GENERAL NOTES:

1. FURNISH AND INSTALL IDENTIFICATION MARKERS ON ALL PIPING AND


DUCTWORK INSTALLED UNDER THIS CONTRACT. MARKERS SHALL BE A
MINIMUM OF 1-1/2" X 8" AND IDENTIFIED IN ACCORDANCE WITH THE
8" ø
BACKGROUND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL
8" ø STANDARDS INSTITUTE (ANSI). MARKERS SHALL BE MANUFACTURED BY
G-2
150 D-1 D-1 D-1
CHAMPION AMERICA INC. OR EQUAL.
8" ø 250 250 8" ø 250
2. NOT ALL DUCTWORK OFFSETS REQUIRED ARE SHOWN. CONTRACTOR IS

24/14
G-2 RESPONSIBLE FOR ALL OFFSETS REQUIRED.
8" ø
150

G-1 3. ALL EXPOSED PIPING AND DUCTWORK TO BE PAINTED. CLEAN AND DEGREASE
850 ALL DUCTWORK, PIPE AND FITTINGS AS REQUIRED FOR PAINTING.
8" ø
D-1 D-1 D-1 4. ALL CONCEALED DUCTWORK TO BE INSULATED. REFER TO SPECIFICATIONS
250 250 250 FOR INSULATION REQUIREMENTS.
8" ø

8" ø 8" ø
G-2
150

26/14
8" ø
8" ø G-1
G-2 850
150

24/12
8" ø
D-1 D-1 CODED NOTES:
250 250

8" ø
8" ø
1. EXISTING DUCTWORK UP TO AHU-10. CONTRACTOR SHALL REPLACE RETURN,
RELIEF, AND OUTSIDE AIR DAMPERS AND ACTUATORS WITH NEW. REPLACE
HQ Office
UNIT FILTERS AND FAN BELTS, GREASE BEARINGS. INSURE RESTORED UNIT
FUNCTIONALITY UPON RESTARTING AND REPORT ANY DEFICIENCY IN
8" ø 88 Builders Lane

36/14
8" ø OPERATION TO ENGINEER. REBALANCE AHU-10 TO 7700 CFM TOTAL AIR AND
8" ø D-2 San Francisco, CA 94110
G-2 1540 CFM OA.
135
150

G-1 D-1 2. EXISTING DUCTWORK UP TO AHU-11. CONTRACTOR SHALL REPLACE RETURN,


G-2 D-2 850 250 RELIEF, AND OUTSIDE AIR DAMPERS AND ACTUATORS WITH NEW. REPLACE
150 135 UNIT FILTERS AND FAN BELTS, GREASE BEARINGS. INSURE RESTORED UNIT ARCHITECT
TYP. FUNCTIONALITY UPON RESTARTING AND REPORT ANY DEFICIENCY IN
36/14
OPERATION TO ENGINEER. REBALANCE AHU-11 TO 3250 CFM TOTAL AIR AND Sekella + Partners
650 CFM OA.
25 E. Livingston Avenue
3. EXISTING DUCTWORK UP TO AHU-12. CONTRACTOR SHALL REPLACE RETURN, San Francisco, CA 94108
RELIEF, AND OUTSIDE AIR DAMPERS AND ACTUATORS WITH NEW. REPLACE
UNIT FILTERS AND FAN BELTS, GREASE BEARINGS. INSURE RESTORED UNIT
D-1 D-1
FUNCTIONALITY UPON RESTARTING AND REPORT ANY DEFICIENCY IN
8" ø 250 250 OPERATION TO ENGINEER. REBALANCE AHU-12 TO 5100 CFM TOTAL AIR AND
D-2 D-2 D-2 D-2 CIVIL CONSULTANT
G-2 1020 CFM OA.
135 135 135 135 D-1 D-1
250
G-1 G-1
250 150
4. EXISTING DUCTWORK UP TO AHU-13. CONTRACTOR SHALL REPLACE RETURN,
THBI Inc.
300 300 8" ø RELIEF, AND OUTSIDE AIR DAMPERS AND ACTUATORS WITH NEW. REPLACE
8" ø
8" ø UNIT FILTERS AND FAN BELTS, GREASE BEARINGS. INSURE RESTORED UNIT
290 Charmel Street
10"ø TYP.
10"ø
D-2 D-2 D-1 D-1 FUNCTIONALITY UPON RESTARTING AND REPORT ANY DEFICIENCY IN San Francisco, CA 94130
135 135 250 8" ø 250
D-2 OPERATION TO ENGINEER. REBALANCE AHU-13 TO 6600 CFM TOTAL AIR AND
D-2 D-2 D-2 135 1320 CFM OA.
24/12
135 135 135
D-1 G-1 G-1
D-1 8" ø 5. EXISTING DUCTWORK UP TO AHU-14. CONTRACTOR SHALL REPLACE RETURN,
250 500 8" ø 500 MECHANICAL, ELECTRICAL AND
250 RELIEF, AND OUTSIDE AIR DAMPERS AND ACTUATORS WITH NEW. REPLACE

10/14
8" ø PLUMBING CONSULTANT
UNIT FILTERS AND FAN BELTS, GREASE BEARINGS. INSURE RESTORED UNIT
8" ø 8" ø 36/14 26/14 24/14 FUNCTIONALITY UPON RESTARTING AND REPORT ANY DEFICIENCY IN Smith Associates
OPERATION TO ENGINEER. REBALANCE AHU-14 TO 7400 CFM TOTAL AIR AND
1480 CFM OA. 640 W. Portal Ave.
14/16 20/18 D-1 D-1
200 250
D-2 D-2 D-2 San Francisco, CA 94127
8" ø
135 135 135 6. EXISTING DUCTWORK UP TO AHU-15. CONTRACTOR SHALL REPLACE RETURN,
8" ø RELIEF, AND OUTSIDE AIR DAMPERS AND ACTUATORS WITH NEW. REPLACE

14"ø

14"ø
D-2 D-2 D-2 D-2
UNIT FILTERS AND FAN BELTS, GREASE BEARINGS. INSURE RESTORED UNIT
135 135 135 135
FUNCTIONALITY UPON RESTARTING AND REPORT ANY DEFICIENCY IN TECHNOLOGY CONSULTANT
36/14
14"ø

G-1
8" ø 8" ø OPERATION TO ENGINEER. REBALANCE AHU-15 TO 5100 CFM TOTAL AIR AND
TYP.
1020 CFM OA. MA Engineering
14"ø

200 D-1 D-1


200 200
D-1 D-2 D-2 D-2
D-1 200 135 135 135
7. EXISTING DUCTWORK UP TO AHU-16. CONTRACTOR SHALL REPLACE RETURN, 1749 Tiger St.
RELIEF, AND OUTSIDE AIR DAMPERS AND ACTUATORS WITH NEW. REPLACE San Francisco, CA 94116
200 10" ø
8" ø UNIT FILTERS AND FAN BELTS, GREASE BEARINGS. INSURE RESTORED UNIT
8" ø FUNCTIONALITY UPON RESTARTING AND REPORT ANY DEFICIENCY IN
8" ø
D-2 D-2 D-2 D-2 OPERATION TO ENGINEER. REBALANCE AHU-15 TO 5100 CFM TOTAL AIR AND
135 135 135 135 D-1
8" ø 250 1020 CFM OA.

26/14
D-1 G-1 D-1 D-1 G-1
8" ø
200 500 250 250 500 D-2 D-2 D-2 8. NEW EF ON ROOF. REFER TO ARCHITECTURAL PLANS FOR FRAMING AND
135 135 135 ROOFING INFORMATION.
8" ø
D-1 D-1 8" ø
D-1 250 250 TYP. 9. REFER TO DETAIL 1 ON H-102 FOR TYPICAL D-2 DEVICE INSTALLATION.
8" ø

36/14
D-1

24/12
D-1 250 8" ø
8" ø 250
200
D-2
G-1 20/18 14/16
135
G-1 D-1 200
750 200 10" ø
8" ø
8" ø D-2 D-2 D-2 D-2
D-1 135 135 135 135
24/14

8" ø D-1 8" ø D-1


D-1 250 250 250

14"ø

14"ø
200 D-1 D-1 8" ø
8" ø 250 200

26/14
8" ø
D-1 8" ø 8" ø
36/14

200 G-1 G-1 G-1


8" ø 8" ø 250 250 250

24/12
8" ø D-1
D-1 250
200 D-1 D-1 D-1 D-2 D-2 D-2 D-2
10" ø
24/12

250 250 250 135 135 135 135 SIGNATURE


8" ø
D-1 10" ø DATE
200
8" ø D-1
10" ø 200
D-1
D-1
8" ø REVISIONS
200 8" ø 10" ø 10" ø
200 D-1
8" ø NO. DESCRIPTION DATE
200
26/14

8" ø G-2 G-2 G-2 G-2


D-1 150 150 150 150
200 D-2 D-2 D-2 D-2
G-1 D-1 8" ø 135 135 135 135
750 10" ø 200
D-1 D-1
D-1 200 200
200 D-1
8" ø 200
36/14 26/14 24/14
D-1
200
10" ø D-1
200 D-1 D-1 D-2 D-2 D-2 D-2
200 200 135 135 135 135
24/14

8" ø 8" ø PROJECT NUMBER 1605.003


G-1 10" ø
DATE OF ISSUE 11.05.16
14"ø

14"ø
750
DRAWN BY MLF
14"ø

CHECKED BY CRS
10" ø
D-1 D-1
250 250 10" ø D-2 D-2 D-2 D-2 D-2 D-2
135 135 D-2 135 135 135 135
D-1
D-2
135 135 HVAC PLAN
250 TYP.
10" ø 10" ø

1
HVAC PLAN
1/8" = 1'-0"
H-101