SCOPE OF WORK FOR CRANES

Ammonia Plant

1. Replacement of A-101-D catalyst.


2. Glands packing of SX, SH and SL valves.
3. Replacement of Methanator catalyst.
4. CO2 line replacement up to CO2 compressor suction drum.
5. CO2 Absorber (A-101-E), Inspection of distributors, beds height & demister cleaning.
6. CO2 Stripper (A-102-E), Inspection of distributors, beds height & demister cleaning.
7. Inspection of Safety Valves (list will be provided later).
8. A-101-JC Surface condenser.(End plates removal).
9. Punch killing jobs (list will be provided later).

Urea Plant

1. Inspection & Repair of Safety Valves.


2. Overhauling of High pressure pumps.
3. Shifting of water Jetting Machine.
4. Punch Killing jobs.
5. Dismantling & refitting of Stripper Top Man Hole.
6. Dismantling & refitting of control valves.

Utility & Power House

1. Dismantling & refitting of safety valves at Boiler No 1.


2. Repair of walls / doors of superheater of boiler No 3.
3. Punch Killing Jobs (List will be provided later).
4. Cooling water steam turbine CGT 3301 a/b/c general checking & Inspection.
5. Checking of safety valves of superheater and steam drum of Boiler No 3.
6. Overhauling of pump CGA 3302 A/B .
7. General overhauling of motor of IGG Unit.
8. Repair / overhauling / cleaning of cooling water return line main valves (02 Nos.).
9. To rectify the seat leakage of Boiler feed water control valve.
10. Cleaning of Nitrogen cooler.

PH & S

1. Replacement of gear box of SJD-101 Conveyor.


2. Replacement of gear box of SJD-102 Conveyor.
3. Replacement of gear box of SJD-103 Conveyor.
4. Replacement of gear box of SJD-106 Conveyor.
5. Replacement of gear box of SJD-107 Conveyor.
6. Replacement of gear box of SJD-108 Conveyor.
7. Replacement of gear box of SJD-109 Conveyor.
8. Replacement of gear box of SJD-110 Conveyor.
9. Replacement of drive / driven pulleys of Conveyors if required.