PANEL

1 Nyalakan MCCB power utama

Pastikan semua tombol emergency dalam


kondisi "release"
o Grading area +00.00
o Grading area +05.00
2 o Grading area +09.00
o Intake pit +00.00
o Filter area +00.00
o LACB area +00.00
o LACB area +04.50

Pastikan semua switch mesin pada posisi


3
"Auto"
A
STANDARD OPERATING PROCEDURES

DRYING

Department: Area : Rev. : Page :


No Step Picture

Nyalakan tiga motor Blower Fan dan


Compressor

Nyalakan MCCB Dryer dan MCB 3 Phase


Furnace

6 Membuka posisi katup aspirasi


A
STANDARD OPERATING PROCEDURES

DRYING

Department: Area : Rev. : Page :


No Step Picture

9 Running sistem pembuangan debu


A
STANDARD OPERATING PROCEDURES

DRYING

Department: Area : Rev. : Page :


No Step Picture

JUNO
A
STANDARD OPERATING PROCEDURES

DRYING

Department: Area : Rev. : Page :


No Step Picture
MESIN DRYER

Setting
parameter

Running mode "Drying" pada


14 Setting target
mesin Dryer
"MOISTURE"
A
STANDARD OPERATING PROCEDURES

DRYING

Department: Area : Rev. : Page :


No Step Picture

Start
"LOADING"

Setting
parameter
mode
"Combution"
pada mesin
Husk Furnace

Running mode "COMBUTION" Pembakaran


16
pada mesin Husk Furnace sekam
A
STANDARD OPERATING PROCEDURES

DRYING

Department: Area : Rev. : Page :


No Step Picture

Matikan mesin
Husk Furnace
JUNO

18 Running sistem "TRANSFER"


A
STANDARD OPERATING PROCEDURES

DRYING

Department: Area : Rev. : Page :


No Step Picture

21 Ulangi langkah ke 19 & 20 hingga padi habis

JUNO

22 Stop sistem "TRANSFER"