FLOWCHART OF SMP:
APPLY PTW
ISOLATION OF EQUIPMENT
ISSUING PTW
INSPECTION OF WORK
AREA/EQUIPMENT
NORMALIZATION OF EQUIPMENT
PREVENTIVE MAINTANENCE
FOR
CHECK LIST:
ACTIVITY TO BE DONE:-
1. Gland adjustment and setting.
2. Checking of Fasteners/ Mounting
tightness etc.
3. Oil Level/Leakage Inspection of
Gear Box.
4. Inspection of Chain.
5. Inspection of Sprocket.
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
6. Inspection of Shaft Sleeve.
7. Inspection of Roller Assy.
8. Greasing of Bearings DE/NDE.
9. Oil Level Checking Fluid Coupling.
10. Inspection of Coupling (Rubber
Star Pad).
11. Inspection Seal Water Line
Pressure/Leakage.
12. Inspection of Feed Gate Shaft.
13. Inspection of Crusher Teeth.
14. Remarks/Observation.
15. Inspection of nozzle.