Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

VASUDHA PHARMA CHEM LIMITED

SAP IMPLEMENTATION
TRAINING RECORD

Module: Plant MaintenanceDate: xx.xx.xxxx Consultant:

Disagree

Disagree
Strongly

Strongly
Agree

Agree
Specific Highlights and/or suggested
improvements

I feel that my personal learning objectives were met


The training has equipped me with enhanced
knowledge, understanding and/or skills
The training covered everything I had expected it to
I feel that the course was conducted well (e.g training
content delivery, length of course, professionalism of
trainers, good venue)?

Areas Covered 1. SAP System Landscape Overview,


2. Benefits of SAP,
3. Quality Management(PM) process overview,
4. Components available in PM Module
5. PM Masters
6. Integration points with MM, PP and QM Modules.

Page 1 of 2
VASUDHA PHARMA CHEM LIMITED
SAP IMPLEMENTATION
TRAINING RECORD

Module area Process area


SAP System Landscape Overview 1. Overview of SAP R/3 system,
2. Briefed about various clients/Instances like Development, Quality and Production.

Overview of SAP & Benefits 1.


Overview of all Basic modules in Logistics
2.
Benefits of SAP, also in specific to PM module
PM module Components 1.
Explained the components available in PM module,
2.
Briefed in high level about PM components like Functional Location, Equipment, Bill Of
Materials, Work centers, Classifications Measuring points and counters, Catalog profiles,
Warranties
Plant Maintenance Process Overview &1. Briefed about PM business process flow.
Masters 2.
3. Masters of PM module like Material Master PM View, Maintenance processing, Preventive
Maintenance, Breakdown Maintenance, Condition based maintenance, Equipment Calibration,
Refurbishment maintenance.
4. Briefed in high level about each business process steps like Notification, Order, Order release
Briefed SAP screen and navigation on SAP screens.
PM Integration Areas 1. Explained the importance of PM module
2. Briefed in high level about the integration areas in PM with other modules (MM/PP/QM)
3. Overall impacts/Resulting of integration with other modules.

Signature

CTM1: _____________________________________

CTM2: _____________________________________

CTM3: _____________________________________

Page 2 of 2

You might also like