B.E / B.Tech PRACTICAL END SEMESTER EXAMINATIONS,
APRIL / MAY 2018
Second Semester
MARK SPLIT UP
AIM & FINISH & TOTAL
MODEL VIVA - VOCE
PROCEDURE ACCURACY MARKS
10 25 10 5 50
1 PLUMBING
1. Prepare the water line connection to wash basin as shown in the sketch (Fig. 1) using
plumbing components like pipes, elbows, reducers, gate valves.
Figure. 1
2 Prepare the water line connection to the tap as shown in the Fig. 2 from the main water line
using GI pipes, GI reducers, valves and clamps.
Figure. 2
Figure. 3