof, and to
There is still over 2,000 MW of
hydropower that is yet to be will continue to
According to the International and a number of small hydropower developed. Hydropower will
Energy Agency’s World Energy
Outlook report of 2018, hydropower
projects totalling 107 MW.
The key challenges for hydropower
private—partnership arrangement
with Bujagali Energy Limited (BEL).
The plant tremendously reduced
build government capacity in this
field.
therefore continue to play a
critical role in providing electricity
play a critical
is the largest renewable electricity In line with the hydropower master in Uganda in the medium term
generation resource, meeting about
16 per cent of global electricity
development in Uganda, and
most countries in Africa, include
our reliance on expensive thermal
power. Additional investment capital
plan, the government is fast-tracking
the development of the identified
because of a number of benefits,
such as its proven technology,
role in providing
the need for substantial up-front has been attracted through bilateral
demand, followed by wind, solar
PV and bio-energy. This trend
investment capital which cannot
easily be raised by the sector, as
financing with our development
partners. The challenge of
hydropower sites. We are currently
implementing two key flagship
high efficiency, low operation and
maintenance costs, high flexibility, electricity in
is expected to continue in the hydropower projects namely, Isimba ability to be designed with a
well as environmental and social inadequate technical capacity has
medium term which therefore
calls for sustainable development
concerns such as the resettlement
and compensations of persons
been addressed by putting in place
a local content policy to ensure the
(183.2 MW) and Karuma (600 MW).
Other large hydropower plants
large storage capacity to cater for
peak time demand, and due to its Uganda
and utilisation of the hydropower being packaged for development high reliability. For example, the
affected by the projects, and participation of Ugandans during
resource. include Ayago (840 MW), Orianga Nalubaale hydropower project has
inadequate local implementation construction of the projects. The
(392 MW), Uhuru (350 MW) and been providing electricity to Uganda
For Uganda, the development of experience and technical capacity. National Environment Management

22 | International Hydropower Association | Hydropower Status Report 2019 | 23


Policy perspectives

POLICY PERSPECTIVES
The Salto Grande
Hydroelectric Complex on
the Uruguay River between
Argentina and Uruguay.
View from Uruguay

The role of hydropower in the commitment


to sustainable development
Almost 100 per cent of Uruguay’s electricity is generated from
hydropower and other renewable resources. Hydropower’s
role is not just historic, writes Honourable Minister of Industry,
Energy and Mining Dr Guillermo Moncecchi, it will continue
to provide a platform to develop non-conventional renewables
and achieve sustainable development.

Although the discussion between effectively operative, this indicator power generation capacity (in fact surplus of renewable generation small-scale hydroelectric plants is
historians and linguists over exceeds 85 per cent in the case of internationally, Denmark, Uruguay, opens additional opportunities not only compliant with the United
whether the country´s name in Uruguay. All of the above shows Portugal and Ireland, in that order, to the decarbonisation of other Nations’ Sustainable Development
guaraní, Uruguay, refers to the that Uruguay has developed its have the largest share of wind sectors of the economy in which Goal (SDG) 7, but also responds
‘river of snails’ or the ‘river of birds’ hydroelectric resource at an early resource in the electricity mix). In it is more challenging to achieve to the water-food-energy nexus
is not settled, there is no doubt
that etymologically, the name of
stage, practically reaching its
large-scale operation capacity. As a
addition, generation capacities from
biomass and photovoltaic solar are
transformation. initiative through the promotion of
new multi-purpose power plants
Hydroelectric
Between 2014 and 2017, a study was
this country shows a close link to consequence, its historical electric developed. destined for irrigation crops and
the natural resource water. This
link has a technical correlation, the
mix presents sustainability indicators
that are more than satisfactory in
As a result of this process, today
conducted on the complementarity
of renewable sources and the
drinking water for consumption
by the population, which also
power in
our country shows with satisfaction demand for electrical energy,
first hydroelectric plant in South
America, Cuñapirú Dam, was
international terms.
However, the impact of hydroelectric
that, in average terms in the last
years, 98 per cent of electric energy
which evidenced, on one hand, a
strong complementarity between
include the possibility of electricity
generation. The implementation of Uruguay has
inaugurated in 1882 in association these new ventures does not only
generation on the sustainability has come from renewable sources hydroelectric and solar resources.
with a mining enterprise in Uruguay,
and kept in operation until 1918.
of the Uruguayan electricity mix
does not end there, but presents
and 99.8 per cent of the population
has access to electric power. The
On the other hand, it identified that
by managing energy storage or
improve the sustainability of the
energy sector, but also responds not only had a
to the need for adaptation of a key
At the beginning of the twentieth
century, Uruguay reinforced this
two additional dimensions. On
one hand it is the base on which,
share of hydroelectric energy in
the electric mix is approximately
demand it is possible to eliminate
or significantly reduce the inclusion
sector of our economy in a country
that, with 3.5 million inhabitants,
relevant role in
commitment, commissioning more recently, Uruguay has carried 50 per cent in an average year, of new thermal generation plants
the past, but also
produces food for more than 30
studies that concluded with the out a very dynamic incorporation which complements 27 per cent of in the next 30 years. Among other
million people in the world.
construction, around the middle of of sources of non-conventional electricity generated from wind, 18 technological alternatives that
the century, of three hydroelectric renewable energies. On the other per cent from biomass, 3 per cent could contribute to reach this In short, hydroelectric power
plants. Those generation plants,
together with the implementation
hand, the construction of the
binational power plant has been
from solar power and approximately
2 per cent from thermal power
objective, are pumped storage
power plants. Uruguay is currently
in Uruguay has not only had a
relevant role in the past, ensuring
in the present
of a binational dam with Argentina, the driver for the development plants using fossil fuels. working actively in the assessment the sustainability of the electricity
have allowed Uruguay to be among of regional interconnection of alternatives aimed at the mix, but also in the present, acting
Simultaneously, Uruguay has
a group of countries with both infrastructure, a very valuable accumulation and management as a platform to develop non-
changed the role that it traditionally
the largest installed capacity and component to progress in of demand. It advanced in the conventional renewable energies,
occupied in the region as an
hydroelectric generation per capita the integration of other non- identification of potentially useable redoubling the commitment to
energy sink, and since 2013 it has
in the region. manageable sources of renewable sites in the medium term for the comply with the SDGs.
continued without interruption to
generation. location of plants that allow for the
Recent studies carried out by the be a net exporter of electricity to
daily variability of energy demand.
Latin American Energy Organization, Thus today, Uruguay, based on Argentina and Brazil. Additionally,
OLADE, show that, while at a Latin the execution of its energy policy, in the short term, the possibility In this context, our commitment to
American level 25 per cent of presents a ratio of approximately of advancing the electrification the future of the development of
potential generation capacity is 1:1 between hydroelectric and wind of other uses by orienting a

24 | International Hydropower Association | Hydropower Status Report 2019 | 25


IHA FELLOWS
Recognising your experience

Become
a Fellow
Member
If you are a highly experienced hydropower
professional, you can apply to become a Fellow of the
International Hydropower Association (IHA).

Gain international recognition Fellow members join a network of hydropower leaders


whose expertise is internationally recognised. As a Fellow,
you will receive special invitations to IHA events and help
Join a global network of leaders to steer the sector’s future development.

Fellow members are entitled to use the letters ‘F.IHA’ in


their professional title. To qualify, you must have at least
Help steer hydropower’s future five years’ experience in a senior management position
in the hydropower sector or have 10 years’ experience in
a specialist field relating to hydropower. Applicants must
be endorsed by two professional referees.

To learn more, please visit:


hydropower.org/fellow-iha

26 | International Hydropower Association | Hydropower Status Report 2019 | 27


HYDROPOWER TRENDS IN FOCUS
The Kruonis Pumped Storage Plant in Lithuania.
Credit: Lietuvos Energija.

Hydropower
trends in focus

Benefits of hydropower 30

Climate resilience 32

Modernisation 34

Pumped storage 36

Regional interconnections 38

Sustainability 40

28 | International Hydropower Association | Hydropower Status Report 2019 | 29


Commissioned hypdropower projects

Commissioned hypdropower projects


200 500

HYDROPOWER TRENDS IN FOCUS


 Single purpose  Multipurpose  Single purpose  Multipurpose

400
150

300
100
200
Benefits of hydropower 50
100

0 0

00 0
60 0

70 0

80 0

90 0

10 0

8
10 0

20 0

30 0

40 0

50 0
80 0

90 0

00 0

10 0

8
10 0

20 0

30 0

40 0

50 0

60 0

70 0

01
20 201
19 191

19 197
19 192

19 195
19 193

19 196

19 198

19 199
19 194

20 200
01
20 201
19 191

19 197
19 192

19 195
19 193

19 196

19 198

19 199
19 194

20 200
Analysing the multiple services

–2
–2

0–






0–






0
0

19
19
provided by hydropower projects
Figure 2. Growth of single and multi-purpose hydropower Figure 3. Growth of single and multi-purpose hydropower
projects in South America (data from IHA / ICOLD) projects in South & Central Asia (data from IHA / ICOLD)

commissioned hydropower projects between Zambia and Zimbabwe, The environmental and social
were multi-purpose. was commissioned in 1962 as a investment programmes developed
A new research study by IHA shows the multiple power and non- The global trend varies across
single purpose hydropower project, for these projects support close
but the dam is now also used to to one million people. These
geographical regions. Multi-purpose
power services provided by hydropower projects are often under- hydropower projects predominate
irrigate over 2,700 ha of land, and
provides fisheries, transportation,
programmes include improved water
quality, water supply and treatment,
in South and Central Asia, whereas
reported. Greater research is needed to identify and quantify these South America has the lowest
recreation and tourism with 17 hotels
in the surrounding area. None of the
environmental conservation and
irrigation, improved sewage systems,
percentage of multi-purpose dams.
databases IHA examined in this study education, employment, and
benefits and factor them into decision-making processes. Figure 2 and Figure 3 show decadal
reflect these additional services, health opportunities, and increased
evolution growth by region for single
provided at Kariba, nor for many electricity, capacity building, and
and multi-purpose hydropower
other dams around the world. tourism. Ecuador’s Daule Peripa
projects in South America and South
hydropower project, for example,
and Central Asia. Both single and multi-purpose
Overview boosting national macroeconomic Multi-purpose analysis has been essential in supporting
hydropower projects provide a
growth and opportunities for trade. Benefits provided by hydropower population growth, especially in
Single-purpose and multi-purpose The majority (81 per cent) of the wide range of services and benefits
Communities also benefit from safely projects Guayaquil, where it is the main water
hydropower projects deliver a range world’s 51,512 existing large dams to promote the sustainable
managed water for homes, industry supply source for its two million
of power and non-power benefits to are single purpose according to the From a macroeconomic perspective, development of the communities
and agriculture, and flood and habitants.
society and the environment. Over International Commission on Large multi-purpose hydropower projects they serve. In many cases, these
drought mitigation. provide many investment benefits benefits were not taken into account Future research
and above electricity generation, Dams (ICOLD). ICOLD defines a large
power-related benefits include A hydropower project designed dam as having a height of 15 metres over single-purpose projects. in the design phase and later on are
More in-depth research is needed
flexible generation and storage, as and built for a single purpose will or greater from the lowest foundation However, the complexity in planning, difficult to account for.
to identify and quantify hydropower
well as reduced dependence on fossil often find multiple other uses to crest or between five metres and funding and implementing multi-
IHA hydropower database project services, both power-
fuels and avoidance of pollutants. over its long lifetime. In order to 15 metres impounding more than purpose dams is a major challenge.
related and non-power related, and
analyse and quantify some of the three million cubic metres. This is due to the inherent complexity Due to the need to better understand
In addition, hydropower projects factor these into decision-making
often underreported benefits of of dealing with multiple stakeholders, the range of services provided by
support local businesses, create Irrigation accounts for the most processes, particularly at the project
hydropower, the International the need for a sustainable business hydropower projects, whether or
employment and improve common single-purpose dam design phase.
Hydropower Association (IHA) has model for financing, operations not these services were anticipated
livelihoods. Projects deliver type (29 per cent), followed by and maintenance, as well as the in the design phase or emerged IHA will continue working to raise
undertaken a global study to analyse
investment in transportation, hydropower (10 per cent) and flood management of unforeseen risks and later after construction, this study awareness and share good practices
available databases that account for
education and health services, control (5 per cent), excluding the 38 negative externalities. undertook an in-depth analysis of about the additional services and
these additional services.
tourism and recreation, while per cent of dams recorded as having the IHA Hydropower Database. This is benefits of well designed and
an undefined purpose. In particular, diverging interests
the world’s most comprehensive and responsibly managed hydropower
among different users can result in
This study by IHA analyses 9,266 up-to-date hydropower database, projects. IHA will also continue to
10000 complex and potentially vulnerable
hydropower stations worldwide, of holding information on more than expand our Hydropower Database to
 Single purpose  Multipurpose contract structures. Conflicts can
which, according to ICOLD, 40 per 12,000 operational stations globally. quantify hydropower’s contributions
emerge in relation to the operation of
Number of hypdropower projects

8000 cent are multi-purpose and 60 per to energy and food security, as well
the reservoir (i.e. if divided for water This study looked at Ecuador, in
cent single purpose. Figure 1 shows as to the livelihoods of people in
storage for divergent objectives or if South America, and considered 37
the evolution of single and multi- affected communities.
6000 water use patterns vary depending hydropower projects that account
purpose hydropower projects from on the purpose) and project for 99 per cent of the country’s
1900 to 2018. financing, as attracting private hydropower installed capacity. Contact
4000
Trends and evolution investors for a multi-purpose project Only 12.5 per cent of these projects
is more challenging. were designed as multi-purpose. Cristina Diez Santos
2000 Between 1950 and 1980, the Information on additional benefits Senior Hydropower Analyst
number of newly commissioned Nonetheless, a dam designed for cds@hydropower.org
was gathered from 16 stations that
multi-purpose hydropower projects a single purpose often becomes
account for 88 per cent of Ecuador’s
0 doubled, with the highest rate of multi-purpose by practice. In many
total hydropower installed capacity.
cases, this evolution does not allow
10

development of single-purpose
01
01
97
92

95
93

96

98

99
94

00

The majority of these stations


19

–1

–2
–2
–1

–1

–1

–1
–1

–1
–1

the optimum realisation of project


–2
0–

hydropower dams occurring


60
10

10
20

00
40

were commissioned in the last two


70
50

80
30

90
0

19

20
19
19

benefits. For example, the Kariba


19
19
19
19

19

20
19

19

between 1950 and 1980. Between decades, where only two out of the
1970 and 1980, 55 per cent of Dam, in the Zambezi river basin
Figure 1. Cumulative number of hydropower projects (data from IHA / ICOLD) 16 were designed as multi-purpose.

30 | International Hydropower Association | Hydropower Status Report 2019 | 31


HYDROPOWER TRENDS IN FOCUS
Development and consultation the beta version of the guide. The The guide will become highly
consensus view was that a single relevant for hydropower operators
The development of the Hydropower
guide should provide a standardised and investors seeking robust ways of
Sector Climate Resilience Guide was
approach for hydropower projects at demonstrating the climate resilience
coordinated by IHA and developed
any stage of their lifecycle, with the of hydropower projects. In addition, it
with technical and financial support
participants exploring challenges will facilitate assessments of climate
Climate resilience from the European Bank for
Reconstruction and Development
relating to performance metrics, risk risks and resilience measures required
thresholds evaluation, and reporting by financial institutions’ emerging
(EBRD) and the World Bank Group
of results. rating systems.
with funding from the Korea Green
Growth Trust Fund. The technical workshop was a Aligned with sustainability tools
significant milestone towards
Building climate resilience in the The process began in 2015 with a
workshop co-organised by the World
Bank and IHA on the resilience of
developing the Hydropower Sector
The Hydropower Sector Climate
Resilience Guide complements
the Hydropower Sustainability
hydropower sector hydropower and dams to climate
change and natural disasters.
“We see financing hydropower
as being indispensable to the
Guidelines on Good International
Industry Practice (HGIIP), which
After consultation with multiple define expected performance for the
stakeholders a beta version was clean energy transition, but we hydropower sector across a range of
developed by the Mott McDonald really must think about a project’s environmental, social, technical and
IHA’s new Hydropower Sector Climate Resilience Guide will provide consultancy, under contract with
the World Bank, and released in resilience to the impacts of a
governance topics, including climate
change mitigation and resilience.
September 2017. changing climate when investing in
a practical way forward to manage climate risks and incorporate the sector” - Dr Craig Davies, Head
The guide also supports assessment
During 2018 and early 2019, EBRD tools used to measure project
resilience into proposed and existing hydropower projects. and the World Bank supported of Climate Resilience Investments, performance, such as the Hydropower
IHA members and hydropower EBRD Sustainability Assessment Protocol
developers and operators involved (HSAP) and the Hydropower ESG Gap
with new and existing hydropower Analysis Tool (HESG). These tools are
projects around the world in piloting Climate Resilience Guide, following used to examine whether a project is
Background A pathway to informed decisions hydropower project appraisal, design, the beta version of the guide to check which IHA worked with an advisory climate resilient and so, by following
construction and operation, resulting its applicability and practicality. expert panel to integrate the the guide, hydropower projects
As a low carbon technology, To be launched at the World
in more resilient hydropower project feedback into the final version. are more likely to achieve good
hydropower produces almost Hydropower Congress on 15 May Testing and piloting the guide
development and operation. assessment scores.
two-thirds of the world’s renewable 2019, the Hydropower Sector Climate A tool for financial disclosures
electricity and will make a significant Resilience Guide aims to address a It is intended as a resource for Testing experiences from the pilot
contribution to achieving the targets need to provide international good project owners, financial institutions, projects – representing reservoir and Climate related financial disclosure is
of the Paris Agreement and the practice on assessing climate change governments and private developers, run-of-river projects of different scales rapidly becoming a legal requirement Contact
Sustainable Development Goals. risks and to incorporate climate who will utilise the guide to including greenfield, rehabilitation for companies in many parts of the María Ubierna
While offering countries protection resilience into hydropower project make informed decisions in the and operating assets – were shared world. Increasingly, hydropower Hydropower Specialist and Focal Point,
against impacts exacerbated by planning, design and operations. development, rehabilitation and in a technical workshop in London in companies will be expected to Knowledge Building Team
climate change such as floods and operation of hydropower projects. January 2019. disclose to regulators, investors and mu@hydropower.org
The guide seeks to evolve from shareholders how such risks are being
drought, hydropower projects These stakeholders and decision- At the workshop, seven pilot projects
defaulting to the use of only historical managed including measures to build
can also be susceptible to climate makers include: from around the world presented
data and the assumption that resilience.
risks due to their dependency on their practical experiences of testing
hydrological variability will remain the • Project owners, developers
precipitation and runoff.
same over the lifetime of the project, and operators – managers
Failure to adequately consider climate responsible for the planning,
risks may lead to shortcomings in development, design,
technical and financial performance, “The World Bank is pleased to
construction and operation of
safety and environmental protection. support an industry guide for hydropower projects to consider
In addition, investment decisions climate change resilience.”
may not adequately recognise the climate risks in new and existing Preliminary
role of hydropower infrastructure in - Pravin Karki, Global Lead for hydropower projects. Requirements
Phase 1:
providing climate adaptation services. Hydropower and Dams, WBG • Policy-makers – officials in Project climate
risk screening
To facilitate the development of governments and national
hydropower infrastructure that can agencies looking at water and
withstand variable climatic risks, the energy planning and regulatory Does the project need a
as well as the limited knowledge of climate risk assessment?
International Hydropower Association aspects who may use the guide
how best to access, use and interpret Phase 5:
(IHA), together with a range of as a framework to evaluate Monitoring,
climate change modelling and reporting and
partners, prepared a Hydropower systems risks. No evaluation
observed climate data. This approach Yes
Sector Climate Resilience Guide
neglects consideration of short- and
with the objective of providing • Financial institutions – project
long-term impacts that climate
practical and systematic guidance for leads involved in the financing
change may have on investments, Phase 3: Phase 4:
hydropower engineers and project of new projects or major Phase 2:
Climate Climate risk
due to the high uncertainty inherent Initial analysis
stress test management
owners to develop climate resilient rehabilitation and upgrade of
in climate change projections.
projects. existing hydropower projects 3.3
3.1
The guide is designed to take users that request a climate risk 3.2
through a six-phased approach to
assessment as a requirement for
incorporate climate resilience into
financing.
32 | International Hydropower Association | Hydropower Status Report 2019 | 33
HYDROPOWER TRENDS IN FOCUS
Modernisation

Adapting to the new era of digital


hydropower design and operation
The Salto Grande
hydropower complex
on the Uruguay River
between Argentina and
A growing proportion of the global fleet of hydropower assets is Uraguay is undergoing
a modernisation
transitioning to digitalised systems and processes. This revolution in programme.

the way hydropower projects are designed, operated and maintained


will ensure hydropower is well positioned to meet its role in the clean
energy future.

Digitalisation has been part resources, by providing increased enhance real time signal processing digital transformation. Digitalisation
of the hydropower sector for flexibility and enhanced control for with high resolution data. In addition, can in some cases result in staff
decades with some of the earlier ancillary services. EDP’s digitalisation programme will re-deployment, through remote
hydropower utilities pioneering the include an asset optimisation pilot operations and automated processes.
use of computers to manage and At the Salto Grande hydropower
programme. In addition, developing local skills and
operate the electricity grid. Today, complex on the Uruguay River, a
expertise on new digital systems will
digitalisation covers a spectrum of binational project operated by the Emerging challenges
often require training and knowledge
systems and processes from design governments of Argentina and
The process of digitalisation for transfer from experienced operators.
and construction to operation Uruguay, an ongoing modernisation
hydropower assets will need to go
and maintenance (O&M), as programme is rolling out digital As the most mature and reliable source
beyond digital controls and digital
demonstrated in Figure 1. control systems to adapt to new of renewable electricity, both existing
systems for planning and operating at
conditions such as an increasing share and new hydropower projects are
The early stages of planning and the station level. At the power system
of variable renewable generation being prepared to meet even greater
designing modern hydropower level, operators and markets will need
from wind and solar power. The challenges on the road towards a clean
developments are now digitised by to adapt to faster-reacting, more
multi-year digitalisation programme energy future, and digitalisation is the
converting drawings and plans into flexible operating regimes with digital
seeks to optimise performance means by which it will get there.
data to create a computer model, technologies.
through greater integration between
known as a ‘digital twin’ of the plant, operation and maintenance, with the To some extent, the advent and
allowing multiple use scenarios and initial phase focused on improving application of new digital technologies Contact
configurations to be simulated. communications, protection systems throughout the entire energy sector,
Figure 1. A schematic of hydropower digitalisation Bill Girling
Enhanced digital control systems can and monitoring of the infrastructure, while improving production and Senior Hydropower Analyst
intelligence. Smart condition programmes for existing hydropower while the latter phases will include efficiencies and facilitating flexible
improve the performance of turbines bill.girling@hydropower.org
monitoring and diagnostics can assets to ensure that increased increased cyber-security, and further operation of utility-scale power
and generators, helping to extend
detect component failures or flexibility and added cyber-security performance optimisation through systems, has also created increased
the lifetime of a hydropower facility.
deterioration of equipment before protections are replacing outdated integration of dispatch, generation and ‘entry points’ for security breaches. To
Operations and maintenance can be
they happen, by remotely collecting analogue systems, and to improve integrated water management. that end, the industry is responding
optimised and costs reduced using
data and analysing it to improve overall workforce allocation with the with improved and much more secure
advanced performance monitoring In the Iberian peninsula, EDP Portugal
diagnostics on faults. Innovative use of remotely operated stations and IT/OT interconnections to provide
analytics, while maintenance is providing a new asset management
solutions such as the use of drones centralised O&M for cascade systems. additional protection, as well as cyber-
processes can be improved through platform at 56 hydropower units, which
for asset and environmental security monitoring and rapid response
automatic key performance indicator The digitalisation of hydropower will extend the turbine operating range
inspections add another element to systems to detect malicious attackers
(KPI) tracking and benchmarking. systems will also allow traditional and support predictive analytics and
advanced condition monitoring. and restore systems.
hydropower systems – both pumped advanced performance modelling.
Condition monitoring is becoming
Enabling other renewables hydropower storage (PHS) and EDP is working closely with GE to Consultation with stakeholders in
increasingly sophisticated with
conventional hydropower – to work implement new intelligent monitoring the industry has identified other
the advent of digital sensing Around the world, digitalisation is
together with other renewable systems in 12 hydropower plants to challenges for utilities undergoing the
technologies coupled with artificial being integrated into modernisation
34 | International Hydropower Association | Hydropower Status Report 2019 | 35
Lake Cethana was recently named
as one of the most promising sites

HYDROPOWER TRENDS IN FOCUS


for pumped hydropower storage in
Tasmania, Australia.
Credit: Hydro Tasmania.

Pumped storage Direct participation energy retailers, industrial customers noted though that as greater
or governments) and the nature of PHS and other forms of flexibility
Direct-participation is the
such agreements can determine the enter the grid, all offering similar
competitive part of a liberalised
operating model of the facility. ancillary services, it is expected that
market in which PHS operators

Securing the future for pumped


competition in this market will drive
compete with other market For example, a project could act
down prices.
participants. Revenue can be as an insurance product (known

hydropower storage projects


generated in several ways, specific as ‘cap contracts’) for off-takers to Behind-the-meter generation
to each market and they often guard against high price events.
Behind-the-meter generation is
need to be combined, known as An extension of this is the capacity
when a project is located on the
‘revenue stacking,’ to make a project market mechanism which is
generator, consumer or end user
financially viable. However, this can designed to ensure sufficient and
side of the electricity meter and is
be challenging due to the differing reliable supply is available across
undertaken for a variety of reasons,
While we are witnessing renewed interest in pumped hydropower storage operating demands required for an entire market by providing
such as to improve supply reliability
each stream. payments (whether or not they
and to avoid peak electricity prices
as a technology to ensure grid stability, many markets around the world Energy arbitrage
are dispatched) to encourage
investment in new capacity or
and grid charges. A hybrid model
can involve the PHS facility being
Arbitrage is the main source of for existing capacity to remain
have been slow to recognise its value to the clean energy transition. revenue for many PHS projects and operational. Several governments
used for internal purposes while
also offering services into the
involves using electricity to pump around the world, including the
competitive electricity market to
water during periods of low demand United Kingdom, have established
improve its viability.
and off-peak prices, and generating this mechanism resulting in mixed
As one of the central pillars of power and operations have kept pace, policies and regulations in markets when there is high demand into success for PHS due to the policy’s Summary
grid flexibility, energy storage is regulatory and policy frameworks can deter investment in new the spot market reflected by higher preference for less-capital intensive
projects and their inability to Pumped hydropower storage
a vital component of the energy have resisted change, putting the projects and upgrading existing peak prices (i.e. shortage in supply
provide sufficiently long contracts. has proven to be an essential
transition. The significant increase financial viability of some PHS facilities. There are considered to to meet demand). The spread
Capacity markets can also minimise component for modern and future
in variable renewable energy projects at risk. be three broad classes of revenue or difference in price between
energy price volatility which further clean energy systems. However,
(VRE) sources like wind and solar models for PHS projects: ‘cost- pumping and generating also
Much like the development of reduces the ability of PHS to profit if PHS is to continue to deliver
coupled with their displacement of of-service’, ‘direct participation’ needs to take into consideration the
conventional hydropower, securing from arbitrage. Finally, innovative its vital services, either through
conventional generators is putting and ‘behind-the-meter’. In some project’s round-trip efficiency and
favourable financing arrangements new products in some markets existing projects or new greenfield
increasing pressure on power circumstances, a mixture of models other costs such as grid charges.
for PHS is a challenging task, which are seeing flexible technologies projects, the market framework
grids. Energy storage technologies can be employed to optimise Forecasting revenue for arbitrage and regulatory treatment of this
needs to be tailored for each generate revenue for their firming
offer great potential to support revenue streams: can be extremely difficult given technology will need to evolve
project. While a mature and trusted function. These ‘firming products’
renewable energies and power the lifespan of projects. It requires accordingly, particularly in
technology, PHS projects face a long Cost of service could involve wind or solar
grids by absorbing and releasing detailed modelling which needs liberalised markets.
gestation and payback period with generators purchasing the dispatch
energy when required and providing Cost-of-service is a model where to account for potential changes
high upfront capital costs. However, rights to a PHS facility to firm up Pumped storage should be seen
ancillary services that help maintain a facility is compensated via a in market dynamics and the
unlike conventional projects, with their supply in order to always meet not as just a back-up generator or
grid security and stability. regulated arrangement, whereby it regulatory environment, all of
PHS it can be difficult to accurately their contracted obligations such a provider of ancillary grid services,
is able to recoup its operating cost which impact market prices. For
Pumped hydropower storage (PHS), forecast revenues derived from as through PPAs. There are many but as a resource that provides
plus an agreed rate of return on its example, Germany’s renewable
the world’s ‘water battery’, has energy arbitrage, and many of the variations on this that are also benefits across a whole spectrum of
capital costs. This is commonly used energy policies have brought online
provided storage and flexible power ancillary services provided are still possible. roles within local and regional water
by monopoly operators overseen by large amounts of subsidised solar
services to grids since the beginning not adequately remunerated, if at all, and energy systems.
a state regulator. Variations of the and wind which has significantly Ancillary services
of the twentieth century. Accounting in many markets.
model are used in China as payment reduced-price differentials. In Further reading:
for over 94 per cent of installed These non-energy services such as
The vast majority of PHS projects in or tariff mechanisms for PHS facilities turn, this has negatively affected
global energy storage capacity, and frequency control and system restart IHA working paper: The world’s
operation today were commissioned (the majority owned by transmission the profitability of existing PHS
over 99 per cent in terms of energy can be provided and contracted to water battery: Pumped hydropower
and financed under public and distribution companies) which plants, and reportedly diminished
stored, PHS also retains several system operators, commonly via storage and the clean energy
ownership, often by vertically reflect their value across the power the prospects of new investments.
advantages over other forms of a tendering process. While some transition (2018).
integrated utilities that enjoyed a system. In unbundled liberalised PHS developers must also take
storage including lifetime cost, levels electricity markets around the world
monopoly status due to owning markets, regulators have tended to into account to what extent their
of sustainability and scale. are offering opportunities for these
and operating all the generation, restrict bulk energy storage facilities, own project will smooth prices
Pumped storage technologies and transmission and distribution assets. such as PHS, from benefiting services due to the need to integrate Contact
and therefore impact their revenue
operations have demonstrated from this model for fear that they increasing VRE, for certain services Mathis Rogner
Many of the projects under derived from arbitrage. In today’s
their ability to respond to the new would also seek revenue from the such as inertia their true monetary Senior Hydropower Analyst
development today are still markets, energy arbitrage alone
grid requirements incurred by the competitive part of the market and value and contribution to the system mr@hydropower.org
delivered under similar market is generally considered to be
increasing deployment of VRE. PHS therefore gain an unfair advantage. is not yet fully understood and
structures, which points to insufficient to warrant investment.
projects are reacting quicker, more rewarded. Inertia will be vital for grid Nicholas Troja
deficiencies in how some Long-term contracted revenue stability into the future as the share
often and at wider ranges to the Senior Hydropower Analyst
liberalised markets are incentivising of coal and gas-fired generation
higher magnitude and frequency Developers enter into Power nt@hydropower.org
development and rewarding their decreases in a number of markets
of the fluctuations in supply and Purchase Agreements (PPAs) or
services. The failure to provide the as they have traditionally provided
demand. But while technology similar contracted arrangements
required certainty and clarity in this service for free. It should be
with credit worthy off-takers (i.e.
36 | International Hydropower Association | Hydropower Status Report 2019 | 37
Several major interconnection

HYDROPOWER TRENDS IN FOCUS


projects are also currently under Seasonally Balancing
construction to further strengthen the wind/solar
country’s regional links. This includes
the NordLink between Norway and Hydro Hydro
the Netherlands, two interconnections Hydro Hydro
to Great Britain (North Sea Link and
Regional interconnections NorthConnect), the VIKING cable from
Denmark to Great Britain and the
Dry
Thermal/
Thermal/
COBRA cable project from Denmark to Nuclear Nuclear Thermal/
Hydro Hydro Nuclear
the Netherlands.
Generation mix
Thermal/ Wet More wind

Energy cooperation Generation in the Nordics is


dominated by hydropower, along with Thermal/Wind
Nuclear
Less
wind Thermal/Wind

in the Nordic power market contributions coming from nuclear,


conventional thermal and wind. Figure
1 charts out the annual generation
balance for Sweden, Norway, Finland Reserves
and Denmark in 2016, and gives the
breakdown of each energy source. The
Integrating electricity markets through regional interconnection helps countries graph also shows the net electricity Hydro
Hydro
Complementary
production
exchanges (in red) highlighting that
use hydropower and other renewable energy resources more efficiently. The the main hydro producers, Norway
and Sweden, were also net exporters Security of supply
Nordic Power Market offers a blueprint for other world regions to follow. to the neighbouring countries.

es
rv
Thermal/

se
Nordic Power Market Cost synergies

Re
Hydro Nuclear
After power sector reforms in the
1990s, the Nord Pool market started Hydrologic variability
The Nordic countries host one of resulted in a high level of regional operating in Norway in 1993 and Thermal/
the world’s most advanced cross- interconnection between Nordic Key facts: Nordic with the inclusion of Sweden in 1996 Thermal/ Nuclear
border electricity systems, integrating states under a synchronised Wind
Norway, Sweden, Finland, Denmark transmission grid, and high voltage regional power became the first regional power
exchange globally. Nord Pool has
and the Baltic states into a common interconnectors to the European and market since supported competitive power
regional market, and also reaching Baltic transmission systems. exchange among Nordic states, and Figure 2. Examples of the benefits of regional interconnections. Credit: Nord Pool
into mainland Europe. Nord Pool, Location: Northern
In Norway, in particular, investments has extended this service to the Baltic Consulting.
which runs the Nordic Power Market, Europe, including Norway,
in interconnectors have almost states and Great Britain. Today, Nord
provides an overview of the benefits Sweden, Finland, Denmark, dry) or situations under low and high the overall cost of infrastructure.
quadrupled over the last 20 years, Pool’s day-ahead market acts as the
of interconnection and the role of Baltics and others cornerstone for the Nordic Power wind power conditions in Denmark,
thanks to coordinated planning
hydropower in the region. Project stage: Operational Market, where power is auctioned and as a complementary energy • Reducing the need for
across the Nordic and European
Nordic interconnection markets. Only until recently has there Start date: 1996 first daily together with transmission reserve to thermal power assets. In investment in power reserves to
been renewed focus on adding new regional power exchange capacities on an implicit basis. In this way, the system improves energy meet peak demand, therefore
For the last 30 years, investments general the market aims to maximise security through regional cooperation, lowering operational costs while
generating facilities, with the advent (started as Norwegian
in the Nordic regional system have socio-economic benefits across the and develops greater resilience in achieving a more reliable supply.
of green certificates for renewable national market in 1993)
generally focused on transmission region, by reducing daily power prices the face of challenges from variable
energy. Energy volume traded: • Attracting additional investment
infrastructure rather than new and also enabling capital investments renewable resources and climate
generating capacity. This has 524 TWh total volume in the energy system to be planned at variability. into the region’s interconnection
traded in 2018 the regional scale. by providing a price signal for
180 Summary: Regional Summary investors.
 Net exchange  Nuclear  Wind  Hydro  Conventional Mutual benefits of hydropower and
160 cooperation in the As shown in the Nordic experience, a • Accelerating the development
interconnection
Nordics has resulted in regional market has the potential to
and integration of renewable
140
a well interconnected Regional interconnections give provide significant benefits such as:
countries the capability to access power capacity into a region.
120 electricity system. Today, • Allowing a region to operate on
diverse energy resources and This Nordic regional power market
the Nordic Power Market a multilateral basis maximising
100 use hydropower more efficiently. case study was provided by Nord
supports regional trading For example, at times, low-price their overall social welfare. Pool Consulting and is from a
TWh

80 of hydropower and other hydropower from Norway can forthcoming compendium of case
• More efficient utilisation of a
energy sources, improving leverage out wholesale prices across studies to be published by IHA on the
60 region’s energy resources, for
system costs, efficiencies the market, while also providing benefits of and lessons learned from
example connecting countries
40 and security of supply for flexibility to other power systems regional interconnections involving
in the region – especially towards with surplus generation to
participating countries. hydropower.
20
Denmark with its high penetration of neighbouring countries with
Nord Pool is often referred deficits.
0 wind power.
to as the ‘blueprint’ model Contact
-20 for Europe. Figure 2 illustrates how regional • Helping utilities in the region to
Sweden Norway Finland Denmark interconnections in the Nordic region balance their excess supply and David Samuel
support greater use of hydropower demand, improving access to Hydropower Analyst
Figure 1. Nordic annual electricity generation in 2016 by source (source: Eurostat) under seasonal conditions (wet and energy services, and reducing dts@hydropower.org

38 | International Hydropower Association | Hydropower Status Report 2019 | 39


HYDROPOWER TRENDS IN FOCUS
Sustainability

Building national capacity to The Cahora Bassa hydroelectric


scheme in Mozambique was assessed
under the Hydropower Sustainability

advance sustainable hydropower


Assessment Protocol as part of IHA’s
capacity-building programme.

Capacity-building among local stakeholders and institutions


supports the regional development of water and energy
services, guided by international good practices in sustainability. covering preparation, auditing, with a workshop to share the management.
reporting and presentation of findings of the project. These
All three programmes provided
results. activities contributed to Norad’s
evidence that using the ‘early stage’
overarching goal to increase
High-level workshops were used and ‘preparation stage’ of the HSAP
In the context of hydropower, livelihoods across southern Africa. Early stage decision-making to the development impact and
to share assessment results as self-assessments early in project
capacity-building is viewed as the enhance performance sustainability of hydropower.
The river basin’s technical potential with government stakeholders, development is beneficial. These
development of local resources, allowing them to judge the value self-assessments help operators
of nearly 15,000 MW in installed The Indonesia capacity-building
physical and intangible, to improve of the HSAP as an evidence-based prevent potential impacts and
hydropower capacity could prove programme, funded by the Swiss
the understanding of good practice decision-making tool. The events “Indonesia is on the path to improve the overall performance of
sufficient to meet the estimated State Secretariat for Economic
in hydropower policy-making, were a vehicle to raise awareness of hydropower assets.
combined electricity demand Affairs, was geared towards installing an additional 15 GW
development and operations. international good practices, and to
of Angola, Botswana, Malawi, strengthening local institutional of hydropower capacity and 65 Overall, the programmes underlined
In this light, an effective capacity- Mozambique, Namibia, Tanzania, resources through assisted self- address specific interests, such as
a broader need for improving
building programme looks to Zambia and Zimbabwe – known assessments and trainings. climate-aligned financing, and social multipurpose dams by 2025. The awareness internationally of
increase the impact and long-term collectively as the Riparian States. and environmental safeguards. implementation of the Hydropower
The approach included an official what constitutes good practice in
sustainability of a hydropower Strengthened capacity to guide Sustainability Assessment Protocol hydropower development, with
Using the Hydropower Sustainability early stage assessment of the
project by strengthening practitioners and policy-makers stakeholders expressing support
Assessment Protocol (HSAP) as Pelosika hydropower project and during the Pelosika dam project’s
normative and institutional for tools that enhance capacity
a guiding reference, IHA and extensive capacity-building through The Myanmar capacity-building early stage was an important
capacity, particularly in developing building and increase sustainability
the World Bank partnered with pre-assessment training of relevant project was funded by the
countries which face major milestone, which has led to performance at all stages of a
government agencies and local government and local government Norwegian Agency for Development
resource constraints. This requires more effective multi-stakeholder hydropower project’s life cycle.
organisations to assist the Riparian officials. The project incorporated Cooperation (Norad) and focused
engagement with a range of
States in developing and utilising local prospective assessors into the on building institutional capacity participation and better project Further reading:
stakeholders including regulators,
the basin’s hydropower resource in a assessment team at Pelosika under through a series of workshops, preparation.” - Pak Abdul Malik,
developers, project owners, as well Application of the Hydropower
sustainable and responsible way. the supervision of international trainings and self-assessments.
as project-affected communities. Director for Irrigation and Water Sustainability Assessment Protocol
accredited assessors, and also It began with a workshop for
The 2018 assistance programme Resources at Bappenas in the Zambezi River Basin, World
Capacity-building programmes involved engagement with nearby government representatives, which
consisted of a series of assisted Bank (2019).
delivered by the International communities. analysed how the assessment
self-assessments using the HSAP
Hydropower Association (IHA) in the protocol could be used by the
across the river basin, followed by A core group composed of selected
Zambezi river basin, in Myanmar relevant departments to judge Lessons learned and Contact
an official assessment of the existing staff from the Indonesian Ministry
and in Indonesia during 2018 compliance with national laws and recommendations
Cahora Bassa hydroelectric scheme of National Development Planning, João Costa
provide three examples of successful international standards.
in Mozambique using the protocol’s the Ministry of Energy and Mineral The three capacity-building Senior Sustainability Specialist
multi-stakeholder capacity-building
‘operation stage’ assessment criteria, Resources, the Ministry of Public A second IHA workshop introduced programmes were judged to have joao.costa@hydropower.org
programmes aimed at supporting
and involved consultations with Works and Public Housing, and the HSAP to broader hydropower made an important contribution
the adoption of good practices in
local community members. the State Electricity Company PLN stakeholders at the national level. to the responsible management of Alain Kilajian
sustainable hydropower.
attended training sessions on IHA assisted staff from the Ministry water resources in the target areas. Sustainability Specialist
Participants from a range of
Basin-level development to address using the HSAP for sustainability of Electricity and Energy to assess Through a structured process of ak@hydropower.org
operators and water resource
regional energy demands assessment, which strengthened the Tha Htay hydropower project. training, assisted assessments, and
managers, including Hidroeléctrica
the internal capacity of national The assessment was intended to tailored workshops, hydropower
Africa’s fourth largest river basin, the de Cahora Bassa, the Zambezi River
institutions. The core group identify areas for improvement, practitioners and government
Zambezi, offers vast hydropower Authority and ZESCO, learned how
participated in the HSAP ‘early stage’ resulting in an action plan drafted representatives developed the
resources that hold the potential to apply the methodology and
assessment, which provided key to address identified issues at the skills to understand and implement
to support social and economic principles enshrined within the
members of staff with first-hand project, portfolio and policy level. international good practice in
development and improved HSAP to their hydropower projects.
experience of assessment activities sustainable hydropower and
The work in Myanmar concluded efficient water and energy resource

40 | International Hydropower Association | Hydropower Status Report 2019 | 41


SUSTAINABILITY
Sustainability

Tools

Hydropower plays a vital role in reducing the Sustainability Guidelines


world’s dependence on fossil fuels. As a renewable
The Hydropower Sustainability Guidelines on Good
energy, it is essential that hydropower is developed
International Industry Practice (HGIIP) define expected
sustainably. sustainability performance for the hydropower sector across Assessment Protocol Gap Analysis Tool
IHA has played a leading role in the development of a range of environmental, social, technical and governance
recognised sustainability guidelines and tools, working topics. The Hydropower Sustainability Assessment Protocol The Hydropower Sustainability ESG Gap Analysis (HESG)
together with a range of partner organisations. (HSAP) was developed through 30 months of cross-sector Tool was developed by IHA between February 2017
The 26 guidelines present definitions of the processes and engagement between 2007 and 2010, and a review of IHA’s and June 2018 under the mandate of the Hydropower
We serve as the management body for the Hydropower outcomes relating to good practice in project planning, previous sustainability tools, the World Commission on Sustainability Assessment Council, with the support of the
Sustainability Assessment Council, whose 100 members operation and implementation. As a compendium, the Dams Recommendations, the Equator Principles, the World Swiss State Secretariat for Economic Affairs (SECO).
include representatives of social and environmental NGOs, guidelines are a reference document for meeting the Bank Safeguard Policies and IFC Performance Standards.
intergovernmental organisations, development banks, expectations of lenders, regulators and consumers. The HESG Tool is based on the framework of the
governments and hydropower companies and contractors As a tool, it provides a common language for Hydropower Sustainability Assessment Protocol. It assesses
Developed for a range of stages in the lifecycle of a understanding how the criteria outlined in the Hydropower projects against the requirements of the Hydropower
As part of this role, we serve as a custodian of the hydropower project, compliance with each guideline can be Sustainability Guidelines can be addressed at all stages of Sustainability Assessment Protocol’s environmental, social
Hydropower Sustainability Tools, which provide a specified in commercial contracts between financiers and a project’s lifecycle. Assessments use objective evidence to and governance topics.
framework for understanding and measuring hydropower developers, and developers and contractors. create a sustainability profile, which can be used to identify
project performance. The tool provides an action plan to help a project team
Launched in December 2018, the guidelines are aligned gaps and drive improvement. These assessments are
address any gaps against good practice. It is divided into 12
We also oversee the training and accreditation of with standards developed by the World Bank, International delivered by independent accredited assessors.
sections which are compatible with IFC Environmental and
independent project assessors, and deliver capacity- Finance Corporation (IFC) and the Equator Principles group The Hydropower Sustainability Assessment Protocol was Social Performance Standards and the World Bank’s new
building programmes in developing countries. of banks. updated in July 2018, following an 18 month consultation Environmental and Social Framework.
Each guideline is hydropower-specific and designed to process, to examine hydropower’s carbon footprint and
support assessments of project performance using either resilience to climate change. A project that scores well
the Hydropower Sustainability Assessment Protocol or HESG under the new criteria will have a low carbon footprint and Online
Tool. be resilient to the impacts of climate change.
hydropower.org/sustainability

42 | International Hydropower Association | Hydropower Status Report 2019 | 43


HYDROPOWER PRO
Hydropower Pro
“Hydropower Pro is a
rich source of knowledge
for the international
hydropower community.
It provides up-to-date,
authoritative coverage of
a broad range of news,
events, issues and facts
for the sector.”
Colin Clark, Chief Technical Officer
for Brookfield Renewable
and IHA Vice President Directory
Connect with IHA
members

Knowledge
networks
Exchange experiences
with your peers

Introducing Hydropower Pro,


IHA’s new online community

In early 2019, IHA launched Hydropower Pro, an The platform offers:


exclusive new online community and mobile app
• Online groups - forums for IHA knowledge
for individual and corporate members.
networks and regions of interest
Hydropower Pro brings together hydropower • Resource libraries - essential reports, publications,
professionals to connect, exchange experiences and briefings and case studies
collaborate. “Hydropower Pro offers a new link into the
• Member directory and messaging - allowing
extensive world of hydropower. It helps me

members to network
News and blogging - announcements and articles stay updated with the latest issues and Reports
Online: by IHA staff and members
events and network in my areas of interest.” Access briefings and
• Multi-platform access - via desktop and mobile
hydropower.org/pro apps (iOS and Android) Roger Gill, consultant and IHA Vice President
archive publications
• Email alerts - instant alerts and a weekly digest

44 | International Hydropower Association | Hydropower Status Report 2019 | 45


HYDROPOWER BY REGION
HYDROPOWER BY REGION
Maps

The Sogamoso hydroelectric Where has new hydropower capacity been added in 2018? 48
power plant in Colombia.
Credit: Isagen S.A. E.S.P.
Hydropower capacity and generation by region 50

Analysis

North and Central America 52 Europe 76

South America 60 South and Central Asia 84

Africa 68 East Asia and Pacific 92

46 | International Hydropower Association | Hydropower Status Report 2019 | 47


HYDROPOWER BY REGION
WHERE HAS HYDROPOWER
CAPACITY BEEN ADDED IN 2018? 21 9

10 42 27
41
46 32 11 30 40
39 36 26
43 34 22 26 4 38
15
47
16 6

31 1
3
23
13
8
24
12
Key 35 44
45
18
33
99 MW and below
17
7
100 MW to 999 MW 2 25
19 37
5
1,000 MW to 10,000 MW 28
14
20 48

29
NEW INSTALLED CAPACITY BY COUNTRY*
Rank Country Capacity added (MW) Rank Country Capacity added (MW) Rank Country Capacity added (MW) Rank Country Capacity added (MW)
1 China 8,540 13 Laos 254 25 Indonesia 61 37 Malawi 12
2 Brazil 3,866 14 Zimbabwe 150 26 Georgia 60 38 North Korea 10
3 Pakistan 2,487 15 United States 141 27 Russia 57 39 Bosnia and 9
Herzegovina
4 Turkey 1,085 16 Iran 140
28 Bolivia 55 40 Kazakhstan 7
5 Angola 668 17 Democratic Republic of the 121
Congo 29 Argentina 46 41 Czech Republic 4
6 Tajikistan 605 18 Colombia 111 30 Slovenia 45 42 United Kingdom 4
7 Ecuador 556 19 Peru 111 31 Egypt 32 43 Portugal 4
8 India 535 20 Chile 110 32 Switzerland 26 44 Philippines 2
9 Norway 419 21 Iceland 100 33 Uganda 24 45 Nigeria 2
10 Canada 401 22 Italy 88 34 Spain 17 46 France 2
11 Austria 385 23 Nepal 71 35 Panama 17 47 South Korea 1
12 Cambodia 300 24 Guatemala 61 36 Serbia 15 48 Australia 0.1
* including pumped storage

48 | International Hydropower Association | Hydropower Status Report 2019 | 49


HYDROPOWER BY REGION
HYDROPOWER CAPACITY
AND GENERATION BY REGION

204 252
149
720 643
439
480

1,532
138
36
171

726

Installed capacity in 2018 in GW

Estimated generation in 2018, in TWh per year

Technical potential assuming maximum generation

50 | International Hydropower Association | Hydropower Status Report 2019 | 51


NORTH AND CENTRAL AMERICA REGION
NORTH AND
CENTRAL AMERICA

The Romaine Complex on


the Quebec north shore
of the Saint Lawrence
River in Canada.
Photo Hydro-Québec.

52 | International Hydropower Association | Hydropower Status Report 2019 | 53


NORTH AND CENTRAL AMERICA INSTALLED CAPACITY
COUNTRIES BY ADDED CAPACITY IN 2018 (MW*)
NORTH AND CENTRAL AMERICA
1st 2nd 3rd 4th 5th
INSTALLED CAPACITY Canada United States Guatemala Panama Panama
401 141 61 17 1,818

NORTH AND CENTRAL AMERICA


CAPACITY BY COUNTRY*
Total installed capacity
Rank Country (MW)
1 United States 102,745
2 Canada 81,386
3 Mexico 12,117
1 4 Costa Rica 2,375
5 Panama 1,818
6 Guatemala 1,499
7 Honduras 656
8 Dominican Republic 543
9 El Salvador 472
10 Nicaragua 123
11 Puerto Rico 98
Key 12 Cuba 64
3 12
13 Haiti 61
199 MW and below
15 13 8 14 Belize 53
14 11
200 MW to 1,999 MW 6 16 15 Jamaica 23
7 18 16 Guadeloupe 10
9 10 17 17 Saint Vincent And The Grenadines 7
2,000 MW to 9,999 MW
18 Dominica 6
4
5 * including pumped storage
10,000 MW to 19,999 MW

20,000 MW and above

54 | International Hydropower Association | Hydropower Status Report 2019 | 55


North and Central America

NORTH AND CENTRA AMERICA OVERVIEW


OVERVIEW

Despite limited growth in capacity hydropower, the nations’ largest key pillar in the government’s new complex was completed, and will the contractor failed to meet the
over recent years, hydropower source of grid-scale energy storage. national electricity programme, with add another 55 MW of hydropower proposed commercial start-up date of
continues to dominate all sources of an additional MXN 20 billion (USD 985 capacity to the national system, when August 2015.
In Canada, 381 TWh of hydropower
renewable energy across North and million) in investments announced it is finally commissioned in 2019.
was generated over 2018, making up In Honduras, authorities plan to
Central America. In 2018 a further to modernise and upgrade sixty
around 67 per cent of total electricity In Panama, work is progressing on advance a number of planned The Keeyask project is under
575 MW of conventional hydropower existing hydroelectric plants. construction in Manitoba
generation and over 85 per cent the 63 MW Burica project and the hydroelectric plants as part of
installed capacity was added. Mexico’s state-owned power utility, in Canada. Credit: Keeyask
of all renewable energy supply in 33 MW Pando project on the upper the country’s target to achieve
Comisión Federal de Electricidad Hydropower Limited Partnership.
In the United States, 311 TWh of Canada. During 2018, 417 MW of new basin of the Chiriquí Viejo River. Two 95 per cent of energy supplied
(CFE), has estimated that renovation
hydropower was generated over hydropower was added comprised small hydropower projects went into from renewable sources by 2027.
of hydroelectric plants could add
2018, making up around 8 per cent of: the 395 MW Romaine 3 project service during 2018 – La Cuchilla Despite significant delays, Sinohydro
another 3,300 MW of capacity and
of total electricity generation and in Québec; the 16 MW Yellow Falls at 8.7 MW and Macano 3 at 1.75 concluded construction of Patuca
increase the country’s generation by
about 42 per cent of all renewable project on the Mattagami River MW – bringing the total installed III, the largest dam after El Cajón, in
26 per cent.
energy supply. Shifts in the national in Ontario; as well as two projects capacity of hydropower to 1,818 MW late 2018. The project is located in
policy landscape for hydropower in British Columbia (BC) – the Central America added a further 80 in Panama. Over the calendar year, 78 the eastern region of Honduras and,
continue to evolve with new bills John Hart redevelopment project MW in 2018 and several projects are per cent of electricity was generated when completed in late 2019, will
introduced in the US Congress that which increased the original plant under active development in a region by hydropower, 11 per cent from contribute 6 per cent of the country’s
include hydropower in the definition capacity by 6 MW, and the 350 KW in which several countries produce thermal, 8 per cent from wind, 2 per energy.
of renewable energy and facilitate a Nicknaqueet hydro-diesel hybrid in the majority of their electricity from cent from solar and 1 per cent from
In El Salvador, the final phase of
timelier process for both new project BC’s Central Coast region. renewable sources, largely due to self-generation.
construction and commissioning of
approvals and existing projects in hydropower.
Mexico continues to pursue its For the fourth consecutive year, Costa the El Chaparral is underway. The
relicensing. During 2018, Congress
ambitious goals for increasing the Currently, Guatemala has nearly Rica generated more than 98 per plant will have an installed capacity
approved a Water Infrastructure Act
country’s share of renewable energy 1,500 MW of installed hydropower cent of its power from renewable of 73 MW and is located in the
which included several provisions
sources within its overall generation capacity, making up 34 per cent of sources, with over 60 per cent department of San Miguel in the
promoting hydropower deployment.
portfolio. Under the new leadership the country’s overall energy supply. provided by hydropower. While eastern part of the country.
With the rapid growth of solar PV, the
of President Andrés Manuel López Over the past ten years, energy several hydropower projects are
US Department of Energy is focusing
Obrador, the government plans on consumption from renewable under development in Costa Rica, it
on the essential role that hydropower
increasing Mexico’s hydropower sources doubled in the country, was announced that the state power
plays in the current and future energy
generation significantly by the end with renewables supplying up to 70 company, Instituto Costarricense de
profile of the US, with emphasis
of his six-year term by building per cent of national consumption. Electricidad terminated Hidrotárcoles’
on the value of grid reliability and
hydro plants as well as rehabilitating Construction of the fourth phase of contract for the 50 MW Capulín-San
flexibility provided by pumped
existing facilities. Hydropower is a the 301 MW Renace hydroelectric Pablo hydroelectric project, after

56 | International Hydropower Association | Hydropower Status Report 2019 | 57


North and Central America

NORTH AND CENTRAL AMERICA REGION


CANADA GUATEMALA

Renewable energy accounts for two- BC Hydro’s John Hart redevelopment In addition, the National Energy Board Guatemala has almost 1,500 MW of system. The Renace complex is now the 200 MW when CFE has surplus energy.
thirds of Canada’s power generation project, uprated from its original issued its decision approving the installed hydropower capacity, making largest hydropower plant in the country. The contract enables CFE to purchase
largely due to its significant hydropower installed capacity of 126 MW to 132 Manitoba Hydro – Manitoba-Minnesota up 41 per cent of the country’s overall energy on the Guatemalan electricity
resources, which make it the third largest MW at a cost of approximately CAD Transmission Project subject to a Other hydropower facilities
energy production. Hydropower market in the event of a contingency.
producer of hydropower in the world in 1.1 billion. The project featured several number of conditions. commissioned in 2018 include the
plays an important role in meeting This interconnection between the
2018. unique improvements including a new 60 MW OXEC II project, the second
In Quebec and New England (USA), work ambitious targets for renewable energy Mexican transmission system and
underground powerhouse. installation downstream of the 26 MW
During 2018, work progressed on four is underway to advance the proposed generation. Over the past 10 years, the Central American market has
OXEC plant on the Cahabón River, in
major hydropower projects under The Nicknaqueet 350 KW hydro-diesel des Appalaches-Maine interconnection energy consumption from renewable been important for facilitating energy
the Alta Verapaz Department of north
construction across four provinces. hybrid went into service in early 2018 with the New England Clean Energy sources has doubled with generation transactions between both countries
central Guatemala. OXEC II began
In British Columbia, BC Hydro’s 1,100 in BC’s Central Coast region, and is Connect (NECEC) transmission project representing between 65 per cent and through medium- and long-term
operation in September 2018, after the
MW Site C project on the Peace River, expected to replace 92 per cent of through Maine. 70 per cent of national consumption. bilateral contracts.
project had been suspended in 2017
commenced construction in July 2015 existing diesel generation for the Guatemala’s hydraulic resources have due to opposition from indigenous There is a strong push to reform the
In January 2019, Canada joined other
and is anticipated to be completed by community. Elsewhere in the province, the potential to add roughly 11 GW groups. regional market in order to enable
countries in becoming a member of the
2024. The project will generate about work continues on the Narrows Inlet 33 of hydropower capacity, of which better opportunities to export energy to
International Renewable Energy Agency The power market in Guatemala is
5,300 GWh per year. MW project, developed in a partnership roughly 6 GW is technically exploitable Mexico and Central America, specifically
(IRENA). unbundled with about 50 companies
between the Shíshálh Nation and according to the Energy Ministry. El Salvador where energy prices are
In Labrador, the 824 MW Muskrat Falls (private and state-owned) acting
BluEarth Renewables, which is expected However, the country continues to face not competitive. It was reported
project on the Lower Churchill River in generation, distribution, and
to be fully commissioned in 2019. a challenging environment for new that in 2018, electricity exports to
was expected to go into service in 2019, transmission. Guatemala is connected
generating about 4,900 GWh. The 16 MW Yellow Falls project hydropower development due to legal neighbouring countries, in particular
via the Central American Electrical
developed by Boralex on the Mattagami obstacles and high crime rates. In recent to Mexico increased by 76 per cent
In Manitoba, the Keeyask Hydropower Integration System (SIEPAC) to
River in Ontario will be commissioned years 16 hydroelectric projects have compared to exports in 2017.
Limited Partnership, a partnership Honduras and El Salvador. Northern
in mid-2019. Ontario Power Generation reportedly been halted, amounting
between Manitoba Hydro and four Guatemala is also connected to Mexico’s
(OPG) also announced its issue of CAD to USD1.5 billion in investment. Work
Manitoba First Nations, is developing the transmission system.
450 million of green bonds, used to continues to pass legislation that will
695 MW Keeyask project on the Nelson improve the consultative process with The Mexico-Guatemala interconnection
partially fund the development of a
River within the ancestral homeland indigenous peoples. project consists of a 103 kilometre
28 MW hydropower project and the
of all four partner First Nations; 400 kV transmission line, with 32
expansion of an existing project. Despite many challenges, construction
construction commenced in July 2014, kilometres in Mexico and 71 kilometres
with completion scheduled for 2021, Alberta’s legislature approved the of the fourth phase of the 301 MW
in Guatemala. Under an existing
generating about 4,400 GWh. construction of the proposed Canyon Renace hydroelectric complex in Alta
contractual arrangement, Guatemala’s
Creek Pumped Hydro Energy Storage Verapaz was completed in 2018, with
Work continues on Hydro-Québec’s electric utility, the National Institute
Project. The project will have a storage Renace IV becoming operational in
La Romaine 4 hydropower project, of Electrification (INDE), acquires
capacity of 75 MW for 37 hours of full- January 2019, adding 55 MW more
scheduled to go into service in 2021 at a 120 MW of power from the Mexican
capacity operation. hydropower capacity to the national
capacity of 245 MW. La Romaine 4 is the energy authority, CFE, increasing to
final stage of the 1,550 MW La Romaine Work continues to advance major new
complex, which will generate 8,000 interconnections between Canada and
GWh. Romaine 3 was commissioned in the United States. Bipole III, Manitoba
late 2017, adding 395 MW. Hydro’s new 500 kV HVDC transmission
project was commissioned in July
Other hydropower projects completed
2018 after five years of construction.
or under construction in 2018 include

37.2 MILLION 81,386 MW 381,179 GWh 60% 16.8 MILLION 1,499 MW 5,191 GWh 34%
POPULATION INSTALLED HYDROPOWER HYDROPOWER POPULATION INSTALLED HYDROPOWER HYDROPOWER
HYDROPOWER GENERATION SHARE OF ELECTRIC HYDROPOWER GENERATION SHARE OF ELECTRIC
CAPACITY POWER INSTALLED CAPACITY POWER INSTALLED
CAPACITY CAPACITY

58 | International Hydropower Association | Hydropower Status Report 2019 | 59


SOUTH AMERICA REGION
SOUTH AMERICA

The Jaguas hydroelectric power plant, Colombia.


Credit: Isagen S.A. E.S.P.

60 | International Hydropower Association | Hydropower Status Report 2019 | 61


SOUTH AMERICA INSTALLED CAPACITY
COUNTRIES BY ADDED CAPACITY IN 2018 (MW*)
SOUTH AMERICA 1st 2nd 3rd 4th 5th 6
INSTALLED CAPACITY Brazil Ecuador Colombia Peru Chile Chile
3,866 556 111 111 110 6,753

2
3 SOUTH AMERICA CAPACITY BY COUNTRY*
13
11 12 Total installed capacity
Rank Country (MW)
1 Brazil 104,139
2 Venezuela 15,393

7 3 Colombia 11,837
4 Argentina 11,288
5 Paraguay 8,810

1 6 Chile 6,753
7 Ecuador 5,072
8 Peru 4,995
8
9 Uruguay 1,538
10 Bolivia 658
10
11 Suriname 189
12 French Guiana 119
13 Guyana 1
Key * including pumped storage
6
199 MW and below 5

200 MW to 1,999 MW

9
2,000 MW to 9,999 MW

10,000 MW to 19,999 MW

20,000 MW and above

62 | International Hydropower Association | Hydropower Status Report 2019 | 63


South America

SOUTH AMERICA OVERVIEW


OVERVIEW

South America saw the fastest transmission line connecting Ecuador approved USD 80 million in financing levels rapidly rising in the reservoir, also approved the development of
hydropower growth rate after the and Peru. the modernisation of the 1,890 MW HidroItuango took the decision to drain hydropower projects amounting to 250
East Asia and Pacific region in 2018 Argentine-Uruguayan bi-national water from the reservoir through the MW.
The region is moving towards
with close to 4,855 MW of capacity hydropower plant, Salto Grande. powerhouse to avoid the risk of dam
diversifying its renewable energy mix In Chile, the Ministry of Energy
added. Brazil contributed the bulk – Yacyretá complex on the Argentina- collapse. On 12 May, the pressure of
to protect countries from the impacts announced plans to phase-out coal
approximately 80 per cent – of this new Paraguay border is also undergoing the reservoir uncovered one of the two
of severe weather events like droughts generation with a goal to procure 70 per The Itaipú hydropower plant, owned
capacity, which was mainly attributed to rehabilitation and expansion to add 270 original diversion tunnels that had been
and floods. Argentina aims to boost its cent of national electricity generation jointly by Brazil and Paraguay, marks its
the addition of 3,055 MW to the 11,000 MW, which will become operational in permanently blocked and generated 35th anniversary in May 2019.
renewable sources such as wind and from renewables by 2050. This has
MW Belo Monte hydropower complex. 2023, boosting electricity production at a sudden increase of outflows. This Credit: Itaipu Binacional.
solar from 2 per cent to 20 per cent by positioned a number of hydropower
Yacyretá by 10 per cent. affected the nearby town of Puerto
Hydropower generation in South 2025 and Chile’s new energy policy is projects in the development pipeline
Valdivia, however no casualties were
America is increasingly challenged moving away from coal generation to Brazil has now overtaken the United of up to 1.3 GW, the most notable
reported. The project has taken steps to
by climate variability. The region renewables diversification. States as the world’s second largest one being the 531 MW Alto Maipo
mitigate the risks and the damage from
experienced weak La Niña events in country by installed hydropower hydropower complex expected to start
The region is also undergoing the the incident.
the summer of 2017-2018, resulting in capacity. During 2018, a group of private operations in 2020.
rehabilitation and expansion of some
severe drought that affected Argentina, companies consisting of hydropower Ecuador added 556 MW of capacity, Guyana’s Low Carbon Development
major projects in Brazil, Paraguay and Bolivia added 55 MW of hydropower
Uruguay, Venezuela and north-eastern developers and operators formed with the commissioning of two major Strategy (LCDS), with financing received
Argentina. Itaipú, the world’s largest capacity in 2018 with the
parts of Brazil. The drought partially the Forum for the Development of projects; 180 MW Delsitanisagua through the United Arab Emirates and
dam by electricity generation, owned commissioning of the first phase of
accounted for power rationing in Midsize Hydropower Plants in order to and 275 MW Minas San Francisco. the Guyana REDD-plus Investment Fund
jointly by the governments of Brazil the San Jose hydropower project,
Venezuela, and the fall in reservoir strengthen private sector investments The country’s electricity master plan (GRIF).
and Paraguay, began a 10-year global with an additional capacity of 560 MW
levels prompted Brazil’s highest energy in hydropower. This was prompted envisions the installation of 4.7 GW
modernisation project. The 14,000 expected to come online between 2019- Uruguay is one of six countries in
imports in 17 years, with 1,131 GWh by the government’s decision to between 2018 and 2025 with the bulk
MW Itaipú hydropower plant achieved 2023. Farther along the development the world to produce 100 per cent
coming from Argentina and Uruguay in end concession auctions for new of it coming from hydropower from
its highest power generation for the pipeline are projects in their early renewable energy with more than 80
2018. hydropower projects larger than 30 MW. projects such as Cardenillo (596 MW)
first five months of 2018 since its stage amounting to 6,200 MW. These per cent of its electricity production
and Santiago G8 (3,600 MW). This will
Variations in climate and installed inauguration in 1984, but saw this Colombia’s 2,400 MW Ituango project developments will aim at increasing generated from hydropower. In January
increase hydropower’s electricity share
capacity have strengthened the need decrease from May to September, due has been under construction for seven the country’s hydroelectricity share and 2018, the government obtained
to 92 per cent by 2035 from the current
for regional interconnections to meet to water scarcity. years and is set to be the country’s market surplus energy to neighbouring climate insurance worth USD 450
58 per cent.
growing demand in countries with largest power plant, supplying 17 per countries. In this context, Bolivia and million from the International Bank
Paraguay’s state-power company,
an energy deficit. As such, Bolivia’s cent of its electricity, when it comes into As part of the Peruvian government’s Brazil began inventory studies for a for Reconstruction and Development
ANDE, is moving forward with plans
state-owned power company, ENDE, is operation at the end of 2021. On 28 commitment to become energy self- binational hydro project in March 2018. (IBRD) to protect its energy utility from
for rehabilitation, upgrade and
developing an interconnection line to April 2018, an obstruction was reported sufficient by 2040, six plants came into additional costs induced by drought and
modernisation of its 200 MW Acaray In Guyana, two hydropower projects
Argentina, while similar plans for Brazil, in the auxiliary diversion tunnel which operation in 2018 adding 110.6 MW the need to resort to high cost thermal
hydropower plant with USD 125 million of a combined capacity of 4.15 MW
Paraguay and Peru are in the pipeline. had been safely diverting the waterway of installed capacity. The country has generation.
in financing from the Inter-American are advancing development under
Plans have also been made for a 500 kV during construction. With water
Development Bank (IDB). IDB also
64 | International Hydropower Association | Hydropower Status Report 2019 | 65
South America

SOUTH AMERICA REGION


PARAGUAY BOLIVIA

Paraguay’s electricity generation is USD 2.1 billion worth of electricity, as the modernisation of the plant’s Due to the country’s topography and to neighbouring countries, and in USD 139 million project was built by
produced by 100 per cent renewable which represented 7.1 per cent of GDP. electromechanical equipment. extensive river network, Bolivia has the process position the country as a PowerChina and is expected to save
energy sources with a power production an estimated hydropower potential regional energy hub. the country up to USD 6 million a year
All three of Paraguay’s hydropower ANDE is progressing with upgrading,
capacity close to 60,000 GWh per year. of more than 40,000 MW. As a result, in electricity costs. Its sister station,
assets are undergoing developments as strengthening and extension of The plan will require some USD 17
The 14,000 MW Itaipú hydropower hydropower is set to play a central the 69 MW San Jose II is expected to
a means to increase power generation the transmission and distribution billion in investment by 2025 and is
plant, together with the 3,200 MW role in fulfilling the government’s be commissioned in early 2019. Other
to meet the country’s requirements by infrastructure as part of Paraguay’s new heavily reliant on two large hydropower
Yacyretá and 210 MW Acaray plants, aim of becoming a major exporter of large projects under construction are
2030. master plan 2016-2025. The masterplan schemes: El Bala hydropower complex
supply the National Interconnected renewable electricity. the 280 MW Ivirizu hydropower plant in
aims to meet the sustained growth of with a capacity of up to 3,700 MW
System to satisfy electricity demand. Itaipú is undergoing a modernisation Cochabamba and the 203 MW Miguillas
energy demand that was estimated Over the past decade, Bolivia has under development and El Rio Grande
project to increase the power plant’s hydropower complex in the La Paz
Acaray is owned by the state-owned at an annual rate of 8.6 per cent. The enjoyed significant progress in social hydropower complex with up to 2,900
asset life and boost electricity region.
generation and distribution company, reinforcement will also contribute to and economic development largely MW.
generation. The modernisation project
ANDE, while Itaipú and Yacyretá are the efficient utilisation of the binational thanks to its natural gas exports which In order to support the government’s
will take at least 10 years with an Located north of the capital La Paz
binational hydropower plants owned hydropower plants Itaipú and Yacyretá have generated billions of dollars export aspirations, several feasibility
investment of USD 500 million. The on the Beni River, El Bala complex has
jointly with the governments of Brazil in 2030, when the country is expected in revenue for the government. Per studies are being undertaken for the
GE consortium was contracted for the been considered a national priority for
(Itaipú Binational), and Argentina to be consuming all of its generated capita income has more than doubled, construction of transmission lines to
early stages of the project to provide several decades. Despite the economic
(Yacyretá Binational Entity). electricity. electricity access has increased to Brazil and Argentina. Construction
electrical equipment for the electrical benefits through export revenue
above 90 per cent for the first time and is underway on an interconnector
Itaipú alone accounted for 90.8 per cent modernisation of 24 overhead cranes. Paraguay also plans to continue generation, the project continues
the poverty rate has fallen dramatically. between Yaguacua in southern
of supply to Paraguay’s total electricity developing its hydropower potential to face considerable opposition
In 2018, a call for bidding was made for Government subsidised natural gas Bolivia and Tartagal in northern
demand in 2018. Itaipú is the largest with projects such as Itá Corá-Itatí (1,600 from local community groups and
the expansion of Yacyretá hydropower also dominates the country’s electricity Argentina, with a capacity of 500kV.
hydropower plant in the world in MW) scheduled with Argentina at an international NGOs concerning
plant to add three turbine-generator sector, with gas-fired power plants The transmission line is 110 kilometres
electricity generation and the second estimated total cost of USD 4 billion. Itá potential environmental impacts in the
units to the 3.2 GW plant’s existing 20 accounting for up to 70 per cent of its in length and is being developed by
in terms of installed capacity. The Corá-Itatí project is in the pre-feasibility Madidi National Park and a need for
units. The expansion project will add total installed generating capacity. ENDE.
plant closed 2018 with its fourth best stage with tenders for environmental resettlement schemes.
276 MW and will increase production by
production in history at 96.6 TWh since study having been announced in 2018. As part of an ambitious National
9 per cent, increasing annual generation In addition, the Bolivian government
beginning operations, and set a world Electricity Plan 2025, the Bolivian
from 20 TWh to 22 TWh. Paraguay Besides hydropower, biomass and is assessing large-scale projects with
record in 2016 with the production of government intends to drastically
and Argentina through the Yacyretá fossil fuels make up Paraguay’s energy Brazil along the Madeira River through
103.1 TWh. reduce its use of gas for power
Binational Entity will fund the cost of mix, accounting for 44 and 40 per cent a binational initiative which could
generation in favour of renewables,
In 2018, domestic demand was met the USD 500 million works. Meanwhile, respectively, of which all the fossil add a further 3,000 MW of capacity to
and free up additional gas supplies
using only 35 per cent of Paraguay’s’ the 20 existing units are undergoing fuels are imported. Paraguay’s need Bolivia. Studies are being undertaken
for exports. Integral to this strategy
overall power production from rehabilitation to increase their useful life to minimise importation of fossil fuels with Brazilian authorities to determine
is a plan to increase the share of
hydroelectric resources. The surplus of by 50 years. prompted the creation of the country’s the potential design and locations of
hydropower within the country’s
electricity generated from the binational first sectoral policy, the 2040 national future hydropower projects as part of
The Inter-American Development electricity mix from 29 per cent to
hydropower plants Itaipú and Yacyretá energy policy. The 2040 energy policy the initiative.
Bank (IDB) approved a USD 125 70 per cent in 2025. This will satisfy
is sold to Brazil and Argentina, making will guide energy development towards
million loan in 2018 to modernise increasing demand and support In 2018, the 55 MW San Jose I project
Paraguay the fourth largest exporter harnessing the country’s resources, the
Acaray hydropower plant to extend up to 7,600 MW of potential large was commissioned, the first of a two-
of electricity in the world. Electricity efficient use of energy for the country’s
its working life and boost its reliability hydropower schemes for exports. This powerhouse complex located on the
exports represent more than 70 per social and economic development and
and generating capacity. The level of capacity would not only help eastern slopes of the Andes in the
cent of total generation and constitute increasing awareness of energy benefits
programme includes rehabilitation of displace domestic gas generation Cochabamba region. Owned by the
approximately 25 per cent of total among the populations.
the facility and improvements to its but would also enable Bolivia to state-run company Empresa Nacional
exports. In 2017 Paraguay exported
operation and management as well export excess renewable electricity de Electricidad (ENDE) Corani, the

7 MILLION 8,810 MW 59,110 GWh 100% 11.3 MILLION 658 MW 2,490 GWh 29%
POPULATION INSTALLED HYDROPOWER HYDROPOWER POPULATION INSTALLED HYDROPOWER HYDROPOWER
HYDROPOWER GENERATION SHARE OF ELECTRIC HYDROPOWER GENERATION SHARE OF ELECTRIC
CAPACITY POWER INSTALLED CAPACITY POWER INSTALLED
CAPACITY CAPACITY

66 | International Hydropower Association | Hydropower Status Report 2019 | 67


AFRICA REGION
AFRICA

The Jebba Power Station on the


Niger River in Nigeria.
Credit: Mainstream Energy Solutions.

68 | International Hydropower Association | Hydropower Status Report 2019 | 69


AFRICA INSTALLED CAPACITY
COUNTRIES BY ADDED CAPACITY IN 2018 (MW*)

AFRICA INSTALLED 1st 2nd 3rd 4th 5th 6


CAPACITY Angola Zimbabwe Democratic Republic
of the Congo
Egypt Uganda Zambia

668 150 121 32 24 2,397

32
10
AFRICA CAPACITY BY COUNTRY*
22 Total installed capacity Total installed capacity
Rank Country (MW) Rank Country (MW)
4 1 Ethiopia 3,822 22 Algeria 269
2 South Africa 3,595 23 Congo 242
3 Angola 3,083 24 Mali 180
4 Egypt 2,876 25 Madagascar 164
38
24 5 Democratic Republic of 2,704 26 Reunion 134
the Congo
6 Zambia 2,397 27 Equatorial Guinea 128
30
9
7 Mozambique 2,191 28 Rwanda 105
40 8 Nigeria 2,064 29 Liberia 93
1 9 Sudan 1,923 30 Senegal 81
18
11 37 39 8 10 Morocco 1,770 31 Lesotho 73
33 13
29 11 Ghana 1,584 32 Tunisia 66
41
16 12 Zimbabwe 1,076 33 Sierra Leone 64

27 15 13 Cote D'Ivoire 879 34 Eswatini 60


42
14 14 Kenya 826 35 Mauritius 60
21 23
28 15 Uganda 768 36 Burundi 57
5 36
16 Cameroon 747 37 Togo 49
17 Tanzania 572 38 Mauritania 48
18 Guinea 368 39 Benin 33
19 Malawi 364 40 Burkina Faso 32
17
3 20 Namibia 347 41 Central African Republic 19
21 Gabon 331 42 Sao Tome And Principe 2
19
Key
6 * including pumped storage

199 MW and below 12 7 35


25 26
200 MW to 1,999 MW

20
34
2,000 MW to 9,999 MW

2 31

70 | International Hydropower Association | Hydropower Status Report 2019 | 71


Africa

AFRICA OVERVIEW
OVERVIEW

Africa has the highest percentage the 750 MW Kafue Gorge Lower Power projects will contribute almost a third 30 years and output capacity has providing for a new concession period
of untapped technical hydropower Station in Zambia, the 700 MW Zungeru of a national target 9.9 GW of installed increased from the original 24 MW to of 15 years in favour of national
potential in the world, with only 11 project in Nigeria, as well as the 183.2 generation by 2025. The government 36 MW. company Hidroelectrica Cahora
per cent utilised. In 2018, over 1 GW MW Isimba project, commissioned has a target to achieve a 60 per cent Bassa. The Mozambican government
In Egypt, the 32 MW New Assiut Barrage
of hydropower capacity was put into in March 2019, and soon to be electrification rate and has undertaken has also decided to create a cabinet
Project was inaugurated in August 2018.
operation across the continent, with commissioned 600 MW Karuma project a strategic environmental assessment coordinated by the Ministry of A computer generated impression
The barrage includes two navigation
total installed capacity now exceeding in Uganda. to evaluate its 18 GW hydropower Mineral Resources and Energy, which of the under development Nachtigal
locks and provides irrigation water to hydropower project in Cameroon.
36 GW. potential as part of its 2025 strategy. integrates Hydroelectrica Cahora
Ethiopia has targeted energy access 690,000 hectares of land, providing Credit: EDF.
Bassa and national utility Electricidade
Despite its vast renewable energy for all its citizens by 2025. Achieving In the Democratic Republic of Congo, access to electricity for an estimated
de Moçambique to coordinate the
resources, Africa continues to rely on oil this goal means the country will need the 150 MW Zongo II hydropower 130,000 families. It was designed to
development of the Mpanda Nkuwa
and gas along with traditional biomass to increase power from 4,566 MW to project was formally inaugurated in replace an existing dam built in the
Hydroelectric Power Plant. The Mpanda
combustion for energy consumption. more than 17,300 MW by 2025, with June 2018, adding 100 MW of installed early twentieth century 400 metres
Nkuwa plant will be located about 60
Hydropower is responsible for 86 per the assistance of new hydropower, capacity to the 50 MW in operation downstream. During 2018, contracts
km downstream of the Cahora Bassa
cent of all non-fossil fuel energy use. wind, geothermal and biomass projects. since 2017. As part of the modernisation were also signed for the 2,400 MW
Dam on the Zambezi River, and tenders
The Great Ethiopian Renaissance Dam project, the Mwadingusha hydropower Ataqa project, the country’s first ever
The African Union and African have been launched for the selection In Cameroon, construction of the 200
(GERD), expected to reach 6,350 MW, plant increased its installed capacity pumped storage hydropower plant. An
Development Bank supported of the transition adviser and project MW Memve’ele project was completed
was around two-thirds completed by from 22 MW to 32 MW. It is expected interconnection project between Egypt
Programme for Infrastructure director. and is nearly operational. The 420
the end of 2018. The government’s that the modernisation of the three and Sudan forms part of Egypt´s plan
Development in Africa (PIDA) regards MW Nachtigal project, the largest
Growth and Transformation Plan (GTP) remaining turbines will be finished in to become a regional electricity hub for In Zambia, the government in
hydropower development as a priority, independent hydropower project in Sub
outlines a 15-year strategy with three 2019, augmenting installed capacity to Arab, African and European countries. partnership with KfW has launched the
alongside interconnections for regional Saharan Africa, reached financial close
five-year phases to transform Ethiopia 71 MW. The country’s mining sector is GET FiT 100 MW Hydro Tender in 2018,
power pools. The PIDA estimates that In Uganda, the Isimba Hydroelectric in 2018 (see country profile).
from a developing country to a middle also investing in hydropower to provide to be awarded between 2019 and 2020.
the region’s total generating capacity Dam was set for technical
income country by 2025. them with power supply security. In
needs to increase by 6 per cent per year commissioning tests in early 2019 while In Zimbabwe, the Kariba South Bank
2018, the 11 MW Azambi hydropower
to 2040 from the current total of 125 In Angola, the Lauca project the Karuma project was expected to expansion project was commissioned
project was also commissioned.
GW to keep pace with rising electricity commissioned two more turbines in be commissioned by the end of 2019. in March 2018, adding 150 MW of
demand. 2018, making it the largest hydropower In Malawi, the Nkula hydropower station These two hydropower stations will installed capacity to the grid. The newly
plant in the country with 1,336 MW was successfully rehabilitated. Originally double Uganda’s total hydropower commissioned unit, together the unit
Africa’s hydropower installed capacity
of installed capacity. The filling of commissioned in 1966, it had previously installed capacity, moving from 764 MW commissioned in 2017, will significantly
is expected to grow by about 4,700
the reservoir was completed in April been running at less than nameplate today to 1552 MW. reduce the country’s power supply
MW over the next two to three years.
2018. Lauca (2,070 MW) and Caculo capacity due to its poor condition. As a deficit.
Major projects include the 2,070 MW In Mozambique, the government
Cabaça (2,172 MW ) are scheduled to result, the rehabilitated and modernised
Lauca hydropower project in Angola (of issued an extension for the Cahora
be fully commissioned by 2019 and hydropower station has extended its
which 1,336 MW is already operational), Bassa hydroelectric power station,
2022 respectively. Together the two operational life by at least an additional
72 | International Hydropower Association | Hydropower Status Report 2019 | 73
Africa

AFRICA REGION
GHANA CAMEROON

Ghana has rich natural resources and had access to electricity. By 2016, as preferred solutions to address Cameroon has the third highest shortages induced by water variations currency financing is expected to
significant hydropower potential. The this figure had risen to 82.5 per cent. power shortages through improving hydropower potential in Sub-Saharan and insufficient energy supply, the minimise forex challenges and allow
energy sector today is a mixture of Ghana is also participating in the efficiency. Africa after the Democratic Republic government intends to maximise for low local tariffs, making the project
thermal, hydropower and small solar United Nations Sustainable Energy of Congo and Ethiopia. Hydropower is its renewable energy potential and economically sustainable.
Hydropower generation has declined currently the sole renewable energy generate 25 per cent of renewable
developments. Total grid electricity for All (SE4ALL) initiative, which sets a Another major project under
in recent years because of low source on the grid, accounting for energy from variable sources like solar
generation in 2018 was 14,069 GWh of universal access target for 2030. development is the 1,800 MW Grand
reservoir levels. In 2018, Akosombo 54 per cent of the country’s total and wind.
which 4,991 GWh (39.2 per cent) was Eweng project which will be the fourth
The government is focusing on had to operate three turbines out of electricity installed capacity, while
from hydropower. This is accounted The 200 MW Memve’ele hydropower largest hydropower plant in Africa
securing electricity supply by means the six units during off-peak periods the remainder comes from thermal
for by three hydropower stations: plant is nearly operational with following its completion in 2024.
of diversification, in order to deliver and up to four turbines during peak sources. The country also relies on off-
Akosombo (1,020 MW), Kpong (160 construction work completed in 2017. Other planned projects include Kpep
a more resilient and dynamic energy periods in order to keep above its grid diesel generation and small-scale
MW) and Bui (404 MW). Hydropower The project will be connected to the (485 MW) and Makay (365 MW). With
sector. The government’s goal is to minimum operating level by the end hydropower for rural electrification.
makes up 40 per cent of total electric national grid once transmission lines these projects, Cameroon will have
add 10 per cent of power supplied by of the dry season. Currently only
installed capacity. With a rising population and the are completed. As of December 2018, added about 3,000 MW of hydropower
non-hydro renewable energy sources about half the country’s hydropower
The construction of Akosombo, by 2020. This renewable energy installed capacity is available. acceleration of industrial development, the energy evacuation line was 55 per capacity by 2025.
commissioned in 1965, launched for electricity is expected to come electricity demand is expected to triple cent executed.
From 2017 to mid 2018, Ghana was a Cameroon’s energy sector holds
a revolution in the energy sector, mainly from solar, wind, biomass and to 5,000 MW by 2020, as compared to
net exporter of electricity. Improving The Lom Pangar regulating dam, built promising possibilities of development
expanding electricity access to the municipal solid waste, but also smaller 1,455 MW in 2014.
interconnection lines is one of the in 2016, has enabled the regulation and diversification to explore
wider population and allowing scale hydropower plants. Increasing energy access is central to of seasonal flow fluctuations in the alternative sources of renewables
country’s policy priorities. Ghana Grid
exports of electricity to neighbouring Cameroon’s goal to become a middle- Sanaga River basin. This has boosted across the country and utilise its
Despite the increase in generation Company (GRIDCo) has agreed to build
countries. Hydropower generation income country and to reduce poverty the annual generation of the Edéa and massive hydropower potential. The
capacity, which has outstripped a new computerised maintenance
has been since then an integral part levels below 10 per cent by 2035. In Songloulou hydropower plants by realisation of Cameroon’s policy of
demand, the country has experienced management system to help optimise
of Ghana´s electricity mix, peaking in 2018, six out of 10 of Cameroonians 700 GWh from 2015 to 2017and made economic emergence by 2035 will be
power supply shortages due to fuel grid operations, which will help
2000 with 73 per cent of total installed had access to electricity, however possible construction of the 30 MW greatly achieved from the ongoing
supply challenges and high losses the country to continue supplying
electricity capacity. Over the last access varies widely between urban Lom Pangar project to improve rural hydropower development of the
in the distribution system. In a electricity to Burkina Faso.
decade, electricity demand has grown and rural areas. To meet growing electrification in the eastern region; Sanaga River basin.
2018 World Energy Council survey,
rapidly, with a 52 per cent increase energy demand, the government has the hydropower plant is expected to
Ghana’s energy leaders identified In April 2018, the National Electricity
since 2008. prioritised energy sector investment become operational in 2020.
the energy-water nexus, along with Transport Corporation (SONATREL)
Ghana committed to universal access corruption as critical uncertainties in the national budget and in its Vision
The 420 MW Nachtigal hydropower was granted sole charge of managing
to electricity as far back as 1989 when faced by the sector. Digitalisation and 2035 development policy.
project, the largest independent Cameroon’s electricity transmission
only 15-20 per cent of the population grid optimisation are now emerging Domestic hydropower potential is hydropower project in Sub Saharan network which was previously
estimated to be 23,000 MW, with 75 Africa, has been developed by the managed by the private utility, Energy
per cent of this capacity concentrated Cameroonian government together of Cameroon (ENEO). Its mission is
in the Sanaga River basin located in with the International Finance to modernise and put in place new
the north of the country. However Corporation and EDF Group. With transmission lines and improve
only 3 per cent of Cameroon’s construction already underway, the efficiency, given transmission losses
hydropower potential has currently project will augment the country’s are currently estimated at 40 per cent.
been exploited. Forecasts estimate electricity generation by 30 per cent
that hydropower will represent about (more than 2,900 GWh/year) when
75 per cent of the energy mix by 2023. it begins operation in 2023. The
In order to mitigate regular power combination of local and foreign

29.8 MILLION 1,584 MW 4,991 GWh 40% 25.5 MILLION 747 MW 4,973 GWh 54%
POPULATION INSTALLED HYDROPOWER HYDROPOWER POPULATION INSTALLED HYDROPOWER HYDROPOWER
HYDROPOWER GENERATION SHARE OF ELECTRIC HYDROPOWER GENERATION SHARE OF ELECTRIC
CAPACITY POWER INSTALLED CAPACITY POWER INSTALLED
CAPACITY CAPACITY

74 | International Hydropower Association | Hydropower Status Report 2019 | 75


EUROPE REGION
EUROPE

Kvilesteinsvatn dam, Vikafjellet, Norway.


Credit: Statkraft.

76 | International Hydropower Association | Hydropower Status Report 2019 | 77


EUROPE INSTALLED CAPACITY
COUNTRIES BY ADDED CAPACITY IN 2018 (MW*)
EUROPE INSTALLED CAPACITY 1st 2nd 3rd 4th 5th 6
Turkey Norway Austria Iceland Italy Switzerland
1,085 419 385 100 88 16,948

34

EUROPE CAPACITY BY COUNTRY*


23 Total installed capacity Total installed capacity
Rank Country (MW) Rank Country (MW)
15 1 Norway 32,256 22 Croatia 2,141
39
1 2 Turkey 28,358 23 Iceland 2,086
7
3 France 25,519 24 Albania 2,020
42
4 Italy 22,926 25 Latvia 1,576
25
5 Spain 20,378 26 Slovenia 1,524
42 6 Switzerland 16,948 27 Belgium 1,427
29
32 33 7 Sweden 16,466 28 Luxembourg 1,330
13 40 20 8 Austria 14,535 29 Lithuania 1,016

9 9 Germany 11,258 30 North Macedonia 674


27
21 37 11 10 Portugal 7,347 31 Montenegro 658
28
18 11 Ukraine 6,785 32 Ireland 529
6 41 8 35
3 26 12 Romania 6,328 33 Belarus 97
22
12 13 United Kingdom 4,712 34 Greenland 91
19
36 14 Greece 3,396 35 Moldova 76
38 31 17
16 15 Finland 3,236 36 Kosovo 68
4 30
24 16 Bulgaria 3,129 37 Hungary 56
10 5
14 2 17 Serbia 2,932 38 Andorra 45
18 Slovakia 2,522 39 Faroe Islands 39
19 Bosnia and Herzegovina 2,513 40 Netherlands 37
20 Poland 2,353 41 Liechtenstein 35
21 Czechia 2,268 42 Denmark 9

Key * including pumped storage

199 MW and below


10,000 MW to 19,999 MW

200 MW to 1,999 MW

2,000 MW to 9,999 MW 20,000 MW and above

78 | International Hydropower Association | Hydropower Status Report 2019 | 79


Europe

EUROPE OVERVIEW
OVERVIEW

Hydropower in Europe continued supply under the EU’s Framework should have international transmission powerhouse to take advantage of reservoirs, the project will also increase
to grow in 2018, with 2.2 GW added. Strategy for the Energy Union. interconnection capacity of at least 10 more than 600 metres of available the efficiency of the entire fleet. Further
The majority of new installed capacity Launched in 2015, the Energy Union per cent of total domestic generation head. Norwegian hydropower is east, in Salzburg, the 50-year-old
occurred outside of the European drives regional energy and climate capacity by 2020. Germany’s power today seeing a minor resurgence in Dießbach project was converted into a
Union, with 1,085 MW in Turkey and 419 policies. system, already connected to 12 other tunnelling. Lysebotn together with the pumped storage project by adding 24
MW in Norway. Within the EU, traditional power systems, is still seeking to expand 80 MW Rosten project, which became individual pumps operating in a matrix.
In late 2018, the European Commission operational in 2018, are part of a small The innovative matrix coupling of the
hydropower mainstays Austria (385 (see country profile).
presented its strategy for a climate number of new tunnel hydropower pumps allows, like in Obervermuntwerk
MW) and Italy (88 MW) all increased
neutral Europe by 2050, and followed In 2018, Turkey added over 1 GW of projects that also include the 85 II, for faster and highly adjustable
The Herdecke Power Station,
their hydropower installed capacity, Germany, where RWE recently
up three months later with a pledge to new hydropower capacity in a bid to MW Nedre Røssåga project, due for outputs while pumping, thereby
with remaining European countries installed a 7 MWh battery facility.
invest over EUR 10 billion in innovative meet growing power demand, over completion in 2020. Other smaller- increasing overall plant flexibility. The
adding a further 225 MW. Credit: RWE.
clean technologies under its Innovation 5.5 per cent annually on average since scale projects were also completed in project’s turbine installed capacity
The bulk of Europe’s renewable Fund for climate action, starting in 2020. 2002, and to reduce reliance on energy 2018, including Storelva (12.4 MW) and remains at 24 MW, while its pumps can
electricity is provided by hydropower. The Innovation Fund seeks to enable imports. Turkey connected the 625 Tverråa (4.7 MW). Storelva and Tverräa operate at a maximum of 32 MW.
In 2018, hydropower generated an innovative low-carbon technologies and MW Upper Kaleköy project in 2018, represent the final two greenfield
estimated 643 TWh (not including processes, including renewable energy making it the country’s seventh largest In the United Kingdom, a number of
projects out of five commissioned by
generation from pumped storage), generation and energy storage. hydropower project. Located in the east proposed pumped storage projects
Helgeland Kraft since 2015 (3.7 MW
which accounts for approximately 17 of the country, the project is one of a in Scotland received considerable
The Innovation Fund complements the Leiråa, 10.2 MW Tosdalen, and 7.4 MW
per cent of total generation. Wind and cascade of six projects along the Murat media attention in 2018. The proposed
EU’s ongoing Horizon 2020 programme Bjørnstokk).
solar have grown considerably in the River, including the 580 MW Beyhan 1 projects look to provide balancing consists of a single 100 MW turbine,
which supports the Hydropower-Europe Austrian pumped storage developers services for Scottish off-shore but future plans anticipate a 40 MW
last 10 years, from nearly 64 GW and project completed in 2015, and the 500
initiative, launched in early 2019 to completed two expansion projects windfarms, and many of these will use addition.
16 GW in 2008 to 190 GW and 127 MW Lower Kaleköy project scheduled
develop a research and innovation in 2018. In the west, the 360 MW existing infrastructure. France is also
GW, respectively, in 2018, accounting for completion in 2020. In the same Slovenia commissioned the 45 MW
agenda and strategic innovation Obermuntwerk II project employs a pursuing increased energy storage
for the vast majority of new installed region, Turkey also commissioned the Brežice project during 2018. It is the
roadmap for hydropower. ternary configuration of individual deployment, targeting 10 GW of new
generating capacity. 140 MW Kiğı project during 2018. fourth of a five-project cascade along
European electricity grids have pumps and turbines (each 180 MW), storage by 2035 (see country profile).
The substantial growth of renewables, Norway completed the replacement the Sava River, which include the
increased their level of interconnection which are highly flexible and allow
coupled with the decommissioning of of the 210 MW Lysebotn plant, first After two years of construction, Iceland already completed Boštanj, Blanca and
in recent years, and there are plans to for faster-responding, operation over
large-scale conventional synchronous commissioned in 1953, with a new completed the 100 MW Búrfell II project, Krško projects and the planned 28 MW
further enhance cross-border power a broader range, allowing the project
generators, has put increased onus 370 MW project named Lysebotn II, which utilises water from the reservoir Mokrice project, a further 10 kilometres
transmission capacities through the EU’s to better respond to modern grid
on hydropower’s ability to provide making it one of the larger projects of the existing Burfell project in order downstream.
Trans-European Networks for Energy requirements arising from variable
flexibility in order to maintain secure, in the country. The project involved to maximise exploitation of strong
(TEN-E) strategy. This builds upon the wind and solar. Utilising waters in the
affordable and sustainable energy constructing a new underground flows from the Þjórsá River. The station
EU’s 2014 objective that EU members already existing Silvretta and Vermunt

80 | International Hydropower Association | Hydropower Status Report 2019 | 81


Europe

EUROPE REGION
FRANCE GERMANY

Thanks to its large share of hydropower capacity by roughly 500 MW to 26.05 with the EU to close this case. Germany, Europe’s largest economy, resources in some fashion. German grid is serviced by a further
and nuclear energy, France has GW by 2023. has a rich hydropower heritage and 3 GW sourced from Luxembourg,
Despite the uncertain environment, Germany has twelve ‘electrical
achieved an absolute decoupling of its is at the vanguard of the transition to Switzerland and Austria. These pumped
As the new plan forecasts 35 per cent major hydropower projects have been neighbours’ with interconnectors
greenhouse gas emissions from GDP renewable power systems. Germany’s storage projects still provide the lion’s
of variable renewable electricity supply launched in recent years. As part of the totalling roughly 20 GW. To the
growth since 2005, as emissions have Energiewende policies – targeting share of utility-scale power storage,
in 2035, compared to only 5 per cent PPE, 2018 saw the announcement of the north, Germany can tap into Nordic
either held steady or reduced as the a shift towards renewable energy, storing 8 TWh of power in 2015. Policy
today, hydropower is poised to play a winners of 37 MW out of the 105 MW of hydropower reservoirs. The 1,400
economy has grown. In 2018, nuclear greenhouse gas emissions reductions, makers are aware that reforms are
central role in meeting the flexibility hydropower capacity tendered. MW HVDC subsea cable with Norway,
energy made up 71 per cent of the and a phase-out of nuclear energy – needed to continue to support storage
needs of the evolving electricity Nordlink, is expected to be completed
country’s power generation, while EDF is currently constructing the 92 MW resulted in renewables contributing facilities. The influx of low-marginal cost
system. Hydropower currently provides in 2019 and will allow Norwegian
hydropower represented 10 per cent. Romanche-Gavet hydropower plant, 35.2 per cent of electricity generation wind and solar has altered electricity
approximately 50 per cent of France’s hydropower reservoirs to absorb excess
which will replace the six powerhouses in 2018, roughly the same as coal. Due price dynamics with consequences on
The country’s 25.5 GW of installed power system flexibility, and pumped German wind and supply hydropower.
and five dams in the valley and increase to drought, hydropower generation business models for PHS operators.
hydropower capacity, including 5 storage still dominates the country’s To the south, hydropower-rich Austria
production by 30 per cent. The first dropped almost 15 per cent, and
GW of pumped storage, makes it the storage landscape. and Switzerland contribute over 3.5 GW In spite of outdated regulatory
turbine commissioning is expected in contributed 2.6 per cent of total
third largest European producer of of hydropower to Germany’s system. frameworks, both Engie Germany and
In March 2018, EDF unveiled its EUR 8 2019, and the project will be completely power production, accounting for just
hydroelectricity behind only Norway RWE deployed innovative batteries
billion new energy storage plan of more online in 2020. In addition, the 330 over 7 per cent of total generation Until October 2018, Germany, Austria
and Turkey. Despite recent rapid growth coupled with their pumped storage
than 10 GW of new storage by 2035, MW La Coche pumped storage plant is from renewables. The majority of the and Luxembourg shared a common
in solar and wind supply, hydropower projects in 2018. In addition to
which includes provisions for up to 2 GW currently undergoing upgrades to add country’s hydropower resources are power price-bidding zone, allowing
continues to make up over half of upgrading the Pfreimd project, Engie
of new pumped storage, in line with the a 240 MW Pelton turbine, making it the located in the mountainous southern for unlimited commercial exchange of
renewable energy supply. installed onsite a 12.5 MW lithium-ion
previous PPE’s target of adding 1 to 2 most powerful of its type in France; the provinces, with 50 per cent of all projects power between the grids. Bottlenecks
The 2015 Energy Transition for Green GW of pumped storage between 2025 upgrading is expected to be completed battery to provide additional rapid
located in Bavaria and 20 per cent in in Germany’s north-south transmission
Growth Act (LTECV) set ambitious goals and 2030. in 2019, which will increase production frequency balancing services. This
Baden-Württemberg. These two states grid, however, were causing problems
for France’s energy transition, targeting by 20 per cent. augments the already significant
In France, hydropower generation account for over 80 per cent of annual and knock-on effects to neighbouring
40 per cent of electricity generation to balancing role of the project, which
facilities greater than 4.5 MW in capacity Major regional interconnection projects German hydropower production. Of an countries.
be sourced from renewables by 2030, itself is responsible for 5 per cent of all
are operated under concessions achieved significant milestones in estimated 7,300 hydropower stations,
up from 18.4 per cent in 2018. The In 2018, the EU split the common balancing power delivered to Germany’s
awarded by the French state, which 2018. In July, a EUR 578 million grant about 6,900 have less than 1 MW
ETL mandates a Multiannual Energy price-zone at the German – Austrian grid network and 1 per cent of total
allows companies to operate facilities for agreement was signed to strengthen capacity, while nearly 6,000 have less
Programme (PPE) to assign compulsory border, giving Germany time to balancing power in Western Europe.
a set period of time. Among these plants, the energy interconnection between than 100 kW.
installed capacity targets for each build the necessary north-south RWE installed a 7 MWh battery facility at
more than 80 per cent are operated France and Spain, which aims to increase As deployment of wind and solar connectors. Nevertheless, Austrian their Herdecke Power Station.
generation technology.
by EDF and 15 per cent by Engie. interconnection capacity between both continues to grow, flexibility will hydropower projects will continue to
In 2018, the first revision to the PPE Despite uncertainty in the renewal of countries to 5,000 MW. become a key criterion for the next support the German grid, constrained
announced objectives for energy hydropower concessions, EDF and other phase of Germany’s energy transition. only by the physical capacity of their
storage projects with the following: the French operators continue to invest Hydropower, despite occupying only interconnectors. Austrian pumped
closure of all coal plants by 2022; tripling significantly in the maintenance and a small proportion of the energy mix, storage projects will still have access
wind generating capacity; increasing renovation of their hydropower assets. will remain a system cornerstone due to to the German grid, including the 360
solar capacity fivefold by 2030; and In 2015 the European Commission its relative reliability and predictability. MW Obervermuntwerk II pumped
decommissioning France’s nuclear launched a legal proceeding against German flexibility services, whether hydropower project in Vorarlberg,
assets to reduce nuclear generation by France to ensure “competitive bidding coming from interconnections to commissioned in 2018.
50 per cent by 2035. The PPE targeted for hydroelectric concessions”. The neighbouring grids, energy storage,
an increase of hydropower installed French authorities are still in discussion flexible generation or demand-side Germany itself has 6,806 MW of installed
management all depend on hydropower pumped storage capacity, but the

67.2 MILLION 25,519 MW 63,100 GWh 19.5% 82.7 MILLION 11,258 MW 16,290 GWh 2.7%
POPULATION INSTALLED HYDROPOWER HYDROPOWER POPULATION INSTALLED HYDROPOWER HYDROPOWER
HYDROPOWER GENERATION SHARE OF ELECTRIC HYDROPOWER GENERATION SHARE OF ELECTRIC
CAPACITY POWER INSTALLED CAPACITY POWER INSTALLED
CAPACITY CAPACITY

82 | International Hydropower Association | Hydropower Status Report 2019 | 83


SOUTH AND CENTRAL ASIA REGION
SOUTH AND
CENTRAL ASIA

The Krasnoyarsk hydropower plant on


the Yenisey River in Russia.
Credit: En+ Group.

84 | International Hydropower Association | Hydropower Status Report 2019 | 85


SOUTH AND CENTRAL ASIA INSTALLED CAPACITY
COUNTRIES BY ADDED CAPACITY IN 2018 (MW*)
SOUTH AND CENTRAL ASIA
INSTALLED CAPACITY 1st 2nd 3rd 4th 5th 6
Pakistan Tajikistan India Iran Nepal Georgia
2,487 605 535 140 71 3,221

2
SOUTH AND CENTRAL ASIA CAPACITY BY COUNTRY*
Total installed capacity
Rank Country (MW)
1 India 49,917
9 2 Russia 48,506
3 Iran 11,951
4 Pakistan 9,827
5 Tajikistan 5,795

6 6 Georgia 3,221
10 7 Kyrgyzstan 3,091
7
14 15 8 Iraq 2,753
22
9 Kazakhstan 2,561
13
5 10 Uzbekistan 1,731

19 11 Sri Lanka 1,719


8
3 12 Bhutan 1,615
21 20 13 Syria 1,505
17
14 Armenia 1,249
12
15 Azerbaijan 1,122
Key
4 16 16 Nepal 1,016
18 17 Afghanistan 461
199 MW and below
18 Bangladesh 230
200 MW to 1,999 MW 19 Lebanon 221
1
20 Jordan 12

2,000 MW to 9,999 MW 21 Israel 7


22 Turkmenistan 1

* including pumped storage


10,000 MW to 19,999 MW

11

20,000 MW and above

86 | International Hydropower Association | Hydropower Status Report 2019 | 87


South and Central Asia The 456 MW Upper Tamakoshi

SOUTH AND CENTRAL ASIA OVERVIEW


Hydropower Project is under
construction in Nepal.
Credit: Government of Nepal.

OVERVIEW

MW of new hydropower capacity a priority. In Siberia, turbine repairs complete, promises to raise electricity
was successfully auctioned in 2018, and upgrades were completed at the generation in the country by 15 per
and state-owned Samruk-Energy 3,840 MW Ust-Ilimsk station, improving cent.
put the first modernised unit at the performance, and are now underway
In Iran, new hydropower units are
Shardarinsk plant back into operation. at the 662 MW Irkutsk and 6,000 MW
coming online. The last two units
Krasnoyarsk facilities. New capacity has
Hydropower installed capacity grew projects went into operation. Together There has also been increasing Across the border, UzbekHydroEnergo at the 210 MW Daryan hydropower
been installed at the Ust-Srednekans
by 3.96 GW across South and Central these projects grew Pakistan’s attention on cross-border electricity has plans to develop new stations station were synchronised to the grid
plant in the far northeast of Russia
Asia in 2018, which continues a hydropower sector by over 25 per cent trade in the subcontinent between and modernise Uzbekistan’s existing in 2018. The Daryan facility, located in
totalling 310 MW in 2019, whereas in
similar growth trend seen last year. last year alone, underlining its vital several countries in South Asia’s fleet, most of which was built between Kermanshah province close to Iran’s
western Russia the 1,375 MW Saratov
Pakistan accounted for the majority of contribution to meeting the country’s Association for Regional Cooperation 30 to 80 years ago. Additionally one western border, includes a multi-
station is undergoing modernisation
new capacity added, while Tajikistan electricity needs. (SAARC). For example, Nepal and of four turbines at the largest facility purpose reservoir providing irrigation
and the 346 MW Zaramagskaya-1 is
passed a key milestone with the first Bhutan have each signed agreements in Afghanistan, the 100 MW Naghlu to areas of southwest Iran. The Sardasht
Neighbouring countries in South Asia under construction near the Georgian
unit of the Rogun hydropower project with India to sell power generated plant, was brought back online in 2018 project in West Azerbaijan province
are looking to advance opportunities border.
entering into operation. India also from upcoming hydropower projects, after six years out of service. and the Bakhtiari project on the border
from hydropower development. In
announced a major new energy policy, and in 2018 Bangladesh agreed to a Ageing hydropower stations in the of Lorestan and Khuzestan provinces
Bhutan, the 720 MW Mangdechhu Regional interconnections continue
formally recognising large hydropower new power deal with Nepal. At the end South Caucasus are being modernised, are under construction and when
project is close to completion and, to play an important role in Central
projects above 25 MW as renewable of 2018, India issued new guidelines with notable investments in the 1,300 complete will add 1,650 MW to the
upon entering service, which is Asia. For instance Tajik-Uzbek power
and setting hydropower purchase making provisions for neighbouring MW Enguri dam in Georgia and the country’s capacity. Droughts have
planned for 2019, will expand total flows were restored in 2018, with
obligations for utilities. countries to transfer power via its 424 MW Mingachevir modernisation however affected the Middle East in
grid supplies by almost 50 per added financing plans to reconnect
national grid to a third country, completed in Azerbaijan in 2018. recent years impacting hydropower
Completion of the Tarbela Fourth cent. India, which led the region’s Tajikistan’s grid to the once-unified
representing a major breakthrough for production, with lower reservoir levels
Extension Hydropower Project in hydropower growth in 2017, counted Central Asian Power System (CAPS). In Georgia, hydropower generated
regional power trade. reported in Iran in summer 2018
Pakistan was the largest addition in a net increase of 535 MW in 2018 Countries involved in the CASA 1000 almost 10 TWh in 2018, making up
compared to previous years.
this region. Situated on the Indus river, due to the addition of several new In Central Asia, further to significant project to interconnect Kyrgyzstan, 82 per cent of the country’s total
the extension added 1,410 MW to the hydropower units and existing asset progress on Tajikistan’s Rogun project, Tajikistan, Afghanistan and Pakistan generation mix. Added installations
existing 3,478 MW Tarbela hydropower upgrades. The Indian government modernisation programmes of large, have also made progress in procuring in 2018 included the 27 MW Kirnati
complex from three new units has also given a welcome boost to existing hydropower stations are construction contracts. and 21 MW Old Energy hydropower
commissioned in 2018, bringing the hydropower after announcing that moving ahead as well as new capacity stations along with smaller-scale
site’s installed capacity to 4,888 MW. large hydropower projects would be in the pipeline. A major contract was In Russia, hydropower made up
projects, while a portfolio of assets is
The Water and Power Development recognised as part of the Renewable awarded at Kyrgyzstan’s largest and approximately 17 per cent of overall
at the planning stage. This includes the
Authority (WAPDA) also announced Purchase Obligations (RPO) scheme, oldest facility, Toktogul, which will electricity generated in 2018, where
433 MW Namakhvani project being
that the 969 MW Neelum Jhelum together with small-scale hydropower increase plant capacity from 1,200 modernisation of the installed
developed by the privately-held Clean
and 108 MW Golen Gol hydropower which was already covered. to 1,440 MW. In Kazakhstan 61.5 hydropower fleet is regarded to be
Energy Group Georgia, which when

88 | International Hydropower Association | Hydropower Status Report 2019 | 89


South and Central Asia

SOUTH AND CENTRAL ASIA REGION


NEPAL TAJIKISTAN

With approximately 1 GW of installed 70 per cent reported last year, while around May to October), while facing With mountains covering 93 per cent well as reduced network losses and raising plant capacity to 174 MW and
capacity, hydropower provides almost also reducing use of off-grid diesel deficits in the dry seasons. To address of the country and vast natural water greater power exports. To achieve this, include measures to improve climate
all of Nepal’s domestic electricity generation. this, the NEA is planning storage reserves, Tajikistan has significant measures have been introduced to resilience.
generation on the grid. The economy schemes including the 140 MW Tanahu hydropower potential. Investment in attract foreign funding, including tax
These steps are part of the Adapting hydropower facilities to
is experiencing rising power demand, project and other, larger reservoir existing and new energy infrastructure exemptions, legal rights and guarantees
government’s ambitious plans to reach manage greater climate extremes is
with forecasts that it will more than projects. This infrastructure will play an has been a strategic priority for the in hydropower construction.
5 GW total hydropower capacity over becoming a global issue, particularly
double by 2025 compared to 2018, important role in regulating the power government and significant progress
the next five years, as recently set out in A World Bank study released in 2018 for countries like Tajikistan that are
making clear the need for new capacity. system and managing water resources. was made in 2018.
a white paper by the Ministry of Energy, described the Rogun scheme as the vulnerable to climatic and hydrologic
According to its annual report, the Water Resources and Irrigation. Nepal is The Nepali government is also looking President Emomali Rahmon ‘centrepiece’ of Tajikistan’s development variability. The funding package will
public-owned Nepal Electricity also looking to improve the governance to greater regional interconnection to inaugurated the first of six turbines strategy and highlighted its role in bolster the operator’s capabilities
Authority (NEA) owns 50 per cent of of its electricity sector, including help balance supply and demand. As a at the 3,600 MW Rogun hydropower spurring economic growth. However and working practices in climate risk
the country’s hydropower assets and establishing a new Electricity Regulatory member of the South Asian Association scheme, which began operations in to ensure completion of the scheme management based on international
the other 50 per cent is owned by Commission (ERC) which would help for Regional Cooperation (SAARC), 2018, adding a much needed 600 MW and realise the country’s development good practice.
independent power producers (IPPs). increase private sector investment. Nepal has access to the region’s of capacity to the grid. The dam height objectives, the study also called for
Alongside hydropower, development
Additions in 2018 included the 30 MW electricity markets and is looking to was reported to reach 75 metres at structural reforms to ensure a more
There are several ongoing hydropower of the grid network is a focus for the
Chameliya hydropower plant. The expand its power trading agreements the end of 2018 and will be the world’s sustainable business environment.
developments due to come online in government. With diplomatic relations
run-of-river project was inaugurated with India, as well as other countries tallest at 335 metres upon completion
the next couple of years. Construction Most of Tajikistan’s main hydropower much improved in recent years,
by the former Prime Minister of Nepal, such as Bangladesh and China. in 2032.
of the 456 MW Upper Tamakoshi project plants are installed along the Vakhsh Tajik-Uzbek transmission lines were
Sher Bahadur Deuba, in February 2018,
near the border with Tibet is close to Interconnections exist along the border Construction of the Rogun scheme River downstream of Rogun. This restored in April 2018 allowing annual
marking the end of a 10-year long
completion. The run-of-river plant will with India at various locations. The originally began in 1976 but was stalled includes the 3,000 MW Nurek dam, export of up to 1.5 TWh to Uzbekistan.
development period.
be the country’s largest hydropower cross-border Dhalkebar–Muzaffarpur for decades due to political instability, currently the tallest in Central Asia, In addition, the CASA 1000 project is
Recently commissioned IPPs include station expanding national capacity line is currently operating at the 220kV civil war, floods and financial setbacks. operated by national utility Barqi Tojik. progressing and will bolster regional
the 13.6 MW Thapa Khola hydropower significantly and has been fully funded level and will be charged at 400kW Construction restarted in 2016 following Commissioned in the 1970s, a major trading opportunities with Afghanistan
plant, commissioned at the end of 2017, by domestic sources including the NEA once the 400kV substation at Dhalkebar a push from the Tajik government and contract was awarded in 2018 to replace and Pakistan once completed.
and the 13 MW Madkyu Khola project and other local organisations. The first is completed. A second cross-border support from neighbouring Uzbekistan all nine power units with new 380
In the eastern region of Tajikistan,
which came online in 2018, alongside unit aims to start production at the transmission project, the 400 kV Butwal- after it dropped its objections. When MW Francis turbines and generators,
known as Gorno-Badakhshan
smaller plants. The new Dhalkebar- end of 2019. The 60 MW Upper Trishuli Gorakhpur line, is also at the advanced fully commissioned Rogun will expected to increase total output by 12
Autonomous Oblast (GBAO), an
Muzaffarpur transmission line from 3A hydropower and 14 MW Kulekhani stage of preparation, which will expand represent a landmark achievement per cent. The first unit of the Golovnaya
international initiative has supported
Nepal to India was also commissioned III plants are also both expected to be flow capacity and support large-scale and ensure hydropower continues hydropower station was also put
repairs and installations of small-scale
in 2018, giving a welcome boost to completed in 2019, with a series of hydropower developments in Nepal to fulfil Tajikistan’s electricity needs, back into service in 2018, as part of an
hydropower. The Aga Khan Fund for
Nepal’s power system. other public and private construction with new export routes. alleviating shortages and raising export ongoing modernisation programme
Economic Development (AKFED) set up
projects planned. opportunities to surrounding countries. looking to raise plant capacity from 240
Thanks to new capacity and greater a public-private partnership to assume
MW to 270 MW.
imports from India at peak times, Most of Nepal’s existing hydropower Achieving energy independence by responsibility for existing units and
the NEA was able to end the power stations are run-of-river schemes, 2030 is one of Tajikistan’s priority policy Further north in the Sughd region, the build new local hydro. These efforts
shortages and load shedding that had meaning power generation is impacted objectives, as reflected in the country’s 127 MW Qairokkum hydropower plant were recognised in 2017 for expanding
affected Nepal for a decade. Work to by seasonal rainfall patterns. With National Development Strategy. on the Syr Darya, built even earlier in energy access in the GBAO region, after
expand the existing electricity network further large run-of-river projects in The Ministry of Energy and Water the 1950s, has secured investment for a reported 96 per cent of households
however will be critical to provide 100 the pipeline, there is a need to manage Resources is targeting an increase in replacements and repairs. Financing had achieved access to reliable and
per cent of the population with access surplus power produced during the total generating capacity to 10 GW, as from international funds will assist in clean energy supplies.
to grid electricity, compared to the monsoon months (typically from

30 MILLION 1,016 MW 3,900 GWh 95% 9 MILLION 5,795 MW 17,738 GWh 95%
POPULATION INSTALLED HYDROPOWER HYDROPOWER POPULATION INSTALLED HYDROPOWER HYDROPOWER
HYDROPOWER GENERATION SHARE OF ELECTRIC HYDROPOWER GENERATION SHARE OF ELECTRIC
CAPACITY POWER INSTALLED CAPACITY POWER INSTALLED
CAPACITY CAPACITY

90 | International Hydropower Association | Hydropower Status Report 2019 | 91


EAST ASIA AND PACIFIC REGION
EAST ASIA
AND PACIFIC

Baihetan hydropower project


under construction.
Credit: China Three Gorges.

92 | International Hydropower Association | Hydropower Status Report 2019 | 93


EAST ASIA AND PACIFIC INSTALLED CAPACITY
COUNTRIES BY ADDED CAPACITY IN 2018 (MW*)
EAST ASIA AND PACIFIC
1st 2nd 3rd 4th 5th 6
INSTALLED CAPACITY China Cambodia Laos Indonesia North Korea Malaysia
8,540 300 254 61 10 6,094

20 EAST ASIA AND PACIFIC CAPACITY*

10 Rank Country Total installed capacity Rank Country Total installed capacity
1 China 352,260 13 Philippines 4,314
2
5 2 Japan 49,905 14 Myanmar 3,331
3 Vietnam 16,679 15 Cambodia 1,667
1 4 Australia 8,790 16 Papua New Guinea 234
5 South Korea 6,490 17 Fiji 125
14 11
6 Malaysia 6,094 18 New Caledonia 78

12 7 Indonesia 5,511 19 French Polynesia 47


9 8 New Zealand 5,346 20 Mongolia 23
15 13 9 Laos 5,308 21 Samoa 12
3
10 North Korea 5,010
11 Chinese Taipei 4,691
12 Thailand 4,510
6
* including pumped storage

Key 16
7

199 MW and below

21
200 MW to 1,999 MW
17
19
2,000 MW to 9,999 MW 18
4

10,000 MW to 19,999 MW

20,000 MW and above 8

94 | International Hydropower Association | Hydropower Status Report 2019 | 95


East Asia and Pacific

EAST ASIA AND PACIFIC OVERVIEW


OVERVIEW

The East Asia and Pacific region MW Deeoke projects. Shweli 3 in Developed by two South Korean providing more flexible, reliable and in 2018 including a power purchase
continued to be the engine room Shan State is considered to be a companies, together with local dispatchable renewable energy to agreement between the government
of the world’s hydropower sector priority project in order to meet partners the run-of-river project will a transforming National Electricity and two Korean developers, K-water
in 2018, having added 9.2 GW of the energy needs of the country help displace fossil fuel fired power Market with greater interconnection and Hyundai Engineering. In a country
installed capacity, more than any other over the medium term and will be plants which dominate Sumatra’s capacity to the mainland. In June 2018, which is heavily reliant on expensive
region. China accounted for most of developed by a consortium led by electricity grid. With up to 6 GW of Hydro Tasmania identified 14 options diesel power, the project has gained
Lake Rowallan was recently named
the capacity additions with 8.54 GW French utility EDF. The International capacity either under construction or as one of the most promising sites
that represent 4,800 MW of cost- financial support from a number of for pumped hydropower storage in
added, including 1.5 GW of pumped Finance Corporation also released a in the planning stages, hydropower effective pumped storage potential development agencies and national Tasmania, Australia.
storage. Excluding China, over 650 MW Strategic Environmental Assessment is playing a key role in supporting and these options are now being governments with construction now Credit: Hydro Tasmania.
was added in the region. (SEA) of Myanmar’s hydropower the Indonesian government’s aim to investigated further to identify sites expected to commence in 2019.
sector, the culmination of a two-year increase the share of renewables in the that could deliver an additional 2,500
China’s installed capacity passed 350 In Fiji, the European Investment Bank
process, which is seeking to help guide country’s total energy use to 23 per MW of capacity.
GW in 2018 with several projects, commissioned a feasibility study to
sustainable hydropower development cent by 2025 from 13 per cent in 2018.
mainly located in the country’s south- In the Pacific, the Papua New Guinea identify the best hydropower scheme
with a strong focus on the need for
west entering into operation. The need Australia continued to progress Electrification Partnership was formed on the Qaliwana River which is able to
basin-level planning.
to reduce renewables curtailment, with the development of several to support the aim of providing meet the energy sector objectives of
including hydropower, remains high Laos commissioned a further 254 MW pumped storage projects, most power to 70 per cent of the country’s both the Fijian government and the Fiji
on the government’s agenda having in capacity, but the sector experienced notably Snowy Hydro’s ‘Snowy 2.0’ population by 2030, up from around Electricity Authority.
issued the Clean Energy Consumption a very difficult year due to the collapse project and Tasmania’s ‘Battery of the 13 per cent in 2018. Backed by the
Action Plan 2018-2020. The plan of Xe-Pian Xe-Nam’s saddle dam in Nation’ initiative. In late 2018, the government, as well as Australia,
emphasised the importance of July 2018. Following the collapse, the board of Snowy Hydro approved a Japan, New Zealand and the United
reforming China’s electricity market, Laotian government announced an final investment decision to proceed States, the USD 1.7 billion initiative will
improving provincial interconnections, investigation into its causes, a review with the project and in early 2019 help fund new generation capacity as
increasing energy storage (including of all existing and under-construction its sole shareholder, the Australian well as transmission and distribution
pumped storage) and enhancing dams and a halt to proposed projects. Government followed suit. To be lines throughout the country, which
power system flexibility. The government also established a completed by 2025, Snowy 2.0 will has significant untapped hydropower
centre for dam safety management provide an additional 2,000 MW resources.
Outside of China, significant activity
in order to prevent such incidents of capacity and up to 175 hours of
took place in the Greater Mekong The 15 MW Tina River project in
occurring in the future. storage. Tasmania’s hydropower
region, notably in Myanmar where the Solomon Islands took a step
resources were identified by the
after some delay the government In Indonesia on the island of Sumatra closer to construction with the
state and federal government
issued a notice to proceed for both the 56 MW Semangka project was signing of several key agreements
as an important future source of
the 1,050 MW Shweli 3 and the 60 commissioned in December 2018.

96 | International Hydropower Association | Hydropower Status Report 2019 | 97


East Asia and Pacific

EAST ASIA AND PACIFIC REGION


CHINA CAMBODIA

The year 2018 marked the 40th the 800 kV Wudongde–Guangdong are being developed in eight provinces As one of the fastest growing country on a major tributary of the opportunity to generate revenue
anniversary of China’s historic economic and Guangxi transmission began and regions; however, seven of them economies in Asia, Cambodia is Mekong River, it was built at a cost of through exporting its electricity to
reform programme, which introduced construction. failed to meet the 2018 deadline and seeking to rapidly expand its power USD 780 million and is a joint-venture neighbouring countries including
market principles and opened up have been postponed and in 2019, sector to keep up with increasing between China’s Hydrolancang Vietnam and Thailand where regional
Pumped storage is essential to provide
the economy to foreign investment. the central government will intervene demand, having experienced double International Energy (holding a 51 per interconnectors are already in
flexibility to the power system and
Since these important reforms, China’s to accelerate their development. digit annual growth in recent years. cent stake), Cambodia’s Royal Group operation. However, the project has
continues to be a priority in China’s
hydropower sector has grown twenty- Furthermore, ancillary services markets Blessed with vast water resources (39 per cent) and Vietnam’s EVN raised environmental and social
energy transition. The 1,200 MW
fold to a total capacity of 352 GW, that will better reward the services of including the Mekong River, International Joint Stock Company concerns, particularly over the impact
Shenzhen station was commissioned
representing over a quarter of the pumped storage were successfully hydropower is Cambodia’s main (10 per cent). on fish migrations and a final decision
last year and is the country’s first large
world’s installed capacity. A further implemented in five regional power source of electricity. With less than on its future is still to be made.
scale pumped storage built in a city, As the country’s largest hydropower
8.54 GW capacity was added last year, markets including Northeast China. 20 per cent of its estimated technical
in addition the 600 MW Qiongzhong project, Lower Sesan II will boost As a founding member of the Mekong
including 1.5 GW of pumped storage. potential developed, this source of
station entered into operation. In November 2018, the government electricity production by 20 per cent River Commission in 1995, an inter-
renewable energy is set to play an
In recent years, annual capacity Furthermore, the main civil works of released its third public consultation with the electricity being sold to the governmental organisation formed
even greater role in the future.
growth has slowed in line with weaker three pumped storage projects (1,200 on their renewable portfolio standard, state-owned utility Electricité du to jointly manage the shared water
economic conditions and reduced MW Fu Kang, 1,800 MW Jurong and which sets out provincial wide Cambodia’s electricity sector is Cambodge at a base price of USD resource Cambodia is committed
power demand growth, resulting 1,200 MW Yongtai) began construction minimum consumption levels of undergoing a major transformation, 0.0695 cents/kWh. Its development to regional cooperation in order to
in overcapacity and renewables in 2018. A number of conventional renewable electricity. The new standard and high on the government’s was underpinned by a 45 year Build- sustainably develop the Mekong River
curtailment. In 2018, 33,200 GWh of projects were also commissioned, will require designated electricity users agenda is increasing access (72 per Operate-Transfer (BOT) contract basin. Yet as outlined in the country’s
wind and solar and 69,100 GWh of including 1,900 MW Huangdeng, 348 to purchase an obligated amount of cent of households currently have with the government which will also National Strategic Development
hydropower generation was curtailed. MW Sha Ping II, 920 MW Dahuaqiao renewable energy certificates from access), improving grid reliability, benefit from annual tax revenues in Plan 2014-2018, challenges remain
To tackle this problem, the Chinese and 420 MW Li Di stations. Meanwhile, renewable energy generators, which and reducing imports and costs for the order of USD 30 million. including insufficient financial
government issued the ‘Clean Energy substantial progress has been made will further help to increase hydropower consumers. resources and institutional capacity
With Lower Sesan II entering into
Consumption Action Plan 2018–2020’ with the world’s largest hydropower consumption and reduce curtailment. which needs to be addressed.
Electricity imports, largely from operation, Chinese built hydropower
which aims to virtually eliminate project currently under construction,
Finally, China continues to promote heavy fuel oil, represent around 15 projects in Cambodia have an
curtailment by 2020. The Sichuan China Three Gorges Corporation’s (CTG)
green finance for its massive per cent of consumption and the installed capacity of over 1,300 MW
provincial government also announced 16,000 MW Baihetan project, with the
clean energy investment needs. government is aiming to become and account for half of the country’s
plans to establish a ‘hydropower completion of intake towers for spillway
Internationally-aligned green bond self-sufficient in the medium term to total installed capacity from all energy
consumption demonstration zone’ with tunnels.
issuance reached USD 31.2 billion help address high tariffs which are sources. All based on BOT contracts,
direct power purchase and dedicated
Apart from advancing infrastructure (CNY 210.3 billion) in 2018, and China’s deterring greater foreign investment. hydropower development has been a
power lines for local industrial users.
development, the Chinese government green bond market is the world’s Cambodia’s electricity prices are some key pillar of Sino-Cambodia relations
Inter-provincial power transmission also implemented a series of reforms second largest, accounting for 18 per of the highest in the region and range over the past decade and is set to
channels have been constructed to and policies to speed up their clean cent of global issuance. The country’s from USD 0.09 - 0.25 per kilowatt continue as part of China’s Belt and
export excess hydropower generation energy transformation. In 2018, China green bond standards were developed hour in urban areas connected to the Road Initiative.
and in 2018, two further transmission began reforming its electricity market to support the financing of clean central grid to USD 0.40 - 0.80 per
Several more hydropower projects
lines from Yunnan province achieved to transition from a planned dispatch energy projects including large-scale kilowatt hour in rural areas.
have been proposed in recent years
significant progress. The 800 kV to an electricity spot market that will hydropower. Between 2017 and 2018,
In 2018 Cambodia took an important including the 2,600 MW Sambor
Northwestern Yunnan-Guangdong allow renewables to be dispatched first, CTG raised USD 2.25 billion to finance
step forward in achieving its energy project located on the mainstream
UHVDC power transmission project and hydropower is expected to benefit its Jinsha River cascade projects,
goals with the commissioning of of the Mekong River. Given its
with a transmission capacity of 5,000 from increased generation. Pilot spot including the Baihetan and Wudongde
the 400 MW Lower Sesan II project. significant generating potential, the
MW was commissioned, and the world’s markets, which is the buying and selling hydropower projects.
Located in the northeast of the government views the project as an
first UHV multi-terminal DC project, of electricity for immediate delivery,

1.4 BILLION 352.26 GW 1,232,900 GWh 18.5% 16.4 MILLION 1,667 MW 2,581 GWh 63%
POPULATION INSTALLED HYDROPOWER HYDROPOWER POPULATION INSTALLED HYDROPOWER HYDROPOWER
HYDROPOWER GENERATION SHARE OF ELECTRIC HYDROPOWER GENERATION SHARE OF ELECTRIC
CAPACITY POWER INSTALLED CAPACITY POWER INSTALLED
CAPACITY CAPACITY

98 | International Hydropower Association | Hydropower Status Report 2019 | 99


World hydropower

WORLD HYDROPOWER
INSTALLED CAPACITY
AND GENERATION 2018
AFRICA SOUTH AND CENTRAL ASIA EUROPE NORTH AND CENTRAL AMERICA
Country Total installed Pumped Generation Country Total installed Pumped Generation Country Total installed Pumped Generation Country Total installed Pumped Generation
capacity including storage (TWh) capacity including storage (TWh) capacity including storage (TWh) capacity including storage (TWh)
pumped storage (MW) (MW) pumped storage (MW) (MW) pumped storage (MW) (MW) pumped storage (MW) (MW)
Algeria 269 - 0.09 Afghanistan 461 - 1.10 Albania 2,020 - 8.55 Anguilla - - -
Angola 3,083 - 13.50 Armenia 1,249 - 2.31 Andorra 45 - 0.12 Antigua and Barbuda - - -
Benin 33 - 0.07 Azerbaijan 1,122 - 1.90 Austria 14,535 5,596 37.70 Aruba - - -
Botswana - - - Bahrain - - - Belarus 97 - 0.41 Bahamas - - -
Burkina Faso 32 - 0.10 Bangladesh 230 - 0.87 Belgium 1,427 1,307 0.22 Barbados - - -
Burundi 57 - 0.15 Bhutan 1,615 - 7.50 Bosnia and Herzegovina 2,513 420 6.15 Belize 53 - 0.24
Cote dIvoire 879 - 2.31 Georgia 3,221 - 9.95 Bulgaria 3,129 1,404 5.00 Bermuda - - -
Cameroon 747 - 4.97 India 49,917 4,786 129.96 Croatia 2,141 293 7.71 Canada 81,386 177 381.18
Cape Verde - - - Iran 11,951 1,040 10.03 Cyprus - - - Cayman Islands - - -
Central African Republic 19 - 0.15 Iraq 2,753 240 4.40 Czechia 2,268 1,172 2.75 Costa Rica 2,375 - 8.74
Chad - - - Israel 7 - 0.02 Denmark 9 - 0.01 Cuba 64 - 0.10
Comoros - - - Jordan 12 - 0.05 Estonia 8 - 0.02 Dominica 6 - 0.03
Congo 242 - 1.06 Kazakhstan 2,561 - 10.50 Faroe Islands 39 - 0.11 Dominican Republic 543 - 1.33
Democratic Republic of 2,704 - 9.24 Kuwait - - - Finland 3,236 - 13.15 El Salvador 472 - 1.54
the Congo Kyrgyzstan 3,091 - 12.20 France 25,519 6,985 63.10 Grenada - - -
Djibouti - - - Lebanon 221 - 0.60 Germany 11,258 6,806 16.29 Guadeloupe 10 - 0.02
Egypt 2,876 - 13.10 Nepal 1,016 - 3.90 Gibraltar - - - Guatemala 1,499 - 5.19
Equatorial Guinea 128 - 0.12 Oman - - - Greece 3,396 699 5.84 Haiti 61 - 0.15
Eritrea - - - Pakistan 9,827 - 25.63 Greenland 91 - 0.42 Honduras 656 - 2.59
Eswatini 60 - 0.26 Qatar - - - Hungary 56 - 0.21 Jamaica 23 - 0.12
Ethiopia 3,822 - 9.68 Russia 48,506 1,385 183.76 Iceland 2,086 - 13.69 Martinique - - -
Gabon 331 - 1.74 Saudi Arabia - - - Ireland 529 292 0.91 Mexico 12,117 - 15.90
Gambia - - - Sri Lanka 1,719 - 3.15 Italy 22,926 7,555 49.28 Montserrat - - -
Ghana 1,584 - 4.99 Syria 1,505 - 3.10 Kosovo 68 - 0.31 Nicaragua 123 - 0.43
Guinea 368 - 1.36 Tajikistan 5,795 - 17.70 Latvia 1,576 - 2.81 Panama 1,818 - 10.78
Guinea-bissau - - - Turkmenistan 1 - 0.00 Liechtenstein 35 - 0.13 Puerto Rico 98 - 0.11
Kenya 826 - 2.89 United Arab Emirates - - - Lithuania 1,016 900 0.43 Saint Bartholemy - - -
Lesotho 73 - 0.50 Uzbekistan 1,731 - 10.50 Luxembourg 1,330 1,296 0.07 Saint Kitts And Nevis - - -
Liberia 93 - 0.49 TOTAL 148,511 7,451 439 Malta - - - Saint Lucia - - -
Libya - - - Moldova 76 - 0.35 Saint Pierre And - - -
Madagascar 164 - 0.72 Monaco - - - Miquelon
Malawi 376 - 1.12 Montenegro 658 - 2.04 Saint Vincent And The 7 - 0.03
Maldives - - - Netherlands 37 - 0.07 Grenadines
Mali
Mauritania
180
48
-
-
0.95
0.19
EAST ASIA AND PACIFIC North Macedonia
Norway
674
32,256
-
1,392
1.58
139.51
Trinidad And Tobago
Turks And Caicos Islands
-
-
-
-
-
-
Mauritius 60 - 0.09 Poland 2,353 1,782 2.64 United States 102,745 22,855 291.72
Morocco 1,770 464 2.17 Portugal 7,347 3,919 12.27 Virgin Islands, British - - -
Mozambique 2,191 - 14.40 Country Total installed Pumped Generation Romania 6,328 92 17.68 Virgin Islands, U.S. - - -
Namibia 347 - 1.33 capacity including storage (TWh) San Marino - - - TOTAL 204,056 23,032 720
Niger - - - pumped storage (MW) (MW) Serbia 2,932 628 10.39
Nigeria 2,064 - 5.97 American Samoa - - - Slovakia 2,522 1,017 3.78
Reunion 134 - 0.50 Australia 8,790 1,340 17.91 Slovenia 1,524 180 5.11
Rwanda 105 - 0.37 Brunei - - - Spain 20,378 6,177 34.12
Sao Tome And Principe 2 - 0.01 Cambodia 1,667 - 2.58 Sweden 16,466 99 60.94
Senegal 81 - 0.33 China 352,260 29,990 1,232.90 Switzerland 16,948 3,057 37.78
Seychelles
Sierra Leone
-
64
-
-
-
0.17
Chinese Taipei
Cook Islands
4,691
-
2,602
-
7.84
-
Turkey
Ukraine
28,358
6,785
-
1,563
59.75
11.78 WORLD
Somalia - - - Fiji 125 - 0.36 United Kingdom 4,712 2,833 7.83
South Africa 3,595 2,912 6.93 French Polynesia 47 - 0.27 TOTAL 251,707 57,464 643
South Sudan - - - Guam - - - Total installed Pumped Generation
Sudan 1,923 - 8.42 Hong Kong - - - capacity including storage (TWh)
Tanzania 572 - 2.21 Indonesia 5,511 - 17.91 pumped storage (MW) (MW)
Togo 49 - 0.10 Japan 49,905 27,637 88.47
Tunisia 66 - 0.07 TOTAL 1,291,757 160,281 4,200
SOUTH AMERICA
Kiribati - - -
Uganda 773 - 3.78 Laos 5,308 - 22.75
Western Sahara - - - Macau - - -
Yemen - - - Malaysia 6,094 - 15.66
Zambia 2,397 - 13.65 Marshall Islands - - -
Zimbabwe 1,076 - 7.54 Micronesia, Federated - - - Country Total installed Pumped Generation
TOTAL 36,264 3,376 138 States Of capacity including storage (TWh)
Mongolia 23 - 0.05 pumped storage (MW) (MW)
Myanmar 3,331 - 8.37 Argentina 11,288 974 36.85
Nauru - - - Bolivia 658 - 2.49
New Caledonia 78 - 0.33 Brazil 104,139 30 417.91
New Zealand 5,346 - 25.89 Chile 6,753 - 23.26
Niue - - - Colombia 11,837 - 56.65
North Korea 5,010 - 12.94 Ecuador 5,072 - 20.76
Papua New Guinea 234 - 0.78 French Guiana 119 - 0.58
Philippines 4,314 685 11.09 Guyana 1 - -
Samoa 12 - 0.04 Paraguay 8,810 - 59.11
Singapore - - - Peru 4,995 - 29.36
Solomon Islands - - - Suriname 189 - 1.10
South Korea 6,490 4,700 7.27 Uruguay 1,538 - 6.14
Thailand 4,510 1,000 7.60 Venezuela 15,393 - 72.09
Timor-Leste - - -
TOTAL 170,792 1,004 726
Tonga - - -
Tuvalu - - -
Vanuatu - - -
Vietnam 16,679 - 52.60
TOTAL 480,426 67,954 1,534

100 | International Hydropower Association | Hydropower Status Report 2019 | 101


Membership

Join us
IHA membership is open to organisations and Raise your profile Individual membership Corporate membership
professionals with an interest in sustainable
IHA membership enhances your visibility to an Anyone with a professional or academic interest Our membership community includes hydropower
hydropower.
international audience of leading stakeholders from in hydropower can apply to become an individual owners, developers and operators, equipment
Our members are part of the world’s most extensive the hydropower sector and beyond. By joining our member of IHA. manufacturers, government agencies and utility
hydropower network and enjoy better access association, you can demonstrate your ambition, companies, non-government organisations and
to information, new connections and strong unlock new markets and reach new audiences. national membership associations.
representation on issues that affect them. Become an individual member:
We have three levels of corporate membership, which
IHA members receive reduced registration rates hydropower.org/individual-membership are recommended based on an organisation’s size or
Stay on trend
to participate in special events such as the World total installed capacity:
Hydropower Congress. Our experts share updates on hydropower policy
developments, good practice and new trends from • Platinum (more than 10,000 MW)
around the world, offering insights on a range of Become a Fellow
• Gold (more than 2,000 MW)
specialist topics. These communications are supported Fellowship is a new tier of IHA membership which
Shape your future • Silver (less than 2,000 MW)
by IHA’s hydropower database which monitors sector recognises the expertise of leading professionals
We provide a strong, credible voice for the sector growth and development in all regions. within the hydropower sector. Our corporate members nominate up to 40
and the role of hydropower in the future at national, employees, dependent on membership level, as
regional and international forums. As a member, you Awarded on the basis of proven experience, Fellow
membership provides an opportunity to collaborate corporate representatives to enjoy the full benefits of
can help to shape our strategy and activities through Gain access IHA membership.
our events, knowledge networks and working groups. with industry leaders through online groups, training
We offer members priority treatment and discounted sessions, workshops, webinars and other events. Corporate members can also nominate up to 10
registration to IHA events, workshops and training employees, dependent on membership level, to
programmes, as well as privileged and exclusive access With their wealth of knowledge and experience, our
Network and connect Fellows help to shape IHA’s work programmes. Fellow become Fellows of IHA free of charge.
to essential publications, briefings and knowledge
networks. members are entitled to use the letters ‘F.IHA’ in their
Our membership comprises some of the world’s most
professional title.
reputable hydropower sector organisations, active in Become a corporate member:
more than 100 countries.
hydropower.org/corporate-membership
We also work in partnership with a range of influential Online: Become a Fellow of IHA:
organisations from government, finance, the scientific
To view all benefits, membership rates and apply online, hydropower.org/fellow-iha
and academic communities, and civil society.
please visit:
Members can connect, join specialist networks and
hydropower.org/join
access resources through our new Hydropower Pro
online community and mobile app:
hydropower.org/pro

102 | International Hydropower Association | Hydropower Status Report 2019 | 103


Delivering on
the Paris Climate
Agreement and
the Sustainable
Development Goals
The power of water in a
For more information: hydropower.org/congress sustainable, interconnected world

14 -16 MAY 2019 • PARIS


The seventh World Hydropower Congress is Delegates from more than 70 countries
organised by the International Hydropower are expected to be represented at the
Association (IHA) from 14-16 May 2019. biennial event in Paris, France.

With the theme of ‘The Power of Water in a Latest information on the programme
Sustainable, Interconnected World’, the congress and speakers is available at:
will focus attention on hydropower’s role in www.hydropower.org/congress
delivering on the Paris Climate Agreement The global gathering that brings together decision-makers,
and the Sustainable Development Goals. innovators and experts to shape the future of hydropower.

This high-level event will chart the course for hydropower


development, ensuring that reliable and resilient water and
energy systems benefit all.

ORGANISER
www.hydropower.org

The International Hydropower


Association (IHA) is a non-profit
organisation that works with a vibrant
network of members and partners
active in more than 100 countries.

Our mission is to advance sustainable


hydropower by building and sharing
knowledge on its role in renewable
energy systems, responsible
freshwater management and climate
change solutions.

You might also like