Government of West Bengal
Public Works Department (Roads Wing)
Planning Branch
NABANNA, 8* floor, HRBC Building,
325, Sarat Chandra Chatterjee Road,
P.O.-Shibpur, Howrah-711 102.
No: 1M-24/19/825-R/PL Dated: 14/08/2019
From: The Nodal Officer & Joint Secretary (Roads),
Public Works Department.
To : The Nodal Officer & Superintending Engineer,
Planning Circle - I,
Public Health Engineering Department,
PNB House, 4* Floor, 18A Brabourne Road,
Kolkata - 700001.
Sub: Request for shifting of PHE pipeline for implementation of the work “Suri —
Rajnagar Road from 0.00 kmp to 4.00 kmp, widening & strengthening work under
Birbhum Highway Division No. II in the district of Birbhum”.
Ref: Memo No. 514/Suri-Raj Rd dated 07/08/2019 of Executive Engineer,
Birbhum Highway Division No. II, P.W. (Roads) Directorate.
Sir,
With reference to above cited subject and reference this to inform you that for
implementation of the work “Suri - Rajnagar Road from 0.00 kmp to 4.00 kmp, widening
& strengthening work under Birbhum Highway Division No. II in the district of Birbhum”
the PHE pipeline needs to be shifted from its existing position to the position mentioned in
the enclosed jointly signed sketch map. Therefore you are requested to take suitable
measure for shifting of PHE pipeline. The letter of Executive Engineer, Birbhum Highway
Division No. II with enclosed jointly signed drawing is being sent to you.
Enclo. As stated above.
Yours faithfully
3)
Nodal Officer & Joint a (Roads)
Public Works Department.
No: 1M -24/19/828/1(4)-R/PL Dated: 14/08/2019
Copy forwarded for information and necessary action to:
1) The Chief Engineer, Head Quarter, Public Works (Roads) Directorate.
2) The Chief Engineer, West Zone, Public Works (Roads) Directorate.
3) The Superintending Engineer, Western Highway Circle No. I, Public Works (Roads)
irectorate.
‘The Executive Engineer, Birbhum Highway Division No. I, Public Works (Roads)
Directorate.
be
Nodal Officer & Joint Secretary (Roads)
Public Works Department.
Page 1of 2ae
GOVERNMENT OF WEST BENGAL
OFFICE OF THE EXECUTIVE ENGINEER Ph, & Fax:-03462-255679 / 255278
BIRBHUM HIGHWAY DIVISION-I
P.W. (ROADS) DIRECTORATE Email id.-eabhdtpni@gmailcom
SARAK BHAVAN, LAMBODARPUR
‘SURI, BIRBHUM, PIN-731101
Memo No.- 514/Suri-Raj Rd
To,
‘The Joint Secretary,
(Nodal officer for PW(Rds)Dte)
P.W.(Roads)Dte,
Nabanna,Howrah
Mail id- jstpwrd@gmail.com
Sub:- Regarding PHE Pipe line shifting for the work-"Suri Rajnagar Road from 0.00 km to 4.00 km,
Widening and strengthening work under Birbhum Highway Division -Il, in the District of Birbhum.”
‘Tender no-S8/Bir-II of 2018-19 of WHC-I, PW(Rds)Dte
Head of Account- 25-5054-03-337-001-53-00-V
Est Amt-68696078, Ten Amt -70406610 @2.49% above
Agency ~- Prakash Chandra Mondal
Reference- PHED Guide lines (No. PHE/639/0-53/18 dt 18.3.019) order
Sir,
‘This is to state that Rs 55,59,823 is considered in the sanctioned estimate of the above said project towards
the cost the utility shifting by PHE as per their submitted estimate(AE, BSSD,PHED memo no 292/BSSD dt
29.12.17)
Now in the light of PHED Guide lines (Ne. PHE/639/0-53/18 dt 18.3.019) order, pl find enclosed here with
the details in separate shect containing the details of ROW (varying from 2fnto 13m ), total project length
‘4km, present existing carriage way 5.5m, proposed carriage way 7m, (formation width 10.50m) with
300mmGSB in widening & thorough overlay250mmWMM, 50mmDBM,25mmSDBC.
‘The project is already running delayed with other utility shifting in progress along with encroachment
removal.
‘Therefore it is eamestly requested to instruct the u/s so that the utility shifting related to PHE work can be
executed at earliest.
Enclosure --as stated above feast
Executive Engineer
Birbhum Highway Division-1I
P.W.(Roads) Directorate
Memo No.- 514/1(5)/Suri-Raj Rd Dt. 7.8.2019
Copy forwarded to the:-
(1) The Chief Engineer (HQ), P. W. (Roads) Directorate, 325, Howrah
(2) The Chief Engineer, West Zone, P. W. (Roads) Directorate, Durgapur-713216,
(3) The Superintending Engineer, Western Highway Circle No-I, P. W. (Roads) Directorate, Burdwan-713103
(4) The E.£. Birbhum Divn, PHE Dte, Suri wrt his memo no 1052/BHM dt 25.7.19 (ee_bir@wbphed.gov.in)
(5) Assistant Engineer, SHSD,Suri wrt his memo no 492/W-5 dt 23.11.17to AE,BSSD,PHE Dte
Executive Engineer
Birbhum Highway Division-IT
P.W.(Roads) DirectorateOG T= OCT = tosd ww OO
2
aINaHOS
WOH AO “LSI AHL NI ‘Wx 00'r
OL WX 000 WOW AVON AVOVNEVA- RINS AO ONINAHLONAULS UNV SVAHGRRIVH Jo wHO
ONINACIM YOu SANITHdId ONILATHS YOI NOISSINYAd JO TWSOdOUd(hep
stm901 i g
{ee t
* teahyy
bored Peps
vor boy Mov!
Hy
=a |__=as
E =
we
dorperg _
so eee eae
“m0
PeHL
40 209500} BasSad posodbud Jo seq aabay woay. ast
‘W4 00'F OL ‘WH 00°0 NOU GVO UVOVNIVA - PINS LV ANIT
ddId CHSOdOUd AO NOILOUS SSOUD GNV NV'Id DNIMOS dVW HOLBaAS