Professional Documents
Culture Documents
FINETURN Feasibility Format
FINETURN Feasibility Format
d
y Date:
Model:
(Technical Review Meeting Details) Signature Signature
Supplier Name
1. Identify critical dimn. for fitment and function based on drawing study. 4. Raw Material Source / Sub vendor detail for child parts. 7. Panel Checker / Checking Fixture / Other checking Aids
S. In-house /
5 Part Name Shift Day Month Batch Remarks
No. Sub vendor
S. Equipment
Process Name Control Points
No. Detail
S.
Defect Details Countermeasures
No.
S.
No.
Test name
Control
Specification
Remarks r Stoarge O Operation c Inspection
6. Tool / Mould / Die / Source details
S. No of a) Packing Size
Tool Name Manufacturing Source Remarks
No. Tools b) No. Of Pcs/packet