Professional Documents
Culture Documents
115kV Loop - PYT
115kV Loop - PYT
BAY LINE.1
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1200/5 A112
2 1200/5 X82/5
X83/5
X84/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
12 A f 0.0 0.0
22 B 0.1532 0.0
GIS/=E01+S0
-X610
1
32 C 0.0 0.0 0.1623
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
1 A - 0.0 0.0
N - - -
N - - -
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
BAY LINE.2
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1200/5 A112
2 1200/5 X82/5
X83/5
X84/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
12 A f 0.0 0.0
22 B 0.1532 0.0
GIS/=E04+S0
-X610
1
32 C 0.0 0.0 0.1623
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
1 A - 0.0 0.0
N - - -
N - - -
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
BAY TR2
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1800/1 A112
2 1800/1 X82/5
3 1800/1 X83/5
4 1800/1 X84/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
L2 EX Page 13 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
L2 EX Page 14 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
1 A f 0.0 0.0
5 B 0.1532 0.0
GIS/=E04+S0
-X301
1
9 C 0.0 0.0 0.1623
L2 EX Page 15 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
L2 EX Page 16 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
1 A - 0.0 0.0
13 N - - -
L2 EX Page 17 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
L2 EX Page 18 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
1 A
5 B
GIS/=E04+S0
-X303
1
9 C
13 N
1 A
2 B
-X83
3 C
4. N
21/21N/67/67
Core3 1800/1
N/50BF/79
A
=E04+ B
-SM2 Reading
LCPP2SM C
B
-HMI Reading
C
L2 EX Page 19 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
L2 EX Page 20 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
Distance B
=E04+
Reading
LCPP2
No.2 C
N
21/21N/67/67
Core3 1800/1
N/50BF/79
A
B
DFR Panel -DFR Reading
C
1 A
5 B
GIS/=E04+S0
-X304
1
9 C
13 N
1 A
2 B
-X84
3 C
4. N
=E04+ B
21/21N/67/67
Core4 1800/1 -SM1 Reading
N/50BF/79
LCPP2SM C
B
-HMI Reading
C
Distance B
=E04+
Reading
LCPP2
No.1 C
L2 EX Page 21 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
L2 EX Page 22 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
B
21/21N/67/67
Core4 1800/1 DFR Panel -DFR Reading
N/50BF/79
C
10 Supply 1 A. across the Sec. terminal of CT phase AB , BC, CA at 0° to 180°, and ABC at 0° to -120° to 120°
Device. Measure Secondary measement (A) Correct
Core no. Location
No. Terminal No. Phase Phase A-B Phase B-C Phase C-A Phase ABC Core
1 A OK
5 B
GIS/=E04+S0
1 -X301
1
9 C
13 N
1 A OK
5 B
GIS/=E04+S0
2 -X402
1
9 C
13 N
1 A OK
5 B
GIS/=E04+S0
3 -X303
1
9 C
13 N
1 A OK
5 B
GIS/=E04+S0
4 -X304
1
9 C
13 N
L2 EX Page 23 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
L2 EX Page 24 of 53
PEA. SUBSTATION CONSTRUCTION DIVISION. COMPANY
BAY TR.1
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1200/5 A112
2 1200/5 X82/5
X84/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
11 A
21 B
GIS/=E02+S0
-X610
1
31 C
12 N
1 A
=E02+ 2 B
-X84
TCPP1SM 3 C
4 N
=E02+ B
Core1 1200/5 TCPP1 -F87T Reading 87T
Relay C
B
DFR Panel -DFR Reading
C
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
11 A
21 B
GIS/=E02+S0
X620
1
22 C
12 N
15 A
=E02+ 16 B
Core2 1200/5 X82 87B
TCPP1SM 17 C
18 N
B
=E00+
-F87B1 Reading
BZP
C
B
=E00+
-F87B2 Reading
BZP
C
B
DFR Panel -DFR Reading
C
N
Core2 1200/5 87B
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
131 A
133 B
TR.1 X2
135 C
201 N
15 A
50/50N,51/51
TRANSFORMER 16 B
N
-X82
50BF&METE
1200/5 17 C
RING
=E02+ 18 N
TCPP1SM A
B
-PM Reading
C
B
HMI -HMI Reading
C
B
DFR Panel -DFR Reading
C
TRANSFORME N 50/50N,51/51
R N,50BF&MET
12000/5 A ERING
=E02+ B
TCPP1 -F51.1 Reading
Relay C
B
-BCU Reading
C
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
BAY TR2
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1200/5 A112
2 1200/5 X82/5
X84/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
11 A
21 B
GIS/=E05+S0
-X610
1
31 C
12 N
1 A
=E05+ 2 B
-X84
TCPP2SM 3 C
4 N
=E05+ B
Core1 1200/5 TCPP2 -F87T Reading 87T
Relay C
B
DFR Panel -DFR Reading
C
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
11 A
21 B
GIS/=E05+S0
X620
1
22 C
12 N
15 A
=E05+ 16 B
Core2 1200/5 X82 87B
TCPP2SM 17 C
18 N
B
=E00+
-F87B1 Reading
BZP
C
B
=E00+
-F87B2 Reading
BZP
C
B
DFR Panel -DFR Reading
C
N
Core2 1200/5 87B
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
131 A
133 B
TR.2 X2
135 C
201 N
15 A
50/50N,51/51
TRANSFORMER 16 B
N
-X82
50BF&METE
1200/5 17 C
RING
=E05+ 18 N
TCPP2SM A
B
-PM Reading
C
B
HMI -HMI Reading
C
B
DFR Panel -DFR Reading
C
TRANSFORME N 50/50N,51/51
R N,50BF&MET
12000/5 A ERING
=E05+ B
TCPP2 -F51.1 Reading
Relay C
B
-BCU Reading
C
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
BAY TR2
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1200/5
2 1200/5
3 1200/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
1 5
2 5
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
549 A
552 B
-X1
555 C
558 N
22 A
24 B
-TT4
26 C
28 N
22kV
Core3 1200/5 87T
Incoming .1
A
B
-DFR Reading
C
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
BAY TR2
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1200/5
2 1200/5
3 1200/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
1 5
2 5
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
549 A
552 B
-X1
555 C
558 N
22 A
24 B
-TT4
26 C
28 N
22kV
Core3 1200/5 87T
Incoming .2
A
B
-DFR Reading
C
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
BAY TR2
3 Checking of insulation resistance of each circuit and grounded only one point.
1 1200/5 A112
2 1200/5 X82/5
X83/5
X84/5
5 Measure overall connected loads on CT core including CT sec. winding, wiring to control cubicles, relay and
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
6 Measure load burden including wiring, relay and meter equipment by volt-amp method.
8 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment and fault recorder.
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
12 A f 0.0 0.0
22 B 0.1532 0.0
GIS/=E01+S0
-X610
1
32 C 0.0 0.0 0.1623
BCPP1SM
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE
9 Reading the measured values of all sec. current output at all loads e.g. relays, meter equipment.
Core Device. Measure (A) Correct
Location
No. No. Terminal No. Phase Phase A Phase B Phase C Core
A
=E03+
B
BZP&BCCP1 BCU Reading
RELAY C
PANEL
N
COMPANY ITALTHAI ENGINEERING CO.,LTD. ITALTHAI ENGINEERING CO.,LTD. PROVINCIAL ELECTRICITY AUTHORITY
SIGNATURE