QP.

CODE
B.E / B.Tech PRACTICAL END SEMESTER EXAMINATIONS,
APRIL / MAY 2018
Second Semester

GE8261 - ENGINEERING PRACTICES LAB


GROUP A (CIVIL & MECHANICAL)
CIVIL ENGINEERING PRACTICE
(All exercises should carry the Aim, Tools required, Procedure, Diagram and Result)
(Regulations -2017)

Time : 1 ½ Hours Max. Marks 50

MARK SPLIT UP
AIM & FINISH & TOTAL
MODEL VIVA - VOCE
PROCEDURE ACCURACY MARKS

10 25 10 5 50
1 PLUMBING
1. Prepare the water line connection to wash basin as shown in the sketch (Fig. 1) using
plumbing components like pipes, elbows, reducers, gate valves.

Figure. 1

2 Prepare the water line connection to the tap as shown in the Fig. 2 from the main water line
using GI pipes, GI reducers, valves and clamps.

Figure. 2

3 Prepare the water line connection to the tap as


shown in the Fig. 3 from the main water line
using PVC pipes, PVC reducers, valves and
clamps.

Figure. 3